WWYK263009_65 Design Analysis_Part19_Part2.pdf
PDF 9 MB Posted
- Solicitation number
- W912BV25S0014
About this file
These documents are detailed electrical and communications plans for the Bomber Agile Common Hangar project at Tinker Air Force Base, including first and second floor power plans and communications layouts. The drawings show comprehensive electrical infrastructure designs for a 4-dock hangar facility with administrative spaces, displaying power distribution systems, communications pathways, and electrical equipment locations. The plans are divided into areas A through D and include overall layouts as well as detailed area-specific plans.
The drawings include power center elevations showing electrical panel configurations, circuit layouts, and distribution equipment placement throughout the facility. The communications plans detail data/telecom infrastructure routing, equipment rooms, and pathway systems. All drawings are professionally prepared by Mead & Hunt engineering firm and include appropriate technical specifications, scales, and section details typical of construction documents at the 65% design stage. The level of detail indicates this is a complex mission-critical facility requiring extensive electrical and communications infrastructure to support aircraft maintenance operations.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .