WWYK263009_65 Design Analysis_Part18_Part6.pdf

PDF 7 MB Posted

Attached to
Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This is a finish board package showing materials and finishes for the Tinker Air Force Base Common Agile Hangar project, located at 6001 Arnold St. in Midwest City, OK.

The finishes include plastic laminate in Continental Walnut with Timbergrain finish by Wilsonart, solid surface materials from Corian (Platinum) and Hi-Macs (Geyser), floor and wall tiles from Crossville in Shades 2.0 Mist and Frost with Cross-Sheen finish, Interface carpet in Driftwood Sweet Gum and Teak patterns, luxury vinyl tile from Interface in Natural Woodgrains Madagascar, epoxy flooring in Steel Gray by Sherwin Williams, Armstrong static dissipative flooring in Armor Gray, and various paint colors including Turkish Tile, Cityscape, Smokey Blue and Winsome Gray by Sherwin Williams. Additional materials include corner guards and wall protection by CS Acrovyn, rubber wall base by Roppe, acoustical ceiling panels by Armstrong, and roller shades by MechoShades in white finishes. The package includes detailed finish boards showing colors, textures and patterns for all specified materials.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
WWYK263009_65 Design Analysis_Part7.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LANDING GEAR SHOP

ENGINE SHOP

DOCK OFFICE

TIRE (OPEN) SHOP

SHEET METAL

CORRIDOR

VEST.

HANGAR DOCK #2

MENS

WOMENS

JAN

CORRIDOR

EQ-4

MATCHLINE

SEE A1 / IF103

M A T C H L

IN

E

S E E A I F

EQ-16

EQ-17

EQ-18

EQ-20

EQ-22

EQ-23

EQ-24

EQ-25

EQ-26

EQ-29

4.703

4.703

EQ-42

EQ-43

EQ-44

DR-1

CT-1

AV-4

WB-1

EQ-7

5'-0"

3'-0" 4'-10 1/2"

EQ-11 EQ-11 EQ-11 EQ-11

EQ-11EQ-11EQ-11

EQ-56

EQ-105

EQ-101

EQ-157

EQ-112

EQ-113

EQ-154

EQ-153

EQ-11EQ-144EQ-144EQ-144

SL-1

(5)

EQ-57

EQ-58

EQ-59

EQ-98

EQ-121

EQ-91

EQ-166

(4)

EQ-145 EQ-145

SF-1

(3) I-701

A8

WS-5

CT-1

(5)

WS-13

I-701

A8

6.901

6.901

EQ-30

I-701

G5

FF&E PLAN GENERAL NOTES:

1. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR

COORDINATION, AND IS CONTRACTOR FURNISHED

CONTRACTOR INSTALLED (CFCI).

2. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO

ENSURE PROPER FIT OF ALL ITEMS.

3. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE

DEALER TO ALLOW BUILDING ACCESS FOR FIELD CONDITION

VERIFICATION.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL

CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO

SUPPORT FF&E. FURNITURE DEALER IS RESPONSIBLE FOR

THE ELECTRICAL HOOKUP OF ALL FF&E, INCLUDING WHIPS

FROM WALL CONNECTIONS TO THE FURNITURE AND

CONNECTIONS TO THE FURNITURE AND CONNECTING PRE-

WIRED PANELS, UP TO AND INCLUDING FACEPLATES.

5. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING

TO BE PROVIDED BY OTHERS AFTER INSTALLATION:

COORDINATE WITH CONTRACTING OFFICER.

6. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND

ASSEMBLE FF&E PER MANUFACTURER'S WRITTEN

INSTRUCTIONS. FF&E PROVIDER MUST COORDINATE WITH

CONTRACTING OFFICER AS REQUIRED TO ENSURE THAT ALL

FF&E IS SUCCESSFULLY INSTALLED AND OPERATIONAL PRIOR

TO OCCUPANCY.

7. AWARDED FURNITURE DEALER TO PROVIDE SHOP DRAWINGS

WITH PANELS AND ELECTRICAL / COMM CONNECTIONS FOR

GOVERNMENT APPROVAL.

8. REFER TO FURNITURE SCHEDULE, SHEET I-602 FOR

INFORMATION.

9. REFER TO EQUIPMENT SCHEDULE, SHEET I-602 FOR

INFORMATION.

