35-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf
PDF 110 KB Posted
- Attached to
- 2026 Bristol Borough CDBG Curb Ramp Program
- Solicitation number
- Not on record
- Issued by
- Bucks County, Brodheadsville CDP, Pennsylvania
About this file
This is a Material and Equipment specification document (Section 01 60 00) for the 2026 Bristol Borough CDBG Curb Ramp Program in Pennsylvania. The specification establishes requirements for all products, materials, and equipment used in the construction of ADA/PennDOT compliant curb ramps, sidewalks, curbing, and sign relocation/installation within Bristol Borough. The project encompasses one base bid and alternate bids, with all design, materials, labor, and equipment required to comply with PennDOT Publication 408 and Borough Standards. The specification requires contractors to transport, handle, store, and protect all materials in accordance with manufacturers' instructions, with particular attention to inspection upon receipt, proper storage conditions for sensitive products, and prevention of damage or deterioration during site storage.
The specification addresses product options and substitutions, permitting substitutions only when products become unavailable through no fault of the contractor or when products are specified by reference standards or description. Contractors proposing substitutions must submit three copies of requests with supporting documentation including shop drawings, product data, and certified test results, with the burden of proof on the proposer to demonstrate equivalence to specified products. The specification prohibits the use of materials and equipment removed from existing premises except as specifically permitted in the contract documents and requires interchangeable components from the same manufacturer when replacing existing components. The Owner's Engineer reserves the right to require contractors to use equipment from listed manufacturers for items specified by manufacturer on the bid form, and substitutions will not be considered if indicated on shop drawings or if acceptance requires revision to contract documents. The project involves federal CDBG funding, which introduces Davis-Bacon wage rate requirements, performance and payment bond requirements, and additional federal labor standard provisions.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL AND EQUIPMENT
01 60 00-1
SECTION 01 60 00
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Products.
2. Transportation and handling.
3. Storage and protection.
4. Product options.
5. Substitutions.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Document 00 21 13: Instructions to Bidders.
2. Section 01 40 00: Quality Control.
1.03 PRODUCTS
A. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents.
B. Provide interchangeable components of the same manufacturer for components being replaced.
1.04 TRANSPORTATION AND HANDLING
A. Transport and handle Products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to assure that Products comply with requirements, quantities are correct, and Products are undamaged.
C. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage.
1.05 STORAGE AND PROTECTION
A. Store and protect Products in accordance with manufacturers’ instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive Products in weather tight, climate controlled, enclosures in an environment favorable to Product.
D. For exterior storage of fabricated Products, place on sloped supports above ground.
E. Provide off-site storage and protection when site does not permit on-site storage or protection.
F. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of Products.
G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.
01 60 00-2
H. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of Products to permit access for inspection. Periodically inspect to assure Products are undamaged and are maintained under acceptable condition.
1.06 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named in accordance with the following Article.
1.07 SUBSTITUTIONS
A. Instructions to Bidders specify time restrictions for submitting requests for Substitutions during the bidding period to requirements specified in this section.
B. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
D. A request constitutes a representation that Contractor:
1. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.
2. Will provide the same warranty for the Substitution as for the specified Product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
5. Will reimburse Owner and Owner’s Engineer for review or redesign services associated with re-approval by authorities.
E. Substitutions will not be considered when they are indicated or implied on shop drawing or Product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three copies of request for Substitution for consideration. Limit each request to one (1) proposed Substitution.
2. Submit Shop Drawings, Product data, and certified test results attesting to the proposed Product equivalence. Burden of proof is on proposer.
3. Owner’s Engineer will notify Contractor in writing of decision to accept or reject request.
G. For each equipment item in which the manufacturer was listed on the Bid Form, Owner’s
Engineer reserves the right to require Contractor to use the equipment item of the listed manufacturer.
01 60 00-3
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION