WWYK263009_65 Design Analysis_Part12_Part1.pdf

PDF 9 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This file contains structural engineering design analysis drawings showing truss configurations and loading calculations for a hangar building project. The drawings, generated using RAM Elements software, illustrate two different truss types (T1 and T3) with detailed views of the structural framing, member numbering, and various load conditions including dead loads, live loads, snow loads, and wind loads in different directions. The analysis includes distributed user loads shown in kips/ft applied to specific truss members.

The drawings specifically detail the structural design for what appears to be a large-scale hangar facility, with multiple parallel trusses spanning the width of the building. Load values range from approximately -0.2 to 1.02 kips/ft for different load cases. The structural model shows both 3D isometric views and 2D elevations of the truss systems, with detailed member numbering and connection points identified. The analysis dates shown are from November 2024, suggesting this is part of the 65% design package referenced in the associated contract opportunity for the Bomber Agile Common Hangar at Tinker Air Force Base.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BrownZ7 Text Box

TRUSS TYPE T1

Current Date: 11/13/2024 1:34 PM Units system: English File name: P:\Projects\019503\02 Design\Struc\Calculations\Hangar Framing\Main Framing Model.retx

Current Date: 11/13/2024 1:35 PM

Current Date: 11/13/2024 1:34 PM

Current Date: 11/13/2024 1:31 PM

Load condition: LL=Live Load

Current Date: 11/13/2024 1:31 PM

Load condition: DL=Dead Load

Current Date: 11/13/2024 1:32 PM

Load condition: SL=Snow Load

Current Date: 11/13/2024 1:32 PM

Load condition: Wx_plus=Pos Pres Wind in X

Current Date: 11/13/2024 1:33 PM

Load condition: Wz_plus=Pos Pres Wind in Z

Load condition: Wx_neg=Neg Pres Wind in X

Load condition: Wx_neg=Neg Pres Wind in X

BrownZ7 Text Box

TRUSS TYPE T3

Current Date: 11/18/2024 1:48 PM

Current Date: 11/18/2024 1:51 PM

Current Date: 11/18/2024 1:52 PM

Load condition: DL=Dead Load

File details come from the government source that posted it. Updated .