Bomber Agile Common Hangar Industry Forum Presentation.pdf

PDF 4 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This is an industry forum presentation for the Bomber Agile Common Hangar (BACH) project at Tinker Air Force Base, Oklahoma. The presentation outlines plans for constructing a 4-dock maintenance hangar facility totaling 197,003 square feet with 420,352 square feet of apron paving.

The project, valued between $250M-$500M, will include a single-story structural steel hangar bay with full span trusses, support spaces with shops and two-story administration areas, and special deep foundations. Key features include standing seam metal roof, brick veneer and metal panel exterior finishes, and associated site work including utilities, demolition, and fencing. The Army Corps of Engineers Tulsa District will host a virtual industry forum on February 18, 2025 at 9am Central, with ProjNet open for inquiries from February 14 through March 7, 2025. The NAICS code is 236220 (Commercial and Institutional Building Construction) with a $45M size standard. Interested contractors must email to receive MS Teams meeting invites and can request one-on-one meetings following the forum. The facility will support B-52 modernization and B-21 program depot maintenance activities.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JANUARY 2025

FY26 BOMBER AGILE COMMON HANGER

(BACH)

PROJECT NUMBER: WWYK263009

TINKER AFB

SPECIAL NOTICE

AGENDA

Administrative Items Project Background and Overview Design Overview Future Bomber Campus Additional Information

ADMINISTRATIVE ITEMS

ADMINISTRATIVE ITEMS

Initial Sources Sought Notice was published on 24 Jun 2024 under solicitation number W912BV24SJL15 titled: Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base.

Future notices will be published under Solicitation Number W912BV25R0014. This is projected to be an unrestricted solicitation. DFARs 236.204 Construction Magnitude: $250M to $500M.

NAICS: 236220, Commercial and Institutional Building Construction. The small business size standard for this NAICS is $45,000,000.00.

PSC: Y1BZ – Construction of Other Airfield Structures This presentation is for general information and will not change the terms and conditions of any subsequent solicitation or contract. The industry day is part of our market research, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS PRESENTATION. No reimbursement will be made for any costs associated with providing information in response to this presentation or any follow up information requests.

PROJECT LOCATION

SITE PLAN

PLANNING CHARRETTE REPORT REVIEW

EXISTING CONDITIONS

PROJECT BACKGROUND AND OVERVIEW

PROJECT BACKGROUND AND OVERVIEW

DESIGN OVERVIEW

OVERALL FLOOR PLAN

• 18,302 SM (197,003sf)

• 39,052 SM (420,352sf) of

Apron Paving

OVERALL SECOND FLOOR PLAN

BUILDING SECTION

CONCEPT RENDERINGS

EXTERIOR FINISHES

FUTURE BOMBER CAMPUS

FUTURE BOMBER CAMPUS

N

ADDITIONAL INFORMATION

ONE-ON-ONE MEETINGS

The Government will present this information via Microsoft TEAMS during a Virtual Industry Day to be held on 18 Feb 25 at 9am (Central).

After the presentation, we will be interested in speaking with prime construction contractors and subcontractors and will host one-on-one meetings.

Interested firms, please see the Special Notice narrative that was published with this presentation for information on scheduling these meetings.

ONE-ON-ONE MEETINGS

ProjNet will be open for inquiries from 14 Feb through 7 Mar 25 https://www.projnet.org/projnet Project Name: BACH Industry Forum Bidder Inquiry Key: QJF6H2-BW29SP Feedback on the 65% Design Documents is welcome

The Tulsa District Contracting Team:

Julie S. (Shay) Hill, Contracting Officer Jon A. Larvick, Contract Specialist

(Jon.A.Larvick@usace.army.mil)

Slide Number 1
AGENDA
Administrative Items�
ADMINISTRATIVE ITEMS
Project location
SITE PLAN
PLANNING CHARRETTE REPORT REVIEW
Existing conditions
PROJECT BACKGROUND AND OVERVIEW
Project background and overview
DESIGN OVERVIEW�
Overall Floor Plan
Overall second floor plan
Building section
CONCEPT RENDERINGS
CONCEPT RENDERINGS
CONCEPT RENDERINGS
CONCEPT RENDERINGS
Exterior finishes
FUTURE BOMBER CAMPUS�
FUTURE BOMBER CAMPUS
ADDITIONAL INFORMATION�
ONE-ON-ONE MEETINGS
ONE-ON-ONE MEETINGS

File details come from the government source that posted it. Updated .