1/8" = 1'-0"A1

FIRST FLOOR FF&E PLAN - AREA D

KEYED NOTES

4.703 EYEWASH STATION, SEE PLUMBING FOR MORE

INFORMATION.

6.901 HAND WASH STATION REF. PLUMBING

EQUIPMENT LEGEND - AREA D

TYPE

MARK DESCRIPTION COUNT

EQ-4 PRINTER 1

EQ-7 TELEVISION, 55" 2

EQ-10 CHARGER FOR CART CADDY 8

EQ-11 TUGGER FOR STANDS 8

EQ-16 DRILL PRESS 1

EQ-17 SHRINKER STRETCHER 2

EQ-18 SHEET METAL RACK 1

EQ-20 SHEETMETAL BRAKE 8' - MANUAL 1

EQ-22 BAND SAW - 36" 1

EQ-23 HYDRAULIC PRESS BREAK 1

EQ-24 DIE RACK 1

EQ-25 MEDIA BLASTING CABINET 1

EQ-26 ROLLER - HYDRAULIC 1

EQ-29 OSCILATING SPINDLE AND DISC SANDER 1

EQ-30 SHREDDER 1

EQ-42 INFLATION SYSTEM 1

EQ-43 AIR DRYER 1

EQ-44 COMPRESSOR 1

EQ-56 COMPUTER CHARGING CABINET 1

EQ-57 WALK BEHIND FORK LIFT 1

EQ-58 WALK BEHIND FORK LIFT CHARGING STATION 1

EQ-59 SCISSOR LIFT CHARGING STATION 1

EQ-91 DOWN DRAFT TABLE 1

EQ-98 STANDUP FORK LIFT 1

EQ-101 SHEETMETAL SHEAR 8' 1

EQ-105 HOT DIMPLING MACHINE 1

EQ-112 SCRAP SHEETMETAL TRASH BIN 1

EQ-113 SCRAP SHEETMETAL CABINET 1

EQ-121 JLG SCISSOR LIFT 1

EQ-144 FLATBED TUG 3

EQ-145 MED. CAP. TOW TUG 2

EQ-153 ROLLER - MANUAL 1

EQ-154 PRESS - MANUAL 1

EQ-157 MLG SAW AND BLADES 1

EQ-166 GEAR HOLDING FIXTURE 4

FURNITURE LEGEND - AREA D

TYPE

MARK DESCRIPTION COUNT

AC-3 TRASH RECEPTACLE, SMALL 5

AC-4 RECYCLING RECEPTACLE, SMALL 5

AV-4 WHITEBOARD, MOBILE 1

CT-1 CHAIR, TASK 6

DR-1 DESK, RECTANGULAR 1

SF-1 STORAGE, LAT FILE 3

SL-1 STORAGE, LOCKERS TWO UNITS HIGH 5

WB-1 WORK BENCH, MOBILE 1

WS-5 WORKSTATION, 2 PERSONNEL 2

WS-13 WORKSTATION, 1 PERSONNEL 1

C

A B

D

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S A R M Y C O R P S O F E N G

IN

E E R S

D R A W N B Y

D E S

IG

N E D B Y

S U B M

IT

T E D B Y

S

IZ

E

C H E C K E D B Y

X

IS

S U E D A T E

C O N T R A C T N O

S O L

IC

IT

A T

IO

N N O

M A R K

D E S C R

IP

T

IO

N

D A T E

D A T E

M A R K

D E S C R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

4'-0" 8'-0" 16'-0"

1/8" = 1'-0"

KEYPLAN

Mead & Hunt, Inc.

2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

T U L S A D

IS

T R

IC

T

E S T S T R E E T

T U L S A O K -4

E N G

IN

E E R

IN

G

C O N S T R U C T

IO

N D

IV

IS

IO

N

E N G

IN

E E R

IN

G B R A N C H

W B V -1 -D -0

W B V -2 -D -0

S N A L L

T W O O D

S L A W L E Y

A M A L A N O W S K Y

IF105

F

IR

S T F L O O R F F E P L A N A R E A D

T

IN

K E R A

IR

F O R C E B A S E O K

N O V E M B E R

D E S

IG

N

B O M B E R A G

IL

E C O M M O N H A N G A R

W W Y K

D E S

IG

N

/2 /2

SFTWR

SCHED OFF 207

MECH

BRK

AMXS

CORRIDOR

209B

OFFICE

209A

OFFICE

COMM

218J

CONF

OPEN OFFICE

ELEC

202B

OFFICE

202H

OFFICE

202I

OFFICE

202A

ELEC

202K

COLLAB

M

W

HANGAR DOCK #1

HANGAR DOCK #2

HANGAR DOCK #3

HANGAR DOCK #4

218G

OFFICE

218F

OFFICE

218E

OFFICE

218D

OFFICE

218C

OFFICE

218B

OFFICE

218A

OFFICE

218I

CONF

CTR TRNG

MENS

WOMENS

JAN

218H

COPY

RECYCLING

E2

ELEV

STOR

SB2

STAIR

SC2

STAIR

202G

COPY/FILE

SA1

STAIR

202C

OFFICE

202D

OFFICE

202E

OFFICE

202F

OFFICE

218K

ELEC

202J

OFFICE

MATCHLINE

SEE A1 / IF108 MATCHLINE

SEE A1 / IF107

214B

DEPUTY

C

A B

D

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S A R M Y C O R P S O F E N G

IN

E E R S

D R A W N B Y

D E S

IG

N E D B Y

S U B M

IT

T E D B Y

S

IZ

E

C H E C K E D B Y

X

IS

S U E D A T E

C O N T R A C T N O

S O L

IC

IT

A T

IO

N N O

M A R K

D E S C R

IP

T

IO

N

D A T E

D A T E

M A R K

D E S C R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

4'-0" 8'-0" 16'-0"

1/8" = 1'-0"

KEYPLAN

Mead & Hunt, Inc.

2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

T U L S A D

IS

T R

IC

T

E S T S T R E E T

T U L S A O K -4

E N G

IN

E E R

IN

G

C O N S T R U C T

IO

N D

IV

IS

IO

N

E N G

IN

E E R

IN

G B R A N C H

W B V -1 -D -0

W B V -2 -D -0

S N A L L

T W O O D

S L A W L E Y

A M A L A N O W S K Y

IF106

O V E R A L L S E C O N D F L O O R F F E P L A N

T

IN

K E R A

IR

F O R C E B A S E O K

N O V E M B E R

D E S

IG

N

B O M B E R A G

IL

E C O M M O N H A N G A R

W W Y K

1/16" = 1'-0"A1

OVERALL SECOND FLOOR FF&E PLAN

D E S

IG

N

/2

SCHED OFF

MECH

BRK

AMXS

CORRIDOR

209B

OFFICE

209A

OFFICE

218J

CONF

ELEC

M

W

218G

OFFICE

218F

OFFICE

218E

OFFICE

218D

OFFICE

218C

OFFICE

218B

OFFICE

218A

OFFICE

218I

CONF

MENS

WOMENS

JAN

218H

COPY

E2

ELEV

STOR

SB2

STAIR

SA1

STAIR

218K

ELEC

CTR TRNG

CC-2

(6)

TC-2 TC-3

CG-1

(4)

CC-2

(11)

AV-5

EQ-4

WS-7

AV-2

WS-9

AV-2

WS-6

WS-7

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

CT-3

DL-2

CG-2

(2)

AV-2

AC-1

(2)

AC-2

(2)

CB-1

(24)

TB-1

(12)

EQ-7EQ-7

EQ-9

(4)

EQ-8

EQ-1

EQ-6

WS-8

CT-2

(12)

EQ-4

AV-2

AV-1

AV-2

AV-2

DL-2

CT-3 CG-2

(2)

MATCHLINE

SEE A1 / IF108

AV-5

EQ-7

4.802

CT-2

(52)

AV-5

AV-5

EQ-7

TT-1

(6)

CR-1

(9)

EQ-55

CT-3

CG-2

(2)

DL-2

STOR

WS-3

CT-3

TL-1

CG-1

(4)

(2)

CG-2

(2)

DL-2

CT-3AV-2

CG-2

(2)

DL-2

CT-3AV-2

DU-1

CG-2

(6)

TC-5

AV-2

CT-4

214C

COMMAND SUITE

214B

DEPUTY

RECEPTION

214A

DEPUTY

SF-1

(2)

SF-1

(2)

EQ-150

AC-1

AC-2

AC-3

AC-4

AC-3

AC-4

I-701

C5

I-701

E4

I-701

C1

I-701

C5

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

E1

I-701

F5

AC-5AC-6

CG-1

(8)

FF&E PLAN GENERAL NOTES:

1. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR

COORDINATION, AND IS CONTRACTOR FURNISHED

CONTRACTOR INSTALLED (CFCI).

2. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO

ENSURE PROPER FIT OF ALL ITEMS.

3. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE

DEALER TO ALLOW BUILDING ACCESS FOR FIELD CONDITION

VERIFICATION.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL

CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO

SUPPORT FF&E. FURNITURE DEALER IS RESPONSIBLE FOR

THE ELECTRICAL HOOKUP OF ALL FF&E, INCLUDING WHIPS

FROM WALL CONNECTIONS TO THE FURNITURE AND

CONNECTIONS TO THE FURNITURE AND CONNECTING PRE-

WIRED PANELS, UP TO AND INCLUDING FACEPLATES.

5. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING

TO BE PROVIDED BY OTHERS AFTER INSTALLATION:

COORDINATE WITH CONTRACTING OFFICER.

6. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND

ASSEMBLE FF&E PER MANUFACTURER'S WRITTEN

INSTRUCTIONS. FF&E PROVIDER MUST COORDINATE WITH

CONTRACTING OFFICER AS REQUIRED TO ENSURE THAT ALL

FF&E IS SUCCESSFULLY INSTALLED AND OPERATIONAL PRIOR

TO OCCUPANCY.

7. AWARDED FURNITURE DEALER TO PROVIDE SHOP DRAWINGS

WITH PANELS AND ELECTRICAL / COMM CONNECTIONS FOR

GOVERNMENT APPROVAL.

8. REFER TO FURNITURE SCHEDULE, SHEET I-602 FOR

INFORMATION.

9. REFER TO EQUIPMENT SCHEDULE, SHEET I-602 FOR

INFORMATION.

C

A B

D

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S A R M Y C O R P S O F E N G

IN

E E R S

D R A W N B Y

D E S

IG

N E D B Y

S U B M

IT

T E D B Y

S

IZ

E

C H E C K E D B Y

X

IS

S U E D A T E

C O N T R A C T N O

S O L

IC

IT

A T

IO

N N O

M A R K

D E S C R

IP

T

IO

N

D A T E

D A T E

M A R K

D E S C R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

4'-0" 8'-0" 16'-0"

1/8" = 1'-0"

KEYPLAN

Mead & Hunt, Inc.

2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

T U L S A D

IS

T R

IC

T

E S T S T R E E T

T U L S A O K -4

E N G

IN

E E R

IN

G

C O N S T R U C T

IO

N D

IV

IS

IO

N

E N G

IN

E E R

IN

G B R A N C H

W B V -1 -D -0

W B V -2 -D -0

S N A L L

T W O O D

S L A W L E Y

A M A L A N O W S K Y

IF107

S E C O N D F L O O R F F E P L A N A R E A A

T

IN

K E R A

IR

F O R C E B A S E O K

N O V E M B E R

D E S

IG

N

B O M B E R A G

IL

E C O M M O N H A N G A R

W W Y K

1/8" = 1'-0"A1

SECOND FLOOR FF&E PLAN - AREA A

KEYED NOTES

4.802 SEE ARCHITECTURAL PLANS FOR JANITOR CLOSET

ACCESSORIES.

EQUIPMENT LEGEND - AREA A2

TYPE

MARK DESCRIPTION COUNT

EQ-1 COMMERCIAL REFRIDGERATOR 1

EQ-4 PRINTER 2

EQ-6 WATER/ICE DISPENSER 1

EQ-7 TELEVISION, 55" 4

EQ-8 COFFEE MAKER 1

EQ-9 MICROWAVE 4

EQ-55 REVERSE OSMOSIS 1

EQ-150 COMMERCIAL FREEZER 1

FURNITURE LEGEND - AREA A2

TYPE

MARK DESCRIPTION COUNT

AC-1 TRASH RECEPTACLE 3

AC-2 RECYCLING RECEPTACLE 3

AC-3 TRASH RECEPTACLE, SMALL 79

AC-4 RECYCLING RECEPTACLE, SMALL 79

AC-5 TRASH RECEPTACLE, 55 GAL 2

AC-6 RECYCLING RECEPTACLE, 55 GAL 2

AV-2 MARKERBOARD, 4' X 6' 15

AV-5 MARKERBOARD, PRESENTATION 3

CB-1 CHAIR, BREAK ROOM 24

CC-2 CHAIR, CONFERENCE 18

CG-1 CHAIR, GUEST 17

CR-1 CHAIR, TRAINING 9

CT-2 CHAIR, TASK OFFICE 64

CT-3 CHAIR, TASK OFFICE 12

CT-4 CHAIR, TASK COMMANDER 1

DL-2 DESK, L-SHAPED 11

DU-1 DESK, U SHAPED 1

SF-1 STORAGE, LAT FILE 4

TB-1 TABLE, BREAK ROOM 12

TC-2 TABLE, CONFERENCE 42" X 72" 1

TC-3 TABLE, CONFERENCE 42" X 144" 1

TC-5 TABLE, OFFICE MEETING 1

TL-1 TABLE, LOUNGE 2

TT-1 TABLE, TRAINING 30" X 72" 3

WS-3 WORKSTATION, 6' x 6' RECEPTION 1

WS-6 WORKSTATION, 12 PERSONNEL 1

WS-7 WORKSTATION, 14 PERSONNEL 2

WS-8 WORKSTATION, 12 PERSONNEL 1

WS-9 WORKSTATION, 13 PERSONNEL 1

D E S

IG

N

/2

SFTWR

CORRIDOR

COMM

OPEN OFFICE

202B

OFFICE

202J

OFFICE

202H

OFFICE

202I

OFFICE

202A

ELEC

202K

COLLAB

HANGAR DOCK #4

CTR TRNG

SC2

STAIR

202G

COPY/FILE

202C

OFFICE

202D

OFFICE

202E

OFFICE

202F

OFFICE

CG-1

(8)

AV-2

CC-2

(10)

TC-1

WS-1

WS-1

AV-2

AV-2

EQ-4

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3

AV-2

DL-2

CT-3

AV-2

CG-2

(2)

DL-2

CT-3AV-2CG-2

(2)

DL-2

CT-3AV-2CG-2

(2)

DL-2

CT-3AV-2CG-2

(2)

DL-2

CT-3AV-2CG-2

(2)

MATCHLINE

SEE A1 / IF107

WS-10 WS-10

TC-4 TC-4

CC-1CC-1

(8)

CT-1

(20)

TT-1

(6) TT-2

EQ-7

AV-5

CR-1

(10)

SF-1

(2)

SF-1

(2)

AC-3 AC-4

I-701

A1

I-701

A1

I-701

C9

I-701

C9

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

I-701

J1

FF&E PLAN GENERAL NOTES:

1. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR

COORDINATION, AND IS CONTRACTOR FURNISHED

CONTRACTOR INSTALLED (CFCI).

2. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO

ENSURE PROPER FIT OF ALL ITEMS.

3. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE

DEALER TO ALLOW BUILDING ACCESS FOR FIELD CONDITION

VERIFICATION.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL

CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO

SUPPORT FF&E. FURNITURE DEALER IS RESPONSIBLE FOR

THE ELECTRICAL HOOKUP OF ALL FF&E, INCLUDING WHIPS

FROM WALL CONNECTIONS TO THE FURNITURE AND

CONNECTIONS TO THE FURNITURE AND CONNECTING PRE-

WIRED PANELS, UP TO AND INCLUDING FACEPLATES.

5. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING

TO BE PROVIDED BY OTHERS AFTER INSTALLATION:

COORDINATE WITH CONTRACTING OFFICER.

6. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND

ASSEMBLE FF&E PER MANUFACTURER'S WRITTEN

INSTRUCTIONS. FF&E PROVIDER MUST COORDINATE WITH

CONTRACTING OFFICER AS REQUIRED TO ENSURE THAT ALL

FF&E IS SUCCESSFULLY INSTALLED AND OPERATIONAL PRIOR

TO OCCUPANCY.

7. AWARDED FURNITURE DEALER TO PROVIDE SHOP DRAWINGS

WITH PANELS AND ELECTRICAL / COMM CONNECTIONS FOR

GOVERNMENT APPROVAL.

8. REFER TO FURNITURE SCHEDULE, SHEET I-602 FOR

INFORMATION.

9. REFER TO EQUIPMENT SCHEDULE, SHEET I-602 FOR

INFORMATION.

C

A B

D

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S A R M Y C O R P S O F E N G

IN

E E R S

D R A W N B Y

D E S

IG

N E D B Y

S U B M

IT

T E D B Y

S

IZ

E

C H E C K E D B Y

X

IS

S U E D A T E

C O N T R A C T N O

S O L

IC

IT

A T

IO

N N O

M A R K

D E S C R

IP

T

IO

N

D A T E

D A T E

M A R K

D E S C R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

4'-0" 8'-0" 16'-0"

1/8" = 1'-0"

KEYPLAN

Mead & Hunt, Inc.

2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

T U L S A D

IS

T R

IC

T

E S T S T R E E T

T U L S A O K -4

E N G

IN

E E R

IN

G

C O N S T R U C T

IO

N D

IV

IS

IO

N

E N G

IN

E E R

IN

G B R A N C H

W B V -1 -D -0

W B V -2 -D -0

S N A L L

T W O O D

S L A W L E Y

A M A L A N O W S K Y

IF108

S E C O N D F L O O R F F E P L A N A R E A C

T

IN

K E R A

IR

F O R C E B A S E O K

N O V E M B E R

D E S

IG

N

B O M B E R A G

IL

E C O M M O N H A N G A R

W W Y K

1/8" = 1'-0"A1

SECOND FLOOR FF&E PLAN - AREA C

FURNITURE LEGEND - AREA C2

TYPE

MARK DESCRIPTION COUNT

AC-3 TRASH RECEPTACLE, SMALL 29

AC-4 RECYCLING RECEPTACLE, SMALL 29

AV-2 MARKERBOARD, 4' X 6' 11

AV-5 MARKERBOARD, PRESENTATION 1

CC-1 CHAIR, CONFERENCE 8

CC-2 CHAIR, CONFERENCE 10

CG-1 CHAIR, GUEST 8

CG-2 CHAIR, GUEST OFFICE 44

CR-1 CHAIR, TRAINING 10

CT-1 CHAIR, TASK 20

CT-3 CHAIR, TASK OFFICE 8

DL-2 DESK, L-SHAPED 8

SF-1 STORAGE, LAT FILE 4

TC-4 TABLE, CONFERENCE 60" X 65" 2

TT-1 TABLE, TRAINING 30" X 72" 6

TT-2 TABLE, TRAINING 30" X 60" 1

WS-1 WORKSTATION, 6 PERSONNEL 2

WS-10 WORKSTATION, 4 PERSONNEL 2

EQUIPMENT LEGEND - AREA C2

TYPE

MARK DESCRIPTION COUNT

EQ-4 PRINTER 1

D E S

IG

N

/2

TINKER AIR FORCE BASE COMMON AGILE HANGAR

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

1FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

PLAM-1

PLASTIC LAMINATE

WILSONART

CONTINENTAL WALNUT, TIMBERGRAIN FINISH

SS-1

SOLID SURFACE

CORIAN

PLATIUM

SS-2

SOLID SURFACE

HI-MACS

GEYSER

*SEE SHEET I-601 FOR FINISH SCHEDULE.

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

2FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

TL-1

FLOOR TILE

CROSSVILLE

SHADES 2.0 MIST UPS-UNPOLISHED WITH

CROSS-SHEEN

TL-2

WALL TILE

CROSSVILLE

SHADES 2.0 FROST UPS-UNPOLISHED

WITH CROSS-SHEEN

*SEE SHEET I-601 FOR FINISH SCHEDULE.

GR-1

GROUT

CUSTOM BUILDING PRODUCTS

PEWTER

GR-2

GROUT

CUSTOM BUILDING PRODUCTS

CAPE GRAY

TS-1, TS-2, TS-3, TS-10

METAL TRIM

SCHLUTER BRUSHED ALUMINUM

TS-4, TS-5, TS-6, TS-7

METAL TRIM

SCHLUTER SATIN ANODIZED

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

3FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

CPT-1

FIELD CARPET

INTERFACE

DRIFTWOOD IN SWEET GUM

*SEE SHEET A-701 FOR FINISH SCHEDULE.

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

4FURNITURE, FIXTURES & EQUIPMENT PACKAGE

CPT-2

CARPET

INTERFACE

DRIFTWOOD IN TEAK 104858

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

5FURNITURE, FIXTURES & EQUIPMENT PACKAGE

LVT-1

LUXURY VINYL TILE

INTERFACE

A00202 NATURAL WOODGRAINS MADAGASCAR

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

6FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

EP-1

EPOXY - 5 PART

SHERWIN WILLIAMS

STEEL GRAY

ESD-1

STATIC DISSIPATIVE

FLOORING

ARMSTRONG

ARMOR GRAY

*SEE SHEET I-601 FOR FINISH SCHEDULE.

EF-1

ENTRANCE FLOORING

SHAW

5T031 WELCOME TILE II

STEPING OUT

MULTICOLOR 31481

RST-1

RUBBER STAIR TREAD

JOHNSONITE

TA6 BEDROCK

PART-1

TOILET PARTITIONS

SCRANTON PRODUCTS

HINEY HIDERS

SHALE ORANGE PEEL

TEXTURE

IWP-1

INPRO CORP

ROLLED PALLADIUM RIGID

SHEET

CAPE GREY

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

7FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

RAF-1

RAISED ACCESS

FLOORING

TATE CONCORE 1250

FLEXICO VYNIL FLOOR

TOASTED COCONUT 314

*SEE SHEET I-601 FOR FINISH SCHEDULE.

SS-3

SOLID SURFACE

-SHOWER WALLS

INPROCORP PRISIM

FROSTED WHITE (A1)

P9711

SFI-1

SHOWER FLOOR INSERT

INPRO ADA TRANSFER

SHOWER BASE

BRIGHT WHITE (A) P9011

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

8FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

PT-3

PAINT COLOR - ACCENT

SHERWIN WILLIAMS

SW7610 TURKISH TILE

PT-4

PAINT COLOR - ACCENT

SHERWIN WILLIAMS

SW7067 CITYSCAPE

PT-2

PAINT COLOR - ACCENT

SHERWIN WILLIAMS

SW7604 SMOKEY BLUE

*SEE SHEET I-601 FOR FINISH SCHEDULE.

PT-1 / PT-2

PAINT COLOR - FIELD

SHERWIN WILLIAMS

SW9634 WINSOME GRAY

CUSTOM GRAPHIC

WALL COVERING - SEE

INTERIOR ELEVATIONS

KOROSEAL DIGITAL DESIGNS

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

9FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

CP-1

CORNER

PROTECTION

CS ACROVYN

SM-20 CHARCOAL 162

RB-1 / RB-2

RUBBER WALL BASE -

TYE 1

ROPPE

123 CHARCOAL

SSP-1

STAINLESS STEEL

PANEL

CS ACROVYN

STAINLESS STEEL

*SEE SHEET I-601 FOR FINISH SCHEDULE.

CP-2

CORNER GUARD

CS ACROVYN

A230 CO-8 STAINLESS

STEEL

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

10FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

ACT-1

ACOUSTICAL CEILING PANEL

ARMSTRONG 2846 CALLA HIGH NRC, WHITE 24” X 24”

*SEE SHEET I-601 FOR FINISH SCHEDULE.

ACT-2

ACOUSTICAL CEILING PANEL

TEGULAR CEILING PANELS, MIST

OTS-1, PT-5

PAINT COLOR

SHERWIN WILLIAMS

SW7757 HIGH REFLECTIVE WHITE

6001 ARNOLD ST., MIDWEST CITY, OK 73145

R3167300-232112.01

11FURNITURE, FIXTURES & EQUIPMENT PACKAGE

FINISH BOARD

RS-1

ROLLER SHADES

MECHOSHADES

MECO /5 ECOVEIL WHITE 1351

*SEE SHEET I-601 FOR FINISH SCHEDULE.

RS-2

ROLLER SHADES

MECHOSHADES

MECO /5 CLASSIC WHITE 0701

File details come from the government source that posted it. Updated .