Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This file contains 18 pages of architectural, engineering and construction drawings for a Bomber Agile Common Hangar project at Tinker Air Force Base. The drawings include a cover sheet, drawing index, general notes, abbreviations, architectural dimensioning conventions, and life safety plans for both first and second floors.

The drawings detail a 4-dock hangar facility consisting of a single-story structural steel framed hangar bay with a two-story administration section. Key features shown include hangar bays, support spaces, administrative areas, breakrooms, FEMA storm shelter, hazardous material storage, mechanical/electrical rooms, and restroom facilities. The plans indicate multiple egress paths, fire barriers, smoke partitions, and occupancy load calculations for different areas of the facility. The project appears to be at 65% design completion as of November 20, 2024. The drawings are produced by Mason & Hanger, Larson Design Group, and Mead & Hunt under USACE Tulsa District contract numbers W912BV-19-D-0008 and W912BV-20-D-0032.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA

Canadian River

Enid

Kaw Lake

Arkansas River

Tulsa

Eufaula Lake

Oklahoma City

Canadian River

Muskogee

Lawton

A R

K A

N S

A S

TEXAS

N E

W M

E X

IC

O

COLORADO KANSAS

M

IS

S O

U R

I

Wichita Falls

Red River

Canadian

River

Denton

PROJECT LOCATION

240 240

Oklahoma City

Bethany

The Village

Forest Park Spencer

Jones

Choctaw

Del City

Valley Brook

PROJECT SITE

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

G-001

C O

V E

R S

H E

E T

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

TULSA DISTRICT

W912BV-19-D-0008

W912BV-20-D-0032

NOVEMBER 20, 2024

VOLUME 1 OF 2

TINKER AIR FORCE BASE, OK

BOMBER AGILE COMMON HANGAR

WWYK263009

(FY26 B-52J)

THIS IS AN ARTIST'S RENDERING AND MAY NOT DEPICT ACTUAL CONDITIONS - SHOWN FOR REFERENCE ONLY

CHERRY STREET BUILDING

1616 EAST 15th STREET

TULSA, OK 74120

(918) 585-8844

Mason & Hanger

300 WEST VINE STREET

SUITE 1500

LEXINGTON, KY 40507

(859) 788-0263

Mead & Hunt

LOCATION MAP

MAY NOT DEPICT EXACT LOCATION - SHOWN FOR REFERENCE ONLY

NO SCALE

NO SCALE

TRUE NORTH

: GENERAL, CIVIL, STRUCTURAL, ARCHITECTURAL, INTERIOR DESIGN

VICINITY MAP

D E

S

IG

N

/2

/2

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

G-002

D R

A W

IN

G

I N

D E

X

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

Sheet Number Sheet Name

Current Revision Date

VOLUME 1

G-001 COVER SHEET 65% DESIGN 11/20/24

G-002 DRAWING INDEX 65% DESIGN 11/20/24

G-003 GENERAL NOTES, ABBREVIATIONS 65% DESIGN 11/20/24

G-004 GENERAL CONVENTIONS 65% DESIGN 11/20/24

10 GENERAL: 4

LS001 ABBREVIATIONS, LEGEND AND CODE ANALYSIS 65% DESIGN 11/20/24

LS110 FIRST FLOOR - LIFE SAFETY PLAN - COMPOSITE 65% DESIGN 11/20/24

LS111 FIRST FLOOR - LIFE SAFETY PLAN - AREA A 65% DESIGN 11/20/24

LS112 FIRST FLOOR - LIFE SAFETY PLAN - AREA B 65% DESIGN 11/20/24

LS113 FIRST FLOOR - LIFE SAFETY PLAN - AREA C 65% DESIGN 11/20/24

LS114 FIRST FLOOR - LIFE SAFETY PLAN - AREA D 65% DESIGN 11/20/24

LS120 SECOND FLOOR - LIFE SAFETY PLAN - COMPOSITE 65% DESIGN 11/20/24

LS121 SECOND FLOOR - LIFE SAFETY PLAN - AREA A 65% DESIGN 11/20/24

LS123 SECOND FLOOR - LIFE SAFETY PLAN - AREA C 65% DESIGN 11/20/24

20 LIFE SAFETY: 9

GC001 CIVIL ABBREVIATIONS 65% DESIGN 11/20/24

GC002 CIVIL LEGEND 65% DESIGN 11/20/24

GC111 PROJECT LAYOUT PLAN 65% DESIGN 11/20/24

GC121 SURVEY CONTROL PLAN 65% DESIGN 11/20/24

GC141 CONSTRUCTION SAFETY & PHASING PLAN 65% DESIGN 11/20/24

GC142 COORDINATING WORK 65% DESIGN 11/20/24

GC143 PERMANENT FENCING 65% DESIGN 11/20/24

B051 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B052 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B053 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B054 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B055 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B056 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B057 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B058 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B059 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

B060 PLAN & LOG OF SOIL BORINGS 65% DESIGN 11/20/24

V100 EXISTING CONTOURS & UTILITIES PLAN - OVERALL 65% DESIGN 11/20/24

V101 EXISTING CONTOURS & UTILITIES PLAN 65% DESIGN 11/20/24

V102 EXISTING CONTOURS & UTILITIES PLAN 65% DESIGN 11/20/24

V103 EXISTING CONTOURS & UTILITIES PLAN 65% DESIGN 11/20/24

CG100 EROSION CONTROL PLAN - OVERALL 65% DESIGN 11/20/24

CG101 EROSION CONTROL PLAN 65% DESIGN 11/20/24

CG102 EROSION CONTROL PLAN 65% DESIGN 11/20/24

CG103 EROSION CONTROL PLAN 65% DESIGN 11/20/24

CG501 EROSION CONTROL DETAILS 65% DESIGN 11/20/24

CG502 EROSION CONTROL DETAILS 65% DESIGN 11/20/24

CD100 DEMOLITION PLAN - OVERALL 65% DESIGN 11/20/24

CD101 DEMOLITION PLAN 65% DESIGN 11/20/24

CD102 DEMOLITION PLAN 65% DESIGN 11/20/24

CD103 DEMOLITION PLAN 65% DESIGN 11/20/24

CD104 DEMOLITION PLAN 65% DESIGN 11/20/24

CD501 DEMOLITION DETAILS 65% DESIGN 11/20/24

CS110 PROJECT GEOMETRICS - OVERALL 65% DESIGN 11/20/24

CS111 PROJECT GEOMETRICS 65% DESIGN 11/20/24

CS112 PROJECT GEOMETRICS 65% DESIGN 11/20/24

CS113 PROJECT GEOMETRICS 65% DESIGN 11/20/24

CS114 PROJECT GEOMETRICS 65% DESIGN 11/20/24

CG110 GRADING & DRAINAGE PLAN - OVERALL 65% DESIGN 11/20/24

CG111 GRADING & DRAINAGE PLAN 65% DESIGN 11/20/24

CG112 GRADING & DRAINAGE PLAN 65% DESIGN 11/20/24

CG113 GRADING & DRAINAGE PLAN 65% DESIGN 11/20/24

CG114 GRADING & DRAINAGE PLAN 65% DESIGN 11/20/24

CG115 GRADING & DRAINAGE PLAN 65% DESIGN 11/20/24

CG116 GRADING & ROOF DRAINAGE PLAN 65% DESIGN 11/20/24

CG117 GRADING & ROOF DRAINAGE PLAN 65% DESIGN 11/20/24

CG121 PLAN & PROFILE - TOWWAY NORTH 65% DESIGN 11/20/24

CG122 PLAN & PROFILE - TOWWAY WEST 65% DESIGN 11/20/24

CG123 PLAN & PROFILE - TOWWAY EAST 65% DESIGN 11/20/24

CP100 JOINTING PLANS - OVERALL 65% DESIGN 11/20/24

CP101 JOINTING PLANS 65% DESIGN 11/20/24

CP102 JOINTING PLANS 65% DESIGN 11/20/24

CP103 JOINTING PLANS 65% DESIGN 11/20/24

CP104 JOINTING PLANS 65% DESIGN 11/20/24

CP301 TYPICAL SECTIONS 65% DESIGN 11/20/24

CP302 TYPICAL SECTIONS 65% DESIGN 11/20/24

CP501 SITE PAVEMENT DETAILS 65% DESIGN 11/20/24

CP502 JOINTING DETAILS 65% DESIGN 11/20/24

CS511 FENCE DETAILS 65% DESIGN 11/20/24

CS512 FENCE DETAILS 65% DESIGN 11/20/24

CS520 SIGN DETAILS 65% DESIGN 11/20/24

CG511 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CG512 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CG513 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CG514 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CG515 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CG516 PROPOSED ELEVATIONS PLAN 65% DESIGN 11/20/24

CU111 UTILITY PLAN 65% DESIGN 11/20/24

CU112 UTILITY PLAN 65% DESIGN 11/20/24

CU113 UTILITY PLAN 65% DESIGN 11/20/24

CU114 UTILITY PLAN 65% DESIGN 11/20/24

CU115 UTILITY PLAN 65% DESIGN 11/20/24

CU141 STORM PLAN & PROFILES 65% DESIGN 11/20/24

CU142 STORM PLAN & PROFILES 65% DESIGN 11/20/24

CU143 STORM PLAN & PROFILES 65% DESIGN 11/20/24

CU144 STORM PLAN & PROFILES 65% DESIGN 11/20/24

CU145 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU146 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU147 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU148 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU149 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU150 UNDERDRAIN PLAN & PROFILES 65% DESIGN 11/20/24

CU501 SEWER DETAILS 65% DESIGN 11/20/24

CU502 SEWER DETAILS 65% DESIGN 11/20/24

CU511 WATER DETAILS 65% DESIGN 11/20/24

CU521 DRAINAGE DETAILS 65% DESIGN 11/20/24

CU522 DRAINAGE DETAILS 65% DESIGN 11/20/24

CU523 DRAINAGE DETAILS 65% DESIGN 11/20/24

CM170 MARKING LAYOUT PLAN - OVERALL 65% DESIGN 11/20/24

CM171 MARKING LAYOUT PLAN 65% DESIGN 11/20/24

CM172 MARKING LAYOUT PLAN 65% DESIGN 11/20/24

CM173 MARKING LAYOUT PLAN 65% DESIGN 11/20/24

CM174 SITE LAYOUT PLAN 65% DESIGN 11/20/24

Sheet Number Sheet Name

Current Revision Date

CM531 MARKING DETAILS 65% DESIGN 11/20/24

CX301 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX302 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX303 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX304 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX305 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX306 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX307 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX308 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX309 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX310 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX311 CROSS SECTIONS - TOWWAY NORTH 65% DESIGN 11/20/24

CX312 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX313 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX314 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX315 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX316 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX317 CROSS SECTIONS - TOWWAY WEST 65% DESIGN 11/20/24

CX318 CROSS SECTIONS - TOWWAY EAST 65% DESIGN 11/20/24

CX319 CROSS SECTIONS - TOWWAY EAST 65% DESIGN 11/20/24

CX320 CROSS SECTIONS - TOWWAY EAST 65% DESIGN 11/20/24

CX321 CROSS SECTIONS - TOWWAY EAST 65% DESIGN 11/20/24

CX322 CROSS SECTIONS - TOWWAY EAST 65% DESIGN 11/20/24

50 CIVIL: 116

S-001 GENERAL STRUCTURAL NOTES AND DESIGN CRITERIA 65% DESIGN 11/20/24

S-002 STRUCTURAL ABBREVIATIONS 65% DESIGN 11/20/24

S-100 PIER PLAN - COMPOSITE 65% DESIGN 11/20/24

S-101 PIER PLAN - AREA A 65% DESIGN 11/20/24

S-102 PIER PLAN - AREA B 65% DESIGN 11/20/24

S-103 PIER PLAN - AREA C 65% DESIGN 11/20/24

S-104 PIER PLAN - AREA D 65% DESIGN 11/20/24

S-110 FOUNDATION AND FLOOR SLAB PLAN - COMPOSITE 65% DESIGN 11/20/24

S-111 FOUNDATION AND FLOOR SLAB PLAN - AREA A 65% DESIGN 11/20/24

S-112 FOUNDATION AND FLOOR SLAB PLAN - AREA B 65% DESIGN 11/20/24

S-113 FOUNDATION AND FLOOR SLAB PLAN - AREA C 65% DESIGN 11/20/24

S-114 FOUNDATION AND FLOOR SLAB PLAN - AREA D 65% DESIGN 11/20/24

S-115 SLAB JOINT PLAN 65% DESIGN 11/20/24

S-120 SECOND FLOOR AND LOW ROOF FRAMING PLAN -

COMPOSITE

65% DESIGN 11/20/24

S-121 SECOND FLOOR FRAMING PLAN - AREA A 65% DESIGN 11/20/24

S-122 LOW ROOF FRAMING PLAN - AREA B 65% DESIGN 11/20/24

S-123 SECOND FLOOR AND LOW ROOF FRAMING PLAN - AREA C 65% DESIGN 11/20/24

S-124 LOW ROOF FRAMING PLAN - AREA D 65% DESIGN 11/20/24

S-130 ADMIN ROOF FRAMING PLAN - COMPOSITE 65% DESIGN 11/20/24

S-131 ADMIN ROOF FRAMING PLAN - AREA A 65% DESIGN 11/20/24

S-133 ADMIN ROOF FRAMING PLAN - AREA C 65% DESIGN 11/20/24

S-140 TRUSS BOTTOM CHORD BRACING PLAN - COMPOSITE 65% DESIGN 11/20/24

S-141 TRUSS BOTTOM CHORD BRACING PLAN - AREA A 65% DESIGN 11/20/24

S-142 TRUSS BOTTOM CHORD BRACING PLAN - AREA B 65% DESIGN 11/20/24

S-143 TRUSS BOTTOM CHORD BRACING PLAN - AREA C 65% DESIGN 11/20/24

S-144 TRUSS BOTTOM CHORD BRACING PLAN - AREA D 65% DESIGN 11/20/24

S-145 STRUCTURAL FRAMING PLAN AT TOP OF SLIDING DOORS 65% DESIGN 11/20/24

S-150 HIGH ROOF FRAMING PLAN - COMPOSITE 65% DESIGN 11/20/24

S-151 HIGH ROOF FRAMING PLAN - AREA A 65% DESIGN 11/20/24

S-152 HIGH ROOF FRAMING PLAN - AREA B 65% DESIGN 11/20/24

S-153 HIGH ROOF FRAMING PLAN - AREA C 65% DESIGN 11/20/24

S-154 HIGH ROOF FRAMING PLAN - AREA D 65% DESIGN 11/20/24

S-201 TRUSS FRAMING ELEVATIONS 65% DESIGN 11/20/24

S-202 TRUSS FRAMING ELEVATIONS 65% DESIGN 11/20/24

S-203 TRUSS CAMBER DIAGRAMS 65% DESIGN 11/20/24

S-211 FRAMING ELEVATIONS 65% DESIGN 11/20/24

S-212 FRAMING ELEVATIONS 65% DESIGN 11/20/24

S-221 CLADDING SUPPORT ELEVATIONS 65% DESIGN 11/20/24

S-222 CLADDING SUPPORT ELEVATIONS 65% DESIGN 11/20/24

S-231 FALL PROTECTION AND HOIST ELEVATION 65% DESIGN 11/20/24

S-232 BRIDGE CRANE ELEVATIONS 65% DESIGN 11/20/24

S-301 FOUNDATION SECTIONS 65% DESIGN 11/20/24

S-302 FOUNDATION SECTIONS 65% DESIGN 11/20/24

S-311 FRAMING SECTIONS 65% DESIGN 11/20/24

S-321 FRAMING SECTIONS 65% DESIGN 11/20/24

S-331 FRAMING SECTIONS 65% DESIGN 11/20/24

S-332 FRAMING SECTIONS 65% DESIGN 11/20/24

S-401 ENLARGED STORM SHELTER ROOF FRAMING PLANS 65% DESIGN 11/20/24

S-402 ENLARGED CATWALK FRAMING PLAN AND SECTION 65% DESIGN 11/20/24

S-411 STORM SHELTER SECTIONS 65% DESIGN 11/20/24

S-501 TYPICAL FOUNDATION DETAILS 65% DESIGN 11/20/24

S-502 TYPICAL FOUNDATION DETAILS 65% DESIGN 11/20/24

S-503 TYPICAL FOUNDATION DETAILS 65% DESIGN 11/20/24

S-504 TYPICAL HANGAR SLAB DETAILS 65% DESIGN 11/20/24

S-505 COLUMN BASEPLATE DETAILS 65% DESIGN 11/20/24

S-511 TYPICAL PRECAST CONCRETE PANEL DETAILS 65% DESIGN 11/20/24

S-512 TYPICAL CMU DETAILS 65% DESIGN 11/20/24

S-521 STRUCTURAL CLADDING SUPPORT DETAILS 65% DESIGN 11/20/24

S-522 STRUCTURAL CLADDING SUPPORT DETAILS 65% DESIGN 11/20/24

S-523 STRUCTURAL CONNECTION DETAILS 65% DESIGN 11/20/24

S-524 STRUCTURAL CONNECTION DETAILS 65% DESIGN 11/20/24

S-531 STRUCTURAL TRUSS CONNECTION DETAILS 65% DESIGN 11/20/24

S-532 STRUCTURAL TRUSS CONNECTION DETAILS 65% DESIGN 11/20/24

S-533 STRUCTURAL TRUSS CONNECTION DETAILS 65% DESIGN 11/20/24

S-541 STRUCTURAL FRAMING CONNECTION DETAILS 65% DESIGN 11/20/24

S-551 TYPICAL STEEL FRAMING DETAILS 65% DESIGN 11/20/24

S-552 TYPICAL STEEL FRAMING DETAILS 65% DESIGN 11/20/24

S-601 SCHEDULES 65% DESIGN 11/20/24

70 STRUCTURAL: 68

AS100 SITE PLAN 65% DESIGN 11/20/24

AS101 SITE DETAILS 65% DESIGN 11/20/24

A-101 FIRST FLOOR PLAN - OVERALL 65% DESIGN 11/20/24

A-102 FIRST FLOOR PLAN - AREA A 65% DESIGN 11/20/24

A-103 FIRST FLOOR PLAN - AREA B 65% DESIGN 11/20/24

A-104 FIRST FLOOR PLAN - AREA C 65% DESIGN 11/20/24

A-105 FIRST FLOOR PLAN - AREA D 65% DESIGN 11/20/24

A-106 SECOND FLOOR PLAN - OVERALL 65% DESIGN 11/20/24

A-107 SECOND FLOOR PLAN - AREA A 65% DESIGN 11/20/24

A-108 SECOND FLOOR PLAN - AREA C 65% DESIGN 11/20/24

A-110 CONTROLLED AREA PLAN - FIRST FLOOR 65% DESIGN 11/20/24

A-111 AIR BARRIER PLAN - FIRST FLOOR 65% DESIGN 11/20/24

A-112 AIR BARRIER PLAN - SECOND FLOOR 65% DESIGN 11/20/24

A-113 AIR BARRIER BUILDING SECTIONS 65% DESIGN 11/20/24

A-114 WALL CONTROL JOINT PLAN 65% DESIGN 11/20/24

Sheet Number Sheet Name

Current Revision Date

A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL 65% DESIGN 11/20/24

A-132 FIRST FLOOR REFLECTED CEILING PLAN - AREA A 65% DESIGN 11/20/24

A-133 FIRST FLOOR REFLECTED CEILING PLAN - AREA B 65% DESIGN 11/20/24

A-134 FIRST FLOOR REFLECTED CEILING PLAN - AREA C 65% DESIGN 11/20/24

A-135 FIRST FLOOR REFLECTED CEILING PLAN - AREA D 65% DESIGN 11/20/24

A-136 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL 65% DESIGN 11/20/24

A-137 SECOND FLOOR REFLECTED CEILING PLAN - AREA A 65% DESIGN 11/20/24

A-138 SECOND FLOOR REFLECTED CEILING PLAN - AREA C 65% DESIGN 11/20/24

A-139 HANGAR UPPER CEILING PLAN 65% DESIGN 11/20/24

A-151 ROOF PLAN 65% DESIGN 11/20/24

A-152 ROOF PLAN - AREA A 65% DESIGN 11/20/24

A-153 ROOF PLAN - AREA B 65% DESIGN 11/20/24

A-154 ROOF PLAN - AREA C 65% DESIGN 11/20/24

A-155 ROOF PLAN - AREA D 65% DESIGN 11/20/24

A-201 BUILDING ELEVATIONS - OVERALL

A-202 BUILDING ELEVATIONS - OVERALL 65% DESIGN 11/20/24

A-205 ENLARGED BUILDING ELEVATIONS - NORTH 65% DESIGN 11/20/24

A-206 ENLARGED BUILDING ELEVATIONS - EAST, WEST AND

SOUTH

65% DESIGN 11/20/24

A-207 ENLARGED BUILDING ELEVATIONS - SOUTH CONT. 65% DESIGN 11/20/24

A-210 ENLARGED HANGAR ELEVATIONS - NORTH 65% DESIGN 11/20/24

A-211 ENLARGED HANGAR ELEVATIONS - EAST 65% DESIGN 11/20/24

A-212 ENLARGED HANGAR ELEVATIONS - SOUTH 65% DESIGN 11/20/24

A-213 ENLARGED HANGAR ELEVATIONS - WEST 65% DESIGN 11/20/24

A-301 BUILDING SECTIONS 65% DESIGN 11/20/24

A-302 BUILDING SECTIONS 65% DESIGN 11/20/24

A-303 BUILDING SECTIONS 65% DESIGN 11/20/24

A-304 WALL SECTIONS 65% DESIGN 11/20/24

A-305 WALL SECTIONS 65% DESIGN 11/20/24

A-306 WALL SECTIONS 65% DESIGN 11/20/24

A-307 WALL SECTIONS 65% DESIGN 11/20/24

A-308 WALL SECTIONS 65% DESIGN 11/20/24

A-401 ENLARGED TORNADO SHELTER PLAN & CRITERIA 65% DESIGN 11/20/24

A-402 ENLARGED PLANS 65% DESIGN 11/20/24

A-501 VERTICAL DETAILS 65% DESIGN 11/20/24

A-502 VERTICAL DETAILS 65% DESIGN 11/20/24

A-503 VERTICAL DETAILS - CEILING 65% DESIGN 11/20/24

A-504 VERTICAL DETAILS - CEILING 65% DESIGN 11/20/24

A-505 VERTICAL DETAILS - ROOF 65% DESIGN 11/20/24

A-506 VERTICAL DETAILS - ROOF 65% DESIGN 11/20/24

A-510 PLAN DETAILS 65% DESIGN 11/20/24

A-511 PLAN DETAILS 65% DESIGN 11/20/24

A-512 PLAN DETAILS 65% DESIGN 11/20/24

A-601 INTERIOR PARTITION TYPES DIAGRAM 65% DESIGN 11/20/24

A-602 INTERIOR PARTITION DETAILS 65% DESIGN 11/20/24

A-606 DOOR SCHEDULE 65% DESIGN 11/20/24

A-607 DOOR SCHEDULE 65% DESIGN 11/20/24

A-608 DOOR DETAILS & FRAME ELEVATIONS 65% DESIGN 11/20/24

A-609 DOOR DETAILS 65% DESIGN 11/20/24

A-610 DOOR DETAILS 65% DESIGN 11/20/24

A-611 DOOR DETAILS 65% DESIGN 11/20/24

A-612 WINDOW TYPES 65% DESIGN 11/20/24

A-801 VERTICAL CIRCULATION PLANS 65% DESIGN 11/20/24

A-802 VERTICAL CIRCULATION PLANS 65% DESIGN 11/20/24

A-803 STAIR SECTIONS 65% DESIGN 11/20/24

A-804 STAIR SECTIONS 65% DESIGN 11/20/24

A-805 STAIR SECTIONS 65% DESIGN 11/20/24

A-806 STAIR SECTIONS 65% DESIGN 11/20/24

A-807 STAIR SECTIONS 65% DESIGN 11/20/24

A-808 ELEVATOR SECTIONS 65% DESIGN 11/20/24

A-810 STAIR DETAILS 65% DESIGN 11/20/24

A-811 STAIR DETAILS 65% DESIGN 11/20/24

A-901 PERSPECTIVE RENDERING 65% DESIGN 11/20/24

A-902 PERSPECTIVE RENDERING 65% DESIGN 11/20/24

A-903 PERSPECTIVE RENDERING 65% DESIGN 11/20/24

A-904 PERSPECTIVE RENDERING 65% DESIGN 11/20/24

A-905 PERSPECTIVE RENDERING 65% DESIGN 11/20/24

A-906 FINAL RENDERING 65% DESIGN 11/20/24

80 ARCHITECTURAL: 82

I-001 INTERIORS GENERAL SHEET 65% DESIGN 11/20/24

I-121 HANGAR BAY STRIPING DIAGRAM 65% DESIGN 11/20/24

I-401 ELEVATIONS 65% DESIGN 11/20/24

I-402 ENLARGED PLANS AND ELEVATIONS 65% DESIGN 11/20/24

I-403 ENLARGED PLANS AND ELEVATIONS 65% DESIGN 11/20/24

I-404 ENLARGED PLANS AND ELEVATIONS 65% DESIGN 11/20/24

I-405 ELEVATIONS 65% DESIGN 11/20/24

I-601 FINISH SCHEDULES 65% DESIGN 11/20/24

I-602 SIGNAGE SCHEDULES 65% DESIGN 11/20/24

I-603 FF&E SCHEDULES 65% DESIGN 11/20/24

I-610 FINISH DETAILS 65% DESIGN 11/20/24

I-611 MILLWORK DETAILS 65% DESIGN 11/20/24

I-701 FURNITURE DETAILS 65% DESIGN 11/20/24

I-801 SIGNAGE DETAILS 65% DESIGN 11/20/24

IF101 OVERALL FIRST FLOOR FF&E PLAN 65% DESIGN 11/20/24

IF102 FIRST FLOOR FF&E PLAN - AREA A 65% DESIGN 11/20/24

IF103 FIRST FLOOR FF&E PLAN - AREA B 65% DESIGN 11/20/24

IF104 FIRST FLOOR FF&E PLAN - AREA C 65% DESIGN 11/20/24

IF105 FIRST FLOOR FF&E PLAN - AREA D 65% DESIGN 11/20/24

IF106 OVERALL SECOND FLOOR FF&E PLAN 65% DESIGN 11/20/24

IF107 SECOND FLOOR FF&E PLAN - AREA A 65% DESIGN 11/20/24

IF108 SECOND FLOOR FF&E PLAN - AREA C 65% DESIGN 11/20/24

IG101 OVERALL FIRST FLOOR GRAPHICS PLAN 65% DESIGN 11/20/24

IG102 FIRST FLOOR GRAPHICS AND SIGNAGE PLAN - AREA A 65% DESIGN 11/20/24

IG103 FIRST FLOOR GRAPHICS AND SIGNAGE PLAN - AREA B 65% DESIGN 11/20/24

IG104 FIRST FLOOR GRAPHICS AND SIGNAGE PLAN - AREA C 65% DESIGN 11/20/24

IG105 FIRST FLOOR GRAPHICS AND SIGNAGE PLAN - AREA D 65% DESIGN 11/20/24

IG106 OVERALL SECOND FLOOR GRAPHICS AND SIGNAGE PLAN 65% DESIGN 11/20/24

IG107 SECOND FLOOR GRAPHICS AND SIGNAGE PLAN - AREA A 65% DESIGN 11/20/24

IG108 SECOND FLOOR GRAPHICS AND SIGNAGE PLAN - AREA C 65% DESIGN 11/20/24

IN101 OVERALL FIRST FLOOR FINISH PLAN 65% DESIGN 11/20/24

IN102 FIRST FLOOR FINISH PLAN - AREA A 65% DESIGN 11/20/24

IN103 FIRST FLOOR FINISH PLAN - AREA B 65% DESIGN 11/20/24

IN104 FIRST FLOOR FINISH PLAN - AREA C 65% DESIGN 11/20/24

IN105 FIRST FLOOR FINISH PLAN - AREA D 65% DESIGN 11/20/24

IN106 OVERALL SECOND FLOOR FINISH PLAN 65% DESIGN 11/20/24

IN107 SECOND FLOOR FINISH PLAN - AREA A 65% DESIGN 11/20/24

IN108 SECOND FLOOR FINISH PLAN - AREA C 65% DESIGN 11/20/24

90 INTERIOR DESIGN: 38

VOLUME 1: 317

Sheet Number Sheet Name

Current Revision Date

VOLUME 2

G–001 COVER SHEET 65% DESIGN 11/20/24

G–002 DRAWING INDEX 65% DESIGN 11/20/24

10 GENERAL: 2

FX001 ABBREVIATIONS, LEGEND AND GENERAL NOTES 65% DESIGN 11/20/24

FX110 FIRST FLOOR - FIRE PROTECTION PLAN - COMPOSITE 65% DESIGN 11/20/24

FX111 FIRST FLOOR - FIRE PROTECTION PLAN - AREA A 65% DESIGN 11/20/24

FX112 FIRST FLOOR - FIRE PROTECTION PLAN - AREA B 65% DESIGN 11/20/24

FX113 FIRST FLOOR - FIRE PROTECTION PLAN - AREA C 65% DESIGN 11/20/24

FX114 FIRST FLOOR - FIRE PROTECTION PLAN - AREA D 65% DESIGN 11/20/24

FX120 SECOND FLOOR - FIRE PROTECTION PLAN - COMPOSITE 65% DESIGN 11/20/24

FX121 SECOND FLOOR - FIRE PROTECTION PLAN - AREA A 65% DESIGN 11/20/24

FX123 SECOND FLOOR - FIRE PROTECTION PLAN - AREA C 65% DESIGN 11/20/24

FX501 DETAILS 65% DESIGN 11/20/24

FA001 ABBREVIATIONS, LEGEND AND GENERAL NOTES 65% DESIGN 11/20/24

FA101 FIRST FLOOR - FIRE ALARM ADS PLAN 65% DESIGN 11/20/24

FA102 SECOND FLOOR - FIRE ALARM ADS PLAN 65% DESIGN 11/20/24

FA110 FIRST FLOOR - FIRE ALARM PLAN - COMPOSITE 65% DESIGN 11/20/24

FA111 FIRST FLOOR - FIRE ALARM PLAN - AREA A 65% DESIGN 11/20/24

FA112 FIRST FLOOR - FIRE ALARM PLAN - AREA B 65% DESIGN 11/20/24

FA113 FIRST FLOOR - FIRE ALARM PLAN - AREA C 65% DESIGN 11/20/24

FA114 FIRST FLOOR - FIRE ALARM PLAN - AREA D 65% DESIGN 11/20/24

FA120 SECOND FLOOR - FIRE ALARM PLAN - COMPOSITE 65% DESIGN 11/20/24

FA121 SECOND FLOOR - FIRE ALARM PLAN - AREA A 65% DESIGN 11/20/24

FA123 SECOND FLOOR - FIRE ALARM PLAN - AREA C 65% DESIGN 11/20/24

FA501 DETAILS 65% DESIGN 11/20/24

120 FIRE PROTECTION: 22

P-001 NOTES, SYMBOLS AND ABBREVIATIONS 65% DESIGN 11/20/24

P-095 UNDERGROUND DRAIN AND VENT PLAN - OVERALL 65% DESIGN 11/20/24

P-096 UNDERGROUND DRAIN AND VENT PLAN - AREA A 65% DESIGN 11/20/24

P-097 UNDERGROUND DRAIN AND VENT PLAN - AREA B 65% DESIGN 11/20/24

P-098 UNDERGROUND DRAIN AND VENT PLAN - AREA C 65% DESIGN 11/20/24

P-099 UNDERGROUND DRAIN AND VENT PLAN - AREA D 65% DESIGN 11/20/24

P-100 FIRST FLOOR DRAIN AND VENT PLAN - OVERALL 65% DESIGN 11/20/24

P-101 FIRST FLOOR DRAIN AND VENT PLAN - AREA A 65% DESIGN 11/20/24

P-102 FIRST FLOOR DRAIN AND VENT PLAN - AREA B 65% DESIGN 11/20/24

P-103 FIRST FLOOR DRAIN AND VENT PLAN - AREA C 65% DESIGN 11/20/24

P-104 FIRST FLOOR DRAIN AND VENT PLAN - AREA D 65% DESIGN 11/20/24

P-105 SECOND FLOOR DRAIN AND VENT PLAN - OVERALL 65% DESIGN 11/20/24

P-106 SECOND FLOOR DRAIN AND VENT PLAN - AREA A 65% DESIGN 11/20/24

P-108 SECOND FLOOR DRAIN AND VENT PLAN - AREA C 65% DESIGN 11/20/24

P-130 FIRST FLOOR SUPPLY PLAN - OVERALL 65% DESIGN 11/20/24

P-131 FIRST FLOOR SUPPLY PLAN - AREA A 65% DESIGN 11/20/24

P-132 FIRST FLOOR SUPPLY PLAN - AREA B 65% DESIGN 11/20/24

P-133 FIRST FLOOR SUPPLY PLAN - AREA C 65% DESIGN 11/20/24

P-134 FIRST FLOOR SUPPLY PLAN - AREA D 65% DESIGN 11/20/24

P-135 SECOND FLOOR SUPPLY PLAN - OVERALL 65% DESIGN 11/20/24

P-136 SECOND FLOOR SUPPLY PLAN - AREA A 65% DESIGN 11/20/24

P-137 SECOND FLOOR SUPPLY PLAN - AREA B 65% DESIGN 11/20/24

P-138 SECOND FLOOR SUPPLY PLAN - AREA C 65% DESIGN 11/20/24

P-139 SECOND FLOOR SUPPLY PLAN - AREA D 65% DESIGN 11/20/24

P-140 ADMIN ROOF SUPPLY PLANS 65% DESIGN 11/20/24

P-401 ENLARGED PLANS 65% DESIGN 11/20/24

P-402 ENLARGED PLANS 65% DESIGN 11/20/24

P-403 ENLARGED PLANS 65% DESIGN 11/20/24

P-501 DETAILS 65% DESIGN 11/20/24

P-601 SCHEDULES 65% DESIGN 11/20/24

130 PLUMBING: 30

M-001 MECHANICAL - GENERAL NOTES, SYMBOLS &

ABBREVIATIONS

65% DESIGN 11/20/24

M-100 FIRST FLOOR MECHANICAL - OVERALL 65% DESIGN 11/20/24

M-101 FIRST FLOOR MECHANICAL - AREA A & C 65% DESIGN 11/20/24

M-102 FIRST FLOOR MECHANICAL - AREA B & D 65% DESIGN 11/20/24

M-103 SECOND FLOOR MECHANICAL - OVERALL 65% DESIGN 11/20/24

M-104 SECOND FLOOR MECHANICAL - AREA A & C 65% DESIGN 11/20/24

M-110 ADMIN ROOF MECHANICAL - OVERALL 65% DESIGN 11/20/24

M-111 ADMIN ROOF MECHANICAL - AREA A 65% DESIGN 11/20/24

M-112 ADMIN ROOF MECHANICAL - AREA C 65% DESIGN 11/20/24

M-113 ADMIN ROOF MECHANICAL - AREA B 65% DESIGN 11/20/24

M-120 HANGAR MEZZANINE MECHANICAL - OVERALL 65% DESIGN 11/20/24

M-301 MECHANICAL - SECTIONS 65% DESIGN 11/20/24

M-302 MECHANICAL - SECTIONS 65% DESIGN 11/20/24

M-401 ENLARGED MECHANICAL PLAN - MECH 111 65% DESIGN 11/20/24

M-402 ENLARGED MECHANICAL PLANS 65% DESIGN 11/20/24

M-501 MECHANICAL - DETAILS 65% DESIGN 11/20/24

M-502 MECHANICAL - DETAILS 65% DESIGN 11/20/24

M-601 MECHANICAL - SCHEDULES 65% DESIGN 11/20/24

M-602 MECHANICAL - SCHEDULES 65% DESIGN 11/20/24

M-603 MECHANICAL - SCHEDULES 65% DESIGN 11/20/24

M-604 MECHANICAL - SCHEDULES 65% DESIGN 11/20/24

M-606 MECHANICAL - CHILLED WATER SINGLE-LINE DIAGRAM 65% DESIGN 11/20/24

M-607 MECHANICAL - HEATING WATER SINGLE-LINE DIAGRAM 65% DESIGN 11/20/24

M-700 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-701 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-702 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-703 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-704 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-705 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-706 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-707 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-708 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-709 MECHANICAL CONTROLS 65% DESIGN 11/20/24

M-710 MECHANICAL CONTROLS 65% DESIGN 11/20/24

MP-100 FIRST FLOOR PIPING - OVERALL 65% DESIGN 11/20/24

MP-101 FIRST FLOOR PIPING - AREA A & C 65% DESIGN 11/20/24

MP-102 FIRST FLOOR PIPING - AREA B & D 65% DESIGN 11/20/24

MP-103 SECOND FLOOR PIPING - OVERALL 65% DESIGN 11/20/24

MP-104 SECOND FLOOR PIPING - AREA A & C 65% DESIGN 11/20/24

MP-110 ADMIN ROOF PIPING - AREA B & D 65% DESIGN 11/20/24

MP-120 HANGAR MEZZANINE PIPING - OVERALL 65% DESIGN 11/20/24

150 MECHANICAL: 41

Sheet Number Sheet Name

Current Revision Date

ED100 SITE ELECTRICAL PLAN - DEMOLITION 65% DESIGN 11/20/24

ES001 SITE ELECTRICAL GENERAL NOTES AND LEGEND 65% DESIGN 11/20/24

ES100 SITE ELECTRICAL PLAN 65% DESIGN 11/20/24

ES501 SITE ELECTRICAL DETAILS 65% DESIGN 11/20/24

ES7001 SITE ELECTRICAL PANEL SCHEDULE 65% DESIGN 11/20/24

E-001 LEGEND 65% DESIGN 11/20/24

E-002 GENERAL NOTES 65% DESIGN 11/20/24

E-003 ABBREVIATIONS 65% DESIGN 11/20/24

EL110 FIRST FLOOR - LIGHTING PLAN - OVERALL 65% DESIGN 11/20/24

EL111 FIRST FLOOR - LIGHTING PLAN - AREA A 65% DESIGN 11/20/24

EL112 FIRST FLOOR - LIGHTING PLAN - AREA B 65% DESIGN 11/20/24

EL113 FIRST FLOOR - LIGHTING PLAN - AREA C 65% DESIGN 11/20/24

EL114 FIRST FLOOR - LIGHTING PLAN - AREA D 65% DESIGN 11/20/24

EL115 UPPER LEVEL - LIGHTING PLANS - AREA A 65% DESIGN 11/20/24

EL120 SECOND FLOOR - LIGHTING PLAN - OVERALL 65% DESIGN 11/20/24

EL121 SECOND FLOOR - LIGHTING PLAN - AREA A 65% DESIGN 11/20/24

EL123 SECOND FLOOR - LIGHTING PLAN - AREA C 65% DESIGN 11/20/24

EL701 LIGHTING SCHEDULES 65% DESIGN 11/20/24

EP110 FIRST FLOOR - POWER PLAN - OVERALL 65% DESIGN 11/20/24

EP111 FIRST FLOOR - POWER PLAN - AREA A 65% DESIGN 11/20/24

EP112 FIRST FLOOR - POWER PLAN - AREA B 65% DESIGN 11/20/24

EP113 FIRST FLOOR - POWER PLAN - AREA C 65% DESIGN 11/20/24

EP114 FIRST FLOOR - POWER PLAN - AREA D 65% DESIGN 11/20/24

EP115 FIRST FLOOR - HVAC POWER PLAN - AREA A 65% DESIGN 11/20/24

EP116 FIRST FLOOR - HVAC POWER PLAN - AREA B 65% DESIGN 11/20/24

EP117 FIRST FLOOR - HVAC POWER PLAN - AREA C 65% DESIGN 11/20/24

EP118 FIRST FLOOR - HVAC POWER PLAN - AREA D 65% DESIGN 11/20/24

EP120 SECOND FLOOR - POWER PLAN - OVERALL 65% DESIGN 11/20/24

EP121 SECOND FLOOR - POWER PLAN - AREA A 65% DESIGN 11/20/24

EP123 SECOND FLOOR - POWER PLAN - AREA C 65% DESIGN 11/20/24

EP125 SECOND FLOOR - HVAC POWER PLAN - AREA A 65% DESIGN 11/20/24

EP127 SECOND FLOOR - HVAC POWER PLAN - AREA C 65% DESIGN 11/20/24

EP131 ROOF - POWER, AND HVAC POWER PLAN - AREA A 65% DESIGN 11/20/24

EP132 ROOF - POWER, AND HVAC POWER PLAN - AREA B 65% DESIGN 11/20/24

EP133 ROOF - POWER, AND HVAC POWER PLAN - AREA C 65% DESIGN 11/20/24

EP134 ROOF - POWER, AND HVAC POWER PLAN - AREA D 65% DESIGN 11/20/24

EP410 ENLARGED PLANS 65% DESIGN 11/20/24

EP500 POWER CENTER ELEVATIONS 65% DESIGN 11/20/24

EP501 DETAILS 65% DESIGN 11/20/24

EP502 DETAILS 65% DESIGN 11/20/24

EP601 POWER ONE LINE DIAGRAMS 65% DESIGN 11/20/24

EP602 POWER ONE LINE DIAGRAMS 65% DESIGN 11/20/24

EP603 POWER ONE LINE DIAGRAMS 65% DESIGN 11/20/24

EP604 PANEL SCHEDULES 65% DESIGN 11/20/24

EP605 PANEL SCHEDULES 65% DESIGN 11/20/24

EP606 PANEL SCHEDULES 65% DESIGN 11/20/24

EP607 PANEL SCHEDULES 65% DESIGN 11/20/24

EP608 PANEL SCHEDULES 65% DESIGN 11/20/24

EP609 PANEL SCHEDULES 65% DESIGN 11/20/24

EG110 FIRST FLOOR - GROUNDING - OVERALL 65% DESIGN 11/20/24

EG111 FIRST FLOOR - GROUNDING PLAN - AREA A 65% DESIGN 11/20/24

EG112 FIRST FLOOR - GROUNDING PLAN - AREA B 65% DESIGN 11/20/24

EG113 FIRST FLOOR - GROUNDING PLAN - AREA C 65% DESIGN 11/20/24

EG114 FIRST FLOOR - GROUNDING PLAN - AREA D 65% DESIGN 11/20/24

EG130 HANGAR ROOF - LIGHTNING PROTECTION PLAN 65% DESIGN 11/20/24

EG131 HANGAR ROOF - GROUNDING & LIGHTNING PROTECTION

PLAN - AREA A

65% DESIGN 11/20/24

EG132 HANGAR ROOF - GROUNDING & LIGHTNING PROTECTION

PLAN - AREA B

65% DESIGN 11/20/24

EG133 HANGAR ROOF - GROUNDING & LIGHTNING PROTECTION

PLAN - AREA C

65% DESIGN 11/20/24

EG134 HANGAR ROOF - GROUNDING & LIGHTNING PROTECTION

PLAN - AREA D

65% DESIGN 11/20/24

EG501 GROUNDING DETAILS 65% DESIGN 11/20/24

EG502 GROUNDING DETAILS 65% DESIGN 11/20/24

EG503 LIGHTNING PROTECTION COVERAGE ZONE 65% DESIGN 11/20/24

EG504 LIGHTNING PROTECTION ZONE 65% DESIGN 11/20/24

E-110 FIRST FLOOR - ELECTRICAL CLASSIFICATION PLAN 65% DESIGN 11/20/24

E-120 SECOND FLOOR - ELECTRICAL CLASSIFICATION PLAN 65% DESIGN 11/20/24

160 ELECTRICAL: 65

T-001 NOTES, SYMBOLS & ABBREVIATIONS 65% DESIGN 11/20/24

T-100 COMMUNICATIONS SITE PLAN 65% DESIGN 11/20/24

T-101 FIRST FLOOR COMMUNICATIONS PLAN OVERALL 65% DESIGN 11/20/24

T-102 FIRST FLOOR COMMUNICATIONS PLAN AREA A 65% DESIGN 11/20/24

T-103 FIRST FLOOR COMMUNICATIONS PLAN AREA B 65% DESIGN 11/20/24

T-104 FIRST FLOOR COMMUNICATIONS PLAN AREA C 65% DESIGN 11/20/24

T-105 FIRST FLOOR COMMUNICATIONS PLAN AREA D 65% DESIGN 11/20/24

T-106 SECOND FLOOR COMMUNICATIONS PLAN 65% DESIGN 11/20/24

T-121 FIRST FLOOR SECURITY PLAN AREA A 65% DESIGN 11/20/24

T-122 FIRST FLOOR SECURITY PLAN AREA B 65% DESIGN 11/20/24

T-123 FIRST FLOOR SECURITY PLAN AREA C 65% DESIGN 11/20/24

T-124 FIRST FLOOR SECURITY PLAN AREA D 65% DESIGN 11/20/24

T-141 FIRST FLOOR AUDIO VISUAL PLAN AREA A 65% DESIGN 11/20/24

T-142 FIRST FLOOR AUDIO VISUAL PLAN AREA B 65% DESIGN 11/20/24

T-143 FIRST FLOOR AUDIO VISUAL PLAN AREA C 65% DESIGN 11/20/24

T-144 FIRST FLOOR AUDIO VISUAL PLAN AREA D 65% DESIGN 11/20/24

T-145 SECOND FLOOR AUDIO VISUAL PLAN 65% DESIGN 11/20/24

T-401 ENLARGED PLANS, ELEVATIONS & SECTIONS 65% DESIGN 11/20/24

T-402 ENLARGED PLANS, ELEVATIONS & SECTIONS 65% DESIGN 11/20/24

T-403 ENLARGED PLANS, ELEVATIONS & SECTIONS 65% DESIGN 11/20/24

T-404 ENLARGED PLANS, ELEVATIONS & SECTIONS 65% DESIGN 11/20/24

T-501 DETAILS 65% DESIGN 11/20/24

T-701 ONE-LINE DIAGRAMS 65% DESIGN 11/20/24

170 TELECOMMUNICATIONS: 23

VOLUME 2: 183

Grand total: 500

D E

S

IG

N

/2

DRAWING ABBREVIATIONS

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

AP ANCHOR POINT

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATELY

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

ATFP ANTI-TERRORISM/FORCE PROTECTION

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWC ACOUSTICAL WALL COVERING

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BM BENCHMARK

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BTM BOTTOM

B/T BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR CLEAR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLRCONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUOUS

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET TILE

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DN DOWN

DOAS DEDICATED OUTSIDE AIR SERVICE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWER

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXIST EXISTING

EXT EXTERIOR

EXT GR EXTERIOR GRADE

F ---------------------

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

FF, FIN FLR FINISH FLOOR

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIO FOR INFORMATION ONLY

FL FLOW LINE

G ---------------------

G NATURAL GAS

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GFCI GOVERNMENT FURNISHED/

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED/

GOVERNMENT INSTALLED

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GWB GYPSUM WALLBOARD

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

JST JOIST

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAU MECH. AIR HANDLING UNIT

MAX MAXIMUM

MB MARKERBOARD

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR, MFG MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PORCELAIN CERAMIC TILE

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND

RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

INDEX OF DRAWINGS

BUILDING SUMMARY

NUMBERING SYSTEM:

XX100

DISCIPLINE:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

K - FOOD SERVICE

DISCIPLINE MODIFIER

SHEET NUMBER WITHIN SERIES

ANNOTATION CALLOUTS/DRAWING SYMBOLS

GENERAL NOTES

REFER TO AEC CAD STANDARDS

FOR PROPER SHEET NUMBERING

REVISION

TAG

NORTH ARROW

W/ TRUE NORTH

INDICATION

ROOM TAG

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

LEVEL NAME

SHEET NUMBER

SHEET NUMBER

SHEET NUMBER

A SHEET

KEYNOTE

INTERIOR ELEVATION

SHEET NUMBER

TRUE NORTH

A101

A101

SIM

A101

1 Ref

R e f

1Ref

R e f

1. ORIGINAL TOPOGRAPHIC SURVEY BY GUY ENGINEERING GEOTECHNICAL AND PROVIDED TO DESIGN BUILD TEAM.

2. AN ATTEMPT HAS BEEN MADE TO LOCATE AND SHOW ON THE DRAWINGS EXISTING UNDERGROUND UTILITIES AND OTHER EXISTING SITE CONDITIONS, HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SITE AND VERIFYING ALL EXISTING UTILITIES AND CONDITIONS AT THE SITE PRIOR TO THE START OF CONSTRUCTION, AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.

3. HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO, ASBESTOS, MATERIALS CONTAINING ASBESTOS (ACM), LEAD, POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES SHALL NOT BE CONTAINED IN MATERIALS AND/OR

PRODUCTS USED IN THE CONSTRUCTION OF THIS PROJECT.

4. CONSTRUCTION STAGING AREA & VEHICLE ACCESS SHALL BE CONFIRMED WITH OWNER, AND CONSTRUCTION

MANAGER IF APPLICABLE, PRIOR TO CONSTRUCTION.

5. FINISH GRADE AT BUILDING PERIMETERS SHALL BE 6" BELOW FINISH FLOOR UNLESS SPECIFICALLY NOTED OTHERWISE ON CIVIL DRAWINGS. DEVELOP POSITIVE DRAINAGE AWAY FROM NEW AND/OR EXISTING BUILDING(S).

6. ALL AREAS OF THIS SITE, WHICH ARE NOT IN THE SCOPE OF THE PROJECT AND ARE DISTURBED BY CONSTRUCTION

SHALL BE RETURNED TO ORIGINAL CONDITION.

7. ALL GRID LINES IDENTIFIED BY A LETTER OR NUMBER ARE PARALLEL UNLESS OTHERWISE NOTED.

8. CONTRACTOR SHALL VERIFY ALL COLUMN COORDINATES AND CHECK THEM AGAINST DIMENSIONS SHOW ON PLANS

AND DETAILS. NOTIFY ARCHITECT OF ANY DISCREPENCY DURING STAKING.

9. SIZES OF HOUSEKEEPING PADS AND BASES FOR MECHANICAL EQUIPMENT ARE APPROXIMATE. CONTRACTOR SHALL VERIFY EXACT LOCATION AND REQUIRED SIZE OF ALL CONCRETE PADS AND BASES WITH EQUIPMENT

MANUFACTURERS BEFORE POURING. ALL PADS TO BE PROVIDED BY THE CONTRACTOR.

10. ALL METAL STUDS WALLS WHERE PLUMBING OCCURS OR STRUCTURAL COLUMNS ARE LOCATED SHALL BE MINIMUM 6"

METAL STUDS. NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS.

11. PROVIDE AND INSTALL ACCESS PANELS, WHERE REQUIRED BY BUILDING CODE OR FOR THE PROPER OPERATION OF MECHANICAL OR ELECTRICAL EQUIPMENT, AND AS SHOWN ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE SIZE, LOCATION, AND TYPE OF ACCESS PANEL WITH OTHER CONTRACTORS' WORK AND RECEIVE APPROVAL OF THE

ARCHITECT. ACCESS PANEL SHALL BE AS SPECIFIED.

12. 3/4" FIRE-RETARDANT TREATED PLYWOOD BACKING 8'-0" HIGH SHALL BE PROVIDED AND INSTALLED ON ALL WALLS OF COMMUNICATIONS, SYSTEMS AND ELECTRICAL ROOMS AS REQUIRED UNLESS SPECIFICALLY SHOWN OTHERWISE ON

ELECTRICAL DRAWINGS.

13. ALL WOOD WITHIN THIS PROJECT (I.E. PLYWOOD, BLOCKING, ETC.) SHALL BE FIRE-RETARDANT TREATED.

14. FOR ILLUSTRATION AND DEFINITION OF TYPICAL SYMBOLS USED ON THE ARCHITECTURAL DRAWINGS, SEE “SYMBOLS AND ABBREVIATIONS”. ADDITIONAL SYMBOLS NOT SHOWN OR DEFINED THERE MAY OCCUR AND ARE DEFINED ON

OTHER DRAWINGS.

15. DO NOT SCALE THE DRAWINGS.

16. REFER TO SPECIFICATIONS FOR ADDITIONAL PAINT ITEMS NOT SHOWN ON ROOM FINISH SCHEDULE OR PLANS.

17. HAZARDOUS MATERIALS INCLUDING, BUT NOT LIMITED TO, ASBESTOS, MATERIALS CONTAINING ASBESTOS, POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES SHALL NOT BE CONTAINED IN MATERIALS AND/OR

PRODUCTS USED IN THE CONSTRUCTION OF THIS PROJECT.

18. IN THE CASE OF A CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE MORE RESTRICTIVE AND/OR EXPENSIVE OF THE TWO SHALL TAKE PRECEDENCE. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONFLICT

BEFORE PROCEEDING WITH THE WORK.

19. THE SPECIFICATIONS AND ALL CONSULTANT DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF ANY OF THE CONSULTANTS' WORK AND TO BRING ANY DISCREPANCIES OR CONFLICTS TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION. IMPROPERLY INSTALLED WORK SHALL BE CORRECTED BY THE

CONTRACTOR AT NO EXPENSE TO THE ARCHITECT, HIS CONSULTANTS, OR THE OWNER.

20. ALL ITEMS WITHIN THESE PROJECT DOCUMENTS ARE PART OF THE BASE BID UNLESS OTHERWISE NOTED.

21. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE TO DRAWINGS OF ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS SHALL NOT BE DISTRIBUTED AND UTILIZED BY THE CONTRACTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT BEFORE COMMENCING CONSTRUCTION AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS

OF WHERE THE REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS.

22. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND ELEVATIONS SHOW THE EXACT LOCATION OF MANY, BUT NOT ALL, EXPOSED PARTS OF THE WORK. FOR TYPICAL DIMENSIONING CONVENTIONS, INCLUDING RULES FOR LOCATING DOORS AND OTHER ITEMS WHICH HAVE NOT BEEN DIMENSIONED OR LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE "RULES AND CONVENTIONS" SHEET TO DETERMINE THE EXACT

LOCATION OF EACH EXPOSED PART OF THE WORK.

23. THE ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED APPEARANCE OF ALL EXPOSED ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS ILLUSTRATED PRIMARILY ON DRAWINGS OF OTHER DISCIPLINES. LOCATIONS SHOWN ON OTHER DRAWINGS ARE SCHEMATIC, UNLESS OTHERWISE NOTED ON THE ARCHITECTURAL DRAWINGS. THE ARCHITECTURAL DRAWINGS TAKE PRECEDENCE FOR THE FINISHED APPEARANCE

AND EXACT LOCATION OF ALL EXPOSED PARTS OF THE WORK.

A. EXCEPTIONS: DIMENSIONED LOCATIONS SHOWN ON DRAWINGS OF OTHER DISCIPLINES SHALL GOVERN ONLY

WHERE: (A) SPECIFICALLY AND INDIVIDUALLY INDICATED BY SYMBOL, KEYED NOTE, OR NOTATION ON THE ARCHITECTURAL DRAWINGS. (B) OCCURRING WITHIN A ROOM OR OTHER IDENTIFIED SPACE FOR WHICH ARCHITECTURAL SHEET OR SCHEDULE NOTES INDICATE THAT DIMENSIONS PROVIDED ELSEWHERE SHALL

GOVERN.

24. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE THE CEILINGS (INCLUDING, BUT NOT LIMITED TO STRUCTURAL MEMBERS AND SPRAY-ON INSULATION OR FIREPROOFING, MECHANICAL DUCTS AND BATT INSULATION, CONDUITS, RACEWAY, SPRINKLER SYSTEMS, LIGHT FIXTURES, CEILING SYSTEMS, AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND SHALL BE RESPONSIBLE FOR MAINTAINING THE FINISH CEILING HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS AND FINISH SCHEDULE.

25. WORK NOT SPECIFICALLY INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO WORK SHOWN ON THE DRAWINGS IN CORRESPONDING AND OTHER PLACES SHALL BE CONSTRUCTED SIMILARLY.

FIRE RATED PARTITIONS

ONE HOUR RATED WALL

TWO HOUR RATED WALL

THREE HOUR RATED WALL

FOUR HOUR RATED WALL

SMOKE WALL, 0 HOUR RATED WALL

SMOKE WALL, TWO HOUR RATED WALL

SMOKE WALL, ONE HOUR RATED WALL

R --------------------

R RADIUS OR RISET

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

RE:, REF REFERENCE

REC RECESSED

REC ROOM RECREATION ROOM

REIF REINFORCED

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SMART BOARD

SC SOLID CORE

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

STRUCT STRUCTURAL

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

TB TACKBOARD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOC TOP OF CURB

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOW TOP OF WALL

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

TYP TYPICAL

U --------------------

UNO UNLESS NOTED OTHERWISE

1t

1i

A101

Room name

Name Elevation

WINDOW TAG

WALL TAG

TINKER AFB IS LOCATED IN OKLAHOMA CITY, OKLAHOMA. IT CURRENTLY SUPPORTS

DEPOT MAINTENANCE FOR MULTIPLE UNITED STATES AIR FORCE AIRCRAFT AND HAS

BEEN DESIGNATED THE SOURCE OF REPAIR FOR THE DEPOT MAINTENANCE OF THE

B-52 AND B-21 BOMBER AIRCRAFT. A DEPOT MAINTENANCE COMPLEX IS REQUIRED TO

PROVIDE A RELIABLE AND RESPONSIVE SOURCE FOR REPAIR AND MAINTENANCE FOR

THESE FIRST LINE WEAPON SYSTEMS. THESE SERVICES WILL BE TOWARDS DEPOT

MAINTENANCE ACTIVITIES AND NECESSARY FOR B-52 MODERNIZATION AND B-21

ACTIVATION.

THIS PROJECT PROVIDES FOR THE CONSTRUCTION OF A NEW 4-DOCK HANGAR AND

SUPPORTING FACILITIES. THE FACILITY CONSISTS OF A SINGLE-STORY STRUCTURAL

STEEL FRAMED HANGAR BAY WITH INTERIOR STEEL COLUMNS AND TRUSSES ON A

CAST-IN-PLACE CONCRETE SLAB. SUPPORT SPACES INCLUDE SINGLE-STORY BACK

SHOPS WITH A SECOND-STORY ADMINISTRATION ON ONE SIDE CONSTRUCTED AS A

STEEL FRAMED SYSTEM WITH PRE-CAST PANEL EXTERIOR WALLS. IT INCLUDES

RESTROOMS AND LOCKERS, PRIVATE OFFICES, ADMINISTRATIVE SPACE,

BREAKROOM, FEMA STORM SHELTER, AND HAZARDOUS MATERIAL STORAGE SPACE.

SUPPORTING FACILITIES INCLUDE ALL NECESSARY UTILITIES AND CONNECTIONS,

SITE DEMOLITION AND EARTHWORK, APRON PAVEMENTS, FENCING, AND SITE

IMPROVEMENTS TO PROVIDE A COMPLETE AND USEABLE FACILITY. THIS PROJECT

WILL COMPLY WITH DOD ANTITERRORISM/FORCE PROTECTION REQUIREMENTS PER

UFC 4-010-01 AND HIGH PERFORMACE AND SUSTAINABLE BUILDING REQUIREMENTS

PER UFC 1-200-02. THE NEW FACILITY WILL BE DESIGNED TO MEET OR EXCEED THE

USEFUL SERVICE LIFE SPECIFIED IN DOD UNIFIED FACILITIES CRITERIA AND THE

PROJECT WILL INCORPORATE FEATURES THAT PROVIDE THE LOWEST PRACTICAL

LIFE CYCLE COST SOLUTIONS SATISFYING THE FACILITY REQUIREMENTS WITH THE

GOAL OF MAXIMIZING ENERGY EFFICIENCY.

SEVERAL BUILDINGS WILL BE DEMOLISHED TO MAKE ROOM FOR THE NEW HANGAR.

FACILITY DEMOLITION WILL CONSIST OF THE DEMOLITION OF BUILDINGS 2210, 2211,

2212, 3209, 3772, 43774. FACILITIES WITHIN THE FOOTPRINT OF THE PROPOSED

HANGAR SHALL BE FULLY DEMOLISHED INCLUDING THE FOUNDATIONS. GENERAL

SITE DEMOLITION WILL INCLUDE DEMOLITION OF EXISTING ASPHALT PAVEMENT, THE

EAST SIDE OF THE VEHICULAR ACCESS TO BUILDING 2280, ELIMINATION OF POV

PARKING AREAS, DEMOLITION OF CONCRETE SIDEWALKS AND CURBS AND GUTTERS,

DEMOLITION OF EXISTING VEHICULAR ACCESS GATES AND CHAIN-LINK FENCING.

UTILITY DEMOLITION WILL INCLUDE DEMOLITION OF ALL UTILITY SERVICES TO

EXISTING BUILDINGS 2210, 2211, 2212, 3209, 3772, AND 43774 AS WELL AS DEMOLITION

OF UTILITIES LOCATED WITHIN THE FOOTPRINT OF THE PROPOSED HANGAR.

CAP ALL EXISTING UNDERGROUND UTILITIES THROUGH SLAB AND PATCH AREAS OF

DAMAGED CONCRETE WITH FLEXURAL STRENGTH 650 PSI CONCRETE TO CREATE

FLUSH CONCRETE SURFACE. REMOVE ALL SUPPORTING UTILITIES WITHIN THE

PROJECT SITE AND CAP AT THEIR CONNECTION POINTS TO THE UTILITY MAIN. REFER

TO CIVIL FOR EXTENTS OF DEMOLITION FOR BUILDINGS AND SITE UTILITIES.

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

G-003

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N S

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

D E

S

IG

N

/2

10'-6"

TYPICAL RULES FOR DETERMINING MOUNTING HEIGHTS, LOCATIONS AND CONFIGURATIONS

GRID

C

C

RULE 1 RULE 3

RULE 7

RULE 2

RULE 5 RULE 6

RULE 4

RULE 8

WHEN COMPLETELY DIMENSIONED ON PLANS NOT DIMENSIONED AND LOCATED ON COLUMN OR PILASTER

NOT DIMENSIONED AND LOCATED ADJ TO DOOR AND ON

WALL AGAINST WHICH DOOR SWINGS

NOT DIMENSIONED AND LOCATED ON COLUMN OR PILASTER

NOT DIMENSIONED AND LOCATED ADJ TO MIN STRIKE-SIDE OF DOOR NOT DIMENSIONED AND LOCATED ADJACENT TO DOOR (OR WINDOW)

NOT DIMENSIONED AND LOCATED ON COLUMN OR PILASTER

WHEN NOT DIMENSIONED AND LOCATED ADJACENT TO

CHANGE IN WALL DIRECTION

LOCATE ITEMS AS INDICATED WHEN SHOWN DIMENSIONED (BOTH HORIZ AND

VERT) BY A PLAN OR DETAIL PLAN.

SPECIFIC VERT DIMENSIONS SHOWN BY ELEVATIONS, SECTIONAL ELEVATIONS,

OR DETAIL ELEVATIONS AND SPECIFIC HORIZ DIM SHOWN BY PLANS AND DETAIL

PLANS TAKE PRECEDENCE OVER TYPICAL MOUNTING HEIGHTS AND LOCATION

RULES.

NON-TYPICAL MOUNTING HEIGHTS MAY BE INDICATED BY SYMBOL (AS SHOWN),

BY KEYED NOTE, OR BY NOTATION ON PLANS.

APPLIES: HORIZ CENTER GROUP OF SIMILAR ITEMS HAVING THE

WHEN APPLICABLE, COMBINE THIS RULE WITH RULE 2 (PREVIOUS)

PILASTER, AND WHEN NO OTHER TYPICAL CONFIGURATION DIAGRAM

TO SYMMETRICALLY ARRANGE GROUPS OF ITEMS HAVING BOTH

WHEN NOT DIMENSIONED AND SHOWN LOCATED ON A COLUMN OR

SAME MOUNTING HEIGHT(S) ABOUT THE CENTERLINE OF THE

WHEN NOT DIMENSIONED AND SHOWN LOCATED ADJACENT TO DOOR, AND

WHEN NO OTHER TYPICAL CONFIGURATION DIAGRAM APPLIES: MOUNT ITEMS

IN RELATION TO SWING USING TYP OFFSET DIMENSION. VERTICALLY ALIGN

CENTERS OF ITEMS MOUNTED AT DIFFERENT HEIGHTS.

WHEN MULTIPLE ITEMS HAVING THE SAME TYP MOUNTING HEIGHT ARE INDICATED,

MOUNT FIRST ITEM IN RELATION TO SWING USING TYP OFFSET DIMENSION AND

PLACE REMAINING ITEMS ADJACENT TO FIRST ON SIDE OPPOSITE FRAME AS

ILLUSTRATED BY THIS DIAGRAM.

FOR PURPOSES OF THESE RULES, ITEMS SHOWN APPROX. LOCATED WITHIN 4

FEET OF OPEN DOOR ARE CONSIDERED TO BE ADJACENT TO DOOR.

WHEN MULTIPLE ITEMS HAVING THE SAME TYP MTG HGT ARE INDICATED, MOUNT

FIRST ITEM IN RELATION TO FRAME USING TYP OFFSET DIM AND PLACE

REMAINING ADJ TO FIRST ON SIDE OPP FRAME AS ILLUSTRATED BY THIS

DIAGRAM. DO NOT CROWD MULTIPLE ITEMS AGAINST WALL OR RESTRICTION.

WHEN NOT DIMENSIONED AND SHOWN LOCATED ADJ TO STRIKE SIDE OF DOOR,

AND WHEN STRIKE-SIDE CLEARANCE IS BETWEEN 12 INCHES AND 18 INCHES,

AND WHEN NO OTHER TYPICAL CONFIGURATION DIAGRAM APPLIES: MOUNT

ITEMS IN RELATION TO FRAME USING TYP OFFSET DIMENSION. VERTICALLY

ALIGN CENTERS OF ITEMS MOUNTED AT DIFFERENT HEIGHTS.

LINE OF WALL OR OTHER

RESTRICTION ON STRIKE-

SIDE OF DOOR.

STRIKE-SIDE

OF DOOR.

WHEN MULTIPLE ITEMS HAVING THE SAME TYP MOUNTING HEIGHT ARE

INDICATED, MOUNT FIRST ITEM IN RELATION TO FRAME USING TYP

OFFSET DIMENSION AND PLACE REMAINING ITEMS ADJACENT TO FIRST

DIMENSION. VERTICALLY ALIGN CENTERS OF ITEMS MOUNTED AT

APPLIES:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .