This is a Life-cycle Cost Effectiveness (LCCE) analysis document comparing multiple HVAC and service hot water system options for the Bomber Agile Common Hangar (BACH) at Tinker Air Force Base, with projected costs through 2064. The analysis evaluates nine different configurations against the ASHRAE 90.1-2019 baseline, including natural gas service hot water alternatives (SW-GI-A1, SW-GS-A1, SW-HX-A1), HVAC natural gas options (HC-NG-A1 through HC-NG-A4), and a photovoltaic system alternative (PV-1).

The document provides detailed cost breakdowns for each option, including initial costs ranging from $11.6M to $13.8M and 40-year present values between $30.2M and $32.3M. The baseline system uses electric resistance heating with annual electricity consumption of 4.28M kWh, while natural gas alternatives show reduced electricity usage but added gas consumption. The photovoltaic option includes a 420 kW-DC south-facing array producing 594,575 kWh annually. The analysis includes recurring maintenance costs, replacement costs, and utility costs for each configuration, with the NG SHW Alternative 2 (SW-GS-A1) showing the lowest 40-year present value at $30.2M.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recommendation based on Life-cycle Cost Effectiveness (LCCE)

Tinker BACH

6/7/2024

BASELINE 90.1-2019

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

BASELINE - (HC-EL-B)

ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance

HANGAR - Heating and Ventilating Unit (HVU), electric resistance

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $ 2,897,889.00 $11,649,977 First Costs ($)

Electric Costs ($) $319,769 Annual Energy Costs ($)

Electric Consumption (kWh) 4,280,947.22 Annual Energy Consumption (kWh)

Recurring Costs ($/yr) 103,965.00$ $300 $ 47,100.00 $151,365 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 2,028,522.30$ $6,792,834 Replacement Costs ($)

$30,324,767 Present Value (40 years)

NG SHW Alt 1 SW-GI-A1

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

ALTERNATIVE 1

(SW-GI-A1)

Service hot water, natural gas instantaneous (0 gallon storage), (4x) condensing instantaneous water heaters at

95% efficiency and 199 MBH each (AO

Smith, model ACT-199I-N)

BASELINE - (HC-EL-B)

ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance

HANGAR - Heating and Ventilating Unit (HVU), electric resistance

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $22,183 $ 2,897,889.00 $11,641,949 First Costs ($)

Electric Costs ($) $312,791 Annual Energy Costs ($)

Electric consumption (kWh) 4,187,522.22 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $1,584 Annual NG Costs ($)

Natural Gas consumption (Therms) 3,896.19 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $1,200 $47,100 $152,265 Recurring Costs ($) Non-recurring Costs $0 Non-recurring Costs ($) Total Replacement Costs Over 40 Years 4,703,889.25$ $44,366 $2,028,522 $6,776,778 Replacement Costs ($)

$30,227,762 Present Value (40 years)

NG SHW Alt 2 SW-GS-A1

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

ALTERNATIVE 1

(SW-GS-A1)

Service hot water, (2x) natural gas condensing water heaters at 95% efficiency and 120 MBH each, 60 gallons each (AO Smith, model BTH-120)

BASELINE - (HC-EL-B)

ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance

HANGAR - Heating and Ventilating Unit (HVU), electric resistance

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $23,517 $ 2,897,889.00 $11,643,283 First Costs ($)

Electric Costs ($) $312,791 Annual Energy Costs ($)

Electric consumption (kWh) 4,187,522.22 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $1,355 Annual NG Costs ($)

Natural Gas consumption (Therms) 3,334.14 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $47,100 $151,365 Recurring Costs ($) Non-recurring Costs $0 Non-recurring Costs ($) Total Replacement Costs Over 40 Years 4,703,889.25$ $70,551 $2,028,522 $6,802,963 Replacement Costs ($)

$30,214,062 Present Value (40 years)

NG SHW Alt 3 SW-HX-A1

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

ALTERNATIVE 1

(SW-HX-A1)

Service hot water, (2x) water-to-water combined heat exchangers/storage tanks, 60 gallons each (Cemline, model

V60SPH150-DW)

ALTERNATIVE 1 - (HC-NG-A1)

ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery

HANGAR - MAU gas fired with plate heat recovery (full heating)

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $43,117 $4,768,611 $13,533,605 First Costs ($)

Electric Costs ($) $156,706 Annual Energy Costs ($)

Electric consumption (kWh) 2,097,911.11 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $12,166 Annual NG Costs ($)

Natural Gas consumption (Therms) 29,925.81 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $75,225 $179,490 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $43,117 $3,338,028 $8,085,034 Replacement Costs ($)

$31,512,943 Present Value (40 years)

BASELINE 90.1-2019

NG Base Case Proposed Design Option with NG Service Hot Water Alternate 3

90.1-2019 Baseline with NG Service Hot Water Alternate 2

90.1-2019 Baseline with NG Service Hot Water Alternate 1

LIFE CYCLE COST ANALYSIS

HVAC NG Alt 1 HC-NG-A1

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

ALTERNATIVE 1 - (HC-NG-A1)

ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery

HANGAR - MAU gas fired with plate heat recovery (full heating)

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $4,768,611 $13,520,699 First Costs ($)

Electric Costs ($) $163,889 Annual Energy Costs ($)

Electric consumption (kWh) 2,194,080.56 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $10,861 Annual NG Costs ($)

Natural Gas consumption (Therms) 26,715.84 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $75,225 $179,490 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,338,028 $8,102,339 Replacement Costs ($)

$31,636,899 Present Value (40 years)

HVAC NG Alt 2 HC-NG-A2

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

ALTERNATIVE 2 - (HC-NG-A2)

ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery

HANGAR - Natural gas IR overhead, MAU gas fired with plate heat recovery (tempering only, heating by IR)

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $4,349,182 $13,101,270 First Costs ($)

Electric Costs ($) $157,251 Annual Energy Costs ($)

Electric consumption (kWh) 2,105,208.33 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $9,806 Annual NG Costs ($)

Natural Gas consumption (Therms) 24,120.05 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $111,225 $215,490 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,044,427 $7,808,739 Replacement Costs ($)

$32,201,730 Present Value (40 years)

HVAC NG Alt 3 HC-NG-A3

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

ALTERNATIVE 3 - (HC-NG-A3)

ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery

HANGAR - Infloor radiant hot water heating, MAU gas fired with plate heat recovery (tempering only, heating by infloor radiant)

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $5,096,579 $13,848,667 First Costs ($)

Electric Costs ($) $157,520 Annual Energy Costs ($)

Electric consumption (kWh) 2,108,811.11 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $21,082 Annual NG Costs ($)

Natural Gas consumption (Therms) 51,858.39 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $76,425 $180,690 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,567,605 $8,331,917 Replacement Costs ($)

$32,343,472 Present Value (40 years)

90.1-2019 Baseline with HVAC NG Option 3

90.1-2019 Baseline with HVAC NG Option 2

90.1-2019 Baseline with HVAC NG Option 1

HVAC NG Alt 4 HC-NG-A4

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

ALTERNATIVE 4 - (HC-NG-A4)

ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery

HANGAR - Natural gas unit heaters, MAU gas fired with plate heat recovery (tempering only, heating by unit heaters)

No PV System Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $3,666,185 $12,418,273 First Costs ($)

Electric Costs ($) $163,903 Annual Energy Costs ($)

Electric consumption (kWh) 2,194,266.67 Annual Energy Consumption (kWh)

Natural Gas Costs ($) $6,938 Annual NG Costs ($)

Natural Gas consumption (Therms) 17,065.07 Annual NG Consumption (Therms)

Recurring Costs ($/yr) 103,965.00$ $300 $96,825 $201,090 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $2,566,330 $7,330,641 Replacement Costs ($)

$30,537,444 Present Value (40 years)

Baseline with Photovoltaics PV-1

BASELINE

(RF-IEAD-B)

Insulation Entirely Above

Deck, 2.5" polyiso above metal deck

BASELINE

(WL-SF-B)

Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or

0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB

BASELINE

(FA-AS-B)

Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57

Assembly), SHGC-0.25, VT-0.275

BASELINE

(OD-IS-B)

Uninsulated single layer metal door

BASELINE

(LT-LD-B)

LED, 1.00 W/sf (Admin)

0.80 W/sf (Hangar)

BASELINE

(SW-AS-B)

Service hot water, electric resistance storage water heater, 2x210 gallons

BASELINE - (HC-EL-B)

ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance

HANGAR - Heating and Ventilating Unit (HVU), electric resistance

ALTERNATE 1

PV-1

South Hangar Rooftop PV Array

5 degree tilt

180 degree azimuth

Premium efficiency (21%)

1,420 kWh/kW

34,893 sf PV array

420 kW-DC (300 kW Net Metering Cap)

594,575 kWh annual production

(20 year expected life)

Total

Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $ 2,897,889.00 $1,046,787 $12,696,764 First Costs ($)

Electric Costs ($) $ (44,408.79) $275,361 Annual Energy Costs ($)

Electric Consumption (kWh) (594,575) 3,686,372.44 Annual Energy Consumption (kWh)

Recurring Costs ($/yr) 103,965.00$ $300 $ 47,100.00 $1,125 $152,490 Recurring Costs ($)

Non-recurring Costs $0 Non-recurring Costs ($)

Total Replacement Costs Over 40 Years $1,155,729.31 4,703,889.25$ $60,422 2,028,522.30$ $1,046,787 $8,995,350 Replacement Costs ($)

$31,918,000 Present Value (40 years)

90.1-2019 Baseline with Photovoltaic Alternate 1

90.1-2019 Baseline with HVAC NG Option 4

BASELINE 90.1-2019

NG SHW Alt 1 SW-GI-

A1 NG SHW Alt 2 SW-

GS-A1

NG SHW Alt 3 SW-

HX-A1

HVAC NG Alt 1 HC-

NG-A1

HVAC NG Alt 2 HC-

NG-A2

HVAC NG Alt 3 HC-

NG-A3

HVAC NG Alt 4 HC-

NG-A4

Baseline with

Photovoltaics PV-1

First Costs ($) $11,649,977 $11,641,949 $11,643,283 $13,533,605 $13,520,699 $13,101,270 $13,848,667 $12,418,273 $12,696,764

Present Value (40 years) $30,324,767 $30,227,762 $30,214,062 $31,512,943 $31,636,899 $32,201,730 $32,343,472 $30,537,444 $31,918,000

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

$35,000,000

FIRST COST AND PRESENT VALUE (40 YEARS) OF DIFFERENT ALTERNATES

LIFE CYCLE COST ANALYSIS

First Costs ($) Present Value (40 years)