About this file

This is a Plan Set document prepared for the City of Pasadena, California, in support of a Construction Manager at Risk (CMAR) procurement for the Transit Operations Maintenance Facility project. The Plan Set contains the architectural and engineering drawings and specifications that define the physical scope and technical requirements for the facility construction. The project involves the design and construction of a new transit operations maintenance facility, and the plan set serves as a foundational contract document that establishes the baseline design, dimensional requirements, site layout, building systems, and construction standards that all CMAR proposers must use to develop their technical and price proposals. The document provides detailed graphical representations and technical specifications necessary for preconstruction services during Phase 1 and potential construction execution during Phase 2, allowing qualified contractors to understand the full scope of work, coordinate their proposed approaches, and develop accurate cost estimates aligned with the City's budget and schedule requirements.

The Plan Set functions as a critical reference document for all CMAR proposers responding to the City of Pasadena's RFQ/P, establishing uniform baseline information to ensure competitive equity among bidders. All proposers must utilize these plans and specifications as the foundation for their qualification statements, technical proposals, and price proposals. The document is essential for evaluating proposer qualifications in project experience, team composition, project approach and methodology, and financial strength, as well as for comparing price proposals on an equitable basis across all competing firms during the City's competitive selection process.

View the file

Other files

File Type Posted
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility_(Addendum_#2_Revision).pdf PDF
Plan_Set_TOMF_05.13.26.pdf PDF
TOMF_Agreement_General_Conditions_Exhibits_and_Appendix.pdf PDF
Construction_Manager_at_Risk_(CMAR)_with_Guaranteed_Maximum_Price_for_Construction_of_Transit_Operations_Maintenance_Facility.pdf PDF
Citys_Standard_Form_(Traditional)_CMAR_Agreement.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
[U]_-_CMAR_Price_Proposal_TOMF.pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE_05.2025.pdf PDF
Proof_of_Authority_(8).pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
Civil_Litigation_History_Certification_ver02_(1).pdf PDF
Contractor_Qualificiation_Statement_(CMAR)_TOMF.pdf PDF
Subcontractor_Listing_-_Phase_2_Only.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_(27).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
[H]_Insurance_Requirements_(Phase_1_and_Phase_2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Indemnity_Agreement_Form_05.2025.pdf PDF
Agenda_Report_5_-_02.03.2025.pdf PDF
LA-01684-03_TOMFPas_PhaseIIESARpt_7-8-2025.pdf PDF
TOMF_Geotechnical_Report_02.28.2024.pdf PDF
50%_Technical_Specifications_(Project_Manual)_TOMF.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .