WWYK263009_65 Design Analysis_Part23.pdf

PDF 7 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This file contains the 65% design analysis and calculations for mechanical systems at the Bomber Agile Common Hangar (BACH) project at Tinker Air Force Base in Oklahoma. The document, prepared by Larson Design Group in November 2024, provides detailed mechanical engineering calculations and specifications for a 197,003 square foot hangar facility that includes four hangar bays, administrative spaces, and support areas across two floors.

The analysis contains comprehensive HVAC load calculations, ventilation requirements, and equipment specifications for multiple air handling units (AHUs) serving different zones of the facility. Key details include supply air temperatures of 55°F for cooling, chilled water supply at 44°F, hot water supply at 140°F, and various fan performance specifications. The facility is divided into multiple HVAC zones with different temperature setpoints - offices maintained at 76°F cooling/69°F heating during occupied hours, while hangar bays are allowed wider temperature ranges of 110°F cooling/65°F heating. The document includes detailed space-by-space ventilation requirements, lighting power densities, and equipment heat loads that inform the mechanical system design.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bomber Agile Common Hangar (BACH) Project No.: WWYK263009 Tinker Air Force Base, Oklahoma 65% Design Submittal

Design Analysis - 1996

14.11 MECHANICAL APPENDIX

14.11.1 65% Calculations

14.11.2 Cut-Sheets

Mechanical Calculations

Mechanical Cut-Sheets

Mechanical Calculations

Building Load Inputs

TAFB BACH

Project: TAFB BACH HAP6.2 11/04/2024

Prepared by: LARSON DESIGN GROUP 11:13 AM

1. General Information

Building TAFB BACH Default Level-to-Level Height 18' 1" Default Ceiling Space No Default Raised Floor No Default Window Opening Elevation 3' Validation Errors None Notes None

2. Floor Plan Images

2.1. Summary of Floor Plan Images

Floor Plan Image North Orientation (deg) Scale Used in Level(s)

BACH 1ST FLOOR 90.0 <user-specified scale> HANGAR, Hangar Roof

BACH 1st FLR 6-12-2024 90.0 1/16" = 1'

BACH 2ND FLOOR 90.0 <user-specified scale>

BACH 2nd FLR 6-12-2024 90.0 1/16" = 1'

BACH ROOF 90.0 <user-specified scale>

BACH 1ST FLOOR ROOF, BACH 2ND FLOOR ROOF, SA

Stairs Roof

BACH Roof 6-12-2024 0.0 1/16" = 1'

TI26ACH_Coord-Arch_8-30-2024.pdf (01) 90.0 1/16" = 1' Level 1

TI26ACH_Coord-Arch_8-30-2024.pdf (02) 90.0 1/16" = 1' Level 2, SA Stairs 3

Hourly Analysis Program 6.2 Page 1 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

2.2. Floor Plan Images

BACH 1ST FLOOR:

Hourly Analysis Program 6.2 Page 2 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

BACH 1st FLR 6-12-2024:

Hourly Analysis Program 6.2 Page 3 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

BACH 2ND FLOOR:

Hourly Analysis Program 6.2 Page 4 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

BACH 2nd FLR 6-12-2024:

Hourly Analysis Program 6.2 Page 5 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

BACH ROOF:

Hourly Analysis Program 6.2 Page 6 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

BACH Roof 6-12-2024:

Hourly Analysis Program 6.2 Page 7 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

TI26ACH_Coord-Arch_8-30-2024.pdf (01):

Hourly Analysis Program 6.2 Page 8 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

TI26ACH_Coord-Arch_8-30-2024.pdf (02):

Hourly Analysis Program 6.2 Page 9 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

3. Levels

Level Vertical Position Override General

Defaults Level-to-Level

Height Floor-to-Ceiling

Height Default Opening

Elevation Raised Floor

Height Associated Floor Plan Image

SA Stairs Roof Above SA Stairs 3 - - - - - BACH ROOF

Hangar Roof Above HANGAR - - - - - BACH 1ST FLOOR

BACH 2ND FLOOR ROOF Above Level 2 - - - - - BACH ROOF

SA Stairs 3 Above Level 2 Yes 69' 6" - 3' - TI26ACH_Coord-Arch_8-30-2024.pdf (02)

BACH 1ST FLOOR ROOF Above Level 1 - - - - - BACH ROOF

Level 2 Above Level 1 No 18' 1" - 3' - TI26ACH_Coord-Arch_8-30-2024.pdf (02)

HANGAR At-grade Yes 90' 2" - 3' - BACH 1ST FLOOR

Level 1 At-grade No 18' 1" - 3' - TI26ACH_Coord-Arch_8-30-2024.pdf (01)

4. Walls & Spaces, Roofs

4.1. Building Summary (Occupiable Levels)

Level Space Count Floor Area (sqft) Volume (cuft) Interior Wall Gross Area

(sqft) Exterior Wall Gross Area

(sqft)

SA Stairs 3 1 307.0 21338.5 2019.3 3178.5

Level 2 53 18112.1 327766.3 58603.0 8898.9

HANGAR 4 138418.7 12479449.2 153837.3 150799.8

Level 1 69 39765.1 718816.3 99999.8 14083.4

Total 127 196602.9 13547370.2 314459.4 176960.6

Hourly Analysis Program 6.2 Page 10 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

4.2. Building Summary (Roof Levels)

Level Section Count Total Roof Area (sqft) Heat Transfer Area (sqft) Exterior Wall Gross Area (sqft)

SA Stairs Roof 1 307.0 307.0 0.0

Hangar Roof 6 142202.1 140103.2 11069.6

BACH 2ND FLOOR ROOF 4 18231.1 17980.1 416.6

BACH 1ST FLOOR ROOF 2 21558.3 21558.3 0.0

Implied Roofs 78 37243.1 37243.1 0.0

Total 91 219541.6 217191.6 11486.2

4.3. Space Details

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

SA Stairs 3

SA3 STAIRS 307.0 21338.5 2019.3 3178.5 Yes - -

Ceiling/Floor Spaces - 0.0 - 0.0 - - -

Level 2

200 MACH RM 78.0 1417.1 729.6 0.0 Yes - -

201 CORRIDOR 661.6 12011.0 3121.3 0.0 Yes - -

202 OPEN OFFICE (1) 1046.6 18950.3 2555.6 0.0 Yes - -

202 OPEN OFFICE (2) 1110.9 20095.3 1718.0 879.9 Yes - -

202A ELEC 91.9 1661.6 725.3 0.0 Yes - -

202B OFFICE 137.4 2484.8 660.5 191.6 Yes - -

202C OFFICE 136.8 2474.0 659.6 190.8 Yes - -

202D OFFICE 135.4 2449.8 657.7 189.0 Yes - -

202E OFFICE 140.4 2538.7 664.6 195.9 Yes - -

202F OFFICE 151.3 2737.1 445.5 445.5 Yes - -

202G COPY/FILE 123.7 2246.6 628.0 182.3 Yes - -

202H OFFICE 138.9 2512.0 649.5 203.8 Yes - -

202I OFFICE 134.9 2440.4 643.7 198.0 Yes - -

Hourly Analysis Program 6.2 Page 11 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

202J OFFICE 142.7 2581.5 432.3 432.3 Yes - -

202K COLLAB 394.0 7126.3 1010.0 463.9 Yes - -

203 SFTWR 407.9 7386.9 1488.0 0.0 Yes - -

204 COMM 177.0 3201.1 982.5 0.0 Yes - -

205 STOR 167.9 3036.5 1212.4 0.0 Yes - -

206 CTR TRNG 845.0 15284.9 1693.6 441.4 Yes - -

207 MECH 541.3 9790.4 1314.6 428.0 Yes - -

208 ELEC 92.6 1674.6 699.0 0.0 Yes - -

209 SCHED OFF 1368.9 24749.9 2054.9 801.5 Yes - -

209A OFFICE 130.8 2366.1 829.9 0.0 Yes - -

209B OFFICE 141.9 2575.5 687.3 182.2 Yes - -

210 MENS 335.2 6063.7 1476.1 0.0 Yes - -

211 JAN 40.8 738.3 465.0 0.0 Yes - -

212 WOMENS 250.0 4521.8 1375.3 0.0 Yes - -

213 STOR 42.7 772.9 497.8 0.0 Yes - -

214 RECEPTION 211.0 3816.9 1081.2 0.0 Yes - -

214A DEPUTY 117.7 2128.7 797.0 0.0 Yes - -

214B DEPUTY 121.5 2198.2 638.1 169.7 Yes - -

214C COMMAND SUITE 326.0 5897.8 1437.6 0.0 Yes - -

215 BRK 746.4 13508.9 1334.4 679.8 Yes - -

216 M 71.1 1287.0 611.6 0.0 Yes - -

217 W 71.9 1299.8 614.4 0.0 Yes - -

218 AMXS (1) 2148.2 38869.0 2383.8 1315.3 Yes - -

218 AMXS (2) 2017.4 36491.1 3799.9 0.0 Yes - -

218A OFFICE 138.9 2513.0 857.8 0.0 Yes - -

218B OFFICE 138.7 2509.1 857.2 0.0 Yes - -

218C OFFICE 138.5 2505.9 856.7 0.0 Yes - -

218D OFFICE 137.2 2482.5 853.2 0.0 Yes - -

Hourly Analysis Program 6.2 Page 12 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

218E OFFICE 139.2 2518.7 667.4 191.3 Yes - -

218F OFFICE 137.8 2493.3 854.8 0.0 Yes - -

218G OFFICE 142.3 2574.9 671.7 195.5 Yes - -

218H COPY 131.9 2404.4 911.3 0.0 Yes - -

218I CONF 416.9 7540.7 1321.9 170.4 Yes - -

218J CONF 233.5 4224.6 558.6 558.6 Yes - -

218K ELEC 52.3 946.3 559.0 0.0 Yes - -

219 CORRIDOR 423.6 7662.9 2630.2 0.0 Yes - -

E2 ELEV 22.7 423.1 407.4 0.0 Yes - -

SA2 STAIRS 307.0 5553.4 1352.5 0.0 Yes - -

SB2 STAIR 324.2 5874.2 1244.0 192.5 Yes - -

SC2 STAIR 229.6 4152.8 1223.2 0.0 Yes - -

Ceiling/Floor Spaces - 0.0 - 0.0 - - -

HANGAR

000 Hangar Bay A 34695.3 3128031.5 42378.7 33848.2 No - -

000 Hangar Bay B 34665.5 3125344.0 37009.9 39215.5 No - -

000 Hangar Bay C 34549.7 3114903.1 37541.4 38578.6 No - -

000 Hangar Bay D 34508.2 3111170.1 36907.3 39157.5 No - -

Ceiling/Floor Spaces - 0.0 - 0.0 - - -

Level 1

001 VEST. 86.1 1556.0 697.5 0.0 No - -

002 CORRIDOR 243.2 4397.2 1381.3 126.8 No - -

003 LANDING GEAR SHOP 1728.1 31248.1 2363.9 665.5 No - -

004 ENGINE SHOP 1254.9 22690.2 2181.6 483.2 No - -

005 TIRE (OPEN) SHOP 1128.2 20400.3 2132.9 434.5 No - -

006 SHEET METAL 1519.4 27473.4 2283.5 585.1 No - -

007 CORRIDOR 1524.7 27569.8 2505.1 557.7 No - -

008 DOCK OFFICE 467.4 8452.1 1579.4 0.0 No - -

Hourly Analysis Program 6.2 Page 13 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

009 MENS 302.3 5466.3 1404.6 0.0 No - -

010 JAN 43.9 794.0 486.0 0.0 No - -

011 WOMENS 272.4 4925.6 962.0 447.7 No - -

012 DOCK OFFICE 840.9 15204.6 2182.2 237.6 No - -

013 FIRE 95.7 1730.1 631.5 123.1 No - -

014 COMM 137.9 2493.9 685.8 177.5 No - -

015 MECH 1064.7 19252.7 2733.7 192.4 No - -

016 ELEC 391.3 7075.0 1292.8 244.0 No - -

018 VEST. 85.8 1551.7 705.7 0.0 No - -

019 CORRIDOR 335.8 6071.3 1675.9 0.0 No - -

020 JAN 90.3 1632.3 706.5 0.0 No - -

021 BRK RM/TORNADO

SHELTER

1404.2 25390.2 2009.6 746.4 No - -

021A WELL 116.1 2099.8 784.2 0.0 No - -

021B W 103.5 1871.4 746.3 0.0 No - -

021C M 100.1 1810.7 736.2 0.0 No - -

021D CLOSET 104.6 1892.1 749.7 0.0 No - -

022 MENS 460.6 8328.5 1646.0 0.0 No - -

023 WOMENS 337.1 6094.7 1076.8 341.7 No - -

024 VEST. 91.7 1658.4 540.9 155.7 No - -

025 COMPOSITE 1032.7 18673.1 2096.1 397.7 No - -

026 DLA/IPV 921.6 16664.5 2053.3 354.9 No - -

027 VEST. 85.2 1539.9 706.3 0.0 No - -

028 CORRIDOR 223.6 4042.8 1348.8 118.9 No - -

100 VEST. 75.1 1357.3 647.5 0.0 No - -

100A CORRIDOR 306.4 5540.3 1593.7 300.8 No - -

101 FOM STORAGE 1547.6 27983.0 2595.1 538.7 No - -

101A FOM OFF. 406.3 7346.6 1461.0 0.0 No - -

102 HAZ STOR & 102A HAZ

WSTE

869.0 15713.4 2240.4 0.0 Yes - -

Hourly Analysis Program 6.2 Page 14 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

103 TOOL CHECKOUT 368.3 6648.7 1528.1 0.0 Yes - -

104 TOOL CRIB 1837.5 33225.1 2359.2 747.4 Yes - -

104A COMPOSITE 1861.3 33646.8 2231.1 951.2 Yes - -

104C TC OFFICE 144.1 2601.9 869.6 0.0 Yes - -

105 CORRIDOR 1129.9 20424.8 2425.7 349.5 Yes - -

107 PSC 942.2 17027.0 1635.7 632.3 Yes - -

107A Corridor 147.6 2651.7 1288.8 0.0 Yes - -

108 DOCK OFFICE 504.3 9114.0 1630.1 0.0 Yes - -

110 ELEC 424.3 7671.4 1630.9 0.0 Yes - -

111 MECH & 112 AIR 1553.3 28078.7 3352.7 306.5 Yes - -

113 FIRE 128.0 2305.4 473.5 438.9 Yes - -

114 COMM 229.0 4141.3 962.0 148.7 Yes - -

118A CORRIDOR 794.5 14351.6 2990.0 0.0 Yes - -

118VEST. 110.0 1987.6 759.8 0.0 Yes - -

119 DOCK OFFICE 425.7 7694.7 1503.3 0.0 Yes - -

121 MENS 390.6 7057.8 1559.4 0.0 Yes - -

122 JAN 48.2 871.9 510.8 0.0 Yes - -

123 WOMENS 284.6 5146.4 1478.9 0.0 Yes - -

124 WELL 96.5 1745.2 715.1 0.0 Yes - -

125 BRK RM/TORNADO

SHELTER

1216.8 22001.4 2037.3 539.6 Yes - -

125A CLOSET 61.1 1104.8 598.4 0.0 Yes - -

125B M 88.6 1601.9 688.9 0.0 Yes - -

125C W 85.0 1518.4 677.1 0.0 Yes - -

126 VEST. 202.7 3655.0 527.4 502.8 Yes - -

127 PMD 2244.2 40572.0 3709.4 310.7 Yes - -

127A MT 84.2 1521.8 697.0 0.0 Yes - -

127D SERVER 306.0 5533.5 921.6 350.5 Yes - -

128 LO STOR 3194.3 57756.7 3190.6 1271.3 Yes - -

Hourly Analysis Program 6.2 Page 15 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Space Floor Area

(sqft) Volume (cuft)

Interior Wall Gross Area

(sqft)

Exterior Wall Gross Area

(sqft) Multi-Level

Floor-to- Ceiling Height

Raised Floor Height

Notes

129 EKIT PASSAGEWAY 232.8 4210.3 1195.9 111.4 Yes - -

E1 ELEV 88.6 1587.4 726.9 0.0 Yes - -

SA1 STAIR 315.9 5693.6 1366.9 0.0 Yes - -

SB1 STAIR 329.2 5911.8 1255.3 192.9 Yes - -

SC1 STAIR 97.6 1764.4 879.0 0.0 Yes - -

Ceiling/Floor Spaces - 0.0 - 0.0 - - -

4.4. Unmodeled Space Details

None

4.5. Roof Details

Total Area Heat Transfer Pitch

Name Shape (sqft) Area (sqft) Pitch A Pitch B Notes

SA Stairs Roof

SA Stairs Roof Flat 307.0 307.0 - -

Hangar Roof unnamed roof (1) Flat 715.6 715.6 - -unnamed roof (2) Single Slope, Right 69301.4 68269.4 9.0° -unnamed roof (3) Flat 741.5 738.5 - -unnamed roof (4) Single Slope, Left 69962.1 68898.1 9.0° -unnamed roof (5) Flat 741.0 741.0 - -unnamed roof (6) Flat 740.7 740.7 - -

BACH 2ND FLOOR ROOF

2ND FLOOR EAST ROOF Flat 6626.9 6626.9 - -

2ND FLOOR SLOPE EAST Single Slope, Bottom 2957.3 2900.3 14.0° -

2ND FLOOR SLOPE WEST Single Slope, Top 2918.6 2724.6 14.0° -

2ND FLOOR WEST ROOF (2) Flat 5728.3 5728.3 - -

SA Stairs 3

SA3 STAIRS Flat 307.0 307.0 - -

Hourly Analysis Program 6.2 Page 16 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Total Area Heat Transfer Pitch

Name Shape (sqft) Area (sqft) Pitch A Pitch B Notes

BACH 1ST FLOOR ROOF

unnamed roof Flat 4964.3 4964.3 - -unnamed roof (1) Flat 16593.9 16593.9 - -

Level 2

202 OPEN OFFICE (1) Flat 1047.6 1047.6 - -

202 OPEN OFFICE (2) Flat 1110.9 1110.9 - -

202A ELEC Flat 91.9 91.9 - -

202B OFFICE Flat 137.4 137.4 - -

202C OFFICE Flat 136.8 136.8 - -

202D OFFICE Flat 135.4 135.4 - -

202E OFFICE Flat 140.4 140.4 - -

202F OFFICE Flat 151.3 151.3 - -

202G COPY/FILE Flat 124.2 124.2 - -

202H OFFICE Flat 138.9 138.9 - -

202I OFFICE Flat 134.9 134.9 - -

202J OFFICE Flat 142.7 142.7 - -

202K COLLAB Flat 394.0 394.0 - -

203 SFTWR Flat 408.4 408.4 - -

204 COMM Flat 177.0 177.0 - -

205 STOR Flat 167.9 167.9 - -

206 CTR TRNG Flat 845.0 845.0 - -

207 MECH Flat 369.1 369.1 - -

208 ELEC Flat 60.1 60.1 - -

209A OFFICE Flat 84.9 84.9 - -

209B OFFICE Flat 92.5 92.5 - -

214C COMMAND SUITE Flat 9.5 9.5 - -

218 AMXS (1) Flat 2042.1 2042.1 - -

218 AMXS (2) Flat 1920.5 1920.5 - -

Hourly Analysis Program 6.2 Page 17 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Total Area Heat Transfer Pitch

Name Shape (sqft) Area (sqft) Pitch A Pitch B Notes

218A OFFICE Flat 138.9 138.9 - -

218B OFFICE Flat 138.7 138.7 - -

218C OFFICE Flat 138.5 138.5 - -

218D OFFICE Flat 137.2 137.2 - -

218E OFFICE Flat 139.2 139.2 - -

218F OFFICE Flat 137.8 137.8 - -

218G OFFICE Flat 142.3 142.3 - -

218H COPY Flat 132.9 132.9 - -

218I CONF Flat 416.9 416.9 - -

218J CONF Flat 233.5 233.5 - -

219 CORRIDOR Flat 306.1 306.1 - -

SC2 STAIR Flat 229.6 229.6 - -

HANGAR

000 Hangar Bay A Flat 715.6 715.6 - -

000 Hangar Bay B Flat 745.0 745.0 - -

000 Hangar Bay C Flat 738.5 738.5 - -

000 Hangar Bay D Flat 740.7 740.7 - -

Level 1

001 VEST. Flat 86.1 86.1 - -

002 CORRIDOR Flat 243.2 243.2 - -

003 LANDING GEAR SHOP Flat 1728.1 1728.1 - -

004 ENGINE SHOP Flat 1254.9 1254.9 - -

005 TIRE (OPEN) SHOP Flat 1128.2 1128.2 - -

006 SHEET METAL Flat 1519.4 1519.4 - -

007 CORRIDOR Flat 1524.7 1524.7 - -

008 DOCK OFFICE Flat 467.4 467.4 - -

009 MENS Flat 302.3 302.3 - -

010 JAN Flat 43.9 43.9 - -

Hourly Analysis Program 6.2 Page 18 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

Total Area Heat Transfer Pitch

Name Shape (sqft) Area (sqft) Pitch A Pitch B Notes

011 WOMENS Flat 272.4 272.4 - -

012 DOCK OFFICE Flat 840.9 840.9 - -

013 FIRE Flat 95.7 95.7 - -

014 COMM Flat 137.9 137.9 - -

015 MECH Flat 1064.7 1064.7 - -

016 ELEC Flat 391.3 391.3 - -

018 VEST. Flat 85.8 85.8 - -

019 CORRIDOR Flat 335.8 335.8 - -

020 JAN Flat 90.3 90.3 - -

021 BRK RM/TORNADO SHELTER Flat 1404.2 1404.2 - -

021A WELL Flat 116.1 116.1 - -

021B W Flat 103.5 103.5 - -

021C M Flat 100.1 100.1 - -

021D CLOSET Flat 104.6 104.6 - -

022 MENS Flat 460.6 460.6 - -

023 WOMENS Flat 337.1 337.1 - -

024 VEST. Flat 91.7 91.7 - -

025 COMPOSITE Flat 1032.7 1032.7 - -

026 DLA/IPV Flat 921.6 921.6 - -

027 VEST. Flat 85.2 85.2 - -

028 CORRIDOR Flat 223.6 223.6 - -

100 VEST. Flat 75.1 75.1 - -

100A CORRIDOR Flat 306.4 306.4 - -

101 FOM STORAGE Flat 1547.6 1547.6 - -

101A FOM OFF. Flat 406.3 406.3 - -

102 HAZ STOR & 102A HAZ WSTE Flat 862.0 862.0 - -

104A COMPOSITE Flat 1849.8 1849.8 - -

Hourly Analysis Program 6.2 Page 19 of 20

Prepared by: LARSON DESIGN GROUP 11:13 AM

4.6. Summary of Wall Groups

Wall Group Interior Wall Gross Area (sqft) Exterior Wall Gross Area (sqft) Notes

Default 308535.8 188446.8

Air Walls 5923.6 0.0

5. Openings

5.1. Schedule of Window Openings

Tag Count Total Area (sqft) Width Height Elevation Exterior Shade Notes

1st Floor 6 x 4 9 216.0 6' 4' 3' 2nd Floor Window Shade

2nd floor 25 700.0 6' 4' 8" 3' 2nd Floor Window Shade

Hangar Bay 6x6 10 359.9 6' 6' 68' None

Large Hangar Window 14 8512.1 38' 16' 50' None

Large Lobby Window 5 890.1 12' 14' 10" 3' None

Small Hangar Window 14 4255.2 38' 8' 75' None

5.2. Schedule of Door Openings

Tag Count Total Area (sqft) Width Height Shade Notes

Bay Door 4 426.6 10' 10' 8" None

Double 3 119.9 6' 6' 8" None

Hangar Door 16 42947.0 44' 61' None

Large Bay Door 1 324.0 18' 18' None

Medium Bay Door 3 432.1 12' 12' None

Single 18 359.8 3' 6' 8" None

Single Wider 3 80.1 4' 6' 8" None

Small Bay Door 2 170.6 8' 10' 8" None

5.3. Schedule of Skylight Openings

None

Hourly Analysis Program 6.2 Page 20 of 20

Prepared by: LARSON DESIGN GROUP 11:18 AM

1. General Information

Space Model TAFB BACH Building TAFB BACH Notes:

2. Spaces

The space model contains 127 spaces with total floor area of 196,603 sqft.

2.1. Ventilation

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

1 000 Hangar Bay A HANGAR 34695.3 Hangar Bay User Defined 0.45 CFM/sqft 0.00 CFM/sqft 0.0 CFM

2 000 Hangar Bay B HANGAR 34665.5 Hangar Bay User Defined 0.45 CFM/sqft 0.00 CFM/sqft 0.0 CFM

3 000 Hangar Bay C HANGAR 34549.7 Hangar Bay User Defined 0.45 CFM/sqft 0.00 CFM/sqft 0.0 CFM

4 000 Hangar Bay D HANGAR 34508.2 Hangar Bay User Defined 0.45 CFM/sqft 0.00 CFM/sqft 0.0 CFM

5 001 VEST. Level 1 86.1 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

6 002 CORRIDOR Level 1 243.2 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

003 LANDING

GEAR SHOP

Level 1 1728.1 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

8 004 ENGINE SHOP Level 1 1254.9 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

005 TIRE (OPEN)

SHOP

Level 1 1128.2 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

10 006 SHEET METAL Level 1 1519.4 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

11 007 CORRIDOR Level 1 1524.7 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

12 008 DOCK OFFICE Level 1 467.4 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

13 009 MENS Level 1 302.3 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

14 010 JAN Level 1 43.9 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

15 011 WOMENS Level 1 272.4 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

16 012 DOCK OFFICE Level 1 840.9 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

17 013 FIRE Level 1 95.7 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

18 014 COMM Level 1 137.9 IT Closet MISCELLANEOUS: Telephone closet 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

Hourly Analysis Program 6.2 Page 1 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

19 015 MECH Level 1 1064.7 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

20 016 ELEC Level 1 391.3 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

21 018 VEST. Level 1 85.8 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

22 019 CORRIDOR Level 1 335.8 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

23 020 JAN Level 1 90.3 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

021 BRK

RM/TORNADO

SHELTER

Level 1 1404.2 Break Room GENERAL: Break room 5.0 CFM/person 0.06 CFM/sqft 0.30 CFM/sqft

25 021A WELL Level 1 116.1 Wellness GENERAL: Break room 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

26 021B W Level 1 103.5 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

27 021C M Level 1 100.1 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

28 021D CLOSET Level 1 104.6 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

29 022 MENS Level 1 460.6 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

30 023 WOMENS Level 1 337.1 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

31 024 VEST. Level 1 91.7 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

32 025 COMPOSITE Level 1 1032.7 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

33 026 DLA/IPV Level 1 921.6 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

34 027 VEST. Level 1 85.2 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

35 028 CORRIDOR Level 1 223.6 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

36 100 VEST. Level 1 75.1 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

37 100A CORRIDOR Level 1 306.4 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

101 FOM

STORAGE

Level 1 1547.6 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

39 101A FOM OFF. Level 1 406.3 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

102 HAZ STOR &

102A HAZ WSTE

Level 1 869.0 Storage Chemical/Hazardou s

User Defined 0.0 CFM/person 0.00 CFM/sqft 1.00 CFM/sqft

103 TOOL

CHECKOUT

Level 1 368.3 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

42 104 TOOL CRIB Level 1 1837.5 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

43 104A COMPOSITE Level 1 1861.3 Manufacturering Room

MISCELLANEOUS: Manufacturing, hazardous materials not used

10.0 CFM/person 0.18 CFM/sqft 0.00 CFM/sqft

Hourly Analysis Program 6.2 Page 2 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

44 104C TC OFFICE Level 1 144.1 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

45 105 CORRIDOR Level 1 1129.9 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

46 107 PSC Level 1 942.2 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

47 107A Corridor Level 1 147.6 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

48 108 DOCK OFFICE Level 1 504.3 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

49 110 ELEC Level 1 424.3 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

111 MECH & 112

AIR

Level 1 1553.3 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

51 113 FIRE Level 1 128.0 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

52 114 COMM Level 1 229.0 IT Closet MISCELLANEOUS: Telephone closet 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

53 118A CORRIDOR Level 1 794.5 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

54 118VEST. Level 1 110.0 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

55 119 DOCK OFFICE Level 1 425.7 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

56 121 MENS Level 1 390.6 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

57 122 JAN Level 1 48.2 Janitor User Defined 0.0 CFM/person 0.00 CFM/sqft 1.00 CFM/sqft

58 123 WOMENS Level 1 284.6 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

59 124 WELL Level 1 96.5 Wellness GENERAL: Break room 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

125 BRK

RM/TORNADO

SHELTER

Level 1 1216.8 Break Room GENERAL: Break room 5.0 CFM/person 0.06 CFM/sqft 0.30 CFM/sqft

61 125A CLOSET Level 1 61.1 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

62 125B M Level 1 88.6 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

63 125C W Level 1 85.0 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

64 126 VEST. Level 1 202.7 Entry Lobby OFFICE: Main entry lobby 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

65 127 PMD Level 1 2244.2 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

66 127A MT Level 1 84.2 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

67 127D SERVER Level 1 306.0 IT Closet MISCELLANEOUS: Telephone closet 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

68 128 LO STOR Level 1 3194.3 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

129 EKIT

PASSAGEWAY

Level 1 232.8 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

Hourly Analysis Program 6.2 Page 3 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

70 200 MACH RM Level 2 78.0 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

71 201 CORRIDOR Level 2 661.6 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

202 OPEN OFFICE

(1)

Level 2 1046.6 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

202 OPEN OFFICE

(2)

Level 2 1110.9 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

74 202A ELEC Level 2 91.9 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

75 202B OFFICE Level 2 137.4 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

76 202C OFFICE Level 2 136.8 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

77 202D OFFICE Level 2 135.4 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

78 202E OFFICE Level 2 140.4 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

79 202F OFFICE Level 2 151.3 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

80 202G COPY/FILE Level 2 123.7 Copy OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.5 CFM

81 202H OFFICE Level 2 138.9 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

82 202I OFFICE Level 2 134.9 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

83 202J OFFICE Level 2 142.7 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

84 202K COLLAB Level 2 394.0 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

85 203 SFTWR Level 2 407.9 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

86 204 COMM Level 2 177.0 IT Closet MISCELLANEOUS: Telephone closet 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

87 205 STOR Level 2 167.9 Storage Chemical/Hazardou s

User Defined 0.0 CFM/person 0.00 CFM/sqft 1.50 CFM/sqft

88 206 CTR TRNG Level 2 845.0 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

89 207 MECH Level 2 541.3 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

90 208 ELEC Level 2 92.6 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

91 209 SCHED OFF Level 2 1368.9 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

92 209A OFFICE Level 2 130.8 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

93 209B OFFICE Level 2 141.9 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

94 210 MENS Level 2 335.2 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

95 211 JAN Level 2 40.8 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

Hourly Analysis Program 6.2 Page 4 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

96 212 WOMENS Level 2 250.0 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

97 213 STOR Level 2 42.7 Storage OFFICE: Occupiable storage room for dry materials

5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

98 214 RECEPTION Level 2 211.0 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

99 214A DEPUTY Level 2 117.7 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

100 214B DEPUTY Level 2 121.5 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

214C COMMAND

SUITE

Level 2 326.0 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

102 215 BRK Level 2 746.4 Break Room GENERAL: Break room 5.0 CFM/person 0.06 CFM/sqft 0.30 CFM/sqft

103 216 M Level 2 71.1 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

104 217 W Level 2 71.9 Bathroom User Defined 0.0 CFM/person 0.00 CFM/sqft 0.80 CFM/sqft

105 218 AMXS (1) Level 2 2148.2 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

106 218 AMXS (2) Level 2 2017.4 Open Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

107 218A OFFICE Level 2 138.9 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

108 218B OFFICE Level 2 138.7 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

109 218C OFFICE Level 2 138.5 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

110 218D OFFICE Level 2 137.2 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

111 218E OFFICE Level 2 139.2 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

112 218F OFFICE Level 2 137.8 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

113 218G OFFICE Level 2 142.3 Office OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

114 218H COPY Level 2 131.9 Copy OFFICE: Office space 5.0 CFM/person 0.06 CFM/sqft 0.5 CFM

115 218I CONF Level 2 416.9 Conference Room Small

GENERAL: Conference/meeting 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

116 218J CONF Level 2 233.5 Conference Room Small

GENERAL: Conference/meeting 5.0 CFM/person 0.06 CFM/sqft 0.0 CFM

117 218K ELEC Level 2 52.3 Heating Only Space User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

118 219 CORRIDOR Level 2 423.6 Corridor GENERAL: Corridor 0.0 CFM/person 0.06 CFM/sqft 0.0 CFM

119 E1 ELEV Level 1 88.6 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

120 E2 ELEV Level 2 22.7 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

121 SA1 STAIR Level 1 315.9 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

Hourly Analysis Program 6.2 Page 5 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Ventilation

Index Space Level Floor Area Space Type ASHRAE Standard 62.1-2019 OA Requirement 1 OA Requirement 2 Direct Exhaust

(sqft) Space Usage Airflow Units Airflow Units Airflow Units

122 SA2 STAIRS Level 2 307.0 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

123 SA3 STAIRS SA Stairs 3 307.0 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

124 SB1 STAIR Level 1 329.2 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

125 SB2 STAIR Level 2 324.2 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

126 SC1 STAIR Level 1 97.6 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

127 SC2 STAIR Level 2 229.6 Mechanical / Stairs User Defined 0.0 CFM/person 0.00 CFM/sqft 0.0 CFM

Hourly Analysis Program 6.2 Page 6 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

2.2. Overhead Lighting and Daylighting Control

Overhead Lighting Daylighting Control

Index Space ASHRAE Standard 90.1-2019 Power Units Lighting Schedule Power Control Illum. Units

Lighting Method

Space Usage Type

Multi. Type Setpoint

1 000 Hangar Bay A Building Area Workshop 0.82 W/sqft LED: Free Hanging

Schedule

1.00 Not Used --- ---

2 000 Hangar Bay B Building Area Workshop 0.82 W/sqft LED: Free Hanging Lighting Schedule

1.00 Not Used --- ---

3 000 Hangar Bay C Building Area Workshop 0.82 W/sqft LED: Free Hanging Lighting Schedule

1.00 Not Used --- ---

4 000 Hangar Bay D Building Area Workshop 0.82 W/sqft LED: Free Hanging Lighting Schedule

1.00 Not Used --- ---

5 001 VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

6 002 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

003 LANDING

GEAR SHOP

Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

8 004 ENGINE SHOP Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

005 TIRE (OPEN)

SHOP

Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

10 006 SHEET METAL Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

11 007 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

12 008 DOCK OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

13 009 MENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

14 010 JAN Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

15 011 WOMENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

16 012 DOCK OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

17 013 FIRE Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

18 014 COMM Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

19 015 MECH Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

20 016 ELEC Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

21 018 VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

Hourly Analysis Program 6.2 Page 7 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

22 019 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

23 020 JAN Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

021 BRK

RM/TORNADO

SHELTER

Space by Space Lounge/Breakroom: All others 0.59 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

25 021A WELL Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

26 021B W Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

27 021C M Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

28 021D CLOSET Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

29 022 MENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

30 023 WOMENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

31 024 VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

32 025 COMPOSITE Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

33 026 DLA/IPV Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

34 027 VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

35 028 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

36 100 VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

37 100A CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

101 FOM

STORAGE

Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

39 101A FOM OFF. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

102 HAZ STOR &

102A HAZ WSTE

Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

103 TOOL

CHECKOUT

Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

42 104 TOOL CRIB Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

1.00 Not Used --- ---

43 104A COMPOSITE Space by Space Manufacturing Facility: Low bay area (< 25ft)

0.86 W/sqft LED: Free Hanging

Lighting Schedule(1)

Hourly Analysis Program 6.2 Page 8 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

44 104C TC OFFICE Building Area Office 0.64 W/sqft

Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

45 105 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

46 107 PSC Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

47 107A Corridor Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

48 108 DOCK OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

49 110 ELEC Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

111 MECH & 112

AIR

Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

51 113 FIRE Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

52 114 COMM Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

53 118A CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

54 118VEST. Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

55 119 DOCK OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

56 121 MENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

57 122 JAN Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

58 123 WOMENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

59 124 WELL Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

125 BRK

RM/TORNADO

SHELTER

Space by Space Lounge/Breakroom: All others 0.59 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

61 125A CLOSET Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

62 125B M Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

63 125C W Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

64 126 VEST. Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

65 127 PMD Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

Hourly Analysis Program 6.2 Page 9 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

66 127A MT Building Area Office 0.64 W/sqft

Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

67 127D SERVER Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

68 128 LO STOR Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

129 EKIT

PASSAGEWAY

Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

70 200 MACH RM Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

71 201 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

202 OPEN OFFICE

(1)

Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

202 OPEN OFFICE

(2)

Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

74 202A ELEC Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

75 202B OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

76 202C OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

77 202D OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

78 202E OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

79 202F OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

80 202G COPY/FILE Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

81 202H OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

82 202I OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

83 202J OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

84 202K COLLAB Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

85 203 SFTWR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

86 204 COMM Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

87 205 STOR Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

Hourly Analysis Program 6.2 Page 10 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

88 206 CTR TRNG Building Area Office 0.64 W/sqft

Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

89 207 MECH Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

90 208 ELEC Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

91 209 SCHED OFF Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

92 209A OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

93 209B OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

94 210 MENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

95 211 JAN Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

96 212 WOMENS Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

97 213 STOR Building Area User Defined 0.70 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

98 214 RECEPTION Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

99 214A DEPUTY Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

100 214B DEPUTY Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

214C COMMAND

SUITE

Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

102 215 BRK Space by Space Lounge/Breakroom: All others 0.59 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

103 216 M Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

104 217 W Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

105 218 AMXS (1) Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

106 218 AMXS (2) Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

107 218A OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

108 218B OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

109 218C OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

Hourly Analysis Program 6.2 Page 11 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

110 218D OFFICE Building Area Office 0.64 W/sqft

Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

111 218E OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

112 218F OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

113 218G OFFICE Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

114 218H COPY Building Area Office 0.64 W/sqft Fluorescent: Recessed, no Lens, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

115 218I CONF Building Area User Defined 1.00 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

116 218J CONF Building Area User Defined 1.00 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

117 218K ELEC Building Area Warehouse 0.45 W/sqft Fluorescent: Recessed, no Lens, Unvented

Lighting Schedule

1.00 Not Used --- ---

118 219 CORRIDOR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

Lighting Schedule(1)

1.00 Not Used --- ---

119 E1 ELEV Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

120 E2 ELEV Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

121 SA1 STAIR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

122 SA2 STAIRS Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

123 SA3 STAIRS Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

124 SB1 STAIR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

125 SB2 STAIR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

126 SC1 STAIR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

1.00 Not Used --- ---

127 SC2 STAIR Building Area Office 0.64 W/sqft LED: Recessed, Unvented

90.1 Office

Lights/Elec

Hourly Analysis Program 6.2 Page 12 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

2.3. Task Lighting, Electric Equipment and Miscellaneous Heat Gain

Index Space Task Lighting Electric Equipment Miscellaneous Heat Gain

Power Units Schedule Power Units Schedule Sens.

(BTU/hr) Schedule

Latent (BTU/hr)

Schedule

1 000 Hangar Bay A 0.00 W/sqft (None) 2.00 W/sqft Equipment Schedule 0 (None) 0 (None)

2 000 Hangar Bay B 0.00 W/sqft (None) 2.00 W/sqft Equipment Schedule 0 (None) 0 (None)

3 000 Hangar Bay C 0.00 W/sqft (None) 2.00 W/sqft Equipment Schedule 0 (None) 0 (None)

4 000 Hangar Bay D 0.00 W/sqft (None) 2.00 W/sqft Equipment Schedule 0 (None) 0 (None)

5 001 VEST. 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

6 002 CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

003 LANDING

GEAR SHOP

0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

8 004 ENGINE SHOP 0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

005 TIRE (OPEN)

SHOP

0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

10 006 SHEET METAL 0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

11 007 CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

12 008 DOCK OFFICE 0.00 W/sqft (None) 120.0 Watts Electric Equipment Schedule

0 (None) 0 (None)

13 009 MENS 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

14 010 JAN 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

15 011 WOMENS 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

16 012 DOCK OFFICE 0.00 W/sqft (None) 2.00 W/sqft Electric Equipment Schedule

0 (None) 0 (None)

17 013 FIRE 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

18 014 COMM 0.00 W/sqft (None) 4,400.0 Watts

90.1 Office

Lights/Elec

0 (None) 0 (None)

19 015 MECH 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

20 016 ELEC 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

21 018 VEST. 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

22 019 CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

23 020 JAN 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

021 BRK

RM/TORNADO

SHELTER

0.00 W/sqft (None) 2,273.0 Watts

90.1 Office

Lights/Elec

0 (None) 0 (None)

Hourly Analysis Program 6.2 Page 13 of 31

Prepared by: LARSON DESIGN GROUP 11:18 AM

Index Space Task Lighting Electric Equipment Miscellaneous Heat Gain

Power Units Schedule Power Units Schedule Sens.

(BTU/hr) Schedule

Latent (BTU/hr)

Schedule

25 021A WELL 0.00 W/sqft (None) 1.00 W/sqft

90.1 Office

Lights/Elec

0 (None) 0 (None)

26 021B W 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

27 021C M 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

28 021D CLOSET 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

29 022 MENS 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

30 023 WOMENS 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

31 024 VEST. 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

32 025 COMPOSITE 0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

33 026 DLA/IPV 0.00 W/sqft (None) 2.00 W/sqft Electric Equipment Schedule

0 (None) 0 (None)

34 027 VEST. 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

35 028 CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

36 100 VEST. 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

37 100A CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

101 FOM

STORAGE

0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

39 101A FOM OFF. 0.00 W/sqft (None) 120.0 Watts Electric Equipment Schedule

0 (None) 0 (None)

102 HAZ STOR &

102A HAZ WSTE

0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

103 TOOL

CHECKOUT

0.00 W/sqft (None) 120.0 Watts

Electric Equipment Schedule

0 (None) 0 (None)

42 104 TOOL CRIB 0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

43 104A COMPOSITE 0.00 W/sqft (None) 2.00 W/sqft

90.1 Light Mfg

Lights/Elec

0 (None) 0 (None)

44 104C TC OFFICE 0.00 W/sqft (None) 120.0 Watts Electric Equipment Schedule

0 (None) 0 (None)

45 105 CORRIDOR 0.00 W/sqft (None) 0.00 W/sqft (None) 0 (None) 0 (None)

46 107 PSC 0.00 W/sqft (None) 2.00 W/sqft Electric Equipment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .