[Supplemental]_Walker_Bridge_Widening_As-builts.pdf

PDF 361 KB Posted

Attached to
100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements
Solicitation number
2026.002-LUT CPS
Issued by
Washington County, Oregon

About this file

This supplemental document contains as-built drawings for the Walker Bridge Widening component of the SW Walker Road/SW Murray Boulevard Intersection Improvements project in Washington County, Oregon. The as-built documentation records the final constructed conditions of the bridge widening work, including the deconstructed and reinstalled Murray Bridge over Cedar Mill Creek on Walker Road. These technical drawings serve as the official record of completed construction and are essential for project closeout, future maintenance, and verification that work was performed in accordance with contract specifications and approved designs. The as-built plans document all structural elements, dimensions, material installations, and any field modifications made during the construction process. A mandatory pre-bid meeting was held on January 28, 2026, with questions due by January 30, 2026, and electronic bids were required by February 4, 2026, at 1:00 p.m. through the OpenGov Procurement Portal.

The project carries a significant estimated cost range of $20,000,000 to $40,000,000 and includes two completion deadlines: February 14, 2027, for TVWD waterline installation and activation, and August 31, 2028, for all remaining work. Liquidated damages are assessed at $1,100 per calendar day for the first deadline and $2,700 per calendar day for the second deadline. Contractors must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board, with a bid guaranty of ten percent of the total bid amount required. First-tier subcontractors must be disclosed within two work hours after bid closing. Contractors must comply with Washington County's Clean Air Construction Standard and utilize the online B2G certified business utilization tracking system for monthly subcontractor payment reporting.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .