45-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf
PDF 138 KB Posted
- Attached to
- 2026 Bristol Borough CDBG Curb Ramp Program
- Solicitation number
- Not on record
- Issued by
- Bucks County, Brodheadsville CDP, Pennsylvania
About this file
This specification document outlines the technical requirements for Portland Cement Concrete Paving work in connection with Bristol Borough's CDBG Curb Ramp Program in Pennsylvania. The scope of work encompasses the design and construction of ADA/PennDOT-compliant curb ramps along with associated concrete sidewalks, steps, curbs, and driveway aprons at multiple specified locations within the borough. All work must conform to PennDOT Publication 408 Specifications and Bristol Borough Standards. The project comprises one base bid and multiple alternate bids, with proposals due by August 5, 2025. The specification requires concrete to meet Class A standards with a compressive strength of 3,000 psi at 28 days, slump of 3±1 inches, and air content of 6%±1% by volume. Contractors must utilize state-approved batch plants for concrete, submit PennDOT-approved mix designs for engineer approval prior to work commencement, and engage independent testing laboratories for compressive strength testing at the contractor's expense—specifically one test for each 50 cubic yards of concrete.
The work requires adherence to multiple standards including ACI 301 and 318, ASTM specifications, and PennDOT Publication 408 for materials, formwork, reinforcement, and placement procedures. Concrete sidewalks must be formed into separate slabs of twenty-four feet in length with scored blocks of four feet, while curb sections shall not exceed 15.5 feet. All expansion joints must be sealed with polyurethane elastomeric sealant, and concrete surfaces must be treated with Aquron 2000 or equivalent immediately upon formwork removal. The project is federally funded through the Community Development Block Grant (CDBG) program, which subjects it to Davis-Bacon wage rates and additional federal labor standard provisions. Contractors must submit performance and payment bonds, insurance certificates, non-collusion affidavits, and Contractor Responsibility Certifications. No specific set-asides for disadvantaged enterprises are mentioned, and the contract terms do not include renewal options.
View the file
Other files
Show 40 more
Latest 50 of 122 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTLAND CEMENT CONCRETE PAVING
32 13 13-1
SECTION 32 13 13
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Concrete Sidewalks/Steps
2. Concrete Curbs
3. Concrete Driveway Aprons
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere
1. Section 31 20 00: Earthwork
2. Section 31 23 33: Excavation, Backfill & Compaction
3. Section 32 12 23: Restoration of Paved Surfaces
4. Section 32 92 00: Finish Grading, Seeding & Sodding
1.03 QUALITY ASSURANCE
A. Reference Standards
1. American Concrete Institute
ACI 301, 318
2. American Society for Testing and Materials (ASTM):
A615 Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement
C31 Practices for Making and Curing Concrete Test Specimens in the Field
C39 Test Method for Compressive Strength of Cylindrical Concrete Specimens
C42 Methods of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
C172 Method of Sampling Freshly Mixed Concrete
C260 Specification for Air-Entraining Admixtures for Concrete
D946 Specification for Penetration - Graded Asphalt Cement for Use in Pavement Construction
3. Pennsylvania Department of Transportation
Publication 408 Specifications
B. Testing Laboratory
1. Compressive strength tests shall be performed by an independent testing laboratory engaged by and paid for by the Contractor.
1.04 SUBMITTALS
A. Certificates:
1. Submit certification from the concrete producer attesting that the concrete conforms to
32 13 13-2
Section 704, Publication 408 Specifications for the class of concrete being used.
2. Submit certified results of compressive strength tests performed by an independent testing laboratory.
3. Submit a PennDOT approved Mix Design for each concrete class and use required.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Forms:
1. Forms shall be straight, free from warp and of sufficient strength to resist the pressure of concrete without springing. Forms and template which are worn, bent, warped or broken shall not be used.
2. For sidewalks, steps, pads and driveway aprons, use forms of wood or steel profiled to suit conditions.
3. For curbs, use forms of steel except for sharp curves and short tangent sections where wood forms may be used when approved by the Resident Project Representative. Metal forms shall be of approved sections and shall have a flat surface on top and wood forms shall be of a depth equal to the depth of the curb, designed to permit secure fastening of the face and back forms at the tops. These fastenings shall be constructed in a manner that will not obstruct satisfactory finishing and edging of the top of the curb but will permit removal of the inside or face forms. The outside or back forms shall be straight from top to bottom. The inside of the face forms shall have a batter from the top of the curb to the finished surface line of the pavement, as indicated on the drawings, and shall be straight from this line to the bottom.
