This is a specification document for Construction Facilities and Temporary Controls (Section 01 50 00) for the 2026 Bristol Borough CDBG Curb Ramp Program in Bucks County, Pennsylvania. The specification outlines the contractor's responsibilities for managing temporary facilities and controls throughout the construction phase of ADA/PennDOT-compliant curb ramp improvements. The work includes providing temporary utilities (electricity, lighting, heat, ventilation, communications, water, and sanitary facilities), implementing temporary controls (barriers, enclosures, fencing, dust control, and water management), and establishing construction facilities (access roads, parking, progress cleaning, project signage, and temporary buildings). The contractor must maintain site security, perform daily waste removal, protect installed work and existing facilities from damage, and implement dust control measures as directed by the Owner's Engineer at no additional cost to the Owner. Upon project completion, the contractor must remove all temporary facilities, clean the site, and restore any damaged areas to their original or specified condition.
The specification places full responsibility and cost for temporary utilities, sanitary facilities, barriers, fencing, water control, and dust management on the contractor. The contractor must provide a 6-foot-high fence with gated access around the construction site and must maintain excavations free of water through pumping equipment and proper site grading. All temporary electricity must be provided and paid for by the contractor from the utility source. Progress cleaning must be performed daily with waste materials removed off-site using closed chutes terminating into lidded containers. The project involves federal CDBG funding, which subjects the work to Davis-Bacon wage rates and additional federal labor standards compliance requirements. No additional compensation is provided for dust control measures implemented at the Owner Engineer's discretion, establishing dust control as a baseline contractor obligation rather than a billable service.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 50 00-1
SECTION 01 50 00
PART 1 GENERAL
1.01 GENERAL
A. The Work of this Section shall be the responsibility of the contractor as noted in the Summary of Work (Section 01 11 13).
1.02 SECTION INCLUDES
A. Temporary Utilities: Electricity, lighting, heat, ventilation, communications service, water and sanitary facilities.
B. Temporary Controls: Barriers, enclosures and fencing, protection of the Work, water control and dust control.
C. Construction Facilities: Access roads, parking, progress cleaning, project signage, and temporary buildings.
1.03 RELATED SECTIONS
A. Section 01 57 13: Soil Erosion and Sediment Control.
B. Section 01 55 26: Traffic Regulation.
C. Section 01 70 00: Contract Closeout: Final cleaning.
1.04 TEMPORARY ELECTRICITY
A. Cost: By Contractor; provide and pay for power service required from utility source.
1.05 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures.
Existing facility use is not permitted. Provide at time of project mobilization.
B. At end of construction, return facilities to same or better condition than originally found.
1.06 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.
B. Provide protection for plants designated to remain. Replace damaged plants.
C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.07 FENCING
A. Construction: Contractor's option.
B. Provide 6-foot-high fence around construction site; equip with vehicular and pedestrian gates with locks.
1.08 WATER CONTROL
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
01 50 00-2
B. Protect site from puddling or running water.
1.09 PROTECTION OF INSTALLED WORK
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed Products. Control activity in immediate work area to prevent damage.
C. Prohibit traffic from landscaped areas.
1.10 SECURITY
A. Provide security and facilities to protect Work, and Owner's operations from unauthorized entry, vandalism, or theft.
1.11 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Collect and remove waste materials, debris, and rubbish from site daily and dispose off-site.
C. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
1.12 PROJECT IDENTIFICATION
A. No other signs are allowed without Owner permission except those required by law.
1.13 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Clean and repair damage caused by installation or use of temporary work.
B. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.
1.14 DUST CONTROL
A. Execute Work by methods to minimize raising dust from construction operations.
B. Provide positive means (i.e. use of sprinkling water or other methods approved by the Owner) to prevent air-borne dust from dispersing into atmosphere.
C. Dust control measures shall be employed when required in the opinion of the Owner’s
Engineer at no additional cost to Owner.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION