This is a Design Analysis document that provides details about the Bomber Agile Common Hangar (BACH) project at Tinker Air Force Base. It includes technical specifications and design requirements across multiple disciplines including electrical, telecommunications, life safety/fire protection, energy conservation, sustainability, and cybersecurity.
The document outlines design criteria for a 176,230 SF hangar facility with 137,700 SF of hangar bay space plus administrative and shop areas. Key requirements include: two electrical services (1,000 kVA and 1,500 kVA transformers), BACnet building management system integration, wet pipe sprinkler systems per NFPA 13, mass notification system integration, and compliance with UFC 1-200-02 sustainability requirements targeting 30% energy reduction over ASHRAE 90.1-2019 baseline. The facility must meet DoD Minimum Antiterrorism Standards and various cybersecurity requirements for control systems. The design includes dedicated spaces for B-52 maintenance with flexibility for future B-21 program needs. Notable technical requirements include draft curtains, static grounding systems, bridge cranes, and specialized HVAC systems designed for both all-electric and natural gas options pending waiver approval.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bomber Agile Common Hangar (BACH) Project No.: WWYK263009 Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 91 configuration, with bottle filler.
• Combination emergency shower and eyewash fixture will be freestanding stainless steel, with stainless steel showerhead, eyewash bowl, and dust cover. Emergency fixture tempering valve will be in a surface mounted cabinet.
• Hose bibbs will be cast brass with rough bronze finish and wheel handle operation. Wall hydrants will be freezeproof with loose key operation.
• Floor drains in finished areas will be cast iron body with nickel bronze heel proof grate. Floor drains in mechanical rooms, hangar bay, and work areas will be cast iron body with heavy duty tractor grate.
6.8 ENERGY MANAGEMENT SYSTEM
Building energy management and control system will be BACnet with MS/TP protocols in accordance with the UFGS guide specifications and will be mapped into the existing Tinker AFB UMCS front-end, Honeywell Enterprise Buildings Integrator (EBI).
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 92
SECTION 7 - ELECTRICAL
7.1 DESIGN CRITERIA
Refer to separate Section GENERAL, Subsection "General Design Guidance and Criteria" located at the beginning of this Design Analysis narrative.
ELECTRICAL
USACE ECB 2023-08 Electrification, Decarbonization, and Executive Order (E.O.) 14057., 22 June 2023
SAF/IEE Memorandum Electrification Policy Memo, 12022024
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings, 2019
IES Lighting Handbook Illuminating Engineering Society - The Lighting Handbook, 10th Edition
NFPA 70 National Electrical Code®, 2023
NFPA 70B Recommended Practice for Electrical Equipment Maintenance, current Edition
NFPA 70E Standard for Electrical Safety in the Workplace, current Edition
NFPA 101 Life Safety Code, 2024
UFC 1-200-01 w/ Chg. 2
DoD Building Code, September 1, 2022, with Change 2, 12 June 2023
UFC 3-490-06 w/ Chg. 1 Elevators, 8 June 2018 with Change 1, 13 January 2021
UFC 3-501-01 w/ Chg. 1
Electrical Engineering, October 6, 2015, with Change 1, 01 November 2019
UFC 3-520-01 w/ Chg. 2 Interior Electrical Systems, October 6, 2015, with Change 2, 12 April 2021
UFC 3-530-01 Interior and Exterior Lighting Systems, 09 February 2023
UFC 3-535-01 w/ Chg. 4 Visual Air Navigation Facilities, 11 April 2017 with Change 4, 25 April 2023
UFC 3-550-01 w/ Chg. 3 Exterior Electrical Power Distribution, 1 September 2016, with Change 3, 01 November
UFC 3-575-01 w/ Chg. 1 Lightning and Static Electricity Protection Systems, 01 July 2012 with Change 1, 01 October 2021
UFC 3-560-01 w/ Chg. 3 Operation And Maintenance: Electrical Safety, 24 July 2017 with Change 3, 15 May 2023
UFC 3-600-01 w/ Chg. 6 Fire Protection Engineering for Facilities, 08 Aug 2016, with Change 6, 6 May 2021
UFC 4-211-01 w/ Chg. 3 Aircraft Maintenance Hangars, 13 April 2017 with
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 93
Change 3, 20 April 2021
TAFB Electrical Standards, See Appendix 7.1
* And those listed under "All Design Disciplines" above.
See DA Section 0, General Design Guidance and Criteria
7.2 EXTERIOR ELECTRICAL DISTRIBUTION
7.2.1 Primary Service
All medium voltage primary work will be performed in accordance with Tinker Electrical Standards by the local electric utility, Oklahoma Gas & Electric (OG&E). Voltage, capacity of service, type of service, transformer size, etc.
are all determined by the utility, based on load information provided by Tinker.
Primary service is 12,470V, 3-phase, 4-wire, wye, multi-point grounded.
Primary service to the site will be underground.
7.2.2 Primary Source and Point of Connection
The primary system serving the facility is owned by OG&E. Preliminary coordination has determined the BACH construction contractor is responsible for the following:
• Provision of underground ducts and service lateral conductors from the utility transformer to the connection at the service entrance equipment.
• Furnishing service lateral compression lugs to OG&E.
• Coordinating with OG&E for all work related to the electric utility system during construction.
OG&E is responsible for the following:
• Primary service to the facility pad-mount transformer(s).
• Pad-mounted transformer(s) and pads.
• Termination of service lateral conductors (compression lugs furnished by the building contract) at the utility transformer and connection at the transformer secondary connection service points.
Analysis of the building electrical load sets aside the option to provide a single service for the building and warrants (2) electrical services to serve the hangar building. This configuration agrees with the guidance of UFC 3-520-01 and naturally coordinates with the building plan, north shops and south admin area separated by a large hangar bay. This configuration also supports design criteria for future electrification of the Hangar.
Hangar electrical service sizing calculations are provided in Appendix 7.2. As indicated in the calculations, the Hangar North service should be served from a 1,000 kVA transformer and the south service should be served from a 1,500 kVA transformer. Appendix 7.3 provides calculations for the proposed service
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 94 lateral conductors. These conductors remain sized to accommodate future electrification as agreed in the building de-electrification discussions.
Final transformer loading calculation will follow coordination with OG&E to determine the service source for all loads originating from the BACH project;
the Hangar (North and South), Lift Station, Hangar Doors, and Site Lighting.
One-line diagrams and panelboard schedules are provided in Appendix 7.4.
Additional calculations and any required revisions will be provided at the prefinal submittal. Sizing and feeders for the panelboards have not yet been designed for presentation on the one-lines, this will be completed for the prefinal submittal. Switchboard schedules will also be provided at prefinal.
7.2.3 Secondary Power
Agile Common Hangar
Secondary service to the facility will be 480Y/277 volt, 3-phase, 4-wire.
Secondary service will terminate on the service entrance rated main distribution low voltage switchboard located in each (2) main electrical rooms 110 and 016. One service will be designated the north service (room 016) and the second will be designated the south service (room 110). A third hangar service will be provided, as required by UFC 4-211-01, to serve the hangar bay doors. This service will originate within the north service entrance main switchboard ahead of the service overcurrent protection device. The service will terminate on a meter base and continue to a service entrance rated manual transfer switch located in the north main electrical room 016.
Sanitary Lift Station
The sanitary lift station is not dedicated to the BACH facility, therefore it will be provided an independent electrical service. Secondary service to this facility will be 480Y/277 volt, 3-phase, 4-wire. Secondary service will terminate on a meter and continue to a service entrance rated manual transfer switch in a NEMA 3R enclosure located adjacent to the lift station.
Site Lighting
The site lighting (fence line security and parking lot) is not dedicated to the BACH facility but serves the bomber campus, therefore it will be provided an independent electrical service. Secondary service to this campus infrastructure will be 480Y/277 volt, 3-phase, 4-wire. Secondary service will terminate on a meter and continue to a service entrance rated distribution panel in a NEMA 3R enclosure located on the site.
7.2.4 Special Conditions
SPD -- Surge Suppression Devices will be provided on the main switchboards for the facility and on the service overcurrent protection equipment for hangar door power, the sanitary lift station, and the site lighting panelboard. Primary Type 1 protection will be at each service entrance downstream of the service overcurrent protection device. Type 2 secondary protection as required by
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 95
NFPA 780 “Lightning Protection Systems,” UFC 5-520-01, and UFC 3-530-01 will be provided for each lighting or communications panelboard, and any panelboard that feeds exterior electrical equipment.
Surge devices will be shown on plan and noted on Panel schedules at the prefinal submittal.
The BACH facility hangar doors and the bomber campus sanitary lift station will be provided with an emergency backup generator connection and associated manual transfer switch.
7.2.5 Hazardous Locations
There are specific hazardous (NFPA 70, Classified) areas in the vicinity of aircraft located in the hangar bay. These areas extend (5) feet horizontally from any aircraft surface and vertically from (5) feet above the upper aircraft surface down to the floor. The Hangar Bay will generally be rated Class I, Division 2, for the areas noted above and throughout the room from finished floor up to (18) inches above finished floor. Pits or depressions below finished floor elevation will be rated Class I, Division 1.
Maintenance shops and other adjacent and communicating areas not suitably cut-off from the hangar bay will be rated Class I, Division 2 up to (18) inches above the finished floor. UFC 4-211-01 provided the criteria for suitably cutoff including solid walls with sealed openings extending a minimum (18) inches above finished floor or two normally closed (self-closing) doors in series and separated by a minimum of (5) feet.
The classification plans presented at 65% submittal also address special construction requirements related to activities planned for the Hangar Bay, LO Storage, PMD and associated Server Room and Entry Vestibule. Sheet keynotes on the plan describe the means and methods required to accommodate the planned use of these rooms.
7.2.6 Lightning Protection
A Lightning Protection Risk Assessment has been performed in accordance with NFPA 780 to determine that a Lightning Protection System shall be installed at the facility. This assessment is provided in Appendix 7.5. The main hangar roof is standing seam metal on structural steel framing. Air Force criteria prefers that metal roof, steel framed construction not be provided with air terminals as the structural steel framing and metal roof assembly is considered a unitary air terminal. Administrative spaces and shop spaces on the hangar north and south sides employ mixed roof types and a combination of standing seam metal and other roof materials with a combination of structural steel and precast concrete support structure. These areas are provided with lighting protection using dedicated air terminals and an associated roof/down conductor system due to the proximity of the boundary of the cone of protection. Each down conductor will be bonded to the building grounding ring in a test well.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 96
7.2.7 Security Requirements
Refer to SECTION 10 – ANTITERRORISM / FORCE PROTECTION of this Design Analysis.
7.2.8 Cathodic Protection
The project specifications provide Tinker BACH with underground raceways without metal to earth contact.
7.2.9 Communications
7.2.9.1 Site Communications
Refer to SECTION 8 - TELECOMMUNICATIONS of this Design Analysis.
7.2.9.2 Cable Television
Refer to SECTION 8 - TELECOMMUNICATIONS of this Design Analysis.
7.2.10 Public Address System
No public address system will be provided for this project.
7.2.11 Fire Alarm/ Mass Notification
Refer to SECTION 9 - LIFE SAFETY - FIRE PROTECTION of this Design Analysis.
7.2.12 Exterior Site Lighting
Exterior light fixtures will be LED type fixtures. Area lighting fixtures at the hangar will be mounted on the face of the facility. All site lighting fixtures at the hangar will be powered from the building and be provided with a programmable control system with a timeclock/photocell. Parking lot lighting will be powered from existing electrical distribution serving the existing parking lot. Perimeter fence security lighting will be powered from dedicated site lighting circuits originating from dedicated service equipment and a pad mounted transformer as coordinated with OG&E.
Site lighting calculations are provided in the Electrical Appendix.
7.3 INTERIOR ELECTRICAL DISTRIBUTION
7.3.1 Characteristics
The utilization voltage throughout the facility will be 480Y/277, 3-phase, 4-wire. Service sizes are estimated to be 2,000 amps at the south service and 2,500 amps at the north service. A switchboard lineup will be provided for each main service disconnecting means.
