This is a Life-cycle Cost Effectiveness (LCCE) analysis document comparing multiple HVAC and service hot water system options for the Bomber Agile Common Hangar (BACH) at Tinker Air Force Base, with projected costs through 2064. The analysis evaluates nine different configurations against the ASHRAE 90.1-2019 baseline, including natural gas service hot water alternatives (SW-GI-A1, SW-GS-A1, SW-HX-A1), HVAC natural gas options (HC-NG-A1 through HC-NG-A4), and a photovoltaic system alternative (PV-1).
The document provides detailed cost breakdowns for each option, including initial costs ranging from $11.6M to $13.8M and 40-year present values between $30.2M and $32.3M. The baseline system uses electric resistance heating with annual electricity consumption of 4.28M kWh, while natural gas alternatives show reduced electricity usage but added gas consumption. The photovoltaic option includes a 420 kW-DC south-facing array producing 594,575 kWh annually. The analysis includes recurring maintenance costs, replacement costs, and utility costs for each configuration, with the NG SHW Alternative 2 (SW-GS-A1) showing the lowest 40-year present value at $30.2M.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recommendation based on Life-cycle Cost Effectiveness (LCCE)
Tinker BACH
6/7/2024
BASELINE 90.1-2019
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
BASELINE - (HC-EL-B)
ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance
HANGAR - Heating and Ventilating Unit (HVU), electric resistance
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $ 2,897,889.00 $11,649,977 First Costs ($)
Electric Costs ($) $319,769 Annual Energy Costs ($)
Electric Consumption (kWh) 4,280,947.22 Annual Energy Consumption (kWh)
Recurring Costs ($/yr) 103,965.00$ $300 $ 47,100.00 $151,365 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 2,028,522.30$ $6,792,834 Replacement Costs ($)
$30,324,767 Present Value (40 years)
NG SHW Alt 1 SW-GI-A1
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
ALTERNATIVE 1
(SW-GI-A1)
Service hot water, natural gas instantaneous (0 gallon storage), (4x) condensing instantaneous water heaters at
95% efficiency and 199 MBH each (AO
Smith, model ACT-199I-N)
BASELINE - (HC-EL-B)
ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance
HANGAR - Heating and Ventilating Unit (HVU), electric resistance
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $22,183 $ 2,897,889.00 $11,641,949 First Costs ($)
Electric Costs ($) $312,791 Annual Energy Costs ($)
Electric consumption (kWh) 4,187,522.22 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $1,584 Annual NG Costs ($)
Natural Gas consumption (Therms) 3,896.19 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $1,200 $47,100 $152,265 Recurring Costs ($) Non-recurring Costs $0 Non-recurring Costs ($) Total Replacement Costs Over 40 Years 4,703,889.25$ $44,366 $2,028,522 $6,776,778 Replacement Costs ($)
$30,227,762 Present Value (40 years)
NG SHW Alt 2 SW-GS-A1
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
ALTERNATIVE 1
(SW-GS-A1)
Service hot water, (2x) natural gas condensing water heaters at 95% efficiency and 120 MBH each, 60 gallons each (AO Smith, model BTH-120)
BASELINE - (HC-EL-B)
ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance
HANGAR - Heating and Ventilating Unit (HVU), electric resistance
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $23,517 $ 2,897,889.00 $11,643,283 First Costs ($)
Electric Costs ($) $312,791 Annual Energy Costs ($)
Electric consumption (kWh) 4,187,522.22 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $1,355 Annual NG Costs ($)
Natural Gas consumption (Therms) 3,334.14 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $47,100 $151,365 Recurring Costs ($) Non-recurring Costs $0 Non-recurring Costs ($) Total Replacement Costs Over 40 Years 4,703,889.25$ $70,551 $2,028,522 $6,802,963 Replacement Costs ($)
$30,214,062 Present Value (40 years)
NG SHW Alt 3 SW-HX-A1
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
ALTERNATIVE 1
(SW-HX-A1)
Service hot water, (2x) water-to-water combined heat exchangers/storage tanks, 60 gallons each (Cemline, model
V60SPH150-DW)
ALTERNATIVE 1 - (HC-NG-A1)
ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery
HANGAR - MAU gas fired with plate heat recovery (full heating)
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $43,117 $4,768,611 $13,533,605 First Costs ($)
Electric Costs ($) $156,706 Annual Energy Costs ($)
Electric consumption (kWh) 2,097,911.11 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $12,166 Annual NG Costs ($)
Natural Gas consumption (Therms) 29,925.81 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $75,225 $179,490 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $43,117 $3,338,028 $8,085,034 Replacement Costs ($)
$31,512,943 Present Value (40 years)
BASELINE 90.1-2019
NG Base Case Proposed Design Option with NG Service Hot Water Alternate 3
90.1-2019 Baseline with NG Service Hot Water Alternate 2
90.1-2019 Baseline with NG Service Hot Water Alternate 1
LIFE CYCLE COST ANALYSIS
HVAC NG Alt 1 HC-NG-A1
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
ALTERNATIVE 1 - (HC-NG-A1)
ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery
HANGAR - MAU gas fired with plate heat recovery (full heating)
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $4,768,611 $13,520,699 First Costs ($)
Electric Costs ($) $163,889 Annual Energy Costs ($)
Electric consumption (kWh) 2,194,080.56 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $10,861 Annual NG Costs ($)
Natural Gas consumption (Therms) 26,715.84 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $75,225 $179,490 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,338,028 $8,102,339 Replacement Costs ($)
$31,636,899 Present Value (40 years)
HVAC NG Alt 2 HC-NG-A2
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
ALTERNATIVE 2 - (HC-NG-A2)
ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery
HANGAR - Natural gas IR overhead, MAU gas fired with plate heat recovery (tempering only, heating by IR)
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $4,349,182 $13,101,270 First Costs ($)
Electric Costs ($) $157,251 Annual Energy Costs ($)
Electric consumption (kWh) 2,105,208.33 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $9,806 Annual NG Costs ($)
Natural Gas consumption (Therms) 24,120.05 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $111,225 $215,490 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,044,427 $7,808,739 Replacement Costs ($)
$32,201,730 Present Value (40 years)
HVAC NG Alt 3 HC-NG-A3
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
ALTERNATIVE 3 - (HC-NG-A3)
ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery
HANGAR - Infloor radiant hot water heating, MAU gas fired with plate heat recovery (tempering only, heating by infloor radiant)
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $5,096,579 $13,848,667 First Costs ($)
Electric Costs ($) $157,520 Annual Energy Costs ($)
Electric consumption (kWh) 2,108,811.11 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $21,082 Annual NG Costs ($)
Natural Gas consumption (Therms) 51,858.39 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $76,425 $180,690 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $3,567,605 $8,331,917 Replacement Costs ($)
$32,343,472 Present Value (40 years)
90.1-2019 Baseline with HVAC NG Option 3
90.1-2019 Baseline with HVAC NG Option 2
90.1-2019 Baseline with HVAC NG Option 1
HVAC NG Alt 4 HC-NG-A4
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
ALTERNATIVE 4 - (HC-NG-A4)
ADMIN - Chiller (AC) and condensing boiler, hydronic VAVs, with DOAS heat recovery
HANGAR - Natural gas unit heaters, MAU gas fired with plate heat recovery (tempering only, heating by unit heaters)
No PV System Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $3,666,185 $12,418,273 First Costs ($)
Electric Costs ($) $163,903 Annual Energy Costs ($)
Electric consumption (kWh) 2,194,266.67 Annual Energy Consumption (kWh)
Natural Gas Costs ($) $6,938 Annual NG Costs ($)
Natural Gas consumption (Therms) 17,065.07 Annual NG Consumption (Therms)
Recurring Costs ($/yr) 103,965.00$ $300 $96,825 $201,090 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years 4,703,889.25$ $60,422 $2,566,330 $7,330,641 Replacement Costs ($)
$30,537,444 Present Value (40 years)
Baseline with Photovoltaics PV-1
BASELINE
(RF-IEAD-B)
Insulation Entirely Above
Deck, 2.5" polyiso above metal deck
BASELINE
(WL-SF-B)
Stucco, 0.625" GPB, steel stud framing (0.043" for 18 gauge or
0.054" for 16 gauge) @ 3.5" cavity and 16" on-center, 3.5" batt insulation, 0.625" GPB
BASELINE
(FA-AS-B)
Aluminum storefront 1", tinted/tempered low-e, double pane, U-0.45 (COG) (U-0.57
Assembly), SHGC-0.25, VT-0.275
BASELINE
(OD-IS-B)
Uninsulated single layer metal door
BASELINE
(LT-LD-B)
LED, 1.00 W/sf (Admin)
0.80 W/sf (Hangar)
BASELINE
(SW-AS-B)
Service hot water, electric resistance storage water heater, 2x210 gallons
BASELINE - (HC-EL-B)
ADMIN - Packaged VAV with PFP Boxes, DX cooling, electric resistance
HANGAR - Heating and Ventilating Unit (HVU), electric resistance
ALTERNATE 1
PV-1
South Hangar Rooftop PV Array
5 degree tilt
180 degree azimuth
Premium efficiency (21%)
1,420 kWh/kW
34,893 sf PV array
420 kW-DC (300 kW Net Metering Cap)
594,575 kWh annual production
(20 year expected life)
Total
Initial Cost ($) $2,972,136.56 $ 1,948,927.27 $ 2,199,305.25 $33,545 1,567,963.08$ $30,211 $ 2,897,889.00 $1,046,787 $12,696,764 First Costs ($)
Electric Costs ($) $ (44,408.79) $275,361 Annual Energy Costs ($)
Electric Consumption (kWh) (594,575) 3,686,372.44 Annual Energy Consumption (kWh)
Recurring Costs ($/yr) 103,965.00$ $300 $ 47,100.00 $1,125 $152,490 Recurring Costs ($)
Non-recurring Costs $0 Non-recurring Costs ($)
Total Replacement Costs Over 40 Years $1,155,729.31 4,703,889.25$ $60,422 2,028,522.30$ $1,046,787 $8,995,350 Replacement Costs ($)
$31,918,000 Present Value (40 years)
90.1-2019 Baseline with Photovoltaic Alternate 1
90.1-2019 Baseline with HVAC NG Option 4
BASELINE 90.1-2019
NG SHW Alt 1 SW-GI-
A1 NG SHW Alt 2 SW-
GS-A1
NG SHW Alt 3 SW-
HX-A1
HVAC NG Alt 1 HC-
NG-A1
HVAC NG Alt 2 HC-
NG-A2
HVAC NG Alt 3 HC-
NG-A3
HVAC NG Alt 4 HC-
NG-A4
Baseline with
Photovoltaics PV-1
First Costs ($) $11,649,977 $11,641,949 $11,643,283 $13,533,605 $13,520,699 $13,101,270 $13,848,667 $12,418,273 $12,696,764
Present Value (40 years) $30,324,767 $30,227,762 $30,214,062 $31,512,943 $31,636,899 $32,201,730 $32,343,472 $30,537,444 $31,918,000
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
FIRST COST AND PRESENT VALUE (40 YEARS) OF DIFFERENT ALTERNATES