Plan Set for Transit Operations Maintenance Facility

This is a construction plan set document for the City of Pasadena's Transit Operations Maintenance Facility project located at 2180 East Foothill Boulevard. The City is procuring a Construction Manager at Risk (CMAR) contractor to provide preconstruction and design-assist services in Phase 1, with an optional Phase 2 for construction services. The mandatory pre-proposal meeting is scheduled for April 28, 2026, with a question submission deadline of May 22, 2026, and proposal submission deadline of June 8, 2026 at 2:00 PM. Interviews are tentatively scheduled for June 22-25, 2026. Phase 1 preconstruction services are estimated to commence in July 2026 with completion by January 2027, while Phase 2 construction is estimated to commence in March 2027 with substantial completion required by June 2028 and final completion by July 2028. The project scope includes demolition and grading, MEP systems, fire life safety systems, electrical infrastructure, Battery Electric Bus charging equipment, stormwater management, solar panels, and off-site improvements.

Proposers must hold an active California Contractors State License Board license (Class A or B) with a minimum of five years of business experience, completion of at least three prevailing wage public contracts in California, and three similar projects exceeding $70 million within the preceding ten years. The estimated direct construction cost is $60,000,000, and contractors must maintain bonding capacity exceeding this amount. The project is partially funded by the Measure R Mobility Improvement Grant administered by the Metropolitan Transportation Authority. Evaluation criteria are weighted as follows: experience and references (20%), organization and key personnel qualification (20%), project approach and methodology (30%), financial strength and stability (5%), safety record/Experience Modification Rate (5%), local Pasadena business preference (5%), small or micro-business certification (5%), CMAR price proposal (10%), and interview performance (50 additional points). The City grants preference points for local Pasadena business status and small or micro-business certifications by the California Department of General Services. Liquidated delay damages are assessed at $19,000 per day if Phase 2 substantial completion is not achieved.

View the file

Other files

File Type Posted
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility_(Addendum_#2_Revision).pdf PDF
Plan_Set_TOMF_05.13.26.pdf PDF
TOMF_Agreement_General_Conditions_Exhibits_and_Appendix.pdf PDF
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility.pdf PDF
Citys_Standard_Form_(Traditional)_CMAR_Agreement.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
[U]_-_CMAR_Price_Proposal_TOMF.pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE_05.2025.pdf PDF
Proof_of_Authority_(8).pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
Civil_Litigation_History_Certification_ver02_(1).pdf PDF
Contractor_Qualificiation_Statement_(CMAR)_TOMF.pdf PDF
Subcontractor_Listing_-_Phase_2_Only.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_(27).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Plan_Set_TOMF.pdf PDF
[H]_Insurance_Requirements_(Phase_1_and_Phase_2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Indemnity_Agreement_Form_05.2025.pdf PDF
Agenda_Report_5_-_02.03.2025.pdf PDF
LA-01684-03_TOMFPas_PhaseIIESARpt_7-8-2025.pdf PDF
TOMF_Geotechnical_Report_02.28.2024.pdf PDF
50%_Technical_Specifications_(Project_Manual)_TOMF.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .