Bomber Agile Common Hangar; 4-Dock Hangar at Tinker Air Force Base
Solicitation number
W912BV25S0014
Issued by

About this file

This file contains architectural elevation drawings for the Bomber Agile Common Hangar project at Tinker Air Force Base, showing detailed exterior views from multiple angles (south, north, east, and west). The drawings include precise measurements, materials specifications, and construction details for a two-story facility with administrative areas and hangar spaces.

The drawings specify various construction materials including precast architectural concrete (03 45 00), brick veneer masonry (04 21 13.13), insulated metal wall panels (07 42 13.19), standing seam metal roof (07 61 13.A1), and prefinished metal downspouts (07 62 00.P7). Key elevation points include the first floor at 100'-0", second floor at 118'-1", administrative roof at 135'-0", hangar door head at 161'-5", hangar roof at 190'-2", and hangar roof ridge at 210'-2". The drawings are marked as 65% design dated November 20, 2024, prepared by Larson Design Group for the US Army Corps of Engineers Tulsa District under contract W912BV-20-D-0032.

View the file

Other files

File Type Posted
WWYK263009_65 Design Analysis_Part12_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part1.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part5.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part2.pdf PDF
WWYK263009_65_NG-LCCA_BLCC_Summary Report.pdf PDF
WWYK263009_65 Design Analysis_Part24.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part7.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part3.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part1.pdf PDF
WWYK263009_65 Design Analysis_Part17.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part10.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part8.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part1.pdf PDF
WWYK263009_65_NG_energy model results.pdf PDF
Bomber Agile Common Hangar Industry Forum Presentation.pdf PDF
WWYK263009_65 Drawings_Volume 2_Part6.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part4_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part7.pdf PDF
WWYK263009_65 Design Analysis_Part21.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part6_Part4_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part23.pdf PDF
WWYK263009_65 Design Analysis_Part22_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part2.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part3.pdf PDF
WWYK263009_65 Design Analysis_Part20.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part2.pdf PDF
WWYK263009_65 Design Analysis_Part26.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part19_Part4.pdf PDF
WWYK263009_65 Design Analysis_Part27.pdf PDF
WWYK263009_65 Design Analysis_Part18_Part5.pdf PDF
WWYK263009_65 Design Analysis_Part15.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part3.pdf PDF
WWYK263009_65 Design Analysis Part 28_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part9.pdf PDF
WWYK263009_65 Design Analysis_Part12_Part4.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part7_Part1.pdf PDF
WWYK263009_65 Drawings_Volume 1_Part1_Part5.pdf PDF
WWYK263009_65_NG-LCCA_BLCC results.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR ELEVATIONS GENERAL NOTES

1. T.O. SLAB : 0' - 0" = GLOBAL ELEVATION: 1285.00'

2. CONTRACTOR TO VERIFY THE GLOBAL ELEVATION WITH

CIVIL PRIOR TO CONSTRUCTION

3. VERIFY GRADE AT BUILDING WITH WITH CIVIL AND

EXISTING SITE CONDITIONS.

4. COORDINATE EXTERIOR WALL FINISH CONDITIONS AT

GRADE. CONTACT CONTRACTING OFFICER WITH ANY

CONDTIONS THAT VARIES OR CONFLICT WITH THE

DETAILS INCLUDED.

5. SEE DOOR SCHEDULES AND DOOR ELEVATIONS FOR

ADDITIONAL INFORMATION NOT SHOWN.

6. REFER TO OVERALL ELEVATIONS FOR EXTERIOR FINISH

DESIGNATIONS.

7. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION FOR WALL MOUNTED LIGHTING,

CONTROLS, FIXTURES, ETC.

8. REFER TO MECHANICAL FOR ADDITIONAL INFORMATION

FOR EXTERIOR WALL PENETRATIONS, VENTS, EXHAUST

FANS, DUCT AND PIPING PENETRATIONS, ETC

9. REFER TO TELECOM DRAWINGS FOR ADDITIONAL

INFORMATION FOR EXTERIOR MOUNTED SECURITY

DEVICES.

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

FGHJKK.2 E.7J.9

'-0

8" 2'

-8

8"

1' -0

4' -1

4"

8' -1

1" 4"

3' -3

1' -2

"8" 8'

-3

8" 4'

-0

4" 3'

-0

03 45 00

04 21 13.13

03 45 00

03 45 00

04 21 13.13

08 81 00.A1

07 62 00.P7

04 21 13.13

03 45 00

04 21 13.13

03 45 00

04 21 13.1308 81 00.A1

07 62 00.P7

E111E113 E105

E105A

9999999999

10 10 10 10

04 05 23.13.1

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

ABCDEE.7

'-8

6"

4' -1

1"

'-0

1' -2

"8" 8'

-3

8" 4'

-0

4" 3'

-0

03 45 00

04 21 13.13

03 45 00

03 45 0008 81 00.A1

07 61 13.A1

07 42 13.19

07 62 00.P7

E104 E101 E100

E104A 10 10 10 10

04 05 23.13.1 AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

4'-0" 8'-0" 16'-0"

3/16" = 1'-0"

A-207

E N

L A

R G

E D

B U

IL

D

IN

G

E L E

V A

T

IO

N S

S

O U

T H

C O

N T

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

3/16" = 1'-0"E1

ENLARGED ELEVATION SOUTH - AREA A/C

3/16" = 1'-0"A1

ENLARGED ELEVATION SOUTH - AREA C

KEY NOTES

03 45 00 PRECAST ARCHITECTURAL CONCRETE

04 05 23.13.1

MASONRY CONTROL JOINT

04 21 13.13 BRICK VENEER MASONRY

07 42 13.19 INSULATED METAL WALL PANELS

07 61 13.A1 STANDING SEAM METAL ROOF

07 62 00.P7 PREFINISHED METAL DOWNSPOUT

08 81 00.A1 GLAZING

D E

S

IG

N

/2

/2

A B

TR.9

EXTERIOR ELEVATIONS GENERAL NOTES

1. T.O. SLAB : 0' - 0" = GLOBAL ELEVATION: 1285.00'

2. CONTRACTOR TO VERIFY THE GLOBAL ELEVATION WITH

CIVIL PRIOR TO CONSTRUCTION

3. VERIFY GRADE AT BUILDING WITH WITH CIVIL AND

EXISTING SITE CONDITIONS.

4. COORDINATE EXTERIOR WALL FINISH CONDITIONS AT

GRADE. CONTACT CONTRACTING OFFICER WITH ANY

CONDTIONS THAT VARIES OR CONFLICT WITH THE

DETAILS INCLUDED.

5. SEE DOOR SCHEDULES AND DOOR ELEVATIONS FOR

ADDITIONAL INFORMATION NOT SHOWN.

6. REFER TO OVERALL ELEVATIONS FOR EXTERIOR FINISH

DESIGNATIONS.

7. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION FOR WALL MOUNTED LIGHTING,

CONTROLS, FIXTURES, ETC.

8. REFER TO MECHANICAL FOR ADDITIONAL INFORMATION

FOR EXTERIOR WALL PENETRATIONS, VENTS, EXHAUST

FANS, DUCT AND PIPING PENETRATIONS, ETC

9. REFER TO TELECOM DRAWINGS FOR ADDITIONAL

INFORMATION FOR EXTERIOR MOUNTED SECURITY

DEVICES.

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

G H J K L M N P R R.5M.1L.3J.9

'-9

'-4

'-1

'-1

1"

'-1 0"

'-2

'-3

8' -8

1'

-8

2' -7

07 61 13.A1

07 62 00.P7 07 42 13.19

03 45 00

1 1 1 1 1

11111

'-0

0'

-2

SEE SECTIONS FOR THIS AREA

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

C D E F G H J

'-0

'-9

'-4

'-1

'-1

1"

'-1 0"

'-2

'-3

8' -8

1'

-8

2' -7

07 61 13.A1

07 62 00.P7

07 42 13.19

03 45 00

0'

-2

SEE SECTIONS FOR THIS AREA

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

4'-0" 8'-0" 16'-0"

3/16" = 1'-0"

A-210

E N

L A

R G

E D

H A

N G

A R

E L E

V A

T

IO

N S

N

O R

T H

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

1" = 10'-0"E1

ENLARGED BUILDING ELEVATION - NORTH

1" = 10'-0"A1

ENLARGED BUILDING ELEVATION - NORTH

KEY NOTES

03 45 00 PRECAST ARCHITECTURAL CONCRETE

07 42 13.19 INSULATED METAL WALL PANELS

07 61 13.A1 STANDING SEAM METAL ROOF

07 62 00.P7 PREFINISHED METAL DOWNSPOUT

D E

S

IG

N

/2

FIRST FLOOR

100'-0"

HANGAR DOOR

99'-2"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

421.5 32.3

0'

-2

'-0

'-9

'-5

'-1 1"

'-1

A-206

E7

1 2.9 3.9

07 42 13.19

07 61 13.A1

07 42 13.19

05 10 00.A6

07 62 00.P7

03 31 00.Z5

07 42 13.19

9 9

E302

2 22 2

EXTERIOR ELEVATIONS GENERAL NOTES

1. T.O. SLAB : 0' - 0" = GLOBAL ELEVATION: 1285.00'

2. CONTRACTOR TO VERIFY THE GLOBAL ELEVATION WITH

CIVIL PRIOR TO CONSTRUCTION

3. VERIFY GRADE AT BUILDING WITH WITH CIVIL AND

EXISTING SITE CONDITIONS.

4. COORDINATE EXTERIOR WALL FINISH CONDITIONS AT

GRADE. CONTACT CONTRACTING OFFICER WITH ANY

CONDTIONS THAT VARIES OR CONFLICT WITH THE

DETAILS INCLUDED.

5. SEE DOOR SCHEDULES AND DOOR ELEVATIONS FOR

ADDITIONAL INFORMATION NOT SHOWN.

6. REFER TO OVERALL ELEVATIONS FOR EXTERIOR FINISH

DESIGNATIONS.

7. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION FOR WALL MOUNTED LIGHTING,

CONTROLS, FIXTURES, ETC.

8. REFER TO MECHANICAL FOR ADDITIONAL INFORMATION

FOR EXTERIOR WALL PENETRATIONS, VENTS, EXHAUST

FANS, DUCT AND PIPING PENETRATIONS, ETC

9. REFER TO TELECOM DRAWINGS FOR ADDITIONAL

INFORMATION FOR EXTERIOR MOUNTED SECURITY

DEVICES.

FIRST FLOOR

100'-0"

HANGAR DOOR

99'-2"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

65 7

0'

-2

'-0

'-9

'-5

'-1 1"

'-1

1' -8

8'

-3

8"

4' -0

4"

2' -1

0"

'-3

TOWER STAIRS HANGER

ROOF LEVEL

198'-0"

TOWER STAIRS ADMIN

ROOF LEVEL

138'-6"

5.8

03 45 00

04 21 13.13

04 21 13.13

03 45 00

07 42 13.19

07 42 13.B1

E303A

E303

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

4'-0" 8'-0" 16'-0"

3/16" = 1'-0"

A-211

E N

L A

R G

E D

H A

N G

A R

E L E

V A

T

IO

N S

E

A S

T

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

1" = 10'-0"A1

ENLARGED BUILDING ELEVATION - EAST

1" = 10'-0"E1

ENLARGED BUILDING ELEVATION - EAST

KEY NOTES

03 31 00.Z5 CONCRETE SLAB, RE: STRUCT.

03 45 00 PRECAST ARCHITECTURAL CONCRETE

04 21 13.13 BRICK VENEER MASONRY

05 10 00.A6 STEEL DECK, RE: STRUCT.

07 42 13.19 INSULATED METAL WALL PANELS

07 42 13.B1 PREFINISHED METAL WALL PANELS

07 61 13.A1 STANDING SEAM METAL ROOF

07 62 00.P7 PREFINISHED METAL DOWNSPOUT

D E

S

IG

N

/2

EXTERIOR ELEVATIONS GENERAL NOTES

1. T.O. SLAB : 0' - 0" = GLOBAL ELEVATION: 1285.00'

2. CONTRACTOR TO VERIFY THE GLOBAL ELEVATION WITH

CIVIL PRIOR TO CONSTRUCTION

3. VERIFY GRADE AT BUILDING WITH WITH CIVIL AND

EXISTING SITE CONDITIONS.

4. COORDINATE EXTERIOR WALL FINISH CONDITIONS AT

GRADE. CONTACT CONTRACTING OFFICER WITH ANY

CONDTIONS THAT VARIES OR CONFLICT WITH THE

DETAILS INCLUDED.

5. SEE DOOR SCHEDULES AND DOOR ELEVATIONS FOR

ADDITIONAL INFORMATION NOT SHOWN.

6. REFER TO OVERALL ELEVATIONS FOR EXTERIOR FINISH

DESIGNATIONS.

7. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION FOR WALL MOUNTED LIGHTING,

CONTROLS, FIXTURES, ETC.

8. REFER TO MECHANICAL FOR ADDITIONAL INFORMATION

FOR EXTERIOR WALL PENETRATIONS, VENTS, EXHAUST

FANS, DUCT AND PIPING PENETRATIONS, ETC

9. REFER TO TELECOM DRAWINGS FOR ADDITIONAL

INFORMATION FOR EXTERIOR MOUNTED SECURITY

DEVICES.

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

HANGAR ROOF RIDGE

210'-2"

HANGAR ROOF

190'-2"

T HJKLMNPRR.3 P.3 M.4N.3 L.5 K.2 H.1J.3K.1L.4P.2 N.1P.9S

0'

-2

'-0

'-2

'-1

1"

'-1

R.5 M.1 L.3 J.9R.9

03 45 00

04 21 13.13

03 45 00

04 21 13.13

03 45 00

07 42 13.19

2' -2

'-0

'-0

07 61 13.A1

07 61 13.A1

SEE SECTIONS FOR THIS AREA

FIRST FLOOR

100'-0"

SECOND FLOOR

118'-1"

ADMIN. ROOF

135'-0"

HANGAR ROOF RIDGE

210'-2"

HANGAR ROOF

190'-2"

ABCDEFGH G.9 F.8 E.7 C.6D.7 B.4C.8D.8E.8G.1H.1

0'

-2

'-1

1"

'-0

'-2

'-1

1"

'-1

03 45 00

04 21 13.13

03 45 00

04 21 13.13

03 45 00

07 62 00.P7

07 42 13.19

2' -2

'-0

'-0

SEE SECTIONS FOR THIS AREA

1 1

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

4'-0" 8'-0" 16'-0"

3/16" = 1'-0"

A-212

E N

L A

R G

E D

H A

N G

A R

E L E

V A

T

IO

N S

S

O U

T H

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

1" = 10'-0"A1

ENLARGED HANGAR ELEVATION - SOUTH

AREA A

1" = 10'-0"E1

ENLARGED HANGAR ELEVATION - SOUTH

AREA C

KEY NOTES

03 45 00 PRECAST ARCHITECTURAL CONCRETE

04 21 13.13 BRICK VENEER MASONRY

07 42 13.19 INSULATED METAL WALL PANELS

07 61 13.A1 STANDING SEAM METAL ROOF

07 62 00.P7 PREFINISHED METAL DOWNSPOUT

D E

S

IG

N

/2

FIRST FLOOR

100'-0"

HANGAR DOOR

99'-2"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

6 57

0'

-2

'-5

'-9

'-0

5.8

3' -0

"4 "4

'-0 "8

8'

-3

8"

'-3

5' -7

'-2

03 45 00

04 21 13.13

04 21 13.13

03 45 00

07 42 13.19

07 42 13.B1

'-3

E301A

E301

2 2 2 2 2

E300

EXTERIOR ELEVATIONS GENERAL NOTES

1. T.O. SLAB : 0' - 0" = GLOBAL ELEVATION: 1285.00'

2. CONTRACTOR TO VERIFY THE GLOBAL ELEVATION WITH

CIVIL PRIOR TO CONSTRUCTION

3. VERIFY GRADE AT BUILDING WITH WITH CIVIL AND

EXISTING SITE CONDITIONS.

4. COORDINATE EXTERIOR WALL FINISH CONDITIONS AT

GRADE. CONTACT CONTRACTING OFFICER WITH ANY

CONDTIONS THAT VARIES OR CONFLICT WITH THE

DETAILS INCLUDED.

5. SEE DOOR SCHEDULES AND DOOR ELEVATIONS FOR

ADDITIONAL INFORMATION NOT SHOWN.

6. REFER TO OVERALL ELEVATIONS FOR EXTERIOR FINISH

DESIGNATIONS.

7. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION FOR WALL MOUNTED LIGHTING,

CONTROLS, FIXTURES, ETC.

8. REFER TO MECHANICAL FOR ADDITIONAL INFORMATION

FOR EXTERIOR WALL PENETRATIONS, VENTS, EXHAUST

FANS, DUCT AND PIPING PENETRATIONS, ETC

9. REFER TO TELECOM DRAWINGS FOR ADDITIONAL

INFORMATION FOR EXTERIOR MOUNTED SECURITY

DEVICES.

FIRST FLOOR

100'-0"

HANGAR DOOR

99'-2"

HANGAR ROOF RIDGE

210'-2"

HANGAR DOOR HEAD

161'-5"

HANGAR ROOF

190'-2"

4 2 1.53

'-5

'-9

'-0

0'

-2

A-206

E2

12.93.9

05 10 00.A6

07 42 13.19

07 62 00.P7

07 42 13.B1

07 42 13.19

07 61 13.A1

03 45 00

04 21 13.13

03 45 00

04 21 13.13

03 45 00

E300

E300A

2 2 2 2

AN

R P

M

E L

I

I R Y

N G

E S

I

D

NOT FOR

CONSTRUCTION

SCALE:

US Army Corps of Engineers

SHEET OF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

X

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

M A

R K

D E

S C

R

IP

T

IO

N

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12

3817 NW EXPRESSWAY

SUITE 840

OKLAHOMA CITY, OK 73112

(405) 722-7270

Larson Design Group

4'-0" 8'-0" 16'-0"

1/8" = 1'-0"

A-213

E N

L A

R G

E D

H A

N G

A R

E L E

V A

T

IO

N S

W

E S

T

T

IN

K E

R A

IR

F

O R

C E

B A

S E

O

K

T U

L S

A D

IS

T

R

IC

T E

S

T S

T R

E E

T T

U L S

A O

K

-4

E N

G

IN

E E

R

IN

G

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G B

R A

N C

H

R S

IL

E

R

R U

L M

S N

A L L

K B

L A

N D

F O

R D

N O

V E

M B

E R

W B

V -1

-D

-0

W B

V -2

-D

-0

D E

S

IG

N

B O

M B

E R

A G

IL

E

C O

M M

O N

H A

N G

A R

W W

Y K

1" = 10'-0"A1

ENLARGED BUILDING ELEVATION - WEST

1" = 10'-0"E1

ENLARGED BUILDING ELEVATION - WEST

D E

S

IG

N

/2

/2

KEY NOTES

03 45 00 PRECAST ARCHITECTURAL CONCRETE

04 21 13.13 BRICK VENEER MASONRY

05 10 00.A6 STEEL DECK, RE: STRUCT.

07 42 13.19 INSULATED METAL WALL PANELS

07 42 13.B1 PREFINISHED METAL WALL PANELS

07 61 13.A1 STANDING SEAM METAL ROOF

07 62 00.P7 PREFINISHED METAL DOWNSPOUT

V1_80 ARCHITECTURAL
Sheets
A-207 - ENLARGED BUILDING ELEVATIONS - SOUTH CONT.
A-210 - ENLARGED HANGAR ELEVATIONS - NORTH
A-211 - ENLARGED HANGAR ELEVATIONS - EAST
A-212 - ENLARGED HANGAR ELEVATIONS - SOUTH
A-213 - ENLARGED HANGAR ELEVATIONS - WEST