2026 Bristol Borough CDBG Curb Ramp Program

Closed State & local contract opportunity Posted

Solicitation number
US.240649
State
Pennsylvania
Responses due

Opportunity facts

Opportunity details come from pennbid.bonfirehub.com. Updated .

About this opportunity

Bristol Borough, Pennsylvania, is soliciting electronic bids through PennBid for a design-build contract (Contract No. 2026-00117) covering ADA/PennDOT-compliant curb ramps, sidewalks, curbing, and sign relocation, with the July 8, 2026 bid deadline at 11:00 A.M. now past as of November 9, 2026. No disadvantaged-enterprise set-aside applies. Federal CDBG requirements instead impose Section 3 Safe Harbor benchmarks of 25% or more of total labor hours performed by Section 3 workers and 5% or more by Targeted Section 3 workers.

The base bid covers 26 curb ramps at eight intersections on Wood Street, Canal Street, Trenton Avenue, Pear Street, and Washington Street, among others. Four alternate bids add two ramps each, for up to 34 ramps. The contractor must retain a Pennsylvania-licensed Professional Engineer to survey intersections, design the ramps, and prepare as-built plans. Scope also includes concrete curbs, sidewalks, and ramps; excavation and backfill; bituminous and Portland cement concrete paving; thermoplastic pavement markings; detectable warning surfaces; post-mounted signs; and traffic regulation. Detectable warning surface installers must demonstrate a minimum of five years of tile installation experience. All work must comply with PennDOT Publication 408 and Borough Standards.

Bidders must submit unit prices with a 10% bid security, a Bidder Qualification Statement, and a non-collusion affidavit. The contractor must self-perform at least 60% of the total bid amount with its own organization and personnel under direct supervision. Performance and payment bonds are each set at 100% of the contract award amount, and a 15% maintenance bond is required for an 18-month period. Insurance minimums are $2.0 million commercial general liability per occurrence and $1.0 million business auto liability. Davis-Bacon wage rates apply, with weekly certified payrolls submitted through SkillSmart, and the Public Works Employment Verification Act (Act 127) requires E-Verify use. Awarded contractors pay a fee of 0.33% of the bid amount, capped at $6,000.

The contract requires substantial completion within 90 calendar days and final completion within 110 calendar days, with liquidated damages of $500 per day for delay. Progress payments are made monthly at 90% of completed work, rising to 95% after 50% completion with satisfactory progress.

The Borough will award to the lowest responsible and responsive bidder whose bid is in the project's best interest, may select any combination of base and alternate bids, and may reject any or all bids. No pre-bid conference will be held, but bidders must visit the site. Gilmore & Associates, Inc. of Newtown, Pennsylvania serves as Owner's Engineer and Project Manager. The Agreement references five addenda. The top-level listing shows a July 7, 2026 due date, which conflicts with the July 8, 2026 deadline in the advertisement. Several attached documents carry 2025 posting and proposal dates that predate the 2026 solicitation.

Opportunity text

This project involves a one base bid and four alternate bids for the design and construction of ADA/PennDOT compliant curb ramps, with all necessary sidewalks, curbing, and sign relocation/installation at specified locations within Bristol Borough. This project has also received CDBG funding. The design and all material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408 and Borough Standards.

Files

File Type Posted
39-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
12-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
55-Doc 00 73 00 - 08 APPENDIX C Part 1 Contract Language Requirements.pdf PDF
30-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
54-Doc 00 73 00 11- CDBG AND STATE REQUIREMENTS.pdf PDF
37-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
43-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
57-Doc 00 73 00 - 09 Part 2 Federal Labor Standard Provisions.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
49-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
58-ADA Curb Ramp Intersections 2026.pdf PDF
10-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
33-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
35-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
52-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
7-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
31-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
23-Doc 00 01 10-TOC.pdf PDF
19-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
48-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
22-Doc 00 73 00 2 Appendix A - Davis Bacon Wage Rates.pdf PDF
9-Doc 00 43 13 - BID BOND.pdf PDF
17-Doc 00 73 00 1 - Appendix A cover sht.pdf PDF
53-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
42-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
8-Doc 00 41 00 - BID FORM - EBID.pdf PDF
13-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
50-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
28-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
3-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
44-Sec 02 41 16 - DEMOLITION.pdf PDF
15-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
5-Doc 00 91 13 - ADDENDA.pdf PDF
1-Doc 00 73 00 3 - Appendix B cover sht.pdf PDF
36-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
24-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
56-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
51-Sec 03 30 00 - CAST IN PLACE CONCRETE.pdf PDF
40-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
41-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
4-Doc 00 73 00 4 - Appendix B - Public Works Employment Verification Form.pdf PDF
45-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
47-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
59-2026 BB CDBG Curb Ramp Program Concept Plans.pdf PDF
29-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
32-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors