100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements
Closed State & local contract opportunity
- Solicitation number
- 2026.002-LUT CPS
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91327 Construction, Highway And Road
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91361 Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72141126 Underground utilities construction service
- 72121505 Waste water and sewage treatment plant construction service
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
Show all 46
- 72141001 Highway and road new construction service
- 72141106 Gravel or dirt road construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 95121810 Irrigation and flood control waterworks
- 72140000 Heavy construction services
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141127 Seal coating of roads, highways and parking lots
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- Point of contact
-
- Kiersten Vanderhoof kiersten_vanderhoof@washingtoncountyor.gov (503) 846-3585
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Washington County, Oregon is soliciting bids for the SW Walker Road/SW Murray Boulevard Intersection Improvements project (Project #100238), a comprehensive infrastructure enhancement initiative. The project encompasses multiple critical infrastructure improvements, including constructing a new bridge on Murray Boulevard over Cedar Mill Creek, deconstructing and reinstalling the existing Murray Bridge on Walker Road, and installing box culverts under Walker Road and Far Vista Street for North Johnson Creek. Key deliverables include installing traffic signals at two intersections, widening approximately 2,350 linear feet on Murray Boulevard and 2,450 linear feet on Walker Road with new curb and sidewalk, constructing gravity retaining walls, and developing a stormwater collection and conveyance system with water quality treatment facilities. A mandatory in-person pre-bid meeting is scheduled for January 28, 2026, at 2:00 p.m., with questions due by January 30, 2026, at 5:00 p.m. Electronic bids must be submitted through the OpenGov Procurement Portal by February 4, 2026, at 1:00 p.m., with a public bid opening via Microsoft Teams video conference. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board.
The procurement allows for broad participation, with no specific set-aside designations noted in the documents. Contractors must comply with Washington County's Clean Air Construction Standard and utilize the online B2G certified business utilization tracking system for monthly subcontractor payment reporting. A bid guaranty of ten percent of the total bid amount is required, and first-tier subcontractors must be disclosed within two work hours after bid closing. The project includes two distinct completion deadlines: February 14, 2027, for TVWD waterline installation and activation, and August 31, 2028, for all remaining work, with liquidated damages of $1,100 per calendar day for the first deadline and $2,700 per calendar day for the second deadline. The project involves installing approximately 875 feet of 42-inch TVWD waterline and 500 feet of CWS sanitary sewer, with comprehensive utility and roadway improvements. The estimated project cost range is $20,000,000 to $40,000,000, representing a significant infrastructure investment for Washington County that will enhance transportation and utility infrastructure in the Beaverton area.
Opportunity text
The project name is: 100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements.
The work to be done under this contract will consist of the following in Washington County:
- Construct bridge on Murray Blvd over Cedar Mill Creek.
- Deconstruct existing Murray Bridge over Cedar Mill Creek, rehabilitate, and reinstall on Walker Road over Cedar Mill Creek
- Install box culvert under Walker Road for North Johnson Creek
- Install box culvert under Far Vista Street for North Johnson Creek
- Install traffic signals at the intersections of Murray Blvd/Walker Road and Walker Road/Park Way
- Construct approximately 2350' of widening on Murray Blvd with new curb and sidewalk
- Construct approximately 2450' of widening on Walker Road with new curb and sidewalk
- Construct Gravity Retaining walls
- Construct stormwater collection and conveyance system to include water quality treatment facilities.
- Construct approximately 875' of 42" TVWD waterline
- Construct approximately 500' of CWS sanitary sewer
- Perform additional and Incidental Work as called for by the Specifications and Plans.
The project includes grading, drainage, paving, signing, striping, illumination, signal modifications, landscaping, and utilities.
The Project cost range is $20,00,000 - $40,000,000.
Files
Show all 25
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity