100238_13_TVWD_Water_Relocation_Plans.pdf
PDF 24 MB Posted
- Solicitation number
- 2026.002-LUT CPS
- Issued by
- Washington County, Oregon
About this file
This document is a comprehensive set of contract drawings for the Tualatin Valley Water District (TVWD) Walker Road Waterline Relocation project at Murray Boulevard in Beaverton, Oregon. The project involves the relocation and installation of water transmission and distribution pipelines as part of the larger SW Walker Road/SW Murray Boulevard Intersection Improvements project (Project No. 100238). The work includes constructing approximately 875 linear feet of 42-inch mortar-lined polyurethane-coated steel pipe (MLPCSP) for the transmission main, approximately 175 linear feet of 12-inch ductile iron pipe (DIP) for distribution, and approximately 103 linear feet of 8-inch DIP for distribution. The transmission line runs from station 9+88.23 to 20+95.52, with distribution lines connecting at various points. The project also encompasses the installation of associated appurtenances including blowoff assemblies, air release valves, butterfly valves, gate valves, access manways, test stations for cathodic protection, and connection points to existing TVWD infrastructure. The drawings are dated November 3, 2020, for the bid set, with professional engineers Daniel V. Johnston, Randy William Harrington, and Brien Clark providing digital signatures and design certifications.
The contract drawings specify detailed construction requirements including pipe materials meeting AWWA standards, flexible trench sections with granular or controlled low-strength material (CLSM) backfill, joint bonding for cathodic protection, and comprehensive testing protocols. The project requires compliance with Oregon Utility Notification Center requirements (OAR 952-001), OSHA safety standards, and all applicable local, state, and federal regulations. Contractor responsibilities include obtaining utility permits, coordinating with the District for valve operation (minimum 48-hour advance notice required), providing a site-specific safety plan, performing exploratory digging to confirm existing utility locations, and submitting shop drawings prior to pipe ordering. Water service interruptions are limited to maximum four-hour durations between Tuesday and Thursday, with the 48-inch main shutdown restricted to October through April with a maximum three-week total duration. The project includes provisions for cathodic protection with multiple test stations, insulating flanges, anode beds, and comprehensive wiring details. All work must be coordinated with roadway design phasing and traffic control requirements, with the contractor responsible for maintaining proper cover depth (minimum 4 feet for the 42-inch transmission line), preventing flotation in wet conditions, and ensuring proper compaction of all backfill materials.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TVWD
C o n t r a c t D r a w i n g s F o r
November 2020
Bid Set
SPACE RESERVED FOR "DIGITAL SEAL AND SIGNATURE"
UTILITIES REPRESENTATIVE:
CONTACT
ERIC B. GEORGE, EIT
AGENCY
TVWD
PHONE
971-297-7540(ENGINEERING ASSOCIATE)
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
SW WALKER RD
NIKE Inc.
0 750 1500
SCALE IN FEET (APROX)
VICINITY MAP
ENGINEER'S REPRESENTATIVES:
CONTACT
DAN JOHNSTON, PE
AGENCY
HDR Inc.
PHONE
503-327-6267
1850 SW 170th Ave, 1050 SW Sixth Ave, Suite 1800
Beaverton, OR 97003
Portland, OR 97204
PROJECT LOCATION
Beaverton, OR
(CELL)
(CELL)
503-727-3946 (OFFICE)
(ENGINEER OF RECORD)
TONY ROOS, PE Kittelson & Associates, Inc. 503-703-2552
851 SW 6th Avenue. Suite 600
Portland, OR 97204
(CELL)
503-535-7444 (OFFICE)
(ROADWAY ENGINEER)
TUALATIN HILLS PARK
MEADOW PARK
MIDDLE SCHOLL
HOLY TRINITY
SCHOOL
SW JENKINS RD
N W
TH
A
VE
SW
M
UR
RA
Y
BL
VD
SW WALKER RD
SW DOWNING ST
SW FAR VISTA ST
SW DEVONSHIRE DR
SW 139TH AVE
SW
M
UR
RA
Y
BL
VD
SW JAY ST
J u l y
D
A
N
I
E
L
V
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021EXPIRES:
DIGITAL SIGNATURE
OREGON
70837PE
Walker Rd. Waterline Relocation at Murray Blvd.
Project No.
TVWD C12601, E8120
HDR 10218284
Daniel V. Johnston (Nov 3, 2020 20:37 PST) Daniel V. Johnston https://na1.documents.adobe.com/verifier?tx=CBJCHBCAABAAhBl2Qq_Ee3liMqY6y_P1afQtoveiSCO8
DESIGNATORDISCIPLINE
DISCIPLINE DESIGNATOR
G
D
CP
SP
SD
GENERAL
PIPELINE DETAILS
CATHODIC PROTECTION
SPECIAL PLANS
STANDARD DETAILS
CCIVIL
G-01
G-02
G-03
G-04
G-05
C-01
C-02
C-03
C-04
C-05
C-06
C-07
C-08
D-01
D-02
D-03
D-04
D-05
D-06
D-07
SP-01
SP-02
CP-01
CP-02
CP-03
CP-04
CP-05
CP-06
DESCRIPTION
DRAWING
NUMBER
SHEET
NUMBER
SHEET INDEX
GENERAL
CIVIL
WWSP STANDARD DETAILS
DESCRIPTION
DRAWING
NUMBER
SHEET
NUMBER
SHEET INDEX
WWSP PIPE STANDARD DETAILS I
WWSP PIPE STANDARD DETAILS II
WWSP PIPE STANDARD DETAILS III
WWSP PIPE STANDARD DETAILS IV
WWSP PIPE STANDARD DETAILS V
WWSP PIPE STANDARD DETAILS VI
WWSP PIPE STANDARD DETAILS VII
WWSP PIPE STANDARD DETAILS VIII
WWSP PIPE STANDARD DETAILS IX
WWSP PIPE STANDARD DETAILS X
WWSP PIPE STANDARD DETAILS XI
WWSP PIPE STANDARD DETAILS XII
WWSP PIPE STANDARD DETAILS XIII
WWSP PIPE STANDARD DETAILS XIV
WWSP PIPE STANDARD DETAILS XV
WWSP PIPE STANDARD DETAILS XVI
WWSP PIPE STANDARD DETAILS XVII
WWSP PIPE STANDARD DETAILS XVIII
WWSP PIPE STANDARD DETAILS XIX
WWSP PIPE STANDARD DETAILS XX
TVWD STANDARD DETAILS I
TVWD STANDARD DETAILS II
TVWD STANDARD DETAILS III
TVWD STANDARD DETAILS IV
TVWD STANDARD DETAILS V
TVWD STANDARD DETAILS VI
SD-01
SD-02
SD-03
SD-04
SD-05
SD-06
SD-07
SD-08
SD-09
SD-10
SD-11
SD-12
SD-13
SD-14
SD-15
SD-16
SD-17
SD-18
SD-19
SD-20
TD-01
TD-02
TD-03
TD-04
TD-05
TD-06
COVER SHEET
SHEET INDEX
GENERAL LEGEND
GENERAL ABBREVIATIONS
NOTES
KEY MAP
PLAN AND PROFILE 42" STEEL WATER LINE STA: 10+00 TO 13+50
PLAN AND PROFILE 42" STEEL WATER LINE STA: 13+50 TO 17+00
PLAN AND PROFILE 42" STEEL WATER LINE STA: 17+00 TO 21+00
PLAN AND PROFILE 12" DI WATER LINE STA: 50+00 TO 52+50
PLAN AND PROFILE 12" DI WATER LINE STA: 52+50 TO 56+00
PLAN AND PROFILE 12" DI WATER LINE STA: 56+00 TO 59+00
PLAN AND PROFILE 8" DI WATER LINE STA: 99+00 TO 102+00
TVWD DISTRIBUTION PIPELINE DETAILS I
TVWD DISTRIBUTION PIPELINE DETAILS II
TVWD DISTRIBUTION PIPELINE DETAILS III
TVWD DISTRIBUTION PIPELINE DETAILS IV
TVWD DISTRIBUTION PIPELINE DETAILS V
TVWD DISTRIBUTION PIPELINE DETAILS VI
TVWD DISTRIBUTION PIPELINE DETAILS VII
EAST AND WEST 48" CONNECTION ENLARGEMENTS
12" AND 8" CONNECTION ENLARGEMENTS
CATHODIC PROTECTION TABLE AND NOTES
CATHODIC PROTECTION DETAILS I
CATHODIC PROTECTION DETAILS II
CATHODIC PROTECTION DETAILS III
CATHODIC PROTECTION DETAILS IV
CATHODIC PROTECTION DETAILS V
PIPELINE DETAILS
TVWD STANDARD DETAILS
CATHODIC PROTECTION
SPECIAL PLANS
TDTVWD STANDARD DETAILS
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
M
A
Y
2 , R
A
N
D
W
I
L
L
I
M
H
R
R
I
N
G
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
91203PE
EXPIRES:
SHEET INDEX
02 - G-02
No Scale
G-02
Randy William Harrington (Nov 3, 2020 20:54 PST) Randy William Harrington
SHEET IDENTIFICATION AND PLAN CALLOUTS
MATERIALS LEGEND
PROPOSED WATER LEGEND
SECTION (LETTER) OR
DETAIL (NUMERAL)
DESIGNATION
DRAWING NUMBER
(REPLACE WITH A LINE
IF TAKEN AND SHOWN
ON SAME DRAWING)
POTHOLE
PH_STL-1
SURFACE MONITORING POINT
10+00
FDN-XXX
OR TC-XXX
OR PL-XXX
OR PDN-XXX
BORE HOLE LOCATION
WITH NUMBER
COMBINATION AIR
RELEASE VALVE (PLAN)
BLOW OFF ASSEMBLY (PLAN)
TEMPORARY BLOWOFF
ACCESS MANWAY
EXISTING PIPE
NEW PIPE
WELDED JOINT
GROOVED END JOINT
FLANGED JOINT
FLEXIBLE COUPLING
ELBOW UP
TEE UP
LATERAL UP
LATERAL DOWN
CONCENTRIC REDUCER
ECCENTRIC REDUCER
UNION
ELBOW DOWN
TEE DOWN
BALL JOINT
MECHANICAL JOINT
CAP
HUB & SPIGOT JOINT
(RUBBER GASKET)
BELL & SPIGOT JOINT
ELBOW, 90 DEGREE
CROSS
TEE
ELBOW, 45 DEGREE
LATERAL
NOTES:
1.
2.
3.
ANCHOR
GATE
BUTTERFLY
GLOBE
BALL
SEAT PORT
ECCENTRIC PLUG
PLUG OR COCK
SWING CHECK
BALL CHECK
EXISTING PIPE
TO BE ABANDONED
EXISTING PIPE
TO BE REMOVED
GROOVED END
ADAPTER FLANGE
FLEXIBLE COUPLING
WITH THRUST TIES
ELASTOMER BELLOWS
EXP JOINT
STEEL BELLOWS
EXP JOINT
FLANGED COUPLING
ADAPTER
FLANGED COUPLING
ADAPTER W/ THRUST TIES
ONLY FLANGED END CONNECTIONS ARE SHOWN HERE
FOR DOUBLE LINE FITTINGS. FITTINGS WITH OTHER END
PATTERNS ARE SHOWN SIMILARLY ON THE CONSTRUCTION
DRAWINGS. ALSO SEE PIPING SPECIFICATIONS.
SYMBOLS SHOWN HERE FOR SINGLE LINE FITTINGS ARE
GENERIC ONLY. REFER TO PIPING SPECIFICATIONS FOR
SPECIFIC END CONNECTIONS FOR SINGLE LINE PIPE AND
FITTINGS.
EXISTING PIPE AND EQUIPMENT IS SHOWN LIGHT-LINED
AND/OR SCREENED AND IS NOTED AS EXISTING. NEW
PIPING AND EQUIPMENT IS SHOWN HEAVY-LINED.
DIAPHRAGM
PRESSURE
CONTROL
CARV
PIPE AND FITTING SYMBOLS
DOUBLE LINE SINGLE LINE
VALVE SYMBOLS
0 20 40
SCALE IN FEET
SCALE IN FEET
VERT
HORZ 20 40
5 10
NATURAL GAS LINE
HIGH PRESSURE GAS LINE
LIQUID PETROLEUM GAS LINE
WATER
POTABLE WATER
FIRE SUPPLY WATER LINE
RECLAIMED WATER
UTILITY / NON-POTABLE WATER
IRRIGATION LINE
STORM DRAIN
SANITARY SEWER
STEAM LINE
TELEPHONE
COMMUNICATIONS LINE
FIBER OPTIC CABLE
CABLE TV
POWER
UNIDENTIFIED
ABANDONED UTILITY
OVERHEAD POWER/UTILITY
G
HPG
LPG
W
PW
FIRE
REW
UW
IRRG
SDR
SS
STM
TEL
COMM
FOC
CATV
E
UNID
ABND
OW
1 TITLE
PP-2
R/W
TEMP ESMT
ESMT
RIGHT OF WAY
PROPERTY LINE
SECTION LINE
TEMPORARY EASEMENT
PERMANENT EASEMENT
FENCE LINE
FLOOD PLAIN LINE
PUBLIC UTILITY EASEMENT
CONTOUR
PROPOSED PIPE SINGLE LINE
10+00
PROPOSED PIPE DOUBLE LINE
SCALE -PLAN VIEW
SCALE PLAN AND PROFILE
WM
WATER LEVEL
FIRE HYDRANT
WATER METER
WATER VALVE
DOUBLE CHECK VALVE ASSEMBLY
EXISTING GROUND
HISTORIC BORE HOLE
LOCATION
TRENCH FOUNDATION
CLSM BACKFILL
STEEL
WELD
PIPE COATING
SAND
CRUSHED ROCK
MECHANICAL SEAL
ASPHALT
PIPE LINING
CP TEST STATION
MARKER POST
LOCATE STATION
LINE TYPES
EXISTING UTILITY ABBREVIATIONS
PROPOSED ALIGNMENT TYPE
NORTH ARROW
** SEE ROADWAY DESIGN DRAWINGS FOR EXISTING CIVIL LEGEND TO INCLUDE STRUCTURES AND UTILITIES
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
M
R
A
N
L
L
I
R
R
I
N
G
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
91203PE
EXPIRES:
GENERAL LEGEND
03 - G-03
No Scale
G-03
Randy William Harrington (Nov 3, 2020 20:54 PST)
FDN FOUNDATION
FE FLANGED END, FIELD EXPLORATION
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FIMS FACILITIES INFORMATION MAPPING
SYSTEM
FL FLOW LINE
FLEX FLEXIBLE
FLG FLANGE, FLANGED
FM FLOW METER, SANITARY SEWER
FORCED MAIN
FND FOUND
FO FIBER OPTIC
FOT FLAT ON TOP
FPS FEET PER SECOND
FPT FEMALE PIPE THREAD
FRP FIBERGLASS REINFORCED PLASTIC
FT FEET
FTG FOOTING
FUT FUTURE
FW FINISHED WATER LINE
FWPS FINISHED WATER LINE PUMP STATION
G GAS MAIN, GENERAL
GA GAGE
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GND, GRND GROUND
GPS GLOBAL POSITIONING SYSTEM
GS GAS SERVICE LINE
GSP GALVANIZED STEEL PIPE
GV GATE VALVE
GVL GRAVEL
HBP HOT BITUMINOUS PAVING
HCL HORIZONTAL CONTROL LINE
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDW HARDWARE GROUP
HERCP HORIZONTAL ELLIPTICAL REINFORCED
CONCRETE PIPE
HG HYDRAULIC GRADIENT
HGL HYDRAULIC GRADE LINE
HGT HEIGHT
HH HANDHOLE
HI HIGH
HMAC HOT MIXED ASPHALT-CEMENT
HOR; HORIZ HORIZONTAL
HP HIGH POINT, HIGH PRESSURE
HPG HIGH PRESSURE GAS
HPI HORIZONTAL POINT OF INTERSECTION
HW HARDWARE
HWY HIGHWAY
HYDID HYDRANT INSIDE DIAMETER
ID INSIDE DIAMETER
IE, INV INVERT ELEVATION
IF INSULATING FLANGE
IN INCH
IP IRON PIPE
IRR IRRIGATION
IV, IVV ISOLATION VALVE VAULT
I&C INSTRUMENTATION AND CONTROLS
JT JOINT
K VERTICAL CURVE PARAMETER DEFINED
BY THE HORIZONTAL DISTANCE
REQUIRED TO ACHIEVE A 1% CHANGE IN
THE SLOPE OF THE VERTICAL CURVE
KV KILOVOLT
L LEFT, ANGLE, LENGTH
LAT'L LATERAL
LB LIGHT BOX
LBS POUNDS
LAV; L LAVATORY
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALIGN ALIGNMENT
ALT ALTERNATIVE; ALTERNATE
ALUM, AL ALUMINUM
AMT AMOUNT
ANSI AMERICAN NATIONAL STANDARD
INSTITUTE
APPROX APPROXIMATELY
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY OF TESTING AND
MATERIALS
AR AIR RELEASE
ASWG, AWG AMERICAN (STEEL) WIRE GAUGE
@ AT
ATSR ALTERNATIVE TERMINAL STORAGE
RESERVOIR
AUTH AUTHORIZE
AUTO AUTOMATIC
AVRV AIR VACUUM RELEASE VALVE
AVE AVENUE
AV AIR VACUUM
AVG AVERAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS
ASSOCIATION
BC BEGINNING OF CURVE
BCR BEGIN CURVE RETURN
BETW BETWEEN
BF BLIND FLANGE
BFV BUTTERFLY VALVE
BH BORE HOLE
BITUM BITUMINOUS
BK BACK
BLDG BUILDING
BLVD, BD BOULEVARD
BM BENCH MARK, BEAM
BMPS BEST MANAGEMENT PRACTICES
BMW BURIED MANWAY
BO BLOW OFF
BOC BACK OF CURB
BOT BOTTOM
BOV BLOW OFF VALVE
BP BLOWOFF PLANS
BPA BONNEVILLE POWER ADMINISTRATION
BRG BEARING
BTM BOTTOM
BTW BETWEEN
BV BALL VALVE
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
BW BOTH WAYS
℄ CENTER LINE
C&G CURB AND GUTTER
CATH CATHODIC
CARV, CAV COMBINATION AIR RELEASE VALVE
CB CATCH BASIN
CC CENTER TO CENTER
CCP CONCRETE CYLINDER PIPE
CDF CONTROLLED DENSITY FILL
CE CONCRETE ENCASEMENT
CEM CEMENT
CEN CENTER OF CURVE
CESMT CONSTRUCTION EASEMENT
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CL CENTERLINE
CLASS CLASSIFICATION
CLR CLEAR
CLSM CONTROLLED LOW STRENGTH
MATERIAL
CMC CEMENT MORTAR COATING
CML, CML&C CEMENT MORTAR LINED (AND COATED)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
C/O CARE OF
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCT
CONT CONTINUED/CONTINUATION
COORD COORDINATE
CORP CORPORATION
CPEP CORRUGATED POLYETHYLENE PIPE
CPI COMBINED POINT OF INTERSECTION
CPLG COUPLING
CPP CORRUGATED PLASTIC PIPE
CR COUNTRY ROAD
CSG CASING
CT COUNT
CTB CONCRETE TREATED BASE
CTR CENTER
CTRD CENTERED
CU CUBIC
CULV CULVERT
CV CHECK VALVE
CY CUBIC YARD
D STORM DRAIN, DIAMETER, DETAIL
DB/WB DRY BULB/ WET BULB
DC DEDICATED CORRIDOR, DRAINAGE
CROSSING
DET DETAIL
DEQ DEPARTMENT OF ENVIRONMENTAL
QUALITY
DIA, Ø DIAMETER
DI DUCTILE IRON
DIAG DIAGONAL
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DN DOWN
DR DRAIN
D/W, DW DRIVEWAY
DWG DRAWING
E EAST, EASTING, ELECTRIC
EA EACH
EB EAST BOUND
EC, ECR END OF CURVE (RETURN)
ECC ECCENTRIC
EF EXHAUST FAN
EL, ELEV ELEVATION
ELB, ELL ELBOW
EMBD EMBEDDED
ENGR ENGINEER
EOP EDGE OF PAVEMENT
EPS EXPANDED POLYSTYRENE
EQ EQUAL, EQUATION
EQPT EQUIPMENT
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EW EACH WAY
EWEF EACH WAY EACH FACE
EXST, EX, EXTG EXISTING
EXC EXCAVATE
EXP EXPANSION, EXPOSED
EY EXPRESSWAY
FB FLAT BAR
FBO FURNISHED BY OTHERS
FC FLEXIBLE COUPLING
FCA FLANGED/FLEXIBLE COUPLING
ADAPTER
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
LF LINEAR FEET
LG LENGTH
LLV LONG LEG VERTICAL
LP LOW POINT
L-R LEFT TO RIGHT
LT LEFT
LVC LENGTH OF VERTICAL CURVE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBH THOUSANDS OF BRITISH THERMAL
UNITS PER HOUR
MD MOTORIZED DAMPER
MGD MILLION GALLONS PER DAY
MFR MANUFACTURER
MH MANHOLE
MILS MILI-INCH (ONE THOUSANDTH OF
AN INCH)
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MLPCSP MORTAR LINED POLYURETHANE
COATED STEEL PIPE
MON MONITORING
MTP MAIN TRANSMISSION PIPELINE
MTR METER
MUTCD MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
MW MANWAY
N NORTH
NA NOT APPLICABLE
NACE NATIONAL ASSOCIATION OF
CORROSION ENGINEERS
NAD NORTH AMERICAN DATUM
NB NORTHBOUND
NEPA NATIONAL ENVIRONMENTAL
POLICY ACT
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NGS NATIONAL GEODETIC SURVEY
NGVD NATIONAL GEODETIC VERTICAL DATUM
NIC NOT IN CONTRACT
NO, # NUMBER, NUMBERING
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NRS NON-RISING STEM
NTS NOT TO SCALE
O&M OPERATIONS AND MAINTENANCE
OA ODOROUS AIR
OAVA ODOR AND AIR VALVE ASSEMBLY
OC ON CENTER
OD OUTSIDE DIAMETER
ODOT OREGON DEPARTMENT OF
TRANSPORTATION
OE, OHE OVERHEAD ELECTRIC
OF OVERFLOW PIPE
OG ORIGINAL GROUND
OH OVERHEAD
OHWM ORDINARY HIGH WATER MARK
OPNG OPENING
ORIG ORIGINAL
OSSC OREGON STRUCTURAL SPECIALTY
CODE
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PC POINT OF CURVE
PCC POINT OF COMPOUND CURVE
PCCP PRESTRESSED CONCRETE CYLINDER
PIPE
PDG PIPELINE DESIGN GUIDELINE
PDN PRELIMINARY DESIGN NORTH
PE, P/E PERMANENT EASEMENT,
POLYETHYLENE
PERM PERMANENT
PG PRESSURE GAGE
PGE PORTLAND GENERAL ELECTRIC
PH POTHOLE LOCATION
PI POINT OF INTERSECTION
PL PLATE, PROPERTY LINE
P/L PROPERTY LINE
PM POWER METER
PMP PUMP
PNL PANEL
POB POINT OF BEGINNING
POC POINT OF CONNECTION, POINT ON
CURVE
POE POINT OF END
PP POWER POLE, PLAN AND PROFILE
PRC POINT OF REVERSE CURVE
PREFAB PREFABRICATED
PROP PROPOSED
PRV PRESSURE REDUCING VALVE
PS PIPE SUPPORT, PUMPING STATION
PSF POUND PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUND PER SQUARE INCH GAGE
PT POINT OF TANGENCY
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
(USED INTERCHANGEABLY WITH VPI)
PVMT PAVEMENT
R RIGHT
R, RAD RADIUS
R&R REMOVE AND REPLACE PER EXISTING
R/W RIGHT OF WAY
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RCPA REINFORCED CONCRETE PIPE ARCH
RD ROAD, RECORD DRAWING
RDCR REDUCER
REINF REINFORCE
REM REMOVED
REQ'D REQUIRED
RED REDUCING, REDUCER
REF REFERENCE
RH RODHOLE
RJ RESTRAINED JOINT
RLA RUNNING LOAD AMPS
RP RADIUM POINT
RR RAILROAD
RT RIGHT
R/W, ROW RIGHT-OF-WAY
RW RAW WATER
S SOUTH
SAN SANITARY SEWER MAIN
SB SOUTH BOUND
SCFM STANDARD CUBIC FEET PER MINUTE
SCH SCHEDULE
SCP STEEL CASING PIPE
SD STORM DRAIN, STANDARD DETAIL
SDR SPECIFIC DIAMETER RATIO
SE SEWAGE EFFLUENT
SEC SECTION
SERV SERVICE
SF SQUARE FEET, SHEATH FOOTAGE
SHLD SHOULDER
SHTS SHEETS
SIG SIGNAL
SIM SIMILAR
SLG SLIDE GATE
SLP SLOPE
SLV SLEEVE
SMS SHEET METAL SCREW
SPEC SPECIFICATION
SQ SQUARE
SS SANITARY SEWER
SSD STOPPING SIGHT DISTANCE
SSFM SANITARY SEWER FORCE MAIN
SSMH SANITARY SEWER MANHOLE
SST, SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STM STORM
STRUCT STRUCTURE
SUB ELECTRICAL SUB STATION
SWMP STORM WATER MANAGEMENT PLAN
SYMM SYMMETRICAL
T TANGENT, TELEPHONE, UNDERGROUND
TELEPHONE
T&B TOP AND BOTTOM
t THICKNESS
TBM TEMPORARY BENCHMARK
TC TOP OF CURB
TCE TEMPORARY CONSTRUCTION
EASEMENT
TEL TELEPHONE
TF TRENCH FOOTAGE
TEMP TEMPORARY
TOC TOP OF CONCRETE
TOP TOP OF PIPE
TOPO TOPOGRAPHY
TP TEST PIT
TP/DT TEMPORARY PROTECTION/DIRCETION
OF TRAFFIC
TRANS TRANSITION
TS TEST STATION
TV TELEVISION
TVWD TUALATIN VALLEY WATER DISTRICT
TYP TYPICAL
TSS TEMPORARY SIGN SUPPORT
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UGT UNDERGROUND TELEPHONE
UGTV UNDERGROUND TV CABLE
UNO UNLESS NOTED OTHERWISE
UPRR UNION PACIFIC RAILROAD
US UNITED STATES
USCGS UNITED STATES COAST AND GEODETIC
SURVEY
USGS UNITED STATES GEOLOGICAL SURVEY
UT ULTRASONIC TESTING
V VALVE
VB VAPOR BARRIER
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
VIF VERIFY LOCATION AND/OR FEATURES
IN FIELD PRIOR TO CONDUCTING
POTENTIALLY IMPACTED
CONSTRUCTION ACTIVITY
VPI VERTICAL POINT OF INTERSECTION
(USED INTERCHANGEABLY WITH PVI)
V V VACUUM VALVE
W/ WITH
W WATER, WEST
WG WATER GAUGE
WL WORK LIMIT
WM(S) WATER METER(S)
WS WATER SURFACE, WATER STOP,
WATER SERVICE
WSP WELDED STEEL PIPE
W/O WITHOUT
WTP WATER TREATMENT PLANT
WWSP WILLAMETTE WATER SUPPLY PROGRAM
Δ DELTA
NOTES:
1. NOT ALL ABBREVIATIONS MAY BE IN USE.
ABBREVIATIONS
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
M
R
A
N
L
L
I
R
R
I
N
G
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
91203PE
EXPIRES:
GENERAL ABBREVIATIONS
04 - G-04
No Scale
G-04
Randy William Harrington (Nov 3, 2020 20:54 PST)
1. PROJECT SAFETY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. PRIOR TO BEGINNING WORK ON THE PROJECT, THE CONTRACTOR MUST ASSESS POTENTIAL
HAZARDS THAT WILL BE ENCOUNTERED WHILE PERFORMING THE CONTRACTED WORK AND DEVELOP A SITE SPECIFIC SAFETY PLAN (SSSP). THE PLAN MUST INCLUDE
THE PROCEDURES AND METHODS FOR ELIMINATING OR CONTROLLING THE PROJECT-SPECIFIC SAFETY HAZARDS IDENTIFIED. THIS DOES NOT HAVE TO BE A WRITTEN
PLAN. HOWEVER, THE CONTRACTOR MUST BE ABLE TO ARTICULATE THE SSSP TO THE INSPECTOR DURING THE PRE-CONSTRUCTION MEETING.
2. CONTRACTOR SHALL INFORM THE INSPECTOR OF THE SPECIFIC REQUIREMENTS OF CONTRACTOR’S SSSP THAT THE INSPECTOR AND OTHER DISTRICT
REPRESENTATIVES MUST COMPLY WITH WHILE AT THE SITE.
3. CONTRACTOR IS RESPONSIBLE FOR AND SHALL CONDUCT THEIR OPERATIONS IN A MANNER ENSURING SAFE WORKING CONDITIONS AT ALL TIMES FOR ALL
EMPLOYEES, PUBLIC, AND ALL OTHERS WHO MAY COME IN CONTACT WITH, OR MAY BE EXPOSED TO, ANY OPERATIONS RELATED TO THE PROJECT. COMPLIANCE WITH
THE REQUIREMENTS OF THESE PROVISIONS WILL NOT RELIEVE THE CONTRACTOR OF THE OBLIGATIONS ASSUMED BY THE CONTRACTOR AS REQUIRED BY LAW.
4. CONTRACTORS SHALL ABIDE BY ALL OREGON OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION AND OTHER APPLICABLE SAFETY REGULATIONS. CONTRACTOR
SHALL COMPLY WITH CONTRACTOR’S SSSP FOR THE HEALTH AND SAFETY OF PERSONS AND PROPERTY IN THE VICINITY OF THE WORK AREA. NONCOMPLIANCE BY
CONTRACTOR OR ITS EMPLOYEES WITH THE SSSP OR REGULATORY REQUIREMENTS IS GROUNDS FOR A STOP WORK ORDER. CONTRACTOR BEARS SOLE
RESPONSIBILITY FOR PENALTIES IMPOSED FOR NONCOMPLIANCE.
5. CONTRACTORS SHALL PROVIDE AND MAINTAIN SANITARY FACILITIES FOR EMPLOYEES IN ACCORDANCE WITH APPLICABLE REGULATIONS. CONTRACTOR SHALL ENSURE
ALL WORK SITES AND AREAS ARE MAINTAINED FREE OF RECOGNIZED HAZARDS AND IN A SANITARY AND ORGANIZED STATE.
6. THE CONTRACTOR SHALL CLEAN ALL SPILLED DIRT, GRAVEL, OR OTHER FOREIGN MATERIAL CAUSED BY CONSTRUCTION OPERATIONS FROM ALL STREETS AND
WALKWAYS AT THE END OF EACH DAY’S OPERATION AND SHALL ADHERE TO ALL APPLICABLE EROSION CONTROL REQUIREMENTS.
7. CONTRACTORS SHALL FOLLOW OREGON SAFE DIG LAWS AND STANDARDS (OAR 952-001).
8. CONTRACTOR SHALL ENSURE THAT WORKERS ARRIVE AT THE JOBSITE FIT FOR DUTY, WHICH INCLUDES BEING PHYSICALLY ABLE TO WORK, RESTED, AND NOT UNDER
THE INFLUENCE OF ALCOHOL OR DRUGS.
9. ALL SAFETY-RELATED EQUIPMENT INSTALLED FOR USE BY THE CONTRACTOR SHALL BE MADE AVAILABLE TO THE INSPECTOR FOR COMPLETION OF REQUIRED DUTIES
(E.G., INSPECTIONS, TESTING, OBSERVATIONS). THIS INCLUDES BUT IS NOT LIMITED TO, SANITATION FACILITIES, ACCESS AND EGRESS POINTS, ANCHORAGES, GUARDRAIL SYSTEMS, SCAFFOLDS, VENTILATION, RESCUE SYSTEMS, SHADE SYSTEMS, PARKING, ELECTRICAL FACILITIES, AND ARTIFICIAL LIGHTING.
1. THE CONTRACTOR OR DEVELOPER SHALL OBTAIN THE APPROPRIATE UTILITY PERMIT(S) FROM THE CITY, STATE, OR COUNTY WITH JURISDICTION FOR THE STREETS OR ROADS
WITHIN THE PROJECT WORK AREA PRIOR TO CONSTRUCTION OF SYSTEM IMPROVEMENTS.
2. CONTRACTORS SHALL COMPLY WITH ALL RULES AND REGULATIONS OF THE APPLICABLE CITY, STATE, AND COUNTY AUTHORITIES REGARDING THE CLOSING OF PUBLIC STREETS
OR HIGHWAYS TO USE OF PUBLIC TRAFFIC. NO ROAD SHALL BE CLOSED TO THE PUBLIC, EXCEPT BY EXPRESS PERMISSION OF THE AFFECTED REGULATING AUTHORITY.
3. REFER TO THE ROADWAY DESIGN PLANS AND SPECIFICATIONS FOR CONSTRUCTION PHASING GUIDANCE, AS WELL AS TRAFFIC CONTROL PLANS.
A. SAFETY AND WORKSITE CONDITIONS
B. PERMITS AND ROAD CLOSURES
1. OPERATION OF VALVES IN THE DISTRICT’S WATER SYSTEM BY ANYONE OTHER THAN DISTRICT EMPLOYEES IS STRICTLY PROHIBITED. CONTRACTORS SHALL NOT
OPEN OR CLOSE VALVES, OR TAKE ANY OTHER ACTION THAT MAY AFFECT THE OPERATION OF THE EXISTING WATER SYSTEM, EXCEPT AS SPECIFICALLY
REQUIRED BY THE PLANS AND SPECIFICATIONS, AND ONLY WITH PRIOR APPROVAL BY THE DISTRICT.
2. THE CONTRACTOR SHALL NOTIFY THE DISTRICT AT LEAST 48 HOURS IN ADVANCE OF NEEDED VALVE OPERATION.
C. VALVE OPERATION PROHIBITED
1. IN THE EVENT OF ACCIDENTAL INTERRUPTION OF DOMESTIC WATER SERVICE, THE RESPONSIBLE PARTY SHALL IMMEDIATELY NOTIFY THE INSPECTOR OR DISTRICT AT
503-848-3000. THE RESPONSIBLE PARTY SHALL ARRANGE FOR RESTORATION OF SERVICE AS PROMPTLY AS POSSIBLE AND BEAR ALL COSTS OF REPAIR. IN NO CASE SHALL
INTERRUPTION OF ANY WATER SERVICE BE ALLOWED OUTSIDE OF WORKING HOURS, UNLESS PRIOR APPROVAL IS GRANTED BY THE DISTRICT.
2. THE CONTRACTOR SHALL PROVIDE A WRITTEN SHUTDOWN AND SWITCHOVER PLAN FOR AGENCY REVIEW A MINIMUM OF EIGHT (8) WEEKS PRIOR TO ANY PLANNED SHUTDOWN
OR INTERRUPTION OF UTILITY SERVICE. THE SHUTDOWN PLAN SHALL PROVIDE DETAILS OF THE SEQUENCE, TIMING, DURATION, AND WORK ACTIVITIES PLANNED DURING THE
SHUTDOWN PERIOD. THE PLAN SHALL INCLUDE A DEWATERING PLAN FOR THE EXISTING PIPE AND TRENCH. NO WATER FROM THE DITCH SHALL BE ALLOWED TO ENTER THE
PIPE. THE DISTRICT ENGINEER SHALL HAVE SOLE DISCRETION FOR APPROVAL OF THE SHUTDOWN PLAN.
3. PLANNED WATERLINE SHUTDOWNS SHALL BE LIMITED TO A MAXIMUM DURATION OF FOUR (4) HOURS WHEN THERE IS A CUSTOMER OUTAGE, AND SHALL ONLY OCCUR BETWEEN
TUESDAY AND THURSDAY. SHUTDOWNS ON FEDERAL HOLIDAYS WILL NOT BE APPROVED. SHUTDOWN OF THE EXISTING 48" CCP WATER MAIN MAY ONLY OCCUR BETWEEN
OCTOBER AND APRIL. THE TOTAL DURATION OF THE SHUTDOWN SHALL BE A MAXIMUM OF THREE (3) WEEKS WHICH INCLUDES TIME NECESSARY FOR ISOLATION, DRAINING, CONSTRUCTION OF CONNECTIONS, CLEANING, TESTING, FILLING, AND GOING LIVE. THE CONTRACTOR SHOULD EXPECT THAT THE TIME NEEDED FOR ISOLATION, DRAINING, CUTTING AND REMOVAL, FILLING, AND GOING LIVE WILL TOTAL APPROXIMATELY (1) WEEK, ALLOWING TWO (2) WEEKS FOR CONSTRUCTION OF CONNECTIONS, CLEANING, AND
TESTING.
D. INTERRUPTION OF UTILITY SERVICE
1. THE DISTRICT SHALL BE NOTIFIED IMMEDIATELY IF ANY PART OF THE WATER SYSTEM IS DAMAGED IN ANY WAY.
2. REPAIR OF ANY DAMAGE TO THE DISTRICT'S FACILITIES CAUSED BY A CONTRACTOR SHALL BE MADE TO THE DISTRICT’S STANDARDS AT THE CONTRACTOR'S
EXPENSE. THE DISTRICT, AT ITS OPTION, MAY MAKE THE REPAIRS AND BILL THE CONTRACTOR ON A TIME AND MATERIALS BASIS.
E. DAMAGE TO WATER SYSTEM DURING CONSTRUCTION
1. ALL DUCTILE IRON PIPE (DIP), AT A MINIMUM, SHALL BE THICKNESS CL 52, ZINC COATED, AND POLYETHYLENE WRAPPED AS PER THE SPECIFICATIONS. ALL
PIPE JOINTS SHALL BE RESTRAINED AS PER APPROVED METHODS AND MATERIALS STATED IN THE SPECIFICATIONS. WITH THE EXCEPTION OF JOINTS
CALLED OUT SPECIFICALLY AS MECHANICAL OR FLANGED, DIP JOINTS SHALL BE TR FLEX OR FLEX RING, OR AN APPROVED EQUAL. JOINT BONDING PER
DETAIL 1/CP-06 IS REQUIRED FOR ALL DIP AND FITTINGS FOR PIPELINES AND BRANCHES THAT ARE CONNECTED TO THE 42" STEEL PIPELINE, BUT IS NOT
REQUIRED FOR THE DIP DISTRIBUTION PIPELINE (8" AND 12" LINES) INDEPENDENT FROM THE 42" STEEL PIPELINE.
2. DEFLECT DIP PIPE JOINTS AS REQUIRED, PER THE SPECIFICATIONS, TO MEET HORIZONTAL AND VERTICAL INFLECTIONS SHOWN ON THE PLAN AND
PROFILE.
3. REFER TO ROADWAY DESIGN PLANS FOR SURVEY INFORMATION AND PROJECT CONTROLS.
4. PROVIDE OWNER WITH GPS COORDINATE OF EACH WATER TRANSMISSION LINE JOINT (TOP OF PIPE) AND APPURTENANCES, INCLUDING ALL BURIED
MANWAYS, BLOWOFFS, AND AIR VALVES. INCLUDE DEPTH TO TOP OF PIPE AT EACH LOCATION.
5. ALL WATER TRANSMISSION LINE CONSTRUCTION WORK SHALL BE STAKED BASED ON THE SURVEY CONTROL POINTS DEFINED ON THE PLANS.
6. EXISTING UTILITIES ARE SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. DEPTHS SHOWN ARE AN ASSUMED DEPTH AND HORIZONTAL
LOCATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY DEPTH AND LOCATION IN THE FIELD. THE PLANS MAY NOT SHOW ALL EXISTING
UNDERGROUND UTILITIES. IF SIZE IS NOT SHOWN, IT IS UNKNOWN.
7. PRIOR TO CONSTRUCTION LOCATE ALL UTILITIES ALONG THE WATER TRANSMISSION LINE AND WITHIN THE CONSTRUCTION LIMITS BY CALLING THE
OREGON UTILITY NOTIFICATION CENTER AT 811 OR 1-800-332-2344. SERVICE CONTACT SHALL BE MADE A MINIMUM OF 2 BUSINESS DAYS IN ADVANCE OF
ANY WORK. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE MARKINGS. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES
ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN
COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE ADMINISTRATIVE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS
(503) 232-1987).
8. LOCATE AND POTHOLE ALL EXISTING UTILITIES THAT WILL BE CROSSED, OR WITH POTENTIAL TO BE DISTURBED BY TRENCHING OR CONSTRUCTION
ACTIVITY (I.E. PARALLEL UTILITIES). POTHOLING SHALL OCCUR PRIOR TO ORDERING THE PIPE FROM THE SUPPLIER OR MANUFACTURER.
9. CONTACT THE UTILITIES TO COORDINATE CONSTRUCTION ACTIVITY AND PROTECTION OF EXISTING UTILITIES.
10. THE CONTRACTOR SHALL FOLLOW ALL STATE SURVEY LAWS IF PROPERTY CORNERS, RIGHT-OF WAY MARKERS OR SURVEY MONUMENTS WILL BE
DISTURBED.
11. ALL CONFINED SPACE ENTRY WORK SHALL COMPLY WITH STATE AND FEDERAL OSHA REQUIREMENTS.
12. OBTAIN RIGHTS OF ENTRY FROM PRIVATE PROPERTY OWNERS PRIOR TO ENTERING PRIVATE PROPERTY. PROVIDE RIGHTS OF ENTRY AGREEMENTS TO
DISTRICT AND OWNER.
13. IF THERE IS A CONFLICT WITH AN EXISTING UTILITY, CONTACT OWNER'S REPRESENTATIVE AND SUBMIT PLAN FOR ADJUSTMENT.
14. DURING 42-INCH WATER TRANSMISSION LINE CONSTRUCTION PROTECT WATER TRANSMISSION LINE FROM CONSTRUCTION LOADS UNTIL THERE IS A
MINIMUM 4 FT OF COVER. 4 FT OF COVER IS ALSO REQUIRED TO PREVENT FLOTATION IN THE PRESENCE OF WATER, OR WHEN PLACED IN CLSM.
15. NOMINAL PIPE DIAMETER (NOM ID) SHALL MEAN THE APPROXIMATE INSIDE DIAMETER OF THE CEMENT MORTAR LINING.
GENERAL NOTES:CONSTRUCTION NOTES:
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
NOTES
05 - G-05
No Scale
G-05
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G
P
X
X
T
S
D
S F
D
G
P
G
P
T
P
S
T
P
G P
G P
G
P
G
P
GP
G P
S
E
S
J
T
P
D
F
T
T
P
S
G
P
G
P
C
O
T
P
T
P
G
V
S
S
G
V
S
S
S
T P
D
T
S
S
D
S
G
V
G
V
S
T
T
S
S S
C
C
G
P
S
S
C
S
G
P
G
P
S
S
C
S S
C
G
P
G
P
S S
C
G
P
G
P
S
G
P
G
P
G
P
G
P
G
P
G
P
S
S
S
S
S
PSUE
TCE
C
C
C
C
C
PUE
PUE PUE
TCE
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
P
S
E
C
C
C
C
C
C
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
S
S
S
S
KEY MAP
06 - C-01
No Scale
C-01
1 PLAN
0 80 160
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
SHEET C-02 (42" STEEL STA 9+88.23 TO 13+50)
SHEET C-05 (12" DI STA 49+88.34 TO 52+50)
SHEET C-03 (42" STEEL STA 13+50 TO 17+00)
SHEET C-06 (12" DI STA 52+50 TO 56+00)
SHEET C-04 (42" STEEL STA 17+00 TO 20+95.52)
SHEET C-07 (12" DI STA 56+00 TO 58+33.70
SHEET C-08 (8" DI STA 99+30.63 TO 101+99.60)
STA 9+88.23
BEGIN 42" WATER
TRANSMISSION LINE
S
U
R
R
B
V
D
SW WALKER RD
C
E
D
R
C
E
E
K
STA 20+95.52
END 42" WATER
TRANSMISSION LINE
STA 49+88.34
BEGIN 12"
WATER LINE
STA 58+33.70
END 12"
WATER LINE
N
J
O
H
N
S
E
E
K
F
S
T
STA 101+99.60
END 8"
WATER LINE
STA 99+30.63
BEGIN 8"
WATER LINE
S
V
O
N
S H
I R
E
D
R
T
H
A
V
SW DERBY ST
R
R
V
D
SW WALKER RD
NIKE INC.
N JOHNSON CREEK
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
0.10%
-0.85%
-0.85%
P R
P
S
T O
R M
S T
A
E L
S
W
E R
S T
A
E L
-0.85%
G
N A
L
S T
A
G
N A
L
S T
A
R
P
G E
S T
A
F O
F
T R
S T
A
F O
S
A Y
O
S T
A
G
S
S T
A
W
A T
E R
S T
A
R
P
G E
S T
A
P R
S
T O
R M
S T
A
E L
B
L E
S T
A
L E
P H
O N
E
S T
A
R
P
G E
S T
A
R
P
G E
S T
A
B
L E
S T
A
M
I N
B E
G
W
A T
E R
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
P R
O
S
I N
S T
A
E L
B L O
W O
P
E
I
S T
A
A C
C E
Y
S T
A
FLEXIBLE PIPE TRENCH SECTION - TYPE I (GRANULAR)
42" NOM ID WATER TRANSMISSION LINE, MLPCSP, T=0.3125", DOUBLE WELDED LAP JOINT
X
X
X
X
X
G
G
T
S
D
F
D
W
S
S
W
C
T V
C
T
V
S
S
S
S
S
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
R
R
V
D
SW WALKER RD
C
E
D
E
E
K
O
H
W
OHW
OHW OHW
OHW
OHW
O H W
O H W
O H W
O H W
O H W
TCE
F
F
F
F
F
F
F
F
P S D U E
PSDU
E
F
F
F
F
F
F
F
C
C
C
C
C
C
C C
C C
C
C
C
C
C
PSDU
E
PSDU
E
PSDU
E
PSDU
E
C
C
C
C
C
C
C
D
D
D
D
S
S
10+00
12+00
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
SD-13
PLAN AND PROFILE
42" STEEL WATER LINE
STA 10+00 TO 13+50
07 - C-02
No Scale
C-02
M A
T C
H L
I N
E
S
T
E
1 PROFILE
SCALE IN FEET
VERT
HORZ 20 40
5 10
M A
T C
H L
I N
E
S
T
E
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
ROADWAY STA 9+88.23
N 7161.20
E 60160.87
BEGIN 42" WATER
TRANSMISSION LINE
STA 10+28.23
N 7128.9563
E 60184.54
Δ=52' 4' 34"
HPI
STA 11+32.89
N 7125.95
E 60289.16
Δ=50' 50' 7"
HPI
STA 13+43.06
N 6943.64
E 60356.31
Δ=45' 16' 16"
HPI
EXIST 12"
TVWD WATER
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
EXIST 48" CCP
TVWD WATER
EXIST
GAS MAIN
STA 12+63.06
N 7022.71
E 60368.44
Δ=46' 14' 27"
HPI
PROP 12" W
SP-01
SP-01
CP-02
SD-10
SD-10
SD-07
SD-02
EXIST 48" CCP
TVWD WATER
SD-20
SD-10
SD-09
SD-01
CONSTRUCTION NOTES:
PRIOR TO SUBMITTAL OF STEEL PIPE SHOP DRAWINGS,
CONTRACTOR SHALL PERFORM EXPLORATORY
DIGGING TO CONFIRM EXISTING 48-INCH CCP JOINT
LOCATIONS FOR CONNECTION.
REMOVE UP TO APPROXIMATELY 50 FEET OF THE
EXISTING 48-INCH CCP FROM THE CONNECTION TO 10
FEET PAST THE HPI.
REMOVE EXISTING WATER APPURTENANCE (BLOW OFF,
ARV, TEST STATION, ETC.) TO MIN 3' BELOW FINISH
GRADE AND ABANDON.
REMOVE APPROXIMATELY 298 LF OF EXIST 48" CCP
WATER MAIN.
COMPLY WITH ALL PERMITTING REQUIREMENTS FOR
IN-WATER CREEK CROSSING.
1 2
C-05
SD-17
SD-07
KEY NOTES:
STA 10+74.20 (1), STA 13+26.27 (1) - BRASS CAP,
SEE DETAIL
STA 11+32.89 (1), STA 12+63.06 (1) - CONCRETE MONUMENT,
SEE DETAIL
STA 11+91.06 (1) - MARKER POST, SEE DETAIL
STA 11+80.00 (1) - BLOW-OFF TYPE I, SEE DETAIL
STA 10+33.33 (1) - BUTTERFLY VALVE, SEE DETAIL
STA 10+89.09 (1) - LOCATE STATION, SEE DETAIL
STA 10+02.41 (1) - BURIED ACCESS WAY, SEE DETAIL
STA 11+55.13 (1), STA 12+71.66 (1) -
TRENCH CUTOFF WALL, SEE DETAIL
42" DIA MLPCSP, SEE DETAIL
STA 9+88.23 (1) - CONNECTION TO EXISTING SYSTEM,
SEE DETAIL
STA 10+69.00 (1) - 30" ACCESS WAY,
SEE DETAILS &
4CONNECTION
ENLARGEMENT DETAIL
CONNECTION
ENLARGEMENT DETAIL
THRUST BLOCK, SEE 1
D-04
SP-01
STA 10+88.83 (1), STA 11.85.08 (1) - 4-WIRE
ISOLATION FLANGE TEST STATION WITH ANODE
BED, SEE DETAIL
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
EXISTING
GROUND @ PIPE ℄
PROPOSED
GROUND @ PIPE ℄
M
I N
-0.10%
-0.10%
O
S
I N
S T
A
E L
S
W
E R
S T
A
E L
S
T O
R M
S T
A
E L
O
R M
F I E
R
I F
Y
S T
A
P R
W
A T
E R
S T
A
E L
O
S
I N
S T
A
E L
T
E R
F I E
R
I F
Y
S T
A
T
E R
F I E
R
I F
Y
S T
A
S
F I E
R
I F
Y
S T
A
W
A T
E R
S T
A
V P
I
S T
A
V P
I
S T
A
P R
M
A I N
S T
A
M
I N
M
I N
M
I N
M
I N
V P
I
S T
A
FLEXIBLE PIPE TRENCH SECTION -
TYPE I (GRANULAR)
42" NOM ID WATER TRANSMISSION LINE, MLPCSP, T=0.3125", DOUBLE WELDED LAP JOINT
X
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
X
X
X
X
X
X
X
X
G
G
G G
G G
G G
G
G G
G
G
G
W
C
O
T
S
S
D
S
G
V
G
V
S
T
S
S
S
S
(SS)
(SS)
(S S
(SS)
(SS)
(SS)
(S S
(SS)
G
G
G
G
G
G
G
SW WALKER RD
N JOHNSON CREEK
N JOHNSON CREEK
S
D
S
OH
W
OH
W
OH
W
OH
W
O
H
W
O H W
O
H
W
O
H
W
O H W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O H W
O H W
OH
W
TCE TCE
F
F
F
F
F
F
F
F
F
F
PU
E
PSDU
E
PSDU
E
PUEPUE
PUE PUE PUE PUE
TC
E
TC
E
14+00
15+00
16+00
17+00
13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
42" STEEL WATER LINE
STA 13+50 TO 17+00
08 - C-03
No Scale
C-03
M A
T C
H L I N
E
S
T
E
SCALE IN FEET
VERT
HORZ 20 40
5 10
M A
T C
H L
I N
E
S
T
E
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
M A
T C
H L
I N
E
S
T
E
M
A T
C H
L I N
E
S
T
E
STA 16+35.56
N 6721.82
E 60523.85
Δ=36' 56' 6"
HPI
STA 13+71.89
N 6919.55
E 60374.17
Δ=1' 0' 0"
HPI
STA 14+15.73
N 6895.44
E 60391.40
Δ=1' 0' 0"
HPI
RELOCATED 8"
DIA CWS SS
RELOCATED 48"
DIA CWS SS
KEY NOTES:
42" DIA MLPCSP
STA 14+60.00 (1) - TRENCH CUTOFF WALL,
SEE DETAIL
STA 13+98.00 (1), STA 14+02.37 (1), STA 15+72.19 (1),
STA 16+70.05 (1) - BRASS CAP, SEE DETAIL
STA 13+95.64 (1) - 4-WIRE ISOLATION FLANGE TEST
STATION WITH ANODE BED SEE DETAIL
STA 13+98.00 (1) - AIR VALVE ASSEMBLY TYPE I,
SEE DETAIL
STA 14+00.63 (1) - LOCATE STATION, SEE DETAIL
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
EXIST
GAS MAIN
STA 16+07.19
N 6726.9998
E 60507.3860
Δ=37' 59' 15"
HPI
EXIST
SANITARY
EXIST 12"
TVWD WATER
SD-15
SD-10
SD-02
ABANDON 48"
CCP WATER
SD-01
CONSTRUCTION NOTES:
PROTECT PROPOSED DIP WATER MAIN WHERE IT
CROSSES THE PROPOSED 42" WATER MAIN.
PROP 12" W
C-05
CP-02
SW WALKER RD
S
SD-09
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
0.10%
-0.10%
0.75%
.0
.0
P R
S
T O
R M
S T
A
E L
P R
S
T O
R M
S T
A
E L
P R
S
T O
R M
S T
A
E L
P R
S
T O
R M
S T
A
E L
S
W
E R
S T
A
E L
0.75%
S
S T
A
S
S T
A
W
A T
E R
S T
A
S
S T
A
F O
Z
A Y
O
S T
A
M
I N
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
E N
D
W
A T
E R
S T
A
P R
W
S T
A
E L
M I N
A C
C E
Y
S T
A
B L O
W O
P
E
I
S T
A
42" NOM ID WATER TRANSMISSION LINE, MLPCSP, T=0.3125", DOUBLE WELDED LAP JOINT
FLEXIBLE PIPE TRENCH SECTION -
TYPE I (GRANULAR)
D
D
D
D
D
D
D
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
G
G
P
G
G
G
G
G
G
G
G G
G G
G
G
G
G
G
G
G
G
V
S
S
G
V
S
S
S
D
G
P
S
S
C
S
G
P
G
P
S
S
C
S S
C
G
P
G
P
W W
G
P
G
P
W
W
G
G
G
G
G
G
G
SW WALKER RD
OH
W
O
HW
OH
W
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H W
O H W
O H W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
PSUE PSUE PSUE
F
F
F F
F
F
C
C
C
C
C
C
C
C
C
TCE
TCE
TCE
C
C
C
C
C
C
C
C
17+00
19+00
17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
42" STEEL WATER LINE
STA 17+00 TO 21+00
09 - C-04
No Scale
C-04
M A
T C
H L I N
E
S
T
E
SCALE IN FEET
VERT
HORZ 20 40
5 10
M A
T C
H L
I N
E
S
T
E
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
STA 20+95.52
N 6374.75
E 60725.60
END 42" WATER
TRANSMISSION LINE
STA 17+36.17
N 6630.04
E 60589.56
Δ=45' 40' 35"
HPI
STA 19+42.49
N 6512.51
E 60742.05
Δ=57' 34' 57"
HPI
STA 20+55.52
N 6429.89
E 60701.79
Δ=57' 23' 36"
HPI
KEY NOTES:
STA 20+95.52 (1) - CONNECTION TO EXISTING SYSTEM
42" DIA MLPCSP
STA 18+05.00 (1), STA 19+10.00 (1) - TRENCH CUTOFF
WALL, SEE DETAIL
STA 19+60.00 (1) - 30" ACCESS WAY,
SEE DETAILS &
STA 17+48.71 (1), STA 20+02.80 (1), STA 20+24.75 (1), -
BRASS CAP, SEE DETAIL
STA 18+09.86 (1), STA 18+42.16 (1) STA 18+66.70 (1),
STA 19+42.49 (1) - MARKER POST, SEE DETAIL
STA 18+29.83 (1) - BLOW-OFF TYPE I, SEE DETAIL
STA 18+34.83 (1), STA 20+95.35 (1) - 4-WIRE ISOLATION
FLANGE TEST STATION WITH ANODE BED SEE DETAIL
STA 17+19.97 (1), STA 20+90.35 (1) - LOCATE STATION,
SEE DETAIL
STA 20+81.34 (1) - BURIED ACCESS WAY, SEE DETAIL
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
EXIST 12"
TVWD WATER
ABANDON 48"
CCP WATER
STA 18+09.86
N 6618.82
E 60662.75
Δ=44' 33' 43"
HPI
EXIST
GAS MAIN
EXIST
SANITARY
EXIST
SANITARY
SD-13
SD-10
SD-07
SD-02
SD-10
SP-01
EXIST 48" CCP
TVWD WATER
D-04
CP-02
SD-09
SD-01
CONSTRUCTION NOTES:
CONTRACTOR TO PERFORM EXPLORATORY DIGGING
TO CONFIRM EXISTING JOINT LOCATIONS FOR
CONNECTION.
REMOVE 50 FEET OF THE EXISTING 48-INCH CCP FROM
THE CONNECTION TO 10 FEET PAST THE HPI.
REMOVE EXISTING WATER APPURTENANCE (BLOW
OFF, ARV, TEST STATION, ETC.) TO 3' BELOW FINISH
GRADE.
REMOVE APPROXIMATELY 99 LF OF EXIST 48" CCP
WATER MAIN.
COMPLY WITH ALL PERMITTING REQUIREMENTS FOR
IN-WATER CREEK CROSSING.
PROTECT PROPOSED DIP WATER MAIN WHERE IT
CROSSES THE PROPOSED 42" WATER MAIN.