B. Expansion Joint Filler: 1/2" thickness conforming to Section 705.1, Publication 408 Specifications.
C. Joint Sealing Material: Liquid Asphalt Cement, ASTM D-946. PG 64-22 Sealant (Publication 408)
D. Concrete Curing Material/Compound: Section 711.1 and 711.2(a), Publication 408 Specifications.
E. Coarse Aggregate: AASHTO No. 57, Publication 408 Specifications.
F. Reinforcement Bars: ASTM A615; Grade 60, deformed billet steel bars, finish conforming to Section
709.1, Publication 408 Specifications and Bulletin 15.
G. Welded Steel Wire Fabric: Deformed type; unfinished, coiled rolls, conforming to gage and mesh size as noted on the Drawings and Sections 709.3 and 709.4, Publication 408 Specifications and Bulletin 15.
2.02 CONCRETE MIX
A. Conforming to Section 704, Publication 408 Specifications.
1. Requirements for State approved batch plants, design computations and plant inspection shall apply. The acceptability of concrete will be based on conformance with the Cement Concrete Criteria specified below and the results of the specified tests.
B. Cement Concrete Criteria:
32 13 13-3
1. All Concrete shall be Class A.
a. Compressive strength @ 7 days: 2750 psi
b. Compressive strength @ 28 days: 3,000 psi
c. Slump: 3+1“ except for slip forming of curbs which shall be a maximum of 1-1/2”
d. The air content of air-entrained concrete shall be 6% + 1% by volume. Air-Entraining
Agents shall conform to ASTM C260
2. All Concrete shall be Class A as defined by PennDOT Publication 408, Section 704.
3. Concrete design mix shall be submitted to Engineer for approval prior to work commencement. No concrete shall be placed until Engineer has approved the design mix.
PART 3 - EXECUTION
3.01 EXAMINATION AND PREPARATION
A. Subgrade Preparation
1. Verify gradients and elevations of subgrade.
2. Soft, spongy, organic or other unsuitable material shall be removed from the subgrade and replaced with dry, firm material.
3. Compact subbase and/or subgrade to a firm unyielding surface at the required depth below the finished line and grade of the required construction work as shown on the Drawings.
B. Aggregate Placement
1. Spread aggregate on prepared subgrade to form a bed of the required depth as shown on Drawings.
2. Compact aggregate thoroughly using mechanical tamping device.
3.02 FORMING
A. Sidewalks, Steps, Pads and Driveway Aprons
1. Place and secure forms to correct location, dimension and grade in a manner to prevent settlement or displacement. Provide sufficient horizontal and vertical support.
2. Radial forms shall be used for all sidewalks with a radius of less than 250 feet.
3. Clean and treat all forms and templates with an approved material as required to prevent the concrete from adhering thereto. Oil, bituminous paper or other material which will adhere to or discolor the concrete shall not be used.
4. Form sidewalks to provide for separate slabs twenty-four (24) feet in length.
5. Place premolded expansion joint filler in joints between slabs, adjacent to existing structures, between the sidewalk and driveway apron, and between the driveway apron and concrete curb.
6. Place premolded expansion joint material vertical in position, in straight lines for the full depth of the concrete.
32 13 13-4
B. Curbs
1. Place and secure forms to correct location, dimension and grade in a manner to prevent settlement or displacement. Provide sufficient horizontal and vertical support.
2. Clean and treat all forms and templates with an approved material as required to prevent the concrete from adhering thereto. Oil, bituminous paper or other material which will adhere to or discolor the concrete shall not be used.
3. Provide construction joints in uniform lengths not exceeding 15.5 feet except where shorter sections are necessary for closures or curves. No section shall be less than four (4) feet.
Saw cut joints may be provided in lieu of hand-formed construction joints.
4. Place premolded expansion joint material, cut to conform to the cross sectional area at all structures and at the end of the day's work.
3.03 REINFORCEMENT
A. Sidewalks, Steps, Pads and Driveway Aprons
1. Place welded wire fabric at the mid-height of sidewalks and driveway aprons.
2. Interrupt reinforcement at expansion joints.
B. Curbs
1. Place steel reinforcement at driveway depressions as noted on the Drawings.
2. Interrupt reinforcement at expansion joints.
3.04 PLACING AND FINISHING CONCRETE
A. General
1. Moisten subbase/subgrade to minimize absorption of water from fresh concrete.
2. For use, proportioning, mixing and placing, and quality of concrete, follow applicable sections of ACI 318.
3. Place concrete in accordance with ACI 301 and PennDOT Publication 408.
4. Do not disturb formwork components or reinforcement during placement of concrete.
5. Place concrete continuously between predetermined joints.
6. Apply Aquron 2000 or equal to all new concrete surfaces immediately upon removal of the formwork. Apply, cure and protect exposed concrete construction as specified in Section 501.3(k), Publication 408 Specifications.
7. Seal all concrete expansion joints with Polyurethane Elastomeric Sealant, Sikaflex-2c NS Ez
Mix or approved equal.
B. Field Tests of Concrete During Construction
1. Each 50 cubic yards or fraction thereof of each class of concrete will be tested for compressive strength. Retain an independent testing laboratory to test cylinders at the expense of CONTRACTOR.
32 13 13-5
a. Sample concrete in accordance with ASTM C172. One test for slump, air entrainment and air and concrete temperature will be taken from each concrete delivery.
b. Prepare and cure one set of four (4) test cylinders in accordance with ASTM C31.
c. Test cylinders in accordance with ASTM C39 at the following schedule: 1 @ 7 days, 2 @ 28 days and 1 held in reserve.
d. One additional set of test cylinders will be taken during cold weather concreting, cured on job site under same conditions as concrete it represents.
2. If test cylinders fail to meet strength requirements, the Owner may require core tests in accordance with ASTM C42 at the expense of CONTRACTOR.
C. Sidewalks, Steps, Pads and Driveway Aprons
1. Provide a slope on sidewalks of towards the street as indicated on the Drawings.
2. Finish surface to a semi-smooth condition.
3. Divide sidewalk slabs between expansion joints into blocks four (4) feet in length by scoring transversely. Divide the width of the driveway apron equally. Score the concrete around any obstructions or structures within the sidewalk area. The scoring shall consist of a block eight
(8) inches wider than the maximum dimension of the structure at the sidewalk elevation.
Scoring shall extend for a depth of at least one-quarter (1/4) of the thickness of the concrete slab.
D. Curbs
1. Place concrete in the forms in horizontal layers not exceeding five (5) inches and spade sufficiently to eliminate all voids. A vibrator may be used when approved by the Resident Project Representative.
2. Provide drainage openings through curb at the elevation and of the size required as shown on the Drawings or as directed by the Resident Project Representative.
3. Provide depressed curb where shown on the Drawings or as directed by the Resident Project Representative.
4. Finish top surface of the curb true to line and grade in a smooth, neat and even manner.
5. Round the edges of the face and back of the top surface of the curb to a radius of not more than 3/4 inch and 1/4 inch respectively while the concrete is still plastic.
6. Saw cut joints where construction joints have not been hand-formed. Sawing of joints shall be done as soon as practicable after the concrete has set sufficiently to preclude raveling during the sawing operation and before any shrinkage cracking occurs. The saw cut depth may be decreased at the edge adjacent to the pavement to obtain a maximum depth that will avoid damage to the pavement. Provide tooled edges on construction joints.
3.05 RESTORATION
A. Backfilling
32 13 13-6
1. Perform backfilling in accordance as required adjacent to the construction following removal of forms in such a way as to not disturb the concrete construction and in accordance with Bristol Borough Specifications and Design Standards and PennDOT Publication 408.
B. Final Grading and Seeding or Sodding
1. Perform final grading and provide seeding or sodding as noted on the Drawings.
C. Concrete Joints at Asphalt Paving
1. Sealing material shall be applied at the joint between the concrete and asphalt paving.
END OF SECTION
PART 1 - GENERAL
File details come from the government source that posted it. Updated .