44-Sec 02 41 16 - DEMOLITION.pdf

PDF 121 KB Posted

Attached to
2026 Bristol Borough CDBG Curb Ramp Program
Solicitation number
Not on record
Issued by
Bucks County, Brodheadsville CDP, Pennsylvania

About this file

This is a technical specification document for demolition work prepared by Bristol Borough, Pennsylvania, in connection with the 2026 CDBG Curb Ramp Program. The scope of work includes the removal of designated concrete curbs and sidewalks as part of a broader infrastructure improvement project focused on constructing ADA/PennDOT compliant curb ramps. The project requires contractors to manage demolition activities in a manner that minimizes interference with traffic and maintains protected egress and access throughout execution. Contractors must comply with Pennsylvania Act 172 requirements by contacting the Pennsylvania One Call System at least three days prior to excavation work and must coordinate with utility companies to identify, protect, and properly abandon or remove underground utilities. The specification mandates that all demolished materials be removed from the site promptly and disposed of in a legal, state-approved manner, with daily cleanup requirements and restoration of any damaged existing pavement in accordance with specified standards.

The specification establishes that all products and materials utilized in restoration and repair work must be of a quality equal to or better than original materials, subject to approval by the Owner's representative. Contractors bear full responsibility for protecting existing facilities and improvements both on the project site and on adjoining properties, with any resulting disturbances to be promptly restored at no extra cost to the owner. The contractor must conduct a thorough pre-work examination of all premises, verify all conditions and dimensions, and immediately report any discrepancies or previously unknown major conditions to the Engineer before proceeding. Appropriate erosion and sediment control measures must be installed prior to work commencement, and the contractor is required to maintain the premises in a neat and orderly condition throughout execution with mandatory daily construction area cleanup.

View the file

Other files

File Type Posted
5-Doc 00 91 13 - ADDENDA.pdf PDF
47-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
6-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
34-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
40-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
21-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
12-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
31-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
15-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
33-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
19-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
28-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
55-Doc 00 73 00 - 08 APPENDIX C Part 1 Contract Language Requirements.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
39-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
43-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
24-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
49-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
1-Doc 00 73 00 3 - Appendix B cover sht.pdf PDF
7-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
56-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
42-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
32-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
50-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
37-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
8-Doc 00 41 00 - BID FORM - EBID.pdf PDF
58-ADA Curb Ramp Intersections 2026.pdf PDF
35-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
30-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
45-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
59-2026 BB CDBG Curb Ramp Program Concept Plans.pdf PDF
26-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
48-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
41-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
9-Doc 00 43 13 - BID BOND.pdf PDF
17-Doc 00 73 00 1 - Appendix A cover sht.pdf PDF
57-Doc 00 73 00 - 09 Part 2 Federal Labor Standard Provisions.pdf PDF
25-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
36-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
4-Doc 00 73 00 4 - Appendix B - Public Works Employment Verification Form.pdf PDF
13-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
53-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
3-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
20-Doc 00 52 00 - AGREEMENT.pdf PDF
23-Doc 00 01 10-TOC.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
54-Doc 00 73 00 11- CDBG AND STATE REQUIREMENTS.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION

02 41 16-1

SECTION 02 41 16

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Remove all items shown on the plans including the following:

1. Remove designated concrete curb and sidewalk.

1.02 RELATED WORK

A. Section 31 23 33: Excavation, Backfill and Compaction

1.03 EXISTING CONDITIONS

A. Conduct demolition to minimize interference with traffic and other property access. Maintain protected egress and access at all times.

B. Provide, erect, and maintain temporary barriers and security devices.

C. Traffic

1. Conduct site preparation, removals and salvaging operations to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities. Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.

D. Protection

1. Contractor shall minimize removal of existing asphalt pavement. In the event curb and sidewalk cannot be removed without damaging pavement, restore damaged pavement in accordance with Section 32 12 23.

2. Contractor shall be responsible for the protection of existing facilities and improvements, indicated to remain in place, within the area of the site where his work is being done.

