This file contains meeting minutes from multiple project discussions held between September 2024 and January 2025 for the Bomber Agile Common Hangar (BACH) project at Tinker AFB, along with RFI responses and a Sundown Policy document for foam fire suppression systems.

The minutes detail discussions about design requirements and coordination between USACE, Air Force, and contractor teams regarding: fire protection systems transitioning from foam to water-only sprinklers per new policy; Equipment and power requirements including 400Hz power for B-52s; Industrial waste and drainage systems; Security requirements during construction; Interior FFE requirements for break rooms and conference spaces; Layout modifications including removal of NDI space; AGE parking requirements (20,000 SF); and Manning levels (280 additional employees for 1st shift). The Sundown Policy document outlines the Air Force's transition away from foam fire suppression systems, requiring facilities to be designated as either Tier 1 (limited special cases) or Tier 2 (standard water sprinkler protection). Key implementation dates include foam systems lockout by March 2023 and full AFFF replacement with fluorine-free foam by October 2024 where foam systems are still required.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E 81ST STREET

TULSA, OKLAHOMA 74137

MEETING MINUTES

MEETING DATE: 10 September 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Cameron Greer - USAF AFMC 72 ABW/CENMP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manger Dustin Baker - USAF AFMC 76 AMXG/MXDEO Melissa Schlick - USAF AFMC AFLCMC/AFLCMC Cody Patterson - AFMC AFIMSC Det 10/AFIMSC Det 10/CE Mark Hill - USAF AFMC 72 ABW/CENMP Brian Ables - USAF AFMC AFLCMC/WBS John Jones - US Air Force AFCAA AF COST ANA AG FO/FMA James Surber - USAF AFMC 72 ABW/CENMP Chris Clark – Larson Design Group Larry Tepen - USAF AFMC 72 ABW/CEFP Rebekah Ulm – Larson Design Group Ashley Gum – Mason and Hanger Doug Chun - USAF AFMC 72 ABW/72ABW/CENPD Tim Craddock – Mason and Hanger

Discussion Items:

Open RFIs

None.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team is working on minor updates to utilities and fence location, ongoing.

Construction Security Plan (CSP) - Melissa Schlick to provide Construction Security Plan (CSP) that will cover the construction security requirements of the areas for our organization within the BACH. This was delivered on 6 September 2024. Please let us know if there are any questions.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor, ongoing.

Interior Design: Waiting on for the Room Data Sheets: Requesting follow up information from meeting on 07-24 about Tool Crib equipment and storage needs, and Hazmat storage and equipment needs from Dustin. Looking for type and quantity needed. Dustin Baker is working on an updated version of the equipment list for the Tool Crib, ongoing.

Electrical: Waiting for word from Rafael via the chain of communications regarding exactly how future electrification capacity/space/etc. may or may not be incorporated into the building’s interior electrical distribution system design. Rafael confirmed the design intent, and the design team is prepared to move forward.

Miscellaneous Items:

The design team has provided a BACH Fire Hydrant Plan. It was discussed that a low-profile hydrant is not permitted per the UFC. Additional discussions will take place at our next meeting. Below are questions from BCE.

1) What are the line sizes for the water lines and fire water lines?

2) Two fire pump rooms in the Hangar with one on north and south sides based on two firewater connections OR they using existing fire pump bldg. on the west side of Douglas as well as the fire water tanks?

3) Do we need the future campus Fire pump bldg. and fire water tanks for the B-21 campus now that

HEF is not required in the hangars? Question for Cahill maybe?

4) PIV locations for Firewater lines?

5) Fire hydrants not blocking any hangar access doors?

6) FH in the southwest corner is a dead leg, how long is this dead leg line?

7) Why not complete the loop on the west side of the Hangar? Paint hangar to the south will have a loop water around it on the north, west, and south sides.

8) Pressure/flow test data of existing lines being connected to on the south and west for domestic water and firewater?

MEETING DATE: 17 September 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Cameron Greer - USAF AFMC 72 ABW/CENMP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manger Melissa Schlick - USAF AFMC AFLCMC/AFLCMC John Jones - US Air Force AFCAA AF COST ANA AG FO/FMA Ashley Gumm – Mason and Hanger Tim Craddock – Mason and Hanger Sara Wakelam-Sayler – USAF Tonya Wood – Mead & Hunt Mitch Hodson Ron Rosebrook – USACE David Delsigne - USAF AFMC 76 AMXG/MXDEB

RFI No. 58 - Monitoring wells in supplemental survey area, GSE storage area. Current detail on page 2 is not part of the RFI.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team is working on minor updates to utilities and fence location, ongoing.

Construction Security Plan (CSP) - Melissa Schlick to provide Construction Security Plan (CSP) that will cover the construction security requirements of the areas for our organization within the BACH. This was delivered on 6 September 2024. Please let us know if there are any questions.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor, ongoing.

Interior Design: Waiting on for the Room Data Sheets: Requesting follow up information from meeting on 07-24 about Tool Crib equipment and storage needs, and Hazmat storage and equipment needs from Dustin. Looking for type and quantity needed. Dustin Baker is working on an updated version of the equipment list for the Tool Crib, suspense is September 27th. Cameron is tracking.

Electrical: Waiting for word from Rafael via the chain of communications regarding exactly how future electrification capacity/space/etc. may or may not be incorporated into the building’s interior electrical distribution system design. Rafael confirmed the design intent, and the design team is prepared to move forward.

BACH Fire Hydrant Plan. We received guidance below from Matt DeToy on Wednesday, September 11, 2024. The design team will present a revised layout as well as address the comments at the 65% design review. Reference below is from UFC 3-260-01, Appendix B, Section 13, Para B13-2.21.2.3.

Miscellaneous Items:

Shop Information

Engine Shop – power service need or grounding provisions?

Composite Shop – no equipment information has been provided to date. Input needed. This could include ventilation, compressed air, dust control. Cameron to track.

RFIs Forthcoming.

Hazmat Storage - Life Safety, Fire Protection – what does it contain, flammable?

Tire Storage – quantity and arrangement – Life Safety concern

Tugg Usage – Battery or gas

Electrical – RO water filters, confirmation that no power is required.

Electrical – Some equipment is TBD, need to finalize.

Mechanical – use of sanders in some of the shops, need to confirm which shops needs ventilation for dust control.

Mechanical – Compressed air – CFM requirements at all drops. Is it needed at work benches, which shops, hose reels, locations?

Attachments: Meeting Minutes June 7 - FFE

Meeting to be scheduled September 19 at 1300 hours (central) to discuss shop requirements.

MH+MH Joint Venture 1616 East 5th Street, Tulsa, OK 74120 The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Mead & Hunt Inc. 2440 Deming Way Madison, WI 53562 t 608.273.6380 f 608.273.6391 meadhunt.com

PROJECT:

Bomber Agile Common Hangar

(BACH)

PROJECT #:

WWYK263009

PREPARED BY:

Scott Nall

DATE PREPARED:

June 7, 2024

MEETING DATE:

June 4, 2024

MEETING LOCATION:

Teams Call

SUBJECT:

Bomber Agile Common Hangar (BACH) – FF&E Discussion

PARTICIPANTS:

Listed Below

CC:

Terry Helms

This confirms and records our understanding of the discussions which occurred, and the decisions reached during this meeting. Unless notified in writing within seven days of the date prepared, we will assume that the following documentation is complete and accurate.

General Notes

1. Mead & Hunt to provide a PDF format of the most current equipment plan sheets and schedules as part of the meeting minutes deliverable.

2. Users requested the eyewash stations move closer to the doors in order to free-up wall space.

Coordinate with plumbing.

3. Walk behind forklifts will likely be positioned at dock corners.

4. Compressed air drops along dock walls with large hose reels along ceilings with regulator and gage for pressure.

5. Power for stands and reels from ceiling.

Equipment Notes with No Room Specified

1. Tool Carousels, Standard Size: 2' x 2' x 7', GFGI, I quad plex and one land drop. Waiting on information for how many and where. This will need to be 18" above the floor.

a. Holds six to 8 laptops each.

b. David to provide verification that 1 cabinet per bay is appropriate.

2. Prefer eye wash and sink to be at the side of the room and not in the middle of the wall. This applies to all rooms with eye wash/sinks.

Tool Crib

1. There is a new B-52 list of equipment. Devin to send this updated list to Mead & Hunt team.

2. Several dollies and carts will go in and out of the tool crib. Devin to measure and provide measurements to the team. Prefer the dollies and carts to be on the northwest corner of this room near the north double door. Mead & Hunt to adjust layout.

3. Dustin to send layout markups for tool crib.

4. No peg board needed.

5. Charging station shelves with power below counter. Coordinate with electrical.

6. Air drops.

7. Safety harnesses will need hanging spaces.

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Mead & Hunt to identify unit for hanging items and will locate near the counter.

8. Tool counter to be an open box with a single shelf with a 4 duplex, which is the charging station.

9. High density storage is for long term storage and will house cases of equipment. Shelving configuration preferred. High density storage is to move to plan South side of room and change orientation.

10. Workstations to move to plan North side of room.

FOM Storage

1. No dividing wall between the cubicles.

2. Dustin sent an image from a CAD layout and the following notes for Rick to review.

a. Remove OHD from south face of room (left edge in image)

b. Size North OHD to 8’ (right edge in image)

c. Consume space in Haz Waste to allow for 5 desk and print station.

d. North personnel door to be a 4’ wide ‘Dutch door’ (right edge in image)

e. South personnel door to be a 4’ wide door (left edge in image

3. Dustin posted a picture to the chat.

Hazardous Storage 102 and Hazardous Waste 102A

1. From Client: Was not a category on the B-52 PDM RFI

2. Devin mentioned revising the layout to send to team.

3. Move the oil stands further South.

4. Would like more shelves along walls.

5. Oil barrels, compactor.

6. Computer power and data drops needed at counter. Coordinate with telecom and electrical.

7. Provide clear aisle straight to counter.

8. Hazmat pallet storage shelves needed. Leave bottom of shelf open.

9. The need for more shelving was expressed.

10. Move layout as sketched:

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Landing Gear Shop

1. Was not a room category on the B-52 PDM RFI sheet.

2. Plan is missing a machine with the wheels.

a. Dustin to get a cutsheet on this piece of equipment and disperse to team.

b. This machine needs power.

c. The clearance footprint is to be added to plan.

3. Column D in equipment excel document indicates the part number.

4. Fixtures for gear landing with an “X” number are bolted down to the floor.

a. #556

b. Main landing gear or holding fixture.

5. The tool crib and the hangar air drops along the walls put regulators on them just in case.

6. Need fixtures for "Gear Fixture", "Gear Holding Fixture" these are bolted to the floor. We need to know the clearance with the gear attached. Part number: X201846389.

7. Users to verify if workbench needs to be ESD type with grounding rod.

8. Add four (4) large landing gear holding fixture mounted to floor with clearances requested with dashed lines on drawings.

Hangar

1. Add a walk behind forklift parking space at each of the four docks with charging stations included.

2. Scissor lift charging station near these areas in each dock keep things consistent.

3. The main hose to fall from the ceiling.

4. Large air hose along the wall in the hangar are on the plans.

Engine Shop 004

1. This room was not on the document sent by Arch.

2. No shelving needed. Space used for general storage for rolling storage.

3. Wrenches will go in Tool Crib Pelican type cases.

4. Large portable cranes will not be in the area.

5. Will be general storage.

6. No shelving.

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Tire Shop

1. 11 tugs total in room.

2. Park tugs at a 45-degree angle for access.

3. Add parking striping on the floor (tape?)

4. If scissor lift doesn't fit in this room, it could go in dock - hangar space.

5. Move doors to the center of the walls.

6. Move personnel doors closer to plan north wall.

7. Floor sweeper.

8. Shift OH coiling doors – coordinate with architect.

Sheet Metal Shop

1. EQ-17 Shrinker stretcher needs more room. Orientation and location to be adjusted.

2. EQ-18 Sheet metal rack: the metal is fed at the end and needs to be accessible on both sides.

3. Move equipment further to the right for the equipment to clear the access area to the hangar.

4. Use an arrow on plan to show where the operator stands\works.

5. It is allowed to put the brake back-to-back.

6. Standoff space to be shown on the plans with dashed lines need striping on the floor finish.

7. Shear and brake: Plan for 10' by 5' pieces of metal to access.

8. Brake machines can be along the wall but need to be offset from the wall. Need to rope the area behind the machine. Access space to be shown with dashed lines on plan.

9. Eyewash to be moved to side of room.

10. Sanders need a vacuum.

11. Down draft table needed.

12. Hot Dimpling Machine - Mounted to the floor. Approximately: 4' x 4' x 6'H Machine. Right and left side to be open.

13. Provide verification if a rotor punch needs to be added.

14. STK means toolbox and does not need to be noted on the plan.

15. Metal work bench need. Information from the previous shop.

16. Sheet rack will be mobile.

17. Sheet metal shop should have drops along the walls.

18. Trunnion box.

19. Long sheet metal is accessed from the small end and will need to be positioned to have short end accessible and long sheet metal pulled from it.

20. Once clearances are clarified, we might need to grow this room to accommodate this function.

Coordinate.

21. L shape layout along wall for brake (hold off wall 3’ or so, Mead & Hunt to verify), zone will have to be roped off behind equipment.

22. Shift MLG saw and blades to Main landing gear shop.

23. Users to advise on Chicken leg fixture- MLG bulkhead shop aide.

24. Workbench or table might need to be added – metal top finish.

Avionics Secure Storage

1.Users to advise on when this function is needed and if this impacts design.

2. Avionics shop usually has static dissipative grounded workstations.

3. Secure grounded component storage.

4. Verify with structure that when LO storage flipped that floor slab updates were captured to accommodate the extra weight of high-density storage.

Dock office north of Tool Crib Confirmed that it does contain workstations.

PSC

Current layout to stay as is.

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

PMD Storage

1. Interiors to fix the layout move the cubes around.

2. PMD storage can move to the engine if need be.

3. Dustin to provide details about the high-density storage.

Dustin to verify if any of the cubicles need to be grounded.

Any special power and data needs?

1. The power for the stands

2. Provided some power information of 200 HZ.

3. Most special power is out in the dock.

ACTION ITEMS:

1. Team to provide drawings for FF&E review by the base,

2. Users to identify equipment that is to be bolted to the floor.

3. Users to advise on any special power, shop compressed air locations, or grounding needs.

4. Users to verify OH coiling door height clearances are sufficient. Currently, Landing Gear, Metal, Tire, Engine Shops are all 10’X10’. Corridor 007 is 18’X18’.

Attendees

Scott Nall – Mason & Hanger William ‘Clint” Rodgers – USACE Christine Fernandez – Mead & Hunt Natalie Anderson – Mead & Hunt Rick Siler – Larson Design Group Rebekah Ulm – Larson Design Group Dustin Baker - 76 AMXG/MXDEO Mark Appleton – 76 AMXG/MXDEO Cote Barber – 76 AMXG/MXDEO Caleb Davis – 76 AMXG/MXDEO Ryan Inskeep – 76 AMXG/MXDEO James Lennarson - 76 AMXG/MXDEO Devin Wiegmann - 76 AMXG/MXDEO

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Bomber Agile Common Hangar

(BACH)

PREPARED BY:

DATE PREPARED:

September 20, 2024

MEETING DATE:

September 19, 2024

MEETING LOCATION:

Teams Call

SUBJECT:

Bomber Agile Common Hangar (BACH) – Shop Discussion Meeting

PARTICIPANTS:

Listed Below

Terry Helms

This confirms and records our understanding of the discussions which occurred, and the decisions reached during this meeting. Unless notified in writing within seven days of the date prepared, we will assume that the following documentation is complete and accurate.

General Notes

1. Mead & Hunt shared the current Equipment List and reviewed line by line the open “TBD” items.

2. Mead & Hunt to provide a consolidated Equipment List summary with “TBD” items called out in highlighted yellow for distribution 09/20/24.

3. Mead & Hunt to provide latest shop layouts to Users 09/20/24.

4. Users to confirm Equipment Layouts, Room Data Sheets, and Equipment List by 09/27/24.

5. Need to confirm if any areas require specific ventilation data, grounding, compressed air, plumbing, and/or power needs.

6. Equipment to be labeled as GF/CI for 65%.

7. In the event that some rooms have more equipment than will fit, the design team requests a prioritized list from Users.

8. Mead & Hunt requested to visit the base Monday, September 23 for a shop equipment list back-check.

Tool Crib

1. Users requested vertical rolling carousel, rather than the current stacking high density storage. Power requirements at charging cabinets need to be coordinated with electrical.

Hazmat

1. Dustin shared an Equipment List that will be incorporated into the Master Equipment List.

2. Dustin confirmed different circuits for (2) different freezers for redundancy. Compactors power requirements need to be coordinated with electrical.

Composite Shop

1. May stay as an open area but need to confirm power and any special ventilation requirements.

2. Users to confirm if clean room with separate ventilation is required.

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

DLA/IPV Shop

1. No specific information required.

Tug Storage

1. Users to confirm whether Tug batteries are lithium-ion or lead acid batteries.

Breakroom

1. Vending machines are handled by a vendor. Current sizes, types can be used for placement on the plans for reference. Submit RFI to contracting vendor.

2. The refrigerator is to be a large commercial-type double door with wire internal shelves.

3. Reverse osmosis – Need model number, size and power requirements. This will likely need a small closet or cabinet.

Sheet Model Shop

1. The HEPA filtered; downdraft sanding table has an integral vacuum to control dust. Users to provide model number as a BOD.

Engine Shop

1. Dustin and David advised that this shop to meet general shop requirements. Compressed air every 25’, etc. Users to advise if any additional needs are required.

Attendees

Scott Nall – Mason & Hanger William ‘Clint” Rodgers – USACE Christine Fernandez – Mead & Hunt Tonya Wood – Mead & Hunt Sarah Lawley – Mead & Hunt Rebekah Ulm – Larson Design Group Randall Carter – Mead & Hunt Eric Carter – Mead & Hunt Dann Layou – Mason & Hanger Bob Mutsch – Mead & Hunt Dustin Baker - 76 AMXG/MXDEO Matthew Detoy – 76 AMXG/MXDEO James Greer – 76 AMXG/MXDEO David Delsigne – 76 AMXG/MXDEO

MEETING DATE: 24 September 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Scott Nall – Mason and Hanger Cameron Greer - USAF AFMC 72 ABW/CENMP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manger Ron Rosebrook – USACE Brian Ables - USAF AFMC AFLCMC Mark Hill - USAF AFMC 72 ABW/CENM Christopher Wilkes - USAF AFMC AFLCMC/WBD Carmie Ashley - USAF AFMC 72 ABW/CENP James Neece - USAF AFMC 72 ABW/CENM Cody Patterson - AFMC AFIMSC Det 10/AFIMSC Det 10/CE Sara Wakelam-Sayler – USAF Steven Halcomb - USAF AFMC 72 ABW/CENME Daniel Bourassa – USAF

Open RFIs – Current suspense date 27 September 2024 for RFIs 59, 60, 61. RFIs 63, 64, 65 Suspense date 1 October 2024.

RFI No. 59 – Electrical

RFI No. 60 – Mechanical

RFI No. 61 – Life Safety / Fire Protection

RFI No. 62 - Monitoring wells in supplemental survey area, GSE storage area. We believe these are clean-outs for an underground drainage system. Survey to be updated.

RFI No. 63 – Electrical-Sun Shade

RFI No. 64 – Electrical Rolling Doors

RFI No. 65 – Electrical-OK Construction Standards

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team to propose tie-in location to be submitted to OKC for approval.

discuss the trash removal process with the contractor. Meeting is scheduled for 25 September 2024

Interior Design: Waiting on for the Room Data Sheets: Requesting follow up information from meeting on 07-24 about Tool Crib equipment and storage needs, and Hazmat storage and equipment needs from Dustin. Looking for type and quantity needed. Site visit occurred on 23 September 2024; final equipment coordination suspense date is 27 September 2024. Tonya Wood to submit an updated equipment list to

BCE & USACE.

BACH Fire Hydrant Plan. We received guidance below from Matt DeToy on Wednesday, 11 September 2024. The design team will present a revised layout as well as address the comments at the 65% design review. Reference below is from UFC 3-260-01, Appendix B, Section 13, Para B13-2.21.2.3.

• Engine Shop – power service need or grounding provisions?

• Composite Shop – no equipment information has been provided to date. Input needed.

This could include ventilation, compressed air, dust control. Cameron Tracking.

Cyber Security POC – Clint Tracking.

MEETING DATE: 1 October 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Scott Nall – Mason & Hanger Cameron Greer - USAF AFMC 72 ABW/CENMP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manger Dustin Baker- USAF AFMC 76 AMXG/MXDEO David Designe - USAF AFMC 76 AMXG/MXDEO Mark Hill - USAF AFMC 72 ABW/CENM John Jones - US Air Force AFCAA AF COST ANA AG FO/FMA Ashley Gum – Mason & Hanger Tonya Wood – Mead &Hunt Christine Fernandez – Mead & Hunt Philip Cox – US Air Force Jennifer Brown - US Air Force Alexander Porter - US Air Force William Patrick - US Air Force Amy R Knecht - US Air Force

Open RFIs – RFIs 63, 64, 65 Suspense date 8 October 2024.

RFI No. 63 – Electrical-Sun Shade

RFI No. 64 – Electrical Rolling Doors

RFI No. 65 – Electrical-OK Construction Standards – Meeting scheduled for 3 October at 1430 hours.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team to propose tie-in location to be submitted to OKC for approval.

discuss the trash removal process with the contractor. Meeting is scheduled for 25 September 2024.

Interior Design: Requesting follow up information from meeting on 07-24 about Tool Crib equipment and storage needs, and Hazmat storage and equipment needs from AMXG. Looking for type and quantity needed. Site visit occurred on 23 September 2024; final equipment coordination suspense date is 27

September 2024. Tonya Wood submitted an updated equipment list to the design team. Design team will review and approve final equipment list no later than 4 October 2024.

Hazardous Materials – B-52 Chemical Listing sent to design team 1 October 2024.

• Engine Shop – power service need or grounding provisions?

• Composite Shop – no equipment information has been provided to date. Input needed.

This could include ventilation, compressed air, dust control. Cameron Tracking.

MEETING DATE: 8 October 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Scott Nall – Mason & Hanger Cameron Greer - USAF AFMC 72 ABW/CENMP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manager John Jones - US Air Force AFCAA AF COST ANA AG FO/FMA Charles Flint - USAF AFMC AFLCMC/WBDCP Alexander Porter - USAF AFMC AFLCMC/FZCX Michael Taber - USAF AFMC AFLCMC/WBS Melissa Schlick - USAF AFMC AFLCMC/AFLCMC Ron Rosebrook – USACE – Project Manager

Open RFIs – RFIs 63, 64, 65, and 66, suspense date is 11 October 2024.

RFI No. 63 – Electrical-Sun Shade – Waiting on a response from Racheal Pierce

RFI No. 64 – Electrical Rolling Doors – Cameron is tracking.

RFI No. 65 – Electrical-OK Construction Standards – Response provided 7 October 2024.

RFI No. 66 - Electrical-System Furniture Wiring Harnesses – Cameron is tracking.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team to propose tie-in location to be submitted to OKC for approval.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor. Meeting occurred on 25 September 2024. Large vehicle turn radius, enclosure sizes, wall locations, interior receptacle locations still being discussed.

Interior Design: Requesting follow up information from meeting on 07-24 about toolcrib equipment and storage needs, and Hazmat storage and equipment needs from AMXG. Looking for type and quantity needed. Site visit occurred on 23 September 2024; final equipment coordination suspense date is 27 September 2024. Tonya Wood submitted an updated equipment list to the design team on 4 October.

AMXG provided an updated toolcrib layout, equipment list, and marked up AE equipment list on 4 October.

Hazardous Materials – B-52 Chemical Listing sent to design team 1 October 2024. Scott Nall is tracking.

Miscellaneous Items: None

MEETING DATE: 29 October 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Scott Nall – Mason & Hanger Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manager Ron Rosebrook – USACE – Project Manager Mark Hill - USAF AFMC 72 ABW/CENP William Patrick - USAF Daniel Bourassa - USAF Chis Moody - USAF AFMC OC ALC/OBPA Sara Wakelam-Sayler - USAF Dustin Baker- USAF AFMC 76 AMXG/MXDEO David Delsigne - USAF AFMC 76 AMXG/MXDEO

RFI No. 66 - Electrical-System Furniture Wiring Harnesses – Cameron is tracking.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team to propose tie-in location to be submitted to OKC for approval.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor. Meeting occurred on 25 September 2024. Large vehicle turn radius, enclosure sizes, wall locations, interior receptacle locations still being discussed.

Interior Design: Requesting follow up information from meeting on 07-24 about toolcrib equipment and storage needs, and Hazmat storage and equipment needs from AMXG. Looking for type and quantity needed. Site visit occurred on 23 September 2024; final equipment coordination suspense date is 27 September 2024. Tonya Wood submitted an updated equipment list to the design team on 4 October.

AMXG provided an updated toolcrib layout, equipment list, and marked up AE equipment list on 4 October. No further changes anticipated. Equipment design to be submitted as part of 65% submittal.

Hazardous Materials – B-52 Chemical Listing sent to design team 1 October 2024. Scott Nall is tracking.

Miscellaneous Items: 65% Documents Submittal is scheduled for 20 November 2024. 65% Design Review Meeting is scheduled for 7 & 8 January 2025.

MEETING DATE: 12 November 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manager Ron Rosebrook – USACE – Project Manager Mark Hill - USAF AFMC 72 ABW/CENP Jodi Pierone - USAF Daniel Bourassa – USAF Cody Patterson – USAF Jonathan Foman – USAF John Jones – USAF Thomas Wesley – USAF William Patrick - USAF

RFI No. 66 - Electrical-System Furniture Wiring Harnesses – Cameron is tracking.

We are requesting confirmation of the furniture layouts from PMD (127 first floor), AMXS (218 second floor), Scheduling Office (209 second floor), Command Suite (214 second floor), and the open office (202 second floor). We will proceed with the response 8-wire harnesses are acceptable with 3 circuits and no share neutrals IAW UFC.

Fire Station Civil Design – Meeting occurred on 9 August 2024. Civil plan mark-ups provided to design team. 12” concrete pavement proposed in lieu of asphalt. Need to maintain 30’ wide drive line. Rafael wants to ensure there is no design effort included for the future fire station design. Updated civil plan provided on 22 August. Design team to propose tie-in location to be submitted to OKC for approval.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor. Meeting occurred on 25 September 2024. Large vehicles turning radius, enclosure sizes, wall locations, interior receptacle locations still being discussed.

Hazardous Materials – B-52 Chemical Listing sent to design team 1 October 2024. Scott Nall is tracking.

Miscellaneous Items:

65% Documents Submittal is scheduled for 20 November 2024.

65% Design Review Meeting is scheduled for 7 & 8 January 2025.

MEETING DATE: 19 November 2024

MEETING TIME: 1400 HOURS

MEETING OBJECTIVE: BOMBER AGILE COMMON HANGER (BACH) - Project Discussion

ATTENDEES:

Cameron Greer - USAF AFMC 72 ABW/CENP Matt DeToy - USAF AFMC 72 ABW/CENP Clint Rodgers – USACE – Design Manager Ron Rosebrook – USACE – Project Manager Jodi Pierone - USAF Thomas Wesley – USAF William Patrick – USAF Jonathan Foman – USAF Jenisha Oli – USAF Chris Moody – USAF Sara Wakelam-Sayler – USAF Wesley Thomas - USAF

RFI No. 66 - Electrical-System Furniture Wiring Harnesses – This can be closed.

Response issued on 18 November. 8-wire harnesses are acceptable with 3 circuits and no share neutrals IAW UFC. Review of the furniture plans can take place as part of the 65% review.

Trash Enclosure – South side of building? Base CE to provide possible locations. Matt DeToy will discuss the trash removal process with the contractor. Meeting occurred on 25 September 2024. Large vehicles turning radius, enclosure sizes, wall locations, interior receptacle locations still being discussed.

Hazardous Materials – B-52 Chemical Listing sent to design team 1 October 2024. Scott Nall is tracking.

Water Connection across Douglas Ave. – The 60” water line along Douglas Ave will be taken offline by the end of next year. A water line project is being designed by TEPA to provide water to MROTC.

USACE and AE need to coordinate water line for BACH with TEPA to ensure proper pipe sizing.

Miscellaneous Items:

65% Documents Submittal is scheduled for 20 November 2024.

65% Design Review Meeting is scheduled for 7 & 8 January 2025.

Bomber Agile Common Hangar (BACH) Project No.: WWYK263009 Tinker Air Force Base, Oklahoma 65% Design Submittal

Design Analysis - 562

14.3 REQUESTS FOR INFORMATION RESPONSES

Gumm, Ashley E

From: Nall, Scott Sent: Monday, October 23, 2023 5:03 PM To: Gumm, Ashley E Subject: Tinker RFI#1

Categories: Red Category

Here you are.

From: Nall, Scott Sent: Monday, October 23, 2023 10:53 AM To: Diana Askew <Diana@guyengr.com> Cc: Gossage, Kimberly <Kimberly.Gossage@soc-usa.com>; Dan Young <Dan.Young@guyengr.com>; Amanda Reid <Amanda@guyengr.com>; Brandon Travers <Brandon@guyengr.com>; Hensley, Darin <Darin.Hensley@masonandhanger.com> Subject: RE: [EXTERNAL] RE: Tinker AFB Agile Common Hangar Project - GUY Survey Proposal Attached

Diana, For your SA, the design team requested and USACE allowed for a different sheet size.

See below:

Darin, Please see a achment for your reading pleasure, page 5. Long story short, Yes, USACE allows flexibility in sheet sizing for larger projects. Table 2-1 only lists ANSI sheet sizes, but we have also listed ARCH sheet sizes in RFPs so 30” x 42” is permi ed.

Architectural Sheet Sizes

Size Width x Height (mm) Width x Height (in) Arch A 229 x 305 mm 9.0 x 12.0 in Arch B 305 x 457 mm 12.0 x 18.0 in Arch C 457 x 610 mm 18.0 x 24.0 in Arch D 610 x 914 mm 24.0 x 36.0 in Arch E 914 x 1219 mm 36.0 x 48.0 in Arch E1 762 x 1067 mm 30.0 x 42.0 in

William (Clint) Rodgers, RA, NCARB

Design Manager, Design Management Section Engineering and Construction Division

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

1616 East 15th Street Tulsa, OK 74120

REQUEST FOR INFORMATION

TO:

William Rodgers

FROM:

File

DATE:

October 17, 2023

Tinker BACH

REFERENCE:

LS\FP

RFI #:

0002 – CRITICAL PATH

Issue and Question:

Please provide the name and contact information for the project Designated Fire Protection Engineer (DFPE).

Cost Impact: No Schedule Impact: Yes

Requested Response From: USACE

Response:

I am the DFPE for the Air Force. Doug Mitchell (cc’d on this email) is the DFPE for USACE.

douglas.k.mitchell@usace.army.mil james.surber.2@us.af.mil

V/R

Jim Surber, PE, CFPS Fire Protection Engineer

72 ABW/CENMP

Tinker AFB, OK

COMM: 405-734-5238

DSN: 884-5238

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0003 – CRITICAL PATH

Please have the DFPE confirm that the base power utility is considered reliable power regarding the use of electric motor-driven fire pumps. (UFC 3-600-01 §1-12.7.2).

OG&E will construct a new 40MVA substation with generator backup north of the BACH site and dedicated to TAFB . From the south of the BACH site OG&E will tie into an existing TAFB dedicated service sourced from OG&E substation 5 which is internal to TAFB. These two actions will satisfy the UFC requirements.

Jim Rowden

72 ABW/CENMP

Electrical Engineer 405-582-4209

DSN 852-4209

10.23.2023

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0004 – CRITICAL PATH

Please confirm that the Bomber Agile Common Hangar is a Tier 2 hangar as discussed during the Charrette.

Confirmed

V/R

Jim Surber, PE, CFPS Fire Protection Engineer

72 ABW/CENMP

Tinker AFB, OK

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0005 – CRITICAL PATH

Please confirm that the hangar design effort is to consider the aircraft as fueled or unfueled as defined in UFC

4-211-01 / NFPA 409.

Tell the DOR to refer to Section 3-6.1.1 of UFC 4-211-01 and Appendix 4 of the “Sundown Policy for Foam Fire Suppression Systems” (Change 2).

V/R

Jim Surber, PE, CFPS Fire Protection Engineer

72 ABW/CENMP

Tinker AFB, OK

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0006 – CRITICAL PATH

Please confirm that expansion of the base Giant Voice wide area mass notification system is, or is not, to be included in this effort.

Giant Voice needs to be considered/added to the MILCON(BDA), considering current complications with KC-46 Hangars project(i.e. b.9501)

Thanks.

v/r, Gary Pfeiffer, GS-12, DAF Information Technology Specialist Plans and Programs Branch 72D Communications Directorate (72 ABW/SC) 8840 Entrance Rd A, Suite 217 Tinker AFB, OK 73145

10.25.23

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0007 – CRITICAL PATH

Please confirm the expected fire suppression for this hangar will be a water-only, closed-head, overhead sprinkler solution with no foam or other low-level suppression. The density / area of this protection solution to be coordinated between the DFPE and the QFPE/DOR.

Confirmed,water-only, closed-head, overhead sprinkler solution with no foam or other low-level suppression.

V/R

Jim Surber, PE, CFPS Fire Protection Engineer

72 ABW/CENMP

Tinker AFB, OK

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Structural

0008 – CRITICAL PATH

Has a design basis threat (DBT) been determined? If not, min. AT/FP standards per UFC 4-010-01 will apply.

The DBT memo is currently in coordination (draft version attached) and is based upon terrorist threats directed against DoD personnel. Threats to other assets and critical infrastructure and specific threats to facilities are beyond the scope of these standards, but they are addressed in UFC 4-020-01. As part of the design process, the designer shall apply UFC 4-020-01 in development of their design criteria.

v/r, Bede Ley, Chief Requirements and Optimization Branch Comm 405-734-0460, DSN 884-0460

10/23/2023

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72D AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

MEMORANDUM FOR 72 ABW/CC

FROM: 72 ABW/CE

SUBJECT: 2023 Tinker AFB Design Basis Threat (DBT)

1. This DBT was developed by the Tinker AFB Threat Working Group in accordance with Unified Facility Criteria (UFC) 4-020-01. It represents the baseline UFC DBT standards. It was reviewed by the Threat Working Group and Antiterrorism Working Group and recommended for approval.

2. The DBT is the threat upon which the preliminary protective system required for facilities in accordance with UFC 4-010-01 will be based. It represents the worst-cases of applicable threat severity levels for the general Department of Defense population. As required, a DBT for additional assets may be developed. This DBT may be changed during the design process based on detailed risk analysis and will be reviewed annually to stay current with the evolving threat.

Aggressor Tactic DBT Weapons Moving / Stationary Vehicle Devices Low 100 kg (220 lbs) TNT Moving / Stationary Vehicle Devices (Commercial Vehicle Inspection Point)

Special Case 9000 kg (19,800 lbs) TNT

Hand Delivered Devices High IID/IED (up to 25 kg/55 lbs TNT) & hand grenades (Mail bomb limited to 1 kg/2.2 lbs TNT)

Indirect Fire Weapons Attack Low Incendiary devices Direct Fire Weapons Attack Low UL 752 Level 3 (.44 magnum) Forced Entry Low None Covert Entry Low Easily Duplicated False Credentials Visual Surveillance High Ocular devices

Acoustic Eavesdropping High Sound amplification or laser "listening" devices

Electronic Emanations Eavesdropping High Electronic emanations interception equipment

Airborne Contamination Low Agents associated with Very Low + external release of biological and radiological particulates

Waterborne Contamination Low Liquid/particulate agent stable in water <2 hours / easily mitigate chlorine

Waterfront Attack N/A

3. If you have any further questions or concerns, my point of contact is Mr. Bede Ley, 72 ABW/CEOE, at 734-0460, bede.ley@us.af.mil.

STEPHANIE P. WILSON, NH-IV

Director/ 72 ABW/CE

Attachment:

DBT Tool

1st Ind, 72 ABW/CC

MEMORANDUM FOR 72 ABW/CE

Approve/Disapprove

ABIGAIL L.W. RUSCETTA, Col, USAF Commander

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0009 – CRITICAL PATH

During the hangar walk-through we discussed providing a 2 Ton bridge crane in the Landing Gear Shop. What other shops require monorails or bridge cranes? Please provide capacities, locations, and hook heights.

Per AMXG, The Landing Gear Shop is the only room with a monorail / bridge crane requirement. Hook height should be no less than 12 feet with a 2-ton bridge crane capacity.

Thanks, Steve Foster Engineering Operations

76MXSG/MXDEO

Desk: (405)734-0114

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0010 – CRITICAL PATH

Hangar Bridge Crane: Please confirm crane coverage of a ~25’ wide area at center of hangar running N-S, aligned with 20’ wide roll-up door. Confirm that capacity of 5 Tons is desired.

Per AMXG, Adjust the covered crane area to maximum width without interfering with the fall protection system.

5-ton capacity is affirmed along with the crane coverage of ~25 feet wide at the center of the hangar running North and South and should be aligned with the 20-foot wide roll up door.

Thanks, Steve Foster Engineering Operations

76MXSG/MXDEO

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0011 – CRITICAL PATH

What shop equipment have special structural requirements?

Per AMXG, special structural requirements pertain to the Landing Gear Shop.

Thanks, Steve Foster Engineering Operations

76MXSG/MXDEO

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0011 – CRITICAL PATH

What shop equipment have special structural requirements?

Please find response below.

-drains requiring sloping slabs No known process requirements

-Trench drains No known process requirements

-utility trenches No known process requirements

-pits or sumps (possibly for hydrostatic testing or ultrasonic equipment) No known process requirements

-composite curing ovens No known process requirements

-aircraft jack test stand foundations No known process requirements

-high-density storage units Yes, toolcrib to contain high-density storage units.

-cranes/monorails (see separate RFI) Yes, prior RFI outlined gear shop requirements.

Thanks, Dustin S. Baker

76 AMXG/MXDEO

Visioneering Team

DSN:852-4713

COMM: (405) 582-4713

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Civil-Site

0012 – CRITICAL PATH

Need confirmation that Industrial waste lines for this facility discharge into tank onsite which will periodically be pumped out (no connection to Tinker industrial waste line required).

It is confirmed that waste lines for this facility discharge into tank onsite which will periodically be pumped out (no connection to Tinker industrial waste line required). These are not industrial waste lines that are plumbed to onsite tank. The tank is for spill containment and it should not be connected to the IWTP.

John Truong john.truong@us.af.mil

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Civil-Site

0013 – CRITICAL PATH

Need confirmation on security requirements for construction (access, fencing, monitoring, etc).

After getting clarification on the request, the safest option is to fence off the construction area so that security and access for the existing compound is maintained, but construction crews can access the site via their own gate that they secure when not in use. Essentially a freezone like currently being used at Lancer gate (construction crews have no access to the current compound they don’t need access to, but can easily access the construction site). I’m not familiar with security requirements for ongoing construction projects, but I assume at least a chain-link fence with barbed wire outrigger that’s secured at night/when not in use and an “authorized personnel only” type sign.

SHAWN C. ROWE, TSgt, USAF Section Chief, Installation Security 72d Security Forces Squadron (AFMC) Tinker Air Force Base, OK 73145

DSN: (405) 582-1965

Cell: (386) 205-9939

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

Civil-Air Side

0014 – CRITICAL PATH

What are the Aircraft Ground Equipment (AGE) parking area requirements?

Advising a 20k SF pad, 10k SF each, to support both AGE and B-52 stand storage yard.

Steve Foster Engineering Operations

76MXSG/MXDEO

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0015 – CRITICAL PATH

What is the aircraft stand space requirements for B-52?

Advising a 20k SF pad, 10k SF each, to support both AGE and B-52 stand storage yard.

Steve Foster Engineering Operations

76MXSG/MXDEO

The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com

0016 – CRITICAL PATH

The 100-year floodplain is within project site which is contrary to 1391. Confirm requirements for impacting the floodplain and will the update of the floodplain map due to this project be a requirement under this contract?

Mitigation cost(s)?

The the answer is no. The contractor will not be required to update the floodplain study.

Further explanation in email below.

Travis Smith, PE

72 ABW/CENMP

MILCON PMO CSAG

Mechanical Engineer Phone: (405)582-4156 travis.smith.81@us.af.mil

11.1.2023

From: SMITH, TRAVIS J CIV USAF AFMC 72 ABW/CENMP To: Rodgers, William C CIV USARMY CESWT (USA) Subject: FW: TAFB BACH - WWYK263009 - RFI No. 16 - Confirm requirements for impacting the floodplain.

Date: Tuesday, October 31, 2023 11:08:30 AM Attachments: image001.png

It looks like the answer is no. The contractor will not be required to update the floodplain study.

Travis Smith, PE

72 ABW/CENMP

MILCON PMO CSAG

Mechanical Engineer Phone: (405)582-4156

From: ASHWORTH, CHAD E CIV USAF AFMC 72 ABW/CEIE <chad.ashworth@us.af.mil> Sent: Monday, October 30, 2023 2:04 PM To: Miller,Tom <Tom.Miller@colostate.edu>; DILL, DAVID C JR CTR USAF AFMC 72 ABW/CEES <david.dill.ctr@us.af.mil> Cc: ASHLEY, CARMIE G CIV USAF AFMC 72 ABW/CENP <carmie.ashley@us.af.mil>; DETOY, MATTHEW J CIV USAF AFMC 72 ABW/CENP <matthew.detoy@us.af.mil>; TURNBULL, HEARTSONG CIV USAF AFMC 72 ABW/CENPD <heartsong.turnbull@us.af.mil>; FLEHARTY, BRANDT L NH-04 USAF AFMC 72 ABW/CEI <brandt.fleharty@us.af.mil>; HILL, MARK E CIV USAF AFMC 72 ABW/CENM <mark.hill.4@us.af.mil>; SMITH, TRAVIS J CIV USAF AFMC 72 ABW/CENMP <travis.smith.81@us.af.mil> Subject: RE: TAFB BACH - WWYK263009 - RFI No. 16 - Confirm requirements for impacting the floodplain.

Thanks very much Tom

Chad Ashworth Chief, Environmental Management Branch Tinker AFB Civil Engineering Directorate Desk (405) 734-9852 DSN 884-9852 Cell (405) 314-7665

From: Miller,Tom <Tom.Miller@colostate.edu> Sent: Monday, October 30, 2023 11:09 AM To: ASHWORTH, CHAD E CIV USAF AFMC 72 ABW/CEIE <chad.ashworth@us.af.mil>; DILL, DAVID C JR CTR USAF AFMC 72 ABW/CEES <david.dill.ctr@us.af.mil> Cc: ASHLEY, CARMIE G CIV USAF AFMC 72 ABW/CENP <carmie.ashley@us.af.mil>; DETOY, MATTHEW J CIV USAF AFMC 72 ABW/CENP <matthew.detoy@us.af.mil>; TURNBULL, HEARTSONG CIV USAF AFMC 72 ABW/CENPD <heartsong.turnbull@us.af.mil>; FLEHARTY, BRANDT L NH-04 USAF AFMC 72 ABW/CEI <brandt.fleharty@us.af.mil>; HILL, MARK E CIV USAF AFMC 72 ABW/CENM <mark.hill.4@us.af.mil>; SMITH, TRAVIS J CIV USAF AFMC 72 ABW/CENMP <travis.smith.81@us.af.mil> mailto:travis.smith.81@us.af.mil mailto:William.C.Rodgers@usace.army.mil mailto:travis.smith.81@us.af.mil mailto:Tom.Miller@colostate.edu mailto:chad.ashworth@us.af.mil mailto:david.dill.ctr@us.af.mil mailto:carmie.ashley@us.af.mil mailto:matthew.detoy@us.af.mil mailto:heartsong.turnbull@us.af.mil mailto:brandt.fleharty@us.af.mil mailto:mark.hill.4@us.af.mil mailto:travis.smith.81@us.af.mil

Subject: [Non-DoD Source] RE: TAFB BACH - WWYK263009 - RFI No. 16 - Confirm requirements for impacting the floodplain.

Chad, Below are the answers I received from CSU-CEMML management regarding a contractor being required to update the floodplain data after construction altered the landscape. Basically, there are no requirements in place for the CSU-CEMML enhanced floodplain data or the FEMA data. For the CSU data they do suggest reaching out to our floodplain sponsor for a “re-do” of the data. For FEMA floodplain data, there is no requirement, but if there is a benefit to the base, a LOMR or LOMA can be submitted.

I am not aware of any requirement to do this, and certainly not from our project or the CSU side of things. For a base to require a contractor to provide updated “post construction” flood data, I would imagine it would have to be in their contract to do so (with requirements for who is qualified for doing so). If you received such data, you could add that in as a separate feature to your Inundation feature class, but I would not recommend trying to alter the CSU Eng provided data (or FEMA for that matter).

In terms of the CSU flood data:

It would be assumed to be accurate as of the modeled date.

…Or in reality the date the LiDAR data that was used in the model was flown.

If a large area was affected, my suggestion would be for the PM to reach out to our sponsor (currently Heather Hatlestad) and request that we add the base back to our flood plain list for a priority “re-do” based upon significant constructions changes.

(Ag…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .