WWYK263009_65 Design Analysis_Part19_Part3.pdf

PDF 7 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This file contains architectural design drawings and item installation lists for a hangar facility at Tinker Air Force Base. The drawings show detailed first and second floor plans including audio-visual layouts, ceiling plans, and reflected ceiling plans (RCP) for different areas (A-D) of the facility.

The installation lists detail the furniture, fixtures and equipment to be installed throughout the facility, including: display boards, markerboards, task chairs, workstations, storage units, break room furniture, and ADA-compliant benches. Key spaces shown in the plans include a hangar bay, dock offices, break room/storm shelter, tool crib, hazardous storage area, and composite area. The drawings illustrate specific placement of items like work benches, lockers, pallet storage racks, and office workstations. The plans also show structural grid lines, wall layouts, doorways, and other architectural elements that define the spaces. The drawings appear to be at 65% design completion level and were prepared by Mead & Hunt and LDG.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM INSTALLATION LIST AND ITEM INSTALLATION LIST

TYPE MARK DESCRIPTION COUNT

AV‐1 DISPLAY BOARD, LOCKABLE 1

AV‐2 MARKERBOARD, 4' X 6' 3

AV‐4 WHITEBOARD, MOBILE 4

CT‐1 CHAIR, TASK 4

DR‐1 DESK, RECTANGULAR 4

SL‐1 STORAGE, LOCKERS TWO UNITS HIGH 65

WB‐1 WORK BENCH, MOBILE 4

AC‐3 TRASH RECEPTACLE, SMALL 5

AC‐4 RECYCLING RECEPTACLE, SMALL 5

CT‐1 CHAIR, TASK 5

SF‐1 STORAGE, LAT FILE 3

WS‐5 WORKSTATION, 2 PERSONNEL 2

WS‐13 WORKSTATION, 1 PERSONNEL 1

AC‐3 TRASH RECEPTACLE, SMALL 9

AC‐4 RECYCLING RECEPTACLE, SMALL 9

CT‐1 CHAIR, TASK 9

SF‐1 STORAGE, LAT FILE 4

WS‐4 WORKSTATION, 4 PERSONNEL 1

WS‐12 WORKSTATION, 5 PERSONNEL 1

AC‐1 TRASH RECEPTACLE 2

AC‐2 RECYCLING RECEPTACLE 2

AV‐1 DISPLAY BOARD, LOCKABLE 1

CB‐1 CHAIR, BREAK ROOM 24

TB‐1 TABLE, BREAK ROOM 12

CW‐1 CHAIR, WELLNESS 1

TW‐1 TABLE, WELLNESS 1

CB‐2 CHAIR, ADA BENCH 1

CB‐2 CHAIR, ADA BENCH 1

022 MENS

000 HANGAR BAY

008 DOCK OFFICE

012 DOCK OFFICE

021 BREAK ROOM/STORM SHELTER

021A WELL

023 MENS

ITEM INSTALLATION LIST AND ITEM INSTALLATION LIST

SS‐2 STORAGE, PALLET 96" X 48" X 120" 3

SS‐3 STORAGE, PALLET 96" X 24" X 96" 2

SS‐4 STORAGE, SHELVING 48" X 18" X 84" 6

AC‐3 TRASH RECEPTACLE, SMALL 2

AC‐4 RECYCLING RECEPTACLE, SMALL 2

CT‐1 CHAIR, TASK 2

SS‐3 STORAGE, PALLET 96" X 24" X 96" 5

SS‐4 STORAGE, SHELVING 48" X 18" X 84" 11

WS‐5 WORKSTATION, 2 PERSONNEL 1

SS‐2 STORAGE, PALLET 96" X 48" X 120" 12

AC‐3 TRASH RECEPTACLE, SMALL 5

AC‐4 RECYCLING RECEPTACLE, SMALL 5

AV‐2 MARKERBOARD, 4' X 6' 1

CT‐1 CHAIR, TASK 5

SF‐1 STORAGE, LAT FILE 2

WS‐2 WORKSTATION, 3 PERSONNEL 1

WS‐5 WORKSTATION, 2 PERSONNEL 1

SS‐6 STORAGE, WIRE SHELF 24" X 36" X 86" 2

AV‐2 MARKERBOARD, 4' X 6' 2

CT‐5 CHAIR, TASK STOOL 2

SS‐2 STORAGE, PALLET 96" X 48" X 120" 3

SS‐5 STORAGE, SHELVING 36" X 24" X 84" 2

SS‐7 STORAGE, HEAVY DUTY 60" X 36" X 72" 3

AC‐3 TRASH RECEPTACLE, SMALL 1

AC‐4 RECYCLING RECEPTACLE, SMALL 1

AV‐2 MARKERBOARD, 4' X 6' 1

CG‐3 CHAIR, GUEST OFFICE 2

CT‐1 CHAIR, TASK 1

DL‐1 DESK, L‐SHAPED 1

SF‐1 STORAGE, LAT FILE 1

101A FOM OFF

102 HAZ STOR

103 TOOL CHECKOUT

104 TOOL CRIB

104C TC OFFICE

026 DLA/IPV

101 FOM

025 COMPOSITE

File details come from the government source that posted it. Updated .