3. Contractor shall be responsible for the protection of existing facilities on adjoining properties.

4. Any disturbances to the work and improvements or any impairment of facilities resulting from work of this Section, shall be promptly restored, repaired or replaced at no extra cost to the owner.

E. Protection of Existing Utilities

1. Pursuant to the requirements of Pennsylvania Act 172, the Contractor shall contact the Pennsylvania One Call System at 1-800-242-1776 at least three days prior to any excavation work.

2. Utility companies owning services that will be affected by alteration and removal of demolition work shall be notified in advance according to the requirements of the utility.

3. The existence and location of underground utilities are not guaranteed and shall be

02 41 16-2 investigated and verified in the field by the Contractor before starting work. Excavation in the vicinity of the existing utilities shall be carried on with extreme caution. Utilities encountered on the Owner's property are to be maintained in existing condition unless otherwise indicated on the drawings. All existing underground utilities, storm piping and associated structures designated for removal shall be completely removed in accordance with the utility company or agency having jurisdiction. Underground utilities designated to be abandoned in place shall be properly plugged and abandoned in accordance with the regulations of the utility company or agency having jurisdiction. Material removed shall be disposed of off-site in a lawful manner.

PART 2 - PRODUCTS

2.01 GENERAL

A. Products and materials utilized in this item of work shall be subject to the approval of the Owner’s representative.

2.02 RESTORATION

A. Products and materials used in restoration and repair of private and public property shall be of a quality equal to or better than the original project or material.

PART 3 - EXECUTION

3.01 PREPARATION

A. Locate existing active utilities and verify whether each utility will remain in service and therefore requires protection of is part of the demolition and removal activity.

B. Protect existing items which are not indicated to be altered.

C. Prior to starting work make arrangements with the proper authorities for turning off and disconnecting utilities in conjunction with demolition activities. Disconnect, remove, and cap designated utility services within demolition areas. Mark location of disconnected utilities.

Identify and indicate capping locations on Project Record Documents.

D. Visit the premises and verify all conditions covering the work of this Section and verify all dimensions. Examine all drawings covering the work of this Section and refer to all other drawings that may affect the work of this Section or require coordination with other trades.

Before starting the work of this Section, make a thorough examination of all portions of the premises in which the work of this Section is to be performed. Check all of the work adjoining, adjacent to, and underlying the locations where the work of this Section is to be performed. Report to the Engineer any and all conditions that may interfere with or otherwise affect or prevent the proper execution and/or completion of the work of this Section. Do not commence work until any and all such conditions have been corrected by the trade or trades responsible.

E. Demolish in an orderly and careful manner. Protect any existing structures to remain from damage.

F. Do not disturb existing paving unless it becomes necessary to do so in order to complete other work.

G. Except where noted otherwise, immediately remove demolished materials from site.

H. Remove materials to be re installed or retained in manner to prevent damage.

02 41 16-3

I. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.

J. Remove demolished materials from site as work progresses. Upon completion of work, leave areas of work in clean condition.

K. In the event of discrepancy, immediately notify the Owner’s Engineer. Do not proceed with work of this Section in areas of discrepancy until all such discrepancies have been fully resolved. Should any work performed under this Section expose previously unknown major conditions, all work shall be stopped and the matter reported immediately to the Engineer for instructions. However, the Contractor shall use any measures necessary to insure adequate safety conditions.

L. Appropriate erosion and sediment control measures (as shown on the Contract Drawings or otherwise required to complete the work) should be installed prior to commencement of work of this Section.

3.03 CLEAN-UP

A. Execute work in such a manner as to avoid interference with, use of, or passage to and from adjoining spaces and facilities. Do not burn materials or debris on premises. Remove from the site all rubbish and debris resulting from work of this Section.

B. Do not allow the accumulation of scraps and debris arising from the work of this Section.

Maintain the premises in a neat and orderly condition at all times. Daily clean-up of construction areas is required.

3.04 DISPOSAL OF DEBRIS

A. All items of demolition within the contract limits, including stones, rubbish, utility lines and fixtures, plant material, and similar items shall be, unless otherwise directed, the Contractor's property and shall promptly be removed from the site and disposed of in a legal manner, in a state approved disposal area.

END OF SECTION

END OF SECTION