WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf

PDF 303 KB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This is a life-cycle cost analysis (LCCA) summary report comparing multiple HVAC alternatives for the Bomber Agile Common Hangar (BACH) project at Tinker Air Force Base. The analysis uses NIST BLCC 5.3-23 software and follows federal life-cycle cost methodology per 10 CFR Part 436.

The report evaluates several alternatives over a 40-year period (June 2024 - May 2064) with a 3% discount rate, including natural gas (NG) and baseline options. Total life-cycle costs range from approximately $30.2M to $32.3M across the alternatives. The HVAC NG Alt 1 Base has the highest initial cost at $13.52M but lower energy consumption costs ($3.66M) compared to baseline options ($6.54M-$6.65M). The analysis includes initial costs, energy consumption, annually recurring O&M costs, replacement costs, and other factors. No water usage costs or energy demand charges are included in any alternative. The 90.1 Baseline SW-GS-A1 option shows the lowest total life-cycle cost at $30.21M, while HVAC NG Alt 3 Base has the highest at $32.34M.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIST BLCC 5.3-23: Summary LCC Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A

General Information

File Name:

C:\Users\03316\OneDrive - Mead and Hunt\Desktop\Tinker BACH_NG Comparitive

Analysis.xml

Date of Study: Fri Jun 07 16:58:53 EDT 2024

Analysis Type: FEMP Analysis, Energy Project

Project Name: Tinker BACH

Project Location: Oklahoma

Analyst: John Kramer

Base Date: June 1, 2024

Service Date: June 1, 2024

Study Period: 40 years 0 months (June 1, 2024 through May 31, 2064)

Discount Rate: 3%

Discounting Convention:

End-of-Year

Discount and Escalation Rates are REAL (exclusive of general inflation)

Alternative: HVAC NG Alt 1 Base LCC Summary

Present Value Annual Value

Initial Cost $13,520,699 $584,958

Energy Consumption Costs $3,655,782 $158,163

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $7,179,600 $310,618

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $7,280,818 $314,997

Less Remaining Value $0 $0

Total Life-Cycle Cost $31,636,899 $1,368,736

Alternative: 90.1 Baseline SW-GI-A1 LCC Summary

Present Value Annual Value

Initial Cost $11,641,949 $503,676

Energy Consumption Costs $6,539,957 $282,944

Energy Consumption Costs $6,539,957 $282,944

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $6,090,600 $263,503

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $5,955,256 $257,648

Less Remaining Value $0 $0

Total Life-Cycle Cost $30,227,762 $1,307,771

Alternative: 90.1 Baseline SW-GS-A1 LCC Summary

Present Value Annual Value

Initial Cost $11,643,283 $503,734

Energy Consumption Costs $6,534,738 $282,718

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $6,054,600 $261,946

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $5,981,441 $258,780

Less Remaining Value $0 $0

Total Life-Cycle Cost $30,214,062 $1,307,178

Alternative: HVAC NG Alt 2 Base LCC Summary

Present Value Annual Value

Initial Cost $13,101,270 $566,812

Energy Consumption Costs $3,493,643 $151,149

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $8,619,600 $372,918

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $6,987,217 $302,294

Less Remaining Value $0 $0

Total Life-Cycle Cost $32,201,730 $1,393,172

Alternative: HVAC NG Alt 3 Base LCC Summary

Present Value Annual Value

Initial Cost $13,848,667 $599,147

Energy Consumption Costs $3,756,810 $162,534

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $7,227,600 $312,694

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $7,510,395 $324,929

Less Remaining Value $0 $0

Total Life-Cycle Cost $32,343,472 $1,399,305

Alternative: 90.1 Baseline PV-A1 LCC Summary

Present Value Annual Value

Initial Cost $12,696,764 $549,312

Energy Consumption Costs $5,725,424 $247,704

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $6,099,600 $263,892

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $7,396,212 $319,989

Less Remaining Value $0 $0

Total Life-Cycle Cost $31,918,000 $1,380,897

Alternative: 90.1-2019 Baseline LCC Summary

Present Value Annual Value

Initial Cost $11,649,977 $504,023

Energy Consumption Costs $6,648,877 $287,656

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $6,054,600 $261,946

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $5,971,312 $258,342

Less Remaining Value $0 $0

Total Life-Cycle Cost $30,324,767 $1,311,968

Alternative: HVAC NG Alt 1 SW-HX-A1 LCC Summary

Present Value Annual Value

Initial Cost $13,533,605 $585,517

Energy Consumption Costs $3,536,225 $152,991

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $7,179,600 $310,618

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $7,263,513 $314,248

Less Remaining Value $0 $0

Total Life-Cycle Cost $31,512,943 $1,363,373

Alternative: HVAC NG Alt 4 Base LCC Summary

Present Value Annual Value

Initial Cost $12,418,273 $537,263

Energy Consumption Costs $3,566,451 $154,299

Energy Demand Costs $0 $0

Energy Utility Rebates $0 $0

Water Usage Costs $0 $0

Water Disposal Costs $0 $0

Annually Recurring OM&R Costs $8,043,600 $347,998

Non-Annually Recurring OM&R Costs $0 $0

Replacement Costs $6,509,120 $281,610

Less Remaining Value $0 $0

Total Life-Cycle Cost $30,537,444 $1,321,169

File details come from the government source that posted it. Updated .