WWYK263009_65 Design Analysis_Part26.pdf

PDF 8 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This is a mechanical cut-sheet document detailing specifications for multiple air handling units to be installed at Tinker Air Force Base. The document includes detailed specifications for two units: MAU-1 through MAU-4 (four identical units) and DOAS-1. The MAU units are significantly larger, with dimensions of approximately 425" x 128" x 121" and an operating weight of 25,078 pounds each. They feature supply fans rated at 30,000 CFM, exhaust fans at 17,350 CFM, electric heaters with capacities of 138.2 kW and 242.8 kW, and a plate heat exchanger.

The DOAS-1 unit is smaller, with dimensions across four sections totaling approximately 351" x 118" x 75" and a total weight of 13,343 pounds. It includes supply fans rated at 5,910 CFM, exhaust fans at 3,948 CFM, electric heaters, and a plate heat exchanger. Both units are manufactured by Nortek Air Solutions and include multiple filter banks, dampers, and doors. The units are designed for outdoor installation with polyester resin finish in Sandstone color, featuring thermal break construction and heavy-duty insulation throughout.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mechanical Cut-Sheets

Air Handling Units

P rin te d

(y yy y- M

M -d

d) : 2

3-

-1 te d

(y yy y- M

M -d

d) : 2

3-te d

(y yy y- M

M -d

d) : 2

3-te d

(y yy y- M

M -d

d) : 2

3-

Preliminary

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Product Type Factory Finish Design Quantity Cabinet Const. Knockdown Const. Factory SAE Environment Measurement System Wall Thickness

Air Handler Polyester Resin 4 ITF - Integrated Frame None Outdoor US Standard 3

Box A Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

77.50 125.83 128.00 527.54 Cabinet Only 3,407

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 5 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation HD Fiberglass Roll Base Liner 20Ga Galv

Qty Box A Component Description Weight (lb) 2 3" Thermal Break Factory Door: 24 x 72 Out Swing VW: None 173 1 OPENING: (Return Air) Rectangle 48.00 x 48.00, Steel Floor Grate 11

1 DAMPER: Ruskin CD 60 (Galvanized) - 48.000 in (Blade Direction) x 48.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 118

1 Pre Filter: 2 Columns x 6 Rows 55 6 Pleated Filter SC 20x25x4 M8 (1 Set) - Face Load 10 6 Pleated Filter SC 16x25x4 M8 (1 Set) - Face Load 8 6 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 20 X 25 43

48 Filter Clip Farr C-86 Gal 5 6 FRAME, TYPE 8, 16ga BR GALV, 16 X 25 39 1 OPENING: (Outside Air) Rectangle 30.00 x 96.00 45

1 DAMPER: Ruskin CD 60 (Galvanized) - 30.000 in (Blade Direction) x 96.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 74

1 Pre Filter: 2 Columns x 5 Rows 62 10 Pleated Filter SC 20x25x4 M8 (1 Set) - Face Load 17 10 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 20 X 25 72 40 Filter Clip Farr C-86 Gal 4 1 Electric Heater (H) 94 (W) 56 (D) 24 88

Box A Component Totals 824 Box A Cabinet & Component Totals 4,231

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Box B Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

77.00 125.83 128.00 318.17 Cabinet Only 2,042

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 5 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation HD Fiberglass Roll Base Liner 20Ga Galv

Qty Box B Component Description Weight (lb) 4 3" Thermal Break Factory Door: 24 x 72 Out Swing VW: None 345 1 Plate Exchanger: IPE5, Innergytech IPE5-IM-107H-50S-0.16 1,135 1 Drain Pan 33.00" x 122.00" (16Ga 304 SS) 101 1 Drain Pan 33.00" x 122.00" (16Ga 304 SS) 101 1 Internal Wall 26"(L) x 112"(H) x 2(D) 137 1 Internal Wall 2"(L) x 112"(H) x 2(D) 22 1 Internal Wall 26"(L) x 112"(H) x 2(D) 137

Box B Component Totals 1,979 Box B Cabinet & Component Totals 4,020

Box C Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

83.00 125.83 128.00 436.86 Cabinet Only 3,022

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 5 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation HD Fiberglass Roll Base Liner 20Ga Galv

Qty Box C Component Description Weight (lb) 1 3" Thermal Break Factory Door: 24 x 72 Out Swing VW: None 86 1 OPENING: (Return Air) Rectangle 48.00 x 48.00, Steel Floor Grate 11

1 DAMPER: Ruskin CD 60 (Galvanized) - 48.000 in (Blade Direction) x 48.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 118

1 FANWALL: (EXHAUST) 20-80 - 184T - 36 x 40 x 28 - C1 (PentaCube) Removal Rail -- ELECTRICAL:

Standard, One Fan, Magnesense, Wired to: MSP Panel & VFD Only 923

3 FANWALL Backdraft Damper, HBD-8, 24"(w) x 24"(h) ID 51 3 Motor Toshiba TEAO 1800rpm 5-7HP 230/460 Insul Brngs Keyed 347 1 VFD Only 20" x 40.6" x 14" NEMA 1 Indoor 37 1 VFD, Yaskawa, 20 HP (Rep Supplied) 0 1 MSP Panel 20" x 16" x 8" NEMA 4 Indoor / Outdoor 75 1 Internal Wall 60"(L) x 112"(H) x 3(D) 377 1 3" Thermal Break Factory Door: 24 x 72 In Swing VW: 10 in x 10 in Thermal Break 103 1 OPENING: (Exhaust Air) Rectangle 30.00 x 99.00 40

1 DAMPER: Ruskin CD 60 (Galvanized) - 30.000 in (Blade Direction) x 99.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 76

Box C Component Totals 2,244 Box C Cabinet & Component Totals 5,266

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Box D Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

101.00 125.83 128.00 354.25 Cabinet Only 2,982

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 5 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation HD Fiberglass Roll Base Liner 20Ga Galv

Qty Box D Component Description Weight (lb) 3 3" Thermal Break Factory Door: 24 x 72 Out Swing VW: None 259 1 Final Filter: 5 Columns x 5 Rows 137 5 Box Filter (No Header) 20x25x4 M13 (1 Set) - Face Load 43

20 Box Filter (No Header) 16x20x4 M13 (1 Set) - Face Load 111 5 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 20 X 25 36

100 Filter Clip Farr C-86 Gal 11 20 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 16 X 20 114 1 Electric Heater (H) 100 (W) 104 (D) 36 147

Box D Component Totals 858 Box D Cabinet & Component Totals 3,840

Box E Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

86.50 125.83 128.00 439.04 Cabinet Only 3,165

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 5 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation HD Fiberglass Roll Base Liner 20Ga Galv

Qty Box E Component Description Weight (lb) 2 3" Thermal Break Factory Door: 30 x 72 In Swing VW: 10 in x 10 in Thermal Break 243

1 FANWALL: (SUPPLY) 20-50 - 184T - 36 x 38 x 26 - C3 (PentaCube) Removal Rail -- ELECTRICAL: Standard, One Fan, Magnesense, Wired to: MSP Panel & VFD Only 2,404

9 FANWALL Backdraft Damper, HBD-8, 24"(w) x 24"(h) ID 154 9 Motor Toshiba TEAO 1800rpm 5-7HP 230/460 Insul Brngs Keyed 1,040 1 VFD Only 20.5" x 40.6" x 15.3" NEMA 1 Indoor 56 1 VFD, Yaskawa, 50 HP (Rep Supplied) 0 1 MSP Panel 30" x 30" x 8" NEMA 4 Indoor / Outdoor 174 1 OPENING: (Supply Air) Rectangle 114.00 x 39.00, Steel Floor Grate 10

Box E Component Totals 4,080 Box E Cabinet & Component Totals 7,245

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Qty Design Items Weight (lb) 1 Factory Testing: None 0 1 Design Miscellaneous 947

Design Item Totals 947

Weight (lb) Weight (Ea) 25,549

Weight (Qty 4) 102,195

Errors and Warnings Electric Heater 1: Component Override must be entered (installation already included) Electric Heater 2: Component Override must be entered (installation already included) Project: The required Project information has not been completed.

Unit Design Options Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

106 Static Pressure Summary

106.1 Condition 1

106.1.1 Supply Air TSP

Tunnel Description APD (in.H20) OA AirTunnel 2 OA Damper/Louver - Louver & Damper (Outside Air) 0.21 OA AirTunnel 2 Filter 1, Pre-Filter (Average Pressure Drop) 0.51 OA AirTunnel 2 Electric Heater 1 0.02

AirTunnel 3 Plate Exchanger 1 OSA to SA 1.25 SA AirTunnel 4 RA Damper 2 - Damper (Return Air) 0.05

AirTunnel 6 Filter 3, Final Filter (Average Pressure Drop) 1.03 AirTunnel 6 Electric Heater 2 0.01 AirTunnel 6 SA Opening (Supply Air) 0.15

FANWALL 2 (Supply) - Supply Air - SA Opening ESP: 3.00 Total Static Pressure: 6.23

106.1.2 Exhaust Air TSP

Tunnel Description APD (in.H20)

EA AirTunnel 5 EA Damper/Louver - Louver & Damper (Exhaust Air) 0.27 RA AirTunnel 1 Filter 2, Pre-Filter (Average Pressure Drop) 0.54

AirTunnel 3 Plate Exchanger 1 RA to EA 1.32 RA AirTunnel 1 RA Damper1 - Damper (Return Air) 0.08

Plenum 1 - Return Air - RA Damper1 ESP: 2.00 Total Static Pressure: 4.21

Legend: ESP - External Static Pressure, OSA - Outside Air, EXH - Exhaust Air, RA - Return Air, SA - Supply Air

106.2 Notes/Legend

1. Summary report does not include static pressure of components supplied by others in the field unless otherwise noted.

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box E 20-50 - 184T - 36 x 38 x 26 - C3

200.1 Configuration / Quantity

Supply Fan1. Function

92. Quantity 3 Rows x 3 Cols3. Array PentaCube4. Construction Upstream Removable5. Inlet Cone Location

Cell Size 6.Height

7.Width

8.Depth

9.Overall Depth

33.25 1,302 ft / 70.0 °F10.Elev. / Temp.

167 lb11.Motor & Wheel Weight 375 lb12.Fan Cell Weight

013.Redundant 014.Empty 015.Ship Loose Fan (Wheel, Motor and Mounting Base)

200.2 Options

Standard Melamine1. Coplanar Insulation No2. Extended Coplanar FBD83. Back Draft Dampers A100 Curved Cone4. Inlet Cone Type None5. Solid Perimeter Material No6. Discharge Safety Guard Steel7. Cell Material

None8. Cell Finish No9. Insulation Retainer None10. Inlet Attenuation 16Ga Galv11.Blankoff Material None12.Blankoff Finish Yes13.Removal Rail

200.3 Fan Wheel

HPF-A1001. Wheel Type

202. Diameter

13. Balancing Planes

504. Width 35215. Max RPM None6. Wheel Finish

200.4 Motor

Toshiba1. Manufacturer 5 / 452. HP Each / Total 4-Pole / 1,7553. Poles / RPM 184T / TEAO4. Frame / Casing 460/3/605. Volts / Phase / Hz

4OA005L1ZVS2106. Model

89.57. Efficiency

1.158. Service Factor

Ceramic Bearings9. Shaft Isolation

6.4 / 57.6 Amps10.FLA Each / Total

3.0 %11.Motor HP Safety Factor

200.5 Variable Frequency Drive

Others1. Furnished by

12. Quantity Yaskawa3. Manufacturer

504. Horsepower 460/3/605. Voltage

65 / 65 Amps6. Input / Output Amps

88.657. Maximum Hertz

No8. Input Line Reactor None9. VFD Communication

Notes:

1. Standalone VFD, not located in electrical panel.

200.6 Control System

No1. Redundant VFD 60Hz Purchased with VFD2. Bypass Circuit Standard3. Drive No4. Optimization Control By Others5. Control Method

Single Fan Airflow Station6. Flow Monitoring One Fan7. Fans to Monitor Magnesense8. Display

200.7 Notes / Features

1. To view patents and other pending U.S. or Canadian applications visit www.nortekair.com/patents.

2. (1) airflow measurement tap. Cone constant = 2524, cone flow differential pressure = 1.99 in.H2O at 3646 CFM per fan.

3. The estimated VFD input watts are based on the motor and VFD efficiency at the selected load and RPM.

4. Fans balanced to a maximum allowable level of 0.022 inches per second peak.

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box E (Continued) 20-50 - 184T - 36 x 38 x 26 - C3

200.8 Operating Conditions

Operating Condition Usage

(%) CFM

SP (in.H20) Input Adj.

Cell Qty On Off Fail

RPM Hz Fanwheel BHP Each Total

Vel.

(ft/min) Watts FEG

% O.P. FEI

Condition 1 100 30,000 6.23 6.34 9 0 0 2,542 86.9 4.70 42.28 441 36,417 FEG80 2% 1.21 Condition 1 w/ Failed 100 29,169 5.89 6.03 8 0 1 2,579 88.2 4.85 38.79 483 33,373 FEG80 0% 1.22 Condition 1 at 60Hz 100 20,780 3.00 3.04 9 0 0 1,755 60 1.53 13.81 306 12,484 FEG80 2% 1.24

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box E (Continued) 20-50 - 184T - 36 x 38 x 26 - C3

200.9 Bare Fan Sound Power with Coplanar Silencer (dB re: 10E-12 watts) Operating Condition 63 125 250 500 1k 2k 4k 8k LwA Lw

Condition 1 Inlet

Outlet

Condition 1 w/ Failed Inlet

Outlet

Condition 1 at 60Hz Inlet

Outlet

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box E (Continued) 20-50 - 184T - 36 x 38 x 26 - C3

200.10 AMCA Statement

Nortek Air Solutions LLC certifies that the HPF-A100 fan wheel shown herein is licensed to bear the AMCA Seal. The ratings shown are based on tests and procedures performed in accordance with AMCA Publication 211 and AMCA Publication 311 and comply with the requirements of the AMCA Certified Ratings Program.

The AMCA licensed air and/or sound performance data has been modified for installation,appurtenances or accessories, etc. not included in the certified data. The modified performance is not AMCA licensed but is provided to aid in selection and applications of the product. Performance certified is for installation type A: Free Inlet/Free Outlet Power [bhp] excludes drives

FWTRating DLL: Ver-1.6 / May 2022

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

201 FANWALL 1 (Exhaust) : FWT1 : Box C 20-80 - 184T - 36 x 40 x 28 - C1

201.1 Configuration / Quantity

Exhaust Fan1. Function

32. Quantity 3 Rows x 1 Cols3. Array PentaCube4. Construction Upstream Removable5. Inlet Cone Location

Cell Size 6.Height

7.Width

8.Depth

9.Overall Depth

35.25 1,302 ft / 70.0 °F10.Elev. / Temp.

172 lb11.Motor & Wheel Weight 387 lb12.Fan Cell Weight

013.Redundant 014.Empty 015.Ship Loose Fan (Wheel, Motor and Mounting Base)

201.2 Options

Standard Melamine1. Coplanar Insulation No2. Extended Coplanar FBD83. Back Draft Dampers A100 Curved Cone4. Inlet Cone Type None5. Solid Perimeter Material No6. Discharge Safety Guard Steel7. Cell Material

None8. Cell Finish No9. Insulation Retainer None10. Inlet Attenuation 16Ga Galv11.Blankoff Material None12.Blankoff Finish Yes13.Removal Rail

201.3 Fan Wheel

HPF-A1001. Wheel Type

202. Diameter

13. Balancing Planes

804. Width 35215. Max RPM None6. Wheel Finish

201.4 Motor

Toshiba1. Manufacturer 6 / 182. HP Each / Total 4-Pole / 1,7453. Poles / RPM 184T / TEAO4. Frame / Casing 460/3/605. Volts / Phase / Hz

4OA005L1ZVS2106. Model

88.57. Efficiency

1.158. Service Factor

Ceramic Bearings9. Shaft Isolation

7.5 / 22.5 Amps10.FLA Each / Total

3.0 %11.Motor HP Safety Factor

201.5 Variable Frequency Drive

Others1. Furnished by

12. Quantity Yaskawa3. Manufacturer

204. Horsepower 460/3/605. Voltage

27 / 27 Amps6. Input / Output Amps

85.657. Maximum Hertz

No8. Input Line Reactor None9. VFD Communication

Notes:

1. Standalone VFD, not located in electrical panel.

201.6 Control System

No1. Redundant VFD 60Hz Purchased with VFD2. Bypass Circuit Standard3. Drive No4. Optimization Control By Others5. Control Method

Single Fan Airflow Station6. Flow Monitoring One Fan7. Fans to Monitor Magnesense8. Display

201.7 Notes / Features

1. To view patents and other pending U.S. or Canadian applications visit www.nortekair.com/patents.

2. Cell velocity is greater than 750.00 ft/min.

3. (1) airflow measurement tap. Cone constant = 2524, cone flow differential pressure = 7.37 in.H2O at 7016 CFM per fan.

4. The estimated VFD input watts are based on the motor and VFD efficiency at the selected load and RPM.

5. Fans balanced to a maximum allowable level of 0.022 inches per second peak.

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

201 FANWALL 1 (Exhaust) : FWT1 : Box C (Continued) 20-80 - 184T - 36 x 40 x 28 - C1

201.8 Operating Conditions

Operating Condition Usage

(%) CFM

SP (in.H20) Input Adj.

Cell Qty On Off Fail

RPM Hz Fanwheel BHP Each Total

Vel.

(ft/min) Watts FEG

% O.P. FEI

Condition 1 100 17,350 4.21 4.59 3 0 0 2,367 81.4 5.74 17.23 723 15,010 FEG85 0% 1.28 Condition 1 w/ Failed 100 14,031 2.75 3.35 2 0 1 2,491 85.7 5.82 11.64 877 10,208 FEG85 5% 1.16 Condition 1 at 60Hz 100 12,904 2.35 2.54 3 0 0 1,745 60 2.29 6.87 538 6,141 FEG85 0% 1.36

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

201 FANWALL 1 (Exhaust) : FWT1 : Box C (Continued) 20-80 - 184T - 36 x 40 x 28 - C1

201.9 Bare Fan Sound Power with Coplanar Silencer (dB re: 10E-12 watts) Operating Condition 63 125 250 500 1k 2k 4k 8k LwA Lw

Condition 1 Inlet

Outlet

Condition 1 w/ Failed Inlet

Outlet

Condition 1 at 60Hz Inlet

Outlet

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

201 FANWALL 1 (Exhaust) : FWT1 : Box C (Continued) 20-80 - 184T - 36 x 40 x 28 - C1

201.10 AMCA Statement

Nortek Air Solutions LLC certifies that the HPF-A100 fan wheel shown herein is licensed to bear the AMCA Seal. The ratings shown are based on tests and procedures performed in accordance with AMCA Publication 211 and AMCA Publication 311 and comply with the requirements of the AMCA Certified Ratings Program.

The AMCA licensed air and/or sound performance data has been modified for installation,appurtenances or accessories, etc. not included in the certified data. The modified performance is not AMCA licensed but is provided to aid in selection and applications of the product. Performance certified is for installation type A: Free Inlet/Free Outlet Power [bhp] excludes drives

FWTRating DLL: Ver-1.6 / May 2022

Components Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

400 Plate Exchanger 1 : PE1 : Box B Innergytech IPE5-IM-107H-50S-0.16

400.1 Plate Exchanger Specifications

Total1. Plate Type IPE52. Plate Material 957 lb3. Weight None4. Coating None5. Lab Seal 1,302 ft6. Elevation

400.2 Plate Exchanger Dimensions

50.240 in1. Side (S)

70.000 in2. Diagonal (D)

107.000 in3. Depth (H)

0.160 in4. Plate Spacing

400.3 Condition 1

Sensible Latent

Total

Effectiveness

76.0 %

25.5 %

67.8 %

Capacity

231.4 MBH

14.9 MBH

246.4 MBH

420 ft/minVelocity - Supply

1.25 in.H20APD Supply 467 ft/minVelocity - Exhaust

1.32 in.H20APD Exhaust

-1.25 in.H20Pressure Differential (2-3)

2.1 %EATR

.99OACF

0 ACFMOACF CFM

Flow Rate DBT WBT RH (%) Spec. Hum.

Plate Outside Air 15,620 ACFM 100.0 °F 73.4 °F 28.9 % 86.96 gr/lb Plate Supply Air 15,620 ACFM 84.8 °F 68.9 °F 45.6 % 85.53 gr/lb Plate Return Air 17,350 ACFM 80.0 °F 66.6 °F 50.5 % 80.99 gr/lb Plate Exhaust Air 17,350 ACFM 92.7 °F 70.6 °F 34.1 % 82.22 gr/lb

400.4 Condition 2

Sensible Latent

Total

Effectiveness

74.1 %

38.7 %

41.7 %

Capacity

40.7 MBH

229.3 MBH

270.0 MBH

420 ft/minVelocity - Supply

1.25 in.H20APD Supply 467 ft/minVelocity - Exhaust

1.30 in.H20APD Exhaust

-1.25 in.H20Pressure Differential (2-3)

2.1 %EATR

.99OACF

0 ACFMOACF CFM

Flow Rate DBT WBT RH (%) Spec. Hum.

Plate Outside Air 15,620 ACFM 83.5 °F 77.1 °F 75.5 % 137.51 gr/lb Plate Supply Air 15,620 ACFM 80.9 °F 72.8 °F 68.7 % 114.50 gr/lb Plate Return Air 17,350 ACFM 80.0 °F 66.0 °F 48.5 % 77.88 gr/lb Plate Exhaust Air 17,350 ACFM 82.3 °F 70.5 °F 56.6 % 98.39 gr/lb

Components Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

400 Plate Exchanger 1 : PE1 : Box B (Continued) Innergytech IPE5-IM-107H-50S-0.16

400.5 Condition 3

Sensible Latent

Total

Effectiveness

70.6 %

49.2 %

67.5 %

Capacity

240.9 MBH

27.6 MBH

268.4 MBH

420 ft/minVelocity - Supply

1.31 in.H20APD Supply 467 ft/minVelocity - Exhaust

1.34 in.H20APD Exhaust

-1.31 in.H20Pressure Differential (2-3)

2.2 %EATR

.99OACF

0 ACFMOACF CFM

Flow Rate DBT WBT RH (%) Spec. Hum.

Plate Outside Air 15,620 ACFM 40.0 °F 40.0 °F 100.0 % 38.14 gr/lb Plate Supply Air 15,620 ACFM 54.1 °F 46.1 °F 54.8 % 35.56 gr/lb Plate Return Air 17,350 ACFM 60.0 °F 48.0 °F 41.0 % 32.88 gr/lb Plate Exhaust Air 17,350 ACFM 46.2 °F 42.3 °F 73.1 % 35.41 gr/lb

400.6 Notes / Features

1. Application Rating is outside of the scope of AHRI ERV Certification Program, but is rated in accordance with AHRI Standard 1060.

2. DLL Version 1.3.0.0

Components Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

401 Electric Heater 1 : EH1 : Box A

401.1 Configuration

Indeeco1. Manufacturer

138.2 kW2. Heating Capacity 460/3/603. Volt/Ph/Hz

173.654. FLA

173.655. Amps/Step

Duct Stat by Heater Manufacturer6. Temperature Controls Open Coil Duct Heaters7. Heater Element

SCR8. Control Steps 0-10V9. Control Signal Magnetic10.Contactor Non-Fused11.Disconnect 16Ga Galv12.Blankoff Material None13.Blankoff Finish

Options NEMA 3R Panel (Outdoor) U.L. Listed SPST Airflow Switch Transformer with Fuse Auto and Manual Reset Switches

Fusing per Step Duct (Slip-In) Mounted Protective Screen on Both Sides Horizontal Airflow

Dimensional Data (in) W

48.00 H

90.00 N

4.00

OL

14.00

OR

2.00

C 8.00

T 2.00

L 2.00

P 94.00

M 24.00

E 8.00

401.2 Operating Conditions

Operating Condition ACFM Entering Temp DB

(°F)

Leaving Temp DB

(°F)

Power

(MBH)

Temp Rise (°F)

Capacity (kW)

Power Density

(kW / ft2)

Face Velocity (ft/min)

APD

(in.H20)

Condition 1 15,620 13.9 40.0 471.5 26.1 138.2 5.2 587.6 0.02

401.3 Electrical Service Information

460/3/601. Volt/Phase/Hertz

173.72. MCA

Electric Heater 13. Provides power to

1. For electrical loads see electrical drawings

401.4 Notes / Features

1. U.L. recognized.

2. Wiring diagram required.

3. Approval drawing required.

4. Unheated section between elements and panel to be left unblanked.

Components Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

402 Electric Heater 2 : EH2 : Box D

402.1 Configuration

Indeeco1. Manufacturer

242.8 kW2. Heating Capacity 460/3/603. Volt/Ph/Hz

305.094. FLA

305.095. Amps/Step

Duct Stat by Heater Manufacturer6. Temperature Controls Open Coil Duct Heaters7. Heater Element

18. Control Steps 0-10V9. Control Signal Magnetic10.Contactor Non-Fused11.Disconnect 16Ga Galv12.Blankoff Material None13.Blankoff Finish

Options NEMA 1 Panel (Indoor) U.L. Listed SPST Airflow Switch Transformer with Fuse Auto and Manual Reset Switches

Fusing per Step Duct (Slip-In) Mounted Protective Screen on Both Sides Horizontal Airflow

Dimensional Data (in) W

96.00 H

96.00 N

4.00

OL

2.00

OR

26.00 C

8.00 T

2.00 L

2.00 P

100.00 M

36.00 E

8.00

402.2 Operating Conditions

Operating Condition ACFM Entering Temp DB

(°F)

Leaving Temp DB

(°F)

Power

(MBH)

Temp Rise (°F)

Capacity (kW)

Power Density

(kW / ft2)

Face Velocity (ft/min)

APD

(in.H20)

Condition 1 30,000 54.1 80.0 828.4 25.9 242.8 4.1 501.0 0.01

402.3 Electrical Service Information

460/3/601. Volt/Phase/Hertz

305.12. MCA

Electric Heater 23. Provides power to

1. For electrical loads see electrical drawings

402.4 Notes / Features

1. U.L. recognized.

2. Wiring diagram required.

3. Approval drawing required.

4. Unheated section between elements and panel to be left unblanked.

Components Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

500 Filter 2 : FILT2 : Box A

500.1 Pre-Filter Size & Quantity

Upstream Face Load1. Loading Galvanized2. Frame Material None3. Frame Finish

(48) C-864. Filter Clips 16Ga Galv5. Blankoff / Rack Material None6. Blankoff / Rack Finish

50.063 in W x 108.000 in H7. Bank Size

(6) 20 in x 25 in8. Qty / set & Frame Size 1

(6) 16 in x 25 in9. Qty / set & Frame Size 2

10.Qty / set & Frame Size 3 11.Qty / set & Frame Size 4

500.2 Pre Filter

4.000 in1. Filter Depth MERV 82. Efficiency American Air Filter3. Manufacturer

14. Number of Sets

462.67 ft/min at 17,350 ACFM5. Max Face Velocity PerfectPleat SC6. Model

500.3 Notes / Features

1. All sets of Filters and clips to ship loose inside unit, installed by others.

501 Filter 1 : FILT1 : Box A

501.1 Pre-Filter Size & Quantity

Upstream Face Load1. Loading Galvanized2. Frame Material None3. Frame Finish

(40) C-864. Filter Clips 16Ga Galv5. Blankoff / Rack Material None6. Blankoff / Rack Finish

50.063 in W x 100.000 in H7. Bank Size

(10) 20 in x 25 in8. Qty / set & Frame Size 1

9. Qty / set & Frame Size 2 10.Qty / set & Frame Size 3 11.Qty / set & Frame Size 4

501.2 Pre Filter

4.000 in1. Filter Depth MERV 82. Efficiency American Air Filter3. Manufacturer

14. Number of Sets

449.86 ft/min at 15,620 ACFM5. Max Face Velocity PerfectPleat SC6. Model

501.3 Notes / Features

1. All sets of Filters and clips to ship loose inside unit, installed by others.

502 Filter 3 : FILT3 : Box D

502.1 Final Filter Size & Quantity

Upstream Face Load1. Loading Galvanized2. Frame Material None3. Frame Finish

(100) C-864. Filter Clips 16Ga Galv5. Blankoff / Rack Material None6. Blankoff / Rack Finish

100.250 in W x 89.000 in H7. Bank Size

(5) 20 in x 25 in8. Qty / set & Frame Size 1

(20) 16 in x 20 in9. Qty / set & Frame Size 2

10.Qty / set & Frame Size 3 11.Qty / set & Frame Size 4

502.2 Final Filter

4.000 in1. Filter Depth MERV 132. Efficiency American Air Filter3. Manufacturer

14. Number of Sets

485.39 ft/min at 30,000 ACFM5. Max Face Velocity VariCel II6. Model

502.3 Notes / Features

1. All sets of Filters and clips to ship loose inside unit, installed by others.

Electrical Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

700 Electrical Layout Diagram

Note: The FLA and MCA values shown are estimated, see the electrical schematics for the actual values.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity

Size (Inches) X Y Z

Operating Weight (Pounds) Center of Gravity (Inches)

X Y Z

425.00 128.00 121.00 25,078 220.00 66.00 57.00

901.1 Notes

1. Center of gravity and weights are estimates and subject to change.

2. The center of gravity and weights shown above are based on operating weights and do not include packaging materials.

3. A 5% safety factor has been applied to the operating weights.

4. Weights shown do not include roof curbs provided by others.

5. Corner weights apply to rectangular boxes only.

6. Corner weights are to assist in handling of the unit. Some units are not intended to be supported only at the corners. Contact your

Sales Representative for support information.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity (Continued)

901.2 Box A

Size (Inches) X Y Z

Shipping Weight (Pounds) Corner Weights (Pounds)

C1 C2 C3 C4

77.50 128.00 121.00 4,379 1,108 1,180 1,078 1,013

◊ Center of gravity, weight, and corner weights shown are based on shipping weight. Values are estimates and subject to change.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity (Continued)

901.3 Box B

Size (Inches) X Y Z

Shipping Weight (Pounds) Corner Weights (Pounds)

C1 C2 C3 C4

77.00 128.00 121.00 4,020 1,025 933 983 1,080

◊ Center of gravity, weight, and corner weights shown are based on shipping weight. Values are estimates and subject to change.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity (Continued)

901.4 Box C

Size (Inches) X Y Z

Shipping Weight (Pounds) Corner Weights (Pounds)

C1 C2 C3 C4

83.00 128.00 121.00 5,395 1,149 1,679 1,525 1,043

◊ Center of gravity, weight, and corner weights shown are based on shipping weight. Values are estimates and subject to change.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity (Continued)

901.5 Box D

Size (Inches) X Y Z

Shipping Weight (Pounds) Corner Weights (Pounds)

C1 C2 C3 C4

101.00 128.00 121.00 3,840 979 979 941 941

◊ Center of gravity, weight, and corner weights shown are based on shipping weight. Values are estimates and subject to change.

Unit Data Project Name: Tinker Air Force Base-BACH

Unit Tag: MAU-1 thru 4 Sales Order #: -006, 007, 008, Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

901 Center of Gravity (Continued)

901.6 Box E

Size (Inches) X Y Z

Shipping Weight (Pounds) Corner Weights (Pounds)

C1 C2 C3 C4

86.50 128.00 121.00 7,443 2,522 2,296 1,251 1,374

◊ Center of gravity, weight, and corner weights shown are based on shipping weight. Values are estimates and subject to change.

te d

(y yy y- M

M -d

d) : 2

3-te d

(y yy y- M

M -d

d) : 2

3-te d

(y yy y- M

M -d

d) : 2

3-

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Product Type Factory Finish Design Quantity Cabinet Const. Knockdown Const. Factory SAE Environment Measurement System Wall Thickness

Air Handler Polyester Resin 1 ITF - Integrated Frame None Outdoor US Standard 3

Box A Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

65.50 74.73 118.00 394.70 Cabinet Only 2,154

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 4 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation Polyurethane Foam Base Liner 20Ga Galv

Qty Box A Component Description Weight (lb) 2 3" Thermal Break Factory Door: 24 x 54 Out Swing VW: None 130 1 Pre Filter: 2 Columns x 2 Rows 44 4 Pleated Filter SC 20x25x2 M8 (1 Set) - Face Load 5 4 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 20 X 25 29

16 Filter Clip Farr C-70 Gal 2 1 OPENING: (Return Air) Rectangle 42.00 x 21.00, Steel Floor Grate 4 1 OPENING: (Outside Air) Rectangle 30.00 x 42.00 30

1 DAMPER: Ruskin CD 60 (Galvanized) - 30.000 in (Blade Direction) x 42.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 64

1 Pre Filter: 2 Columns x 2 Rows 44 4 Pleated Filter SC 20x25x2 M8 (1 Set) - Face Load 5 4 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 20 X 25 29

16 Filter Clip Farr C-70 Gal 2 1 Electric Heater (H) 49 (W) 50 (D) 24 61

Box A Component Totals 447 Box A Cabinet & Component Totals 2,602

Box B Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

77.00 74.73 118.00 235.59 Cabinet Only 1,512

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 4 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation Polyurethane Foam Base Liner 20Ga Galv

Qty Box B Component Description Weight (lb) 4 3" Thermal Break Factory Door: 24 x 54 Out Swing VW: None 260 1 Plate Exchanger: IPE5, Innergytech IPE5-IM-62H-48S-0.14 725 1 Drain Pan 34.00" x 112.00" (16Ga 304 SS) 96 1 Drain Pan 34.00" x 112.00" (16Ga 304 SS) 96 1 Internal Wall 23.12"(L) x 62"(H) x 2(D) 63

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Qty Box B Component Description (Cont.) Weight (lb) 1 Internal Wall 3.239998"(L) x 62"(H) x 2(D) 16 1 Internal Wall 23.12"(L) x 62"(H) x 2(D) 63 1 Internal Wall 3"(L) x 62"(H) x 2(D) 15

Box B Component Totals 1,333 Box B Cabinet & Component Totals 2,845

Box C Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

95.50 74.73 118.00 330.38 Cabinet Only 2,629

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 4 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation Polyurethane Foam Base Liner 20Ga Galv

Qty Box C Component Description Weight (lb) 2 3" Thermal Break Factory Door: 24 x 54 Out Swing VW: None 124 1 3" Thermal Break Factory Door: 24 x 59.5 In Swing VW: 10 in x 10 in Thermal Break 84 2 5WC-26-27x45x10-10AL, .008F, .020T 16Ga 304 SS, 16Ga 304 SS Blankoff 687 1 Drain Pan 31.00" x 55.00" (16Ga 304 SS) 72 1 Electric Heater (H) 49 (W) 50 (D) 24 61

1 FANWALL: (EXHAUST) 12-105 - 145T - 28 x 36 x 24 - B1 (PentaCube) -- ELECTRICAL: Standard, One Fan, Magnesense, Wired to: MSP Panel & VFD Only 453

2 FANWALL Backdraft Damper, HBD-6, 18"(w) x 18"(h) ID 28 2 Motor Toshiba TEAO 3600rpm 2-2.5HP 230/460 Insul Brngs Keyed 116 1 VFD Only 18" x 33" x 14" NEMA 1 Indoor 16 1 VFD, Yaskawa, 5 HP (Rep Supplied) 0 1 MSP Panel 20" x 16" x 8" NEMA 4 Indoor / Outdoor 68 1 OPENING: (Exhaust Air) Rectangle 30.00 x 48.00 26

1 DAMPER: Ruskin CD 60 (Galvanized) - 30.000 in (Blade Direction) x 48.000 in -- Actuator: Furnished by Others, Mounted by Others - Wired by Others 74

Box C Component Totals 1,808 Box C Cabinet & Component Totals 4,437

Line Item Summary Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

Box D Cabinet and Components

* Box Dimensions do not include lifting lugs, electrical panels, pipe connections, door handles, etc. The height dimensions include raised roof seams and sloped roof for outdoor equipment. Box weights do not include roof curbs.

Length (in) Height (in) Width (in) 12" Weight (lb) Weight (lb)

113.50 72.23 61.00 199.86 Cabinet Only 1,890

Exterior Material 16Ga Galv Pre-Paint Finish Color Sandstone Base Structure Steel Tube Base Height 4 in Base Floor Mat. 16Ga Galv Base Insulation Polyurethane Foam

Interior Material 20Ga Galv Insulation Polyurethane Foam Base Liner 20Ga Galv

Qty Box D Component Description Weight (lb) 1 3" Thermal Break Factory Door: 24 x 57 In Swing VW: 10 in x 10 in Thermal Break 81 1 3" Thermal Break Factory Door: 24 x 57 In Swing VW: None 80

1 FANWALL: (SUPPLY) 14-90 - 182T - 28 x 36 x 24 - B1 (PentaCube) -- ELECTRICAL: Standard, One Fan, Magnesense, Wired to: MSP Panel & VFD Only 455

2 FANWALL Backdraft Damper, HBD-6, 18"(w) x 18"(h) ID 28 2 Motor Toshiba TEAO 3600rpm 3-4.5HP 230/460 Insul Brngs Keyed 176 1 MSP Panel 20" x 16" x 8" NEMA 4 Indoor / Outdoor 68 1 Final Filter: 2 Columns x 2 Rows 37 4 Box Filter (Single Header) VXL 24x24x12 M13 (1 Set) - Face Load 71 4 FRAME, TYPE 8, 16ga GALV W/CLOSED CELL, 24 X 24 31

16 Filter Clip Farr C-70 Gal 2 1 VFD Only 18" x 33" x 14" NEMA 1 Indoor 16 1 VFD, Yaskawa, 7.5 HP (Rep Supplied) 0 1 OPENING: (Supply Air) Rectangle 42.00 x 21.00, Steel Floor Grate 4

Box D Component Totals 1,048 Box D Cabinet & Component Totals 2,939

Qty Design Items Weight (lb) 1 Factory Testing: None 0 1 Design Miscellaneous 521

Design Item Totals 521

Weight (lb) Weight (Ea) 13,343

Errors and Warnings Electric Heater 1: Component Override must be entered (installation already included) Electric Heater 2: Component Override must be entered (installation already included) Project: The required Project information has not been completed.

Unit Design Options Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

106 Static Pressure Summary

106.1 Condition 1

106.1.1 Supply Air TSP

Tunnel Description APD (in.H20) OA AirTunnel 2 OA Damper/Louver - Louver & Damper (Outside Air) 0.16 OA AirTunnel 2 Filter 1, Pre-Filter (Average Pressure Drop) 0.50 OA AirTunnel 2 Electric Heater 1 0.01

AirTunnel 3 Plate Exchanger 1 OSA to SA 0.91 SA AirTunnel 4 Chilled Water Coil 1 0.72 SA AirTunnel 4 Electric Heater 2 0.01

AirTunnel 6 Filter 3, Final Filter (Average Pressure Drop) 0.63 AirTunnel 6 SA Opening (Supply Air) 0.15

Filter 3 - Supply Air - SA Opening ESP: 2.00 Total Static Pressure: 5.09

106.1.2 Exhaust Air TSP

Tunnel Description APD (in.H20)

EA AirTunnel 5 EA Damper/Louver - Louver & Damper (Exhaust Air) 0.10 RA AirTunnel 1 Filter 2, Pre-Filter (Average Pressure Drop) 0.43

AirTunnel 3 Plate Exchanger 1 RA to EA 0.90 RA AirTunnel 1 RA Opening (Return Air) 0.03

Filter 2 - Return Air - RA Opening ESP: 2.00 Total Static Pressure: 3.46

Legend: ESP - External Static Pressure, OSA - Outside Air, EXH - Exhaust Air, RA - Return Air, SA - Supply Air

106.2 Notes/Legend

1. Summary report does not include static pressure of components supplied by others in the field unless otherwise noted.

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box D 14-90 - 182T - 28 x 36 x 24 - B1

200.1 Configuration / Quantity

Supply Fan1. Function

22. Quantity 2 Rows x 1 Cols3. Array PentaCube4. Construction Upstream Removable5. Inlet Cone Location

Cell Size 6.Height

7.Width

8.Depth

9.Overall Depth

31.25 1,302 ft / 70.0 °F10.Elev. / Temp.

131 lb11.Motor & Wheel Weight 296 lb12.Fan Cell Weight

013.Redundant 014.Empty 015.Ship Loose Fan (Wheel, Motor and Mounting Base)

200.2 Options

Standard Melamine1. Coplanar Insulation No2. Extended Coplanar FBD63. Back Draft Dampers A100 Curved Cone4. Inlet Cone Type None5. Solid Perimeter Material No6. Discharge Safety Guard Steel7. Cell Material

None8. Cell Finish No9. Insulation Retainer None10. Inlet Attenuation 16Ga Galv11.Blankoff Material None12.Blankoff Finish No13.Removal Rail

200.3 Fan Wheel

HPF-A1001. Wheel Type

142. Diameter

13. Balancing Planes

904. Width 39655. Max RPM None6. Wheel Finish

200.4 Motor

Toshiba1. Manufacturer 4 / 82. HP Each / Total 2-Pole / 3,4603. Poles / RPM 182T / TEAO4. Frame / Casing 460/3/605. Volts / Phase / Hz

2OA003L1ZVS2106. Model

847. Efficiency

1.158. Service Factor

Ceramic Bearings9. Shaft Isolation

4.8 / 9.6 Amps10.FLA Each / Total

3.0 %11.Motor HP Safety Factor

200.5 Variable Frequency Drive

Others1. Furnished by

12. Quantity Yaskawa3. Manufacturer

7.54. Horsepower

460/3/605. Voltage

11 / 11 Amps6. Input / Output Amps

68.257. Maximum Hertz

No8. Input Line Reactor None9. VFD Communication

Notes:

1. Standalone VFD, not located in electrical panel.

200.6 Control System

No1. Redundant VFD 60Hz Purchased with VFD2. Bypass Circuit Standard3. Drive No4. Optimization Control By Others5. Control Method

Single Fan Airflow Station6. Flow Monitoring One Fan7. Fans to Monitor Magnesense8. Display

200.7 Notes / Features

1. To view patents and other pending U.S. or Canadian applications visit www.nortekair.com/patents.

2. (1) airflow measurement tap. Cone constant = 1153, cone flow differential pressure = 11.18 in.H2O at 3948 CFM per fan.

3. The estimated VFD input watts are based on the motor and VFD efficiency at the selected load and RPM.

4. Fans balanced to a maximum allowable level of 0.022 inches per second peak.

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box D (Continued) 14-90 - 182T - 28 x 36 x 24 - B1

200.8 Operating Conditions

Operating Condition Usage

(%) CFM

SP (in.H20) Input Adj.

Cell Qty On Off Fail

RPM Hz Fanwheel BHP Each Total

Vel.

(ft/min) Watts FEG

% O.P. FEI

Condition 1 100 5,910 5.09 5.37 2 0 0 3,704 64.2 3.55 7.09 554 6,592 FEG85 0% 1.21 Condition 1 w/ Failed 100 3,948 2.27 2.85 1 0 1 3,936 68.3 3.36 3.36 740 3,164 FEG85 12% 1.00 Condition 1 at 60Hz 100 5,625 4.62 4.87 2 0 0 3,463 60.1 2.89 5.78 527 5,405 FEG85 0% 1.22

Fans Project Name: Tinker Air Force Base-BACH

Unit Tag: DOAS-1 Sales Order #: -010

Date/Revision: 2023-12-17 / Revision Error 106 N Industrial Blvd. Okarche, Ok 73762

(405) 817-9700 FAX (405) 263-4980

This Document is confidential, copyrighted and property of Nortek Air Solutions LLC.

Design Assistant

9.1.2 / 2.0.2.3

200 FANWALL 2 (Supply) : FWT2 : Box D (Continued) 14-90 - 182T - 28 x 36 x 24 - B1

200.9 Bare Fan Sound Power with Coplanar Silencer (dB re: 10E-12 watts) Operating Condition 63 125 250 500 1k 2k 4k 8k LwA Lw

Condition 1 Inlet

Outlet

Condition 1 w/ Failed Inlet

Outlet

Condition 1 at 60Hz Inlet

Outlet

SECTION 14 - APPENDICES
14.11 MECHANICAL APPENDIX
14.11.2 Cut-Sheets

File details come from the government source that posted it. Updated .