[Supplemental]_Murray_Bridge_As-builts.pdf

PDF 1 MB Posted

Attached to
100238 - SW Walker Road/SW Murray Boulevard Intersection Improvements
Solicitation number
2026.002-LUT CPS
Issued by
Washington County, Oregon

About this file

This supplemental document consists of as-built drawings for the Murray Bridge component of Washington County, Oregon's comprehensive SW Walker Road/SW Murray Boulevard Intersection Improvements project (Project #100238). The as-built drawings document the specifications and final construction details for the deconstructed existing Murray Bridge over Cedar Mill Creek, which was rehabilitated and reinstalled on Walker Road over Cedar Mill Creek as part of the broader $20 million to $40 million infrastructure enhancement initiative. The project encompasses multiple critical components including a new bridge on Murray Boulevard over Cedar Mill Creek, installation of box culverts under Walker Road and Far Vista Street for North Johnson Creek, traffic signal installation at two intersections, roadway widening of approximately 2,350 linear feet on Murray Boulevard and 2,450 linear feet on Walker Road with new curb and sidewalk, gravity retaining walls, stormwater collection and conveyance systems with water quality treatment facilities, approximately 875 feet of 42-inch TVWD waterline, and approximately 500 feet of CWS sanitary sewer. The mandatory pre-bid meeting was scheduled for January 28, 2026, at 2:00 p.m., with questions due by January 30, 2026, and electronic bids required by February 4, 2026, at 1:00 p.m. The project includes two distinct completion deadlines: February 14, 2027, for TVWD waterline installation and activation, and August 31, 2028, for all remaining work, with liquidated damages of $1,100 per calendar day for the first deadline and $2,700 per calendar day for the second deadline.

Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board, with no specific set-aside designations noted. A bid guaranty of ten percent of the total bid amount is required, and first-tier subcontractors must be disclosed within two work hours after bid closing. Contractors must comply with Washington County's Clean Air Construction Standard and utilize the online B2G certified business utilization tracking system for monthly subcontractor payment reporting. The as-built documentation provided in this supplemental file serves as the official record of the Murray Bridge reconstruction specifications and ensures compliance with project requirements and construction standards established by Washington County.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .