WWYK263009_65 Design Analysis_Part12_Part2.pdf
PDF 14 MB Posted
- Solicitation number
- W912BV25S0014
About this file
This is a 65% Design Analysis document for the Bomber Agile Common Hangar (BACH) project at Tinker Air Force Base, attached to a Special Notice announcing a Virtual Industry Forum. The U.S. Army Corps of Engineers Tulsa District is planning construction of a 4-dock hangar facility for program depot maintenance, with an estimated price range of $250-500 million. The project includes an 18,302 SM (197,003 sf) hangar with 39,052 SM (420,352 sf) of apron paving, featuring a single-story structural steel frame with full span trusses, deep foundations with piers and driven piles, and a standing seam metal roof. Support spaces include a two-story administration area, shop facilities, FEMA storm shelter, and hazardous material storage.
The Virtual Industry Forum is scheduled for February 18, 2025, from 9:00-10:00 AM Central Time. Interested parties must email Jon Larvick for MS Teams access. Following the forum, questions can be submitted via ProjNet from February 14-March 7, 2025. One-on-one meetings will be available for selected firms who submit capability statements and relevant experience on the day of the forum. The project falls under NAICS code 236220 with a $45M small business size standard. The facility will utilize natural gas instead of all-electric design and must comply with DoD antiterrorism/force protection requirements.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Current Date: 11/18/2024 1:53 PM Units system: English File name: P:\Projects\019503\02 Design\Struc\Calculations\Hangar Framing\Main Framing Model.retx Load condition: LL=Live Load
Current Date: 11/18/2024 1:53 PM
Load condition: SL=Snow Load
Current Date: 11/18/2024 1:54 PM
Load condition: Wx_plus=Pos Pres Wind in X
Current Date: 11/18/2024 1:54 PM
Load condition: Wz_plus=Pos Pres Wind in Z
Current Date: 11/18/2024 1:55 PM
Load condition: Wx_neg=Neg Pres Wind in X
Current Date: 11/18/2024 1:56 PM
Load condition: Wz_neg=Neg Pres Wind in Z
BrownZ7 Text Box
TRUSS TYPE T2
Current Date: 11/18/2024 7:55 AM
Current Date: 11/18/2024 8:06 AM
Current Date: 11/18/2024 8:07 AM
Load condition: DL=Dead Load
Current Date: 11/18/2024 8:09 AM
Load condition: LL=Live Load
Current Date: 11/18/2024 8:11 AM
Load condition: SL=Snow Load
Current Date: 11/18/2024 8:14 AM
Load condition: Wx_plus=Pos Pres Wind in X
Current Date: 11/18/2024 8:15 AM
Load condition: Wz_plus=Pos Pres Wind in Z
Current Date: 11/18/2024 8:16 AM
Load condition: Wx_neg=Neg Pres Wind in X
File details come from the government source that posted it. Updated .