This is a technical specification document for the Restoration of Paved Surfaces section prepared for Bristol Borough in Bucks County, Pennsylvania, in support of the 2026 CDBG Curb Ramp Program. The specification outlines comprehensive requirements for temporary and permanent paving, asphalt overlays, shoulder restoration, walkway reconstruction, driveway restoration, concrete curb and gutter repairs, stormwater inlet and piping work, and street signage reinstallation. All work must comply with Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications and related standards, including specifications for bituminous mixtures, bituminous materials, and temporary traffic control guidelines. The specification requires submission of certifications from material suppliers, PennDOT-approved Job Mix Formulas for bituminous concrete, and approved Mix Designs for concrete classes prior to work commencement. Temporary paving must be completed within ten working days of trench backfilling and maintained for a minimum of ninety days on state roads, while permanent paving must be maintained throughout the contract maintenance period to the satisfaction of the Resident Project Representative and applicable road departments.

The specification establishes detailed material requirements including Class AA concrete conforming to PennDOT Section 704, PennDOT Superpave bituminous materials for base, binder, leveling, and wearing courses, and specified aggregate standards. Concrete sidewalk reconstruction requires four-inch thickness on six-inch aggregate base, while driveway restoration specifies either six-inch reinforced concrete on four-inch aggregate or minimum two-inch asphalt wearing course on six-inch aggregate base, depending on existing surface type. All paving materials and aggregates require engineer approval through cut sheet submittals before placement. Traffic control measures must comply with Section 01 55 26 requirements and obtain necessary permits from PennDOT and local municipal agencies, with contractors responsible for restoring any existing pavement damaged by construction operations at their own expense.

View the file

Other files

File Type Posted
5-Doc 00 91 13 - ADDENDA.pdf PDF
47-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
6-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
34-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
40-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
21-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
12-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
31-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
15-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
33-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
19-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
28-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
55-Doc 00 73 00 - 08 APPENDIX C Part 1 Contract Language Requirements.pdf PDF
44-Sec 02 41 16 - DEMOLITION.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
39-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
43-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
24-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
49-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
1-Doc 00 73 00 3 - Appendix B cover sht.pdf PDF
7-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
56-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
42-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
32-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
37-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
8-Doc 00 41 00 - BID FORM - EBID.pdf PDF
58-ADA Curb Ramp Intersections 2026.pdf PDF
35-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
30-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
45-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
59-2026 BB CDBG Curb Ramp Program Concept Plans.pdf PDF
26-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
48-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
41-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
9-Doc 00 43 13 - BID BOND.pdf PDF
17-Doc 00 73 00 1 - Appendix A cover sht.pdf PDF
57-Doc 00 73 00 - 09 Part 2 Federal Labor Standard Provisions.pdf PDF
25-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
36-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
4-Doc 00 73 00 4 - Appendix B - Public Works Employment Verification Form.pdf PDF
13-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
53-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
3-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
20-Doc 00 52 00 - AGREEMENT.pdf PDF
23-Doc 00 01 10-TOC.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
54-Doc 00 73 00 11- CDBG AND STATE REQUIREMENTS.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESTORATION OF PAVED SURFACES

32 12 23-1

SECTION 32 12 23

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Temporary Paving

2. Permanent Paving

3. Asphalt Overlay

4. Shoulder Restoration

5. Walkway Restoration

6. Driveways

7. Concrete Curb and Gutter Repairs

8. Stormwater Inlets and Piping

9. Street Signage

B. The Details on the Drawings note the specific paving requirements.

1.02 RELATED SECTIONS

A. Related Work specified elsewhere:

1. Section 01 55 26: Traffic Regulation

1.03 QUALITY ASSURANCE

A. Referenced Standards:

1. Pennsylvania Department of Transportation:

a. Publication 408 Specifications

b. Publication 27 - Specification for Bituminous Mixtures (Bulletin 27)

c. Publication 37 - Specification for Bituminous Materials (Bulletin 25)

d. Publication 213 – Temporary Traffic Control Guidelines

1.04 SUBMITTALS

A. Certificates:

1. Submit certification from bituminous and aggregate suppliers attesting that materials conform to the State Specifications in accordance with Section 01 33 00.

2. Submit a PennDOT approved Job Mix Formula for each bituminous concrete mix required.

3. Submit a PennDOT approved Mix Design for each concrete class and use required.

1.05 JOB CONDITIONS

A. Control of Traffic:

1. Take measures to control traffic during repaving operations. Do not allow traffic on repaved areas until authorized by the Resident Project Representative.

2. Employ traffic control measures in accordance with the requirements of Section 01 55 26 including pertinent permits by PennDOT and/or local municipal agencies having jurisdiction.

B. Restore existing paving outside the limits of the Work that is damaged by Contractor's operations, to its original condition at the expense of Contractor.

32 12 23-2

PART 2 - PRODUCTS

2.01 CONCRETE

A. Class AA concrete conforming to Section 704, PennDOT Publication 408 Specifications.

1. Requirements for State approved batch plants, design computations and plant inspection shall apply. The acceptability of concrete will be based on conformance with the Cement Concrete Criteria specified in Section 704 of PennDOT Publication 408 for the required Class of concrete and the results of the specified tests.

2. Concrete design mix shall be submitted to Engineer for approval prior to work commencement. No concrete shall be placed until Engineer has approved the design mix.

2.02 BITUMINOUS PAVING MATERIALS AND AGGREGATES

A. Base Course: PennDOT Superpave (Section 313 of Publication 408).

B. Binder Course: PennDOT Superpave (Section 410 of Publication 408).

C. Leveling Course: PennDOT Superpave (Section 410 of Publication 408).

D. Wearing Course: PennDOT Superpave (Section 410 of Publication 408).

E. Tack Coat: Per Section 460 of PennDOT Publication 408, except revise the first sentence to read:

Emulsified Asphalt, Class E-8 (AASHTO CSS-1h or SS-1h)

F. Joint Seal: Asphalt PG 64-22 Sealant (Publication 408).

G. Coarse Aggregate: PennDOT No. 2A (Section 703 of Publication 408).

H. The acceptability of the material will be based on conformance with the Criteria specified in PennDOT Publication 408 for the required material.

I. Cut sheets/submittals for all paving materials and aggregates shall be submitted to Engineer for approval prior to work commencement. No paving materials and/or aggregates shall be placed until Engineer has approved the material.

PART 3 - EXECUTION

3.01 TEMPORARY PAVING

A. Provide temporary paving immediately upon completion of trench backfilling. Unpaved trenches shall not remain unpaved longer than ten (10) working days after backfilling.

B. Complete trench backfill with coarse aggregate in accordance with the Drawings and Publication 408 requirements.

C. Trim existing paving with minimum one (1) foot cutbacks to remove damaged areas. Cut straight joint lines and right angle offsets.

D. Place temporary paving material consisting of bituminous concrete base course to the required depth shown on the Drawings for the entire width of the trench. Place with a maximum lift thickness of three

(3) inches and compact each lift individually using a trench roller (minimum 5 ton).

E. Continuously maintain temporary paving to the satisfaction of the Resident Project Representative and the State and local municipal road departments having jurisdiction. Temporary paving on State roads must remain in place for a minimum of ninety (90) days.

3.02 PERMANENT PAVING

A. Place bituminous concrete base course on surface of compacted subbase course to compacted thickness (10 ton roller where possible; minimum 5 ton roller in trenches) as shown on Drawings.

B. Place base and wearing courses to compacted thicknesses (10 ton roller) as shown on the Drawings.

Apply tack coat, per Section 32 12 00, on completed base course before placing wearing course should there be a delay between completion of base course and placement of wearing course.

32 12 23-3

C. Place wearing course overlay to compacted thickness (10 ton roller) as and where shown on the Drawings.

D. Compact pavement by rolling to achieve even and smooth finish, without roller marks. Hand compact in areas inaccessible to rolling equipment.

E. Where proposed asphalt paving adjoins existing asphalt paving, seal the joint with Asphalt PG 64-22 Sealant in accordance with Publication 408 Specifications.

F. Replace pavement markings in their former location which were covered or destroyed.

G. Maintain permanent paving to the satisfaction of the Resident Project Representative and the local municipal and State road departments having jurisdiction throughout the Contract maintenance period.

3.03 ASPHALT OVERLAY

A. Where indicated on the Drawings, or directed by the Resident Project Representative, place an asphalt overlay.

B. Construct in accordance with Publication 408 Specifications and Drawings.

C. Replace pavement markings in their former location which were covered or destroyed.

3.04 SHOULDER RESTORATION

A. Restore shoulders in accordance with the Drawings.

3.05 WALKWAY RESTORATION

A. Reconstruct portland cement sidewalks to 4" thickness of concrete placed on a 6" layer of 2A aggregate.

B. Reconstruct portland cement sidewalks to the first joint on either side of the damaged portion. Install expansion joint material.

3.06 DRIVEWAYS

A. Trim concrete and bituminous driveway surfaces to remove damaged areas. Saw cut straight joint lines parallel to the centerline of the trench. Cut offsets at right angles to the trench centerline.

B. Restore existing portland cement concrete driveways with a 6" layer of concrete reinforced with 6 x 6 l0/l0 wire mesh on a 4” layer of AASHTO 57 aggregate.

C. Restore existing asphalt driveways in kind or with minimum 2" layer wearing course over 6" layer of 2A aggregate.

3.07 CONCRETE CURB AND GUTTER REPAIRS

A. Replace curbs and gutters damaged by construction to match existing.

B. Reconstruct curbs and gutters to the first expansion joint on either side of the damaged portion. Install expansion joint material.

3.08 STORMWATER INLETS AND PIPING

A. Repair or replace storm water inlets and piping damaged by construction to match existing inlets.

B. The Resident Project Representative will determine whether the frame and grate assembly of each affected storm water inlet is suitable for reuse once it has been removed by Contractor.

C. Construct or repair storm water inlets and piping in accordance with relevant section of Publication 408 Specifications.

3.09 STREET SIGNAGE

32 12 23-4

A. Reinstall any signage removed to allow for construction activities at the original location.

END OF SECTION