SD-17
PROP 12" W
C-05
1 2
SD-07
CONNECTION
ENLARGEMENT DETAIL
CONNECTION
ENLARGEMENT DETAIL
THRUST BLOCK
SP-01
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
I
S T
A
V P
I
S T
A
V P
I
S T
A
V P
I
S T
A
-0.68%
-0.06%
0.49% 0.62%
EXIST 12" DI
TVWD WATER
S
T O
R M
S T
A
E L
S
S T
A
E L
S
S T
A
E L
B
S
A N
S T
A
E L
EXIST GROUND
@ PIPE CL
PROP GROUND
@ PIPE CL
M I N
M
J
B
F V
S T
A
E L
M
J
B
F V
S T
A
E L
C
A R
V
S T
A
T O
P
12" CLASS 52
DI PIPE
XX
X
X
X
X
G
G
G
T
D
F
D
W
S
W
C
T V
C
T
V
S
S
S
S
(SS)S
G
G
G
G
G
G
G
G
G
G
G G
G
G
R
R
V
D
SW WALKER RD
C
E
D
E
E
K
O
H
W
OHW
OHW OHW
OHW
OHW
O H W
O H W
O H W
O H W
O H W
TCE
F
F
F
F
F
F
F
F
P S D U E
PSDU
E
F
F
F
F
F
F
F
C
C
C
C
C
C
C C
C C
C
C
C
C
C
PSDU
E
PSDU
E
PSDU
E
PSDU
E
C
C
C
C
C
C
C
D
D
D
D
S
S
49+00
51+00
EXIST 12"
TVWD WATER
EXIST 48"
TVWD WATER
EXIST
GAS MAIN
N 7102.65
E 60229.14
N 6958.46
E 60335.29
EXIST 36"
SANITARY
N 7108.67
E 60224.68
N 7095.35
E 60280.02
N 7012.83
E 60343.09
STA 50+52.74,
OFF 8.99' L
48+50 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
12" DI WATER LINE
STA 50+00 TO 52+50
10 - C-05
No Scale
C-05
M A
T C
H L
I N
E
S
T
E
SCALE IN FEET
VERT
HORZ 20 40
5 10
M A
T C
H L
I N
E
S
T
E
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
KEY NOTES:
STA 50+47.24 (1) - 12" MJ 45° BEND, THRUST BLOCK
STA 50+49.94 (1) - 12" MJ BUTTERFLY VALVE
STA 50+52.70 (1) - 2" COMBINATION AIR RELEASE AND AIR
VACUUM VALVE, SEE TVWD DETAIL
STA 50+56.65 (1) - 12" MJ FORCE BALANCED FLEX-TEND
FLEXIBLE EXPANSION JOINT, SEE DETAIL
STA 51+41.69 (1) - 12" MJ FORCE BALANCED FLEX-TEND
FLEXIBLE EXPANSION JOINT, SEE DETAIL
STA 51+48.40 (1) - 12" MJ BUTTERFLY VALVE
STA 51+51.10 (1) - 12" MJ 45° BEND, THRUST BLOCK
STA 52+06.03 (1) - 12" MJ 45° BEND
12" CLASS 52 DI PIPE WITH CLASS B BACKFILL,
SEE TVWD DETAIL
PROP 48" W
(SEE SHEET
C-02)
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
TD-03
D-05
D-05
TD-01
CONSTRUCTION NOTES:
ABANDON EXISTING WATERLINE. SEE SPECIFICATIONS.
REMOVE APPROXIMATELY 175 LINEAR FEET OF THE
EXISTING 12" WATERLINE.
REFER TO SHEET D-05 AND D-06 FOR DESIGN OF
PIPELINE SUPPORTS ON BRIDGE.
CONTRACTOR TO SUBMIT AND RECEIVE APPROVAL OF
HYDROSTATIC TESTING PLAN FOR PIPELINE ON BRIDGE
PRIOR TO COMPLETE TESTING. SEE SPECIFICATIONS.
CONNECTION
ENLARGEMENT DETAIL
SP-02
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
-0.06%
-2 .5
-0.10%
V P
I
S T
A
V P
I
S T
A
T
V W
D
W
A T
E R
S T
A
C
O B
S
A N
S T
A
S
S T
A
EXIST GROUND
@ PIPE CL
PROP GROUND
@ PIPE CL
M I N
M
J
B
F V
S T
A
X
M
J
C
R O
S S
S T
A
M
J
B
F V
S T
A
M
J
C
A P
S T
A
M
J
B
F V
S T
A
PHASE 0
12" CLASS 52
DI PIPE
F I R
E
H
Y D
R A
N T
S T
A
PHASE 1
T
V W
D
W
A T
E R
S T
A
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
X
X
X
X
G
G G
G G
G
G
G
G
G
G
W
C
O
S
S
D
S
G
V
G
V
S
T
S
S
S
S
(S S
(SS)
(S S
(SS)
(S S
(SS)
(S S
G
G
G
G
G
G
G
SW WALKER RD
N JOHNSON CREEK
N JOHNSON CREEK
S
53+00
54+00
55+00
O
HW
OH
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O H W
O H W
OH
W
TCE TCE
F
F
F
F
F
F
F
F
PU
E
PSDU
E
PUE
PUE PUE PUE PUE
TC
E
D
S
EXIST 12"
TVWD WATER
EXIST 48"
TVWD WATER
EXIST
GAS MAIN
EXIST 36"
SANITARY
RELOCATED
48" CWS SS
PROP 8" W
(SEE SHEET C-8)
PROP 42" STEEL W
(SEE SHEET C-02 TO C-04)
N 6782.52
E 60492.17
N 6788.61
E 60458.43
N 6730.01
E 60529.87
PROP 8" W
(SEE SHEET C-8)
STA 54+78.58,
OFF 11.95' L
N 6908.64
E 60371.44
N 6915.15
E 60366.70
52+50 53+00 53+50 54+00 54+50 55+00 55+50
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
12" DI WATER LINE
STA 52+50 TO 55+50
11 - C-06
No Scale
C-06
M A
T C
H L
I N
E
S
T
E
SCALE IN FEET
VERT
HORZ 20 40
5 10
M A
T C
H L
I N
E
S
T
E
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
M A
T C
H L
I N
E
S
T
E
M A
T C
H L
I N
E
S
T
E
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
KEY NOTES:
STA 54+15.82 (1) - 12" MJ 45° BEND
STA 54+50.10 (1) - 12" MJ 45° BEND
STA 54+78.58 (1) - FIRE HYDRANT ASSEMBLY, SEE TVWD
DETAIL
STA 55+09.98 (1) - 12" MJ BUTTERFLY VALVE
STA 55+14.75 (1) - 12"X8" MJ CROSS
STA 55+19.41 (1) - 12" MJ BUTTERFLY VALVE
12" CLASS 52 DI PIPE WITH CLASS B BACKFILL,
SEE TVWD DETAIL
(1) 6" WATER SERVICE, SEE TVWD DETAIL
TD-04
TD-05
CONSTRUCTION NOTES:
ABANDON EXISTING WATERLINE. SEE SPECIFICATIONS.
NEW WATERLINE TO BE INSTALLED AND SERVICES
TRANSFERRED PRIOR TO ABANDONMENT.
CONTRACTOR TO COORDINATE WITH TVWD TO
EVALUATE CONDITION OF EXISTING METER. EXISTING
METER TO BE REUSED AND REINSTALLED IN NEW
VAULT IF APPROVED BY TVWD. CONTRACTOR TO
ASSUME THE METER SHALL BE REPLACED WITH A NEW
METER FOR THE PURPOSES OF THE BID.
CONNECT TO EXISTING 6" SERVICE LINE AND
BACKFLOW PREVENTER. CONTRACTOR TO POTHOLE
AND CONFIRM LOCATION OF EXISTING SERVICE LINE
PRIOR TO MAKING CONNECTION. COORDINATE WITH
TVWD FOR SHUTDOWN OF EXISTING SERVICE.
CONNECTION
ENLARGEMENT DETAIL
SP-02
TD-01
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
-0.10%
1.3 3%
.6
-0.10%
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
BORE PIT
RECEIVING PIT
80.00'
24"Ø PIPE CASING
EXIST 12"
TVWD WATER
S
T O
R M
S T
A
E L
T
V W
D
W
A T
E R
S T
A
E L
S
S T
A
E L
EXIST GROUND
@ PIPE CL
PROP GROUND
@ PIPE CL
EXIST CHANNEL
PROP BOX CULVERT
M I N
M I N
C
A R
V
S T
A
T O
P
M
J
B
F V
S T
A
E L
M
J
B
F V
S T
A
E L
12" CLASS 52
DI PIPE
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
G
G
G
G
G
G
G G G
G
G
G
G
S
S
S
D
T
S
S
C
S
S
C
S S
C
W W
W
W
G
G
G
SW WALKER RD
N JOHNSON CREEK
OH
W
OH
W
OH
W
OH
W
O H W
OH
W
OHW
OHW
OHW
OHW
OHW
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
PSUE PSUE PSUE
F
F
F
F F
F
C
C
C
C
C
C
C
PUE PUE
TC
E
TCE
TCE
C
C
C
C
C
C
C
D
D
56+00
57+00
59+00
N 6489.96
E 60670.06
N 6526.42
E 60676.05
PIPE CASING
EXIST 12"
TVWD WATER
EXIST
GAS MAIN
PROP 48" W
(SEE SHEET C-03)
STA 58+25.97,
OFF 52.20' L
STA 57+99.36,
OFF 47.6' R
STA 57+28.44,
OFF 76.24' R
N 6464.66
E 60688.60
55+50 56+00 56+50 57+00 57+50 58+00 58+50 59+00
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
12" DI WATER LINE
STA 55+50 TO 59+00
12 - C-07
No Scale
C-07
SCALE IN FEET
VERT
HORZ 20 40
5 10
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
M A
T C
H L I N
E
S
T
E
M A
T C
H L I N
E
S
T
E
EXIST 48"
TVWD WATER
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
TD-06
KEY NOTES:
STA 56+51.00 (1) - 12" MJ BUTTERFLY VALVE
STA 57+63.00 (1) - 2" COMBINATION AIR RELEASE AND AIR
VACUUM VALVE, SEE TVWD DETAIL
STA 57+65.38 (1) - 12" MJ 45° BEND
STA 57+68.08 (1) - 12" MJ BUTTERFLY VALVE
12" CLASS 52 DI PIPE WITH CLASS B BACKFILL,
SEE TVWD DETAIL
1" WATER SERVICE, SEE DETAIL
AND TVWD DETAIL
RECONNECT EXISTING 1" WATER SERVICE, SEE DETAIL
AND TVWD DETAIL
STA 56+69.13 (1), STA 57+58.30 (1) - INSTALL CASING STATION
WITH ANODE BED AT END OF CASING. SEE DETAIL
TD-03
CONSTRUCTION NOTES:
BORE PIT LOCATION AND DIMENSIONS ARE APPROXIMATE.
CONTRACTOR TO FIELD VERIFY DIMENSIONS AND DEPTH,
AND ALL EXISTING UTILITIES WITHIN PROXIMITY OF
DISTURBANCE. COMPLY WITH PHASING AND TRAFFIC
CONTROL REQUIREMENTS FROM THE ROADWAY DESIGN.
ABANDON EXISTING WATERLINE. SEE SPECIFICATIONS.
CONNECTION
ENLARGEMENT DETAIL
SP-02
TD-01
CP-02
TD-05
TD-05
TD-06
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
V
E R
T
B
E N
D
S T
A
V P
I
S T
A
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
60.00'
18"Ø PIPE CASING
-0.67%
-0.42%
-0.67%
0.00%
-0.02%
1.1 8%
-0.10%
M
J
T
E E
S T
A
E L
T
V W
D
W
A T
E R
S T
A
E L
T
V W
D
W
A T
E R
S T
A
E L
S
S T
A
E L
Z
Y
O
S T
A
E L
C
O B
S
A N
S T
A
E L
T
V W
D
W
A T
E R
S T
A
E L
S
S T
A
E L
PROP GROUND
@ PIPE CL
EXIST GROUND
@ PIPE CL
M I N
M I N
M I N
M
J
G
V
S T
A
E L
C
A R
V
S T
A
T O
P
M
J
G
V
S T
A
E L
M
J
G
V
S T
A
E L
S
T O
R M
S T
A
E L
V
E R
T
B
E N
D
S T
A
V
E R
T
B
E N
D
S T
A
F I R
E
H
Y D
R A
N T
S T
A
E L
PROP BOX CULVERT
EXIST BOX CULVERT
8"X4"
REDUCER
EXIST 4" CI
TVWD WATER
EXIST 8" DI
TVWD WATER
8" DI PIPE
RECEIVING
PIT
BORE PIT
8" DI PIPE
X
X
X
G
G
G
G
G
G
G
G
G
G
G
X
X
X
X
X
X
X
G
G G
G
G G
G
G
C
O
S
S
D
S
G
V
G
V
S
T
T
W
S S
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
G
G
G
G
G
G
G
G
138+00
139+00
L K
N
J O
H N
S O
N
C
R E
E K
N
J O
H N
S O
N
C
R E
E K
S
S
D
S
S
O H W
O H W
O H W
O H W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O
H
W
O H W
OHW
O H W
F
F
F
F
F
F
PUE
PU
E
PU
E
PU
E
TCE
TCE
C
C
C
C
C
TC
E
TCE
100+00
N 6730.63
E 60550.66
N 6651.40
E 60357.35
N 6670.43
E 60322.88
N 6730.25
E 60549.04
STA 99+16.00,
OFF 38.53' R
STA 101+87.43,
OFF 6.30' R
PROP 12" TVWD W
(SEE SHEET C-05 TO C-07)
PROP 42" STEEL W
(SEE SHEET C-02 TO C-04)
PIPE CASING
N 6668.09
E 60314.95
98+50 99+00 99+50 100+00 100+50 101+00 101+50 102+00 102+50
KEY PLAN
SCALE: 1" = 500'
W
A
L
K
M
U
R
R
V
D
C
C
C
C
PLAN AND PROFILE
8" DI WATER LINE
STA 99+00 TO 102+00
13 - C-08
No Scale
C-08
SCALE IN FEET
VERT
HORZ 20 40
5 10
NOTES:
1. REFER TO ROADWAY DESIGN PLANS (SCHEDULE A) FOR
SURVEY INFORMATION AND PROJECT CONTROLS.
2. REFER TO SCHEDULE A DRAWINGS FOR INFORMATION
PERTAINING TO THE ROADWAY DESIGN AND
ASSOCIATED DRAINAGE, UTILITIES, SIGNAGE, UTILITY
RELOCATIONS, LIGHTING, STRIPING, LANDSCAPING,
IRRIGATION, EROSION AND SEDIMENTATION CONTROL,
AND TRAFFIC CONTROL.
0 20 40
SCALE IN FEET
B
PROJECT MANAGER
0 0.5" 1"
FILENAME
SCALE
SHEET
C
D
A
1 3 4 5 6 7 8
Walker Road Waterline Relocation at Murray Blvd.
KATIE WALKER
CLIENT NUMBER 4079ISSUEDATE DESCRIPTION
PROJECT NUMBER 10218284
DESIGNED DAN JOHNSTON
DRAWN SHAWN KUHNS
CHECKED KEVIN BRIAN
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
"LOOK UP AND LIVE"
DRAWING IS FULL SIZE @ 11X17
(IF BAR IS NOT 1 INCH ADJUST
SCALES ACCORDINGLY)
0111/03/2020 BID SET PLANS
J u
D
A
N
I
J
O
H
N
S
T
O
N
E
N
G
I N
E
E
R
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
06/30/2021
DIGITAL SIGNATURE
OREGON
70837PE
EXPIRES:
KEY NOTES:
STA 99+36.13 (1) - 8" MJ 11.25° BEND
STA 99+37.79 (1) - 8" MJ 22.5° BEND
STA 99+53.40 (1) - 8" MJ 45° BEND
STA 99+55.46 (1) - 8" MJ GATE VALVE
STA 99+60.69 (1) - 8" MJ GATE VALVE
STA 99+83.48 (1) - 8" MJ 11.25° BEND
STA 99+98.83 (1) - 8" MJ 11.25° BEND
STA 100+25.50 (1) - 8" MJ 11.25° BEND
STA 101+49.87 (1) - 8" MJ GATE VALVE
STA 101+51.93 (1) - 8" MJ 45° BEND
RELOCATE EXISTING WATER METER AND EXTEND 1" WATER
SERVICE PIPING, SEE DETAIL
AND TVWD DETAIL
1" WATER SERVICE, SEE DETAIL
AND TVWD DETAIL
8" CLASS 52 DI PIPE WITH CLASS B BACKFILL,
SEE DETAIL
STA 101+54.62 (1) - FIRE HYDRANT ASSEMBLY, SEE TVWD
DETAIL
STA 101+91.30 (1) - 8" MJ 45° BEND
STA 100+43.28 (1), STA 101+03.28 (1) - INSTALL CASING
STATION WITH ANODE BED AT END OF CASING,
SEE DETAIL
STA 101+20.00 (1) - 2" COMBINATION AIR RELEASE AND AIR
VACUUM VALVE, SEE TVWD DETAIL
REMOVE EXISTING FIRE HYDRANT
TD-05
CONSTRUCTION NOTES:
BORE PIT LOCATION AND DIMENSIONS ARE APPROXIMATE.
CONTRACTOR TO FIELD VERIFY DIMENSIONS AND DEPTH,
AND ALL EXISTING UTILITIES WITHIN PROXIMITY OF
DISTURBANCE. COMPLY WITH PHASING AND TRAFFIC
CONTROL REQUIREMENTS FROM THE ROADWAY DESIGN.
ABANDON EXISTING WATERLINE. SEE SPECIFICATIONS.
EMPLOY ANY NECESSARY SHORING MEASURES TO
PROTECT THE EXISTING 48" CCP WATER MAIN AND PIPE
ZONE DURING CONSTRUCTION OF THE BORE PIT SHAFTS.
MOVEMENT OF THE PIPELINE OR PIPE ZONE MATERIAL
WILL NOT BE ALLOWED.
CONNECTION
ENLARGEMENT DETAIL
SP-02
CONNECTION
ENLARGEMENT DETAIL
SP-02
TD-01
TD-04
CP-02
TD-05
TD-03
TD-06
TD-06
Daniel V. Johnston (Nov 3, 2020 20:37 PST)
UTILITY
UTILITY
BACKFILL
ABOVE CLSM, SEE
FINISHED GRADE
CLSM
(SEE NOTE 1)
2'
12"
6" MIN BETWEEN
UTILITY
AND WATER
TRANSMISSION
LINE
PLACE 2'X2'X6" THICK EPS ON TOP
OF WATER MAIN, ONLY IF
BACKFILLING PIPE ZONE WITH CLSM
UNDERGROUND UTILITY SUPPORT
NTS
2'X2'X6" EPS WHEN CLSM IS USED
FOR TRENCH BACKFILL
WATER TRANSMISSION LINE
GRANULAR BACKFILL
MATERIAL
CLSM BACKFILL
MATERIAL
NOTES:
1. VERIFY WITH THE UTILITY OWNER IF
ANOTHER MATERIAL IS PREFERRED
OVER CLSM.
TRENCH
BACKFILL
NOTES:
1. PIPE LOCATER RIBBON, SEE
2. CLSM UNDERGROUND UTILITY SUPPORT
REQUIRED FOR UTILITY CLEARANCE
LESS THAN 18" OD TO OD.
TRENCH WIDTH 2'
CLSM
B
SD-01
SD-03
EXISTING CPP BELL AND SPIGOT JOINT
NTS
PROPOSED STEEL TO EXISTING CCP SPIGOT
NTS
EXISTING CCP
BELL, REMOVE
AS REQUIRED
REMOVE GROUT BAND
AND CEMENT GROUT
CUT WELD(S) AND
REMOVE FILLER BAR AND
FILLER STRIP, IF PRESENT
EXISTING CCP
SPIGOT, REMOVE
AS REQUIRED
CUT WELD,
IF PRESENT
REMOVE CEMENT
MORTAR
PROPOSED STEEL TO EXISTING CCP BELL
NTS
EXISTING CCP BELL AFTER
SPIGOT END REMOVED
EXISTING CCP
STEEL BELL RING
FIELD-APPLIED
CEMENT MORTAR
SEE NOTE 1
PROPOSED STEEL PIPE
SEE NOTE 2
SEE NOTE 1
SEE NOTE 1
PROPOSED STEEL
SEE NOTE 2
SEE
NOTE 1
PROPOSED STEEL
BUTT STRAP
FIELD-APPLIED
CEMENT MORTAR
EXISTING CCP STEEL
SPIGOT RING
SEE
NOTE 1
EXISTING CCP
SPIGOT AFTER
REMOVAL OF
BELL END
0.500"Ø FILLER BAR,
IF NEEDED
t t t t…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .