100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements

Closed State & local contract opportunity

Solicitation number
2026.002-LUT CPS
State
Oregon
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 46
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Washington County, Oregon is soliciting bids for the SW Walker Road/SW Murray Boulevard Intersection Improvements project (Project #100238), a comprehensive infrastructure enhancement initiative. The project encompasses multiple critical infrastructure improvements, including constructing a new bridge on Murray Boulevard over Cedar Mill Creek, deconstructing and reinstalling the existing Murray Bridge on Walker Road, and installing box culverts under Walker Road and Far Vista Street for North Johnson Creek. Key deliverables include installing traffic signals at two intersections, widening approximately 2,350 linear feet on Murray Boulevard and 2,450 linear feet on Walker Road with new curb and sidewalk, constructing gravity retaining walls, and developing a stormwater collection and conveyance system with water quality treatment facilities. A mandatory in-person pre-bid meeting is scheduled for January 28, 2026, at 2:00 p.m., with questions due by January 30, 2026, at 5:00 p.m. Electronic bids must be submitted through the OpenGov Procurement Portal by February 4, 2026, at 1:00 p.m., with a public bid opening via Microsoft Teams video conference. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board.

The procurement allows for broad participation, with no specific set-aside designations noted in the documents. Contractors must comply with Washington County's Clean Air Construction Standard and utilize the online B2G certified business utilization tracking system for monthly subcontractor payment reporting. A bid guaranty of ten percent of the total bid amount is required, and first-tier subcontractors must be disclosed within two work hours after bid closing. The project includes two distinct completion deadlines: February 14, 2027, for TVWD waterline installation and activation, and August 31, 2028, for all remaining work, with liquidated damages of $1,100 per calendar day for the first deadline and $2,700 per calendar day for the second deadline. The project involves installing approximately 875 feet of 42-inch TVWD waterline and 500 feet of CWS sanitary sewer, with comprehensive utility and roadway improvements. The estimated project cost range is $20,000,000 to $40,000,000, representing a significant infrastructure investment for Washington County that will enhance transportation and utility infrastructure in the Beaverton area.

Opportunity text

The project name is: 100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements.

The work to be done under this contract will consist of the following in Washington County:

  1. Construct bridge on Murray Blvd over Cedar Mill Creek.
  2. Deconstruct existing Murray Bridge over Cedar Mill Creek, rehabilitate, and reinstall on Walker Road over Cedar Mill Creek
  3. Install box culvert under Walker Road for North Johnson Creek
  4. Install box culvert under Far Vista Street for North Johnson Creek
  5. Install traffic signals at the intersections of Murray Blvd/Walker Road and Walker Road/Park Way
  6. Construct approximately 2350' of widening on Murray Blvd with new curb and sidewalk
  7. Construct approximately 2450' of widening on Walker Road with new curb and sidewalk
  8. Construct Gravity Retaining walls
  9. Construct stormwater collection and conveyance system to include water quality treatment facilities.
  10. Construct approximately 875' of 42" TVWD waterline
  11. Construct approximately 500' of CWS sanitary sewer
  12. Perform additional and Incidental Work as called for by the Specifications and Plans.

The project includes grading, drainage, paving, signing, striping, illumination, signal modifications, landscaping, and utilities.

The Project cost range is $20,00,000 - $40,000,000.

Files

File Type Posted
100238_-_SW_Walker_Road_SW_Murray_Boulevard_Intersection_Improvements_(Addendum_#3_Revision).pdf PDF
[Supplemental]_Pre-Bid_Attendees.pdf PDF
[Supplemental]_100238_Early_Tree_Removal_(by_others)_Exhibit.pdf PDF
[Supplemental]_Walker_Bridge_Widening_As-builts.pdf PDF
[Supplemental]_Walker_Bridge_As-builts.pdf PDF
[Supplemental]_Murray_Bridge_As-builts.pdf PDF
100238-Contractor_CAD_Files.zip ZIP file
100238-Contractor_CAD_Files.zip ZIP file
100238_-_SW_Walker_Road_SW_Murray_Boulevard_Intersection_Improvements.pdf PDF
100238_Walker_Murray_Bid_Plans.pdf PDF
[Supplemental]_Walker-Murray_Geotechnical_Report.pdf PDF
100238_Walker_Murray_Bid_Plans.pdf PDF
[Supplemental]_Walker-Murray_Geotechnical_Report.pdf PDF
100238_13_TVWD_Water_Relocation_Plans.pdf PDF
100238_13_TVWD_Water_Relocation_Plans.pdf PDF
100238_13_Book_2.pdf PDF
100238_13_Book_2.pdf PDF
100238_13_Book_1.pdf PDF
100238_13_Book_1.pdf PDF
100238_13_First_Tier_Subs_Disclosure_Fillable.pdf PDF
100238_13_Signature_Page_Fillable.pdf PDF
100238_13_Signature_Page_Fillable.pdf PDF
100238_13_Bid_Guaranty_Fillable.pdf PDF
100238_13_First_Tier_Subs_Disclosure_Fillable.pdf PDF
100238_13_Bid_Guaranty_Fillable.pdf PDF
Show all 25