10-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf

PDF 130 KB Posted

Attached to
2026 Bristol Borough CDBG Curb Ramp Program
Solicitation number
Not on record
Issued by
Bucks County, Brodheadsville CDP, Pennsylvania

About this file

This is a Surety Company Agreement form for Bristol Borough, Pennsylvania, related to Contract 2026-00117, the Bristol Borough 2026 CDBG Design/Build Curb Ramp Project. The agreement obligates the surety company to execute and deliver both a Performance Bond and a Payment Bond, each in an amount equal to 100% of the contract award amount, to Bristol Borough at 250 Pond Street, Bristol, PA 19007. The bonds must be provided within the timeframe specified in the Contract Documents, contingent upon the contract being awarded to the bidder within sixty (60) days after bid opening or as otherwise set forth in the Instructions to Bidders. The project involves the design and construction of ADA/PennDOT compliant curb ramps with associated sidewalks, curbing, and sign relocation/installation throughout Bristol Borough, with all work to comply with PennDOT Publication 408 and Borough Standards.

The agreement includes a financial penalty provision requiring the surety company to pay Bristol Borough the difference between the bidder's proposal amount and any higher cost incurred by the Borough to procure the work if the surety fails to execute the required bonds after award notification, less any forfeiture of proposal security. The surety company must be a corporation authorized to conduct business in the Commonwealth of Pennsylvania. Execution of this agreement requires authorization from the surety company's President or Vice President, or alternatively, must be accompanied by a current certificate of authority for any other signing officer.

View the file

Other files

File Type Posted
5-Doc 00 91 13 - ADDENDA.pdf PDF
47-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
6-Doc 00 11 13 - ADVERTISEMENT FOR BIDS.pdf PDF
34-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
40-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
21-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
12-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID.pdf PDF
31-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
15-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
33-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
19-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
28-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
55-Doc 00 73 00 - 08 APPENDIX C Part 1 Contract Language Requirements.pdf PDF
44-Sec 02 41 16 - DEMOLITION.pdf PDF
38-Sec 01 33 00 - SUBMITTALS.pdf PDF
39-Sec 01 55 26 - TRAFFIC REGULATION.pdf PDF
43-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
24-Doc 00 73 00 0 - SUPPLEMENTARY CONDITIONS.pdf PDF
49-Sec 32 92 00 - FINISH GRADING, SEEDING, AND SODDING.pdf PDF
1-Doc 00 73 00 3 - Appendix B cover sht.pdf PDF
7-Doc 00 21 13.1 - INSTRUCTIONS FOR ELECTRONIC BIDDING.pdf PDF
56-Doc 00 73 00 10 - Part 3 Section 3 Requirements.pdf PDF
42-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
11-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
32-Sec 01 40 00 - QUALITY CONTROL.pdf PDF
50-Sec 32 12 23 - RESTORATION OF PAVED SURFACES.pdf PDF
37-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
8-Doc 00 41 00 - BID FORM - EBID.pdf PDF
58-ADA Curb Ramp Intersections 2026.pdf PDF
35-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
30-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
45-Sec 32 13 13 - PORTLAND CEMENT CONCRETE PAVING.pdf PDF
59-2026 BB CDBG Curb Ramp Program Concept Plans.pdf PDF
26-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
46-Sec 32 12 00 - BITUMINOUS CONCRETE PAVING.pdf PDF
48-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
41-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
9-Doc 00 43 13 - BID BOND.pdf PDF
17-Doc 00 73 00 1 - Appendix A cover sht.pdf PDF
57-Doc 00 73 00 - 09 Part 2 Federal Labor Standard Provisions.pdf PDF
25-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
36-Sec 01 32 16 - NARRATIVE CONSTRUCTION SCHEDULE.pdf PDF
4-Doc 00 73 00 4 - Appendix B - Public Works Employment Verification Form.pdf PDF
13-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
53-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
3-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
20-Doc 00 52 00 - AGREEMENT.pdf PDF
23-Doc 00 01 10-TOC.pdf PDF
18-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
Show 40 more

Latest 50 of 122 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGREEMENT OF SURETY COMPANY

00 45 53-1

DOCUMENT 00 45 53

AGREEMENT OF SURETY COMPANY

We,_____________________________________ as Surety, a corporation existing under the laws of the (Surety Company)

State of ________________________, and authorized to transact business in the Commonwealth of

Pennsylvania hereby agree intending to be legally bound hereby, to execute and deliver to the

Bristol Borough 250 Pond Street, Bristol, PA 19007 within the time limit specified in the Contract Documents, the Performance Bond and Payment Bond in the forms included in the Contract Documents or equivalent each in an amount of 100% of the contract amount, in favor of Owner, as required for the faithful performance and proper fulfillment of

Contract 2026-00117 Bristol Borough 2026 CDBG Design/Build Curb Ramp Project – on behalf of

(Bidder, Name and Address) provided that the above contract is awarded to Bidder within sixty (60) days after the date of opening of the bids or otherwise as set forth in the Instructions to Bidders.

Surety Company further agrees that should Surety Company, after notification of such award, omit or refuse to execute the required bonds then Surety Company shall pay to Owner any difference between the total amount specified in Bidder's proposal for the required work and the amount for which Owner may procure the same work if the latter amount be in excess of the former and after deduction therefrom of payment made by reason of the forfeiture of the proposal security.

IN WITNESS WHEREOF, the Surety Company has hereunto set its hand and seal this _____ day of

_____________________, 20____.

SURETY

Company:

(Corp. Seal) Signature:

Name and Title:

NOTE: This statement, if executed by any person other than the President or Vice President of the Surety Company, must be accompanied by a current and effective certificate showing authority conferred upon the person so signing to execute such instruments on behalf of the Surety Company represented.

File details come from the government source that posted it. Updated .