The switchboards will be front accessible in accordance with NEMA PB2 and UL891. The switchboard will be provided with hinged fronts for maintenance and safety.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 97
The 480Y/277V distribution will provide power to lighting, elevator and other large equipment, and large mechanical loads (greater than or equal to ½ horsepower). Dry-type transformers will step down the 480V to a 208Y/120V, 3 phase 4-wire distribution that will provide service to small mechanical loads, general-purpose receptacle loads, and miscellaneous loads at 120V.
Advanced electrical metering will be provided per ASHRAE 90.1 requirements and Base Electrical standards. In most applications, copper THHN/THWN wiring will be provided in EMT conduit to serve loads in the building.
All panelboards will have copper buses and be provided with main circuit breakers and branch/feeder circuit breakers. Distribution and branch panelboards will be provided with bolt-on type circuit breakers. A dedicated panelboard will be provided in each telecommunications room for electrical loads within those rooms. All panelboards will be provided with a minimum of 15% spare load capacity and 20% spare devices for future use.
Receptacles for general purposes will be of 120V, 20-amp, duplex, NEMA WD 1 type. Ground fault circuit interrupter receptacles will be provided for bathrooms, kitchens, outdoor receptacles, and elsewhere as required by NFPA 70. A minimum of one (1) general purpose receptacle will be provided in each room. Offices and other administrative spaces are provided with a minimum of one general purpose convenience receptacle on each wall. Each cubicle or private office will be provided with one designated computer receptacle as described in Tinker Electrical Standard. Outdoor GFCI receptacles are provided with weatherproof while in use covers. All receptacles and circuiting will be provided as required by Tinker Electrical Standard.
The hangar bay generally has not been designed as a wet or damp location.
Devices adjacent to water sources, and other locations designated in NFPA 70 will be provided with ground fault circuit interruption.
Automatic receptacle control will be provided in accordance with ASHRAE
90.1. Offices, break rooms, conference rooms, classrooms, copy rooms, and individual workstations (those in the hangar bay for example) will have 50% of all receptacles, and 25% of system furniture branch circuits turned off within 20 minutes of vacancy. Sensors supporting this function are shared with the lighting control system.
7.3.2 Lighting
All lighting will be LED type and comply with the requirements of Tinker Electrical Standards. Light levels and uniformity will be per UFC 3-530-01.
Lighting in general throughout the facility will consist of 2’ by 2’ lay-in volumetric fixtures, linear 4’ fixtures, and suspended direct/indirect fixtures.
Linear pendant type fixtures will be located in the offices and open admin areas. The lay-in type fixtures will be located in the break rooms and corridors. Mechanical, electrical, communication and storage areas will utilize industrial type strip fixtures. Restrooms will utilize recessed lay-in lighting and
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 98 perimeter lighting will utilize wall-pack style fixtures. Hangar Bays will utilize high bay type fixtures.
All spaces will be provided with manual (toggle switches) and automatic lighting controls as required per NFPA 70, UFC 3-530-01, and ASHRAE 90.1.
Automatic shut-off systems and/or occupancy sensors will be provided to help reduce energy costs. Occupancy sensors will be dual-technology (ultrasonic and infrared) and will be provided in accordance with ASHRAE 90.1. Daylight harvesting sensors will be provided where applicable and as required by ASHRAE 90.1 to dim lighting levels when sufficient daylight is present in the space. Dimming drivers, multi-level switching and daylight harvesting sensors will be provided with daylighting systems. All control systems will meet the requirements of NFPA-101.
Controls are described on the 65% submittal using the control legend presented on sheet EL701 and corresponding symbols on the lighting plans.
Additional control system including switches, sensors, and zones will be presented at prefinal. Lighting calculations are provided in Appendix 7.6.
7.3.3 Emergency Lighting
Emergency lighting will be in accordance with NFPA 101, International Building Code, and the National Electrical Code, at a minimum. This will be achieved through integral battery packs in the fixtures and central backup systems in the hangar bay, a central system will be provided for each half of the bay. The exterior egress path will be illuminated by dedicated emergency egress fixtures. Emergency lighting in the storm shelter areas will provide 2-hour emergency lighting through the use of appropriately rated emergency battery units.
7.3.4 Wiring
All branch wiring conductors will be stranded copper and of type THHN/THHW or THWN-2. The minimum conductor size is #12 AWG.
Conductors will be provided with type THW insulation for sizes #12 through #1, and type THHN/THWN-2 for conductor sizes #1/0 and larger. The minimum branch circuit size will be 20 amps, unless recommended or required by equipment manufacturers. All feeders and branch circuits will be provided with a separate grounding conductor.
Electrical Metal Tubing (EMT), Intermediate Metallic Conduit (IMC) and Rigid Galvanized Steel (RGS) conduit will be used for interior wiring circuits.
Conduits in finished areas will be installed, concealed in the walls and above ceilings in EMT conduit. All conduit installed exposed and areas subject to damage will be RGS.
7.3.5 Grounding
A grounding system will be provided for the Agile Common Hangar building.
The grounding system consists of a main ground bus bar located in each main electrical room, ground bus bars located in each additional electrical
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 99 room, telecommunications main grounding bus bar located in the main communications room, telecommunications grounding bus bars located in each additional telecommunications room, equipment grounding bus bars located in specific areas for equipment grounding. Ground connections are made to each of the following grounding electrodes: the lightning protection ground loop, incoming water service, concrete encased electrodes, and building steel.
A dedicated static grounding system will be provided throughout the hangar bay and other select shops and below the Server Room access floor. The grid in the hangar bay will provide aircraft static grounding points on an approximate 52’ grid pattern, while shops will be provided with static bonding bars only where requested by the users. Code required bonding between the static grounding system and the building lightning protection grounding will be provided in test wells outside each corner of the hangar bay.
7.3.6 Telecommunications
Refer to SECTION 8 - TELECOMMUNICATIONS of this Design Analysis.
7.3.7 Secure Communications
Refer to SECTION 8 - TELECOMMUNICATIONS of this Design Analysis.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 100
SECTION 8 - TELECOMMUNICATIONS
8.1 DESIGN CRITERIA
Refer to separate Section GENERAL, Subsection "General Design Guidance and Criteria" located at the beginning of this Design Analysis narrative.
ELECTRICAL
Army Technical Criteria Technical Criteria for the Installation Information Infrastructure Architecture (I3A), dated February 2010. (OSP Only)
UFC 3-580-01 w/ Chg 1 Telecommunications Interior Infrastructure Planning and Design, 01 June 2016 with Change 1, 01 June 2016 (ISP Only)
NFPA 70 National Electrical Code®, 2023
NFPA 80 Standard for Fire Doors and Other Opening Protectives, 2022
NECA/BICSI 568 Standard for Installing Building Telecommunications Cabling
ANSI/TIA-568 Telecommunications Cabling for Customer Premises
ANSI/TIA-569 Commercial Building Standard for Telecommunications Pathways and Spaces
ANSI/TIA-606 Labeling Administration Standard for the Telecommunications Infrastructure
ANSI/TIA-607 Telecommunications Bonding and Grounding (Earthing) for Customer Premises
ANSI/TIA-758 Customer-Owned Outside Plant Telecommunications Infrastructure Standard
2020 TAFB Standards Tinker Air Force Base Electrical Standards 2020
* And those listed under "All Design Disciplines" above.
8.2 SITE TELECOMMUNICATIONS SERVICE
Telecommunications services for the Bomber Agile Common Hangar (BACH) facility will be connected to the Tinker Air Force Base, OK operated telecommunications utilities. The base will bring the new services to a new hand hole near the Central Utility Plant (CUP) building. From there, the services will be extended by the contractor.
Point of Contact: Gary Pfeiffer with the Base Communications Group.
gary.pfeiffer.1@us.af.mil mailto:gary.pfeiffer.1@us.af.mil
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 101
Contractor shall be responsible for: Providing and installing a hand hole near the CUP building, then extending (2) 4” conduits through the utility corridor to the BACH. Contractor will also provide and install both (1) 24 strand single-mode fiber optic and (1) 25pair copper back bone cable through the conduit to the BACH.
8.3 INTERIOR TELECOMMUNICATIONS DISTRIBUTION
The telecommunications structured cabling system will be provided per UFC requirements, base requirements, and will tie into switch, server, and LAN equipment that will be GFGI. The main infrastructure will consist of equipment racks, backboards, patch panels, conduit and cable tray, copper category 6 horizontal cabling, RJ-45 plugs and jacks, etc. The system will be provided to accommodate VoIP, NIPR data and SIPR data in the future. The design will follow all requirements of the UFC and the base.
8.4 CABLE TELEVISION (CATV) SERVICE
Cable Television will be provided in dedicated spaces throughout the facility.
The Cable will run underground into the demark location in the main Telecommunications Room, then it will be dispersed from this point to each individual cable television outlet locations. The cable into the TR will be installed by the service provider. The distribution inside the building will be provided and installed by the contractor.
8.5 AUDIO VISUAL (AV) SERVICE
Pathways and outlet boxes will be installed per base needs and requirements to facilitate AV system equipment provided and installed by the base.
8.6 ELECTRONIC SECURITY SYSTEM (ESS) SERVICE
Pathways and outlet boxes will be installed per base needs and requirements to facilitate ESS equipment provided and installed by others.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 102
SECTION 9 - LIFE SAFETY - FIRE PROTECTION
9.1 GENERAL PARAMETERS
This project consists of the construction of a new Bomber Agile Common Hangar (BACH), a two-story maintenance hangar to be used for the B-52 mission with flexibility for the future B-21 program. The project is located at the new proposed new bomber campus at Tinker Air Force Base, Oklahoma City, Oklahoma. The roughly 176,230-SF building will primarily contain approximately 137,700 SF of hangar bay, associated shops and administrative area, and required support spaces. See DA Section 0 General, and Section 4 Architectural for more general parameter information.
The BACH will be fully sprinkler-protected utilizing automatic wet pipe sprinkler systems installed in accordance with NFPA 13, UFC 3-600-01, and UFC 4-211-01, incorporating the DoD foam sundown policy.
Fire protection designs for the BACH will be in accordance with the applicable International Building Code, the Department of Defense Unified Facilities Criteria, and National Fire Protection Association codes.
9.2 DESIGN CRITERIA
Refer to separate Section GENERAL, Subsection "General Design Guidance and Criteria" located at the beginning of this Design Analysis narrative.
UFC 1-200-01 w/ Chg 2 DoD Building Code, 01 September 2022, with Change 2, 12 June 2023
UFC 3-600-01 w/ Chg 6 Fire Protection Engineering for Facilities, 08 Aug 2016, with Change 6, 6 May 2021
UFC 4-021-01 w/ Chg 1 Design and O&M: Mass Notification Systems, 09 April 2008, including Change 1, January 2010
UFC 4-211-01 w/ Chg 3 Aircraft Maintenance Hangars, 13 April 2017, with Change 3, 20 April 2021
IBC International Building Code, 2021
(as adopted by UFC 1-200-01)
NFPA 10 Standard for Portable Fire Extinguishers, 2022
NFPA 13 Standard for the Installation of Sprinkler Systems, 2022
NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances, 2022
NFPA 72 National Fire Alarm and Signaling Code, 2019
NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems, 2021
NFPA 101 Life Safety Code, 2024
NFPA 409 Standard on Aircraft Hangars, 2022
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 103
(as adopted by UFC 4-211-01)
9.3 ANTI-TERRORISM AND FORCE PROTECTION (AT/FP)
Refer to SECTION 3 STRUCTURAL and SECTION 10 ANTITERRORISM FORCE PROTECTION of this Design Analysis.
9.4 BUILDING AND LIFE SAFETY CODE ANALYSIS
9.4.1 Use and Classification of Occupancy
BACH is classified as a Group I hangar by IBC and NFPA 409. Aircraft storage and repair facilities are classified as Moderate-Hazard Storage (Group S-1) use occupancies by IBC as are the support storage areas.
The administrative support office areas are classified as Business (Group B) use occupancies by IBC.
The shop and maintenance areas are classified as Moderate-Hazard Factory Industrial (Group F-1) use occupancies by IBC.
There are accessory Assembly (Groups A-2 and A-3) use areas for meeting and dining (break) / tornado shelter spaces.
9.4.2 Mixed Use and Occupancy Separations
The BACH is a nonseparated, mixed-use building of Groups B, F-1, and S-1 use areas with accessory Group A-2 and A-3 areas.
9.4.3 Incidental Uses
There are no rooms or areas within the BACH that fit the IBC Table 509.1 definitions of Incidental Uses.
9.4.4 Construction Type
The BACH is of Type IIB noncombustible, unprotected construction as permitted by IBC. Column Protection is not required (UFC 4-211-01).
9.4.5 Height and Area Limitations
The BACH is an unlimited area building of Groups B, F, and S use occupancies in accordance with IBC §507.5. There are more than 60 feet of clearance around the BACH and the facility will be sprinkler-protected throughout.
9.5 WATER SUPPLY FOR FIRE PROTECTION
Provided fire pump test data from October 2022 testing indicates that two 1,500-gpm fire pumps are located west of the BACH location in Buildings 2119 and 2123. These fire pumps each produced 115 psi at 1,500 gpm and are connected to a 12-inch underground fire line running north-south along the west side of South Douglas Boulevard. These fire pumps are supplies from an adjacent ground water storage reservoir reported to be of 400,000-
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 104 gallon capacity. The connect fire main is similarly fed by multiple other fire water reservoir/pump arrangements.
Based on the fire pump performance information and hydraulic estimations, the existing water supply will meet the expected BACH fire water demand.
Information about the fire suppression design is in a later section.
The new 12-inch fire main will be routed under South Douglas Boulevard to the Bomber Campus to supply the BACH sprinkler risers. It remains to be determined if a check valve or isolation valve (in a vault) should be provided to permit a higher pressure or isolated zone in the Bomber Campus in the future when the Central Utility Plant fire water tanks / pumps are installed.
In accordance with UFC 4-211-01 site fire hydrants will be supplied from the domestic water underground utility lines. Hydrants will be spaced at maximum 300-foot intervals around the BACH, but not in front of hangar bay door openings; since the hangar bay doors are more than 360 feet wide, a hydrant must be placed at either side of both openings. The minimum service size for the fire hydrants will be 6 inches. A shut-off valve will be provided at each hydrant. One of the new fire hydrants will be located within 150’ of the fire department connection to the sprinkler risers for both buildings.
9.6 FIRE SUPPRESSION SYSTEMS AND OTHER EXTINGUISHING
EQUIPMENT
9.6.1 Sprinkler System Design
An automatic wet pipe sprinkler system will be used to protect the BACH. The maximum floor area supplied by one sprinkler system riser shall be designed in accordance with NFPA 13 §8.2 System Protection Area Limitations. The sprinkler system will be designed per UFC 3-600-01. The discharge requirements for non-storage occupancies must be in accordance with Table 9-3, unless otherwise noted in UFC 3-600-01 and/or UFC 4-211-01. Storage sprinkler protection will be in accordance with NFPA 13, and UFC 3-600-01.
UFC 3-600-01 Table 9-3 only covers ceiling heights up to 100 feet, however the highest deck elevation in the BACH is expected to be more than 109 feet above the finished floor. In the absence of protection criteria for roofs higher than 100 feet, the 100-foot protection solution is applied throughout the hangar bay area. This protection is designed to provide an Extra Hazard density in the form of twelve K-25.2 sprinklers designed to flow with at least 7 psi at the hydraulically most remote sprinkler. This protection is designed to flow for at least 90 minutes. There are no inside hose stations and outside hose streams are not factored in the calculation as the hydrants are to be connected to the domestic water system (not the fire water utility). The admin and support areas are protected as Light or Ordinary Hazard occupancies in accordance with UFC 3-600-01 as indicated on the fire protection drawings.
Sprinkler protection design for the shops and storage areas around the perimeter of the hangar are based on the commodities (hazardous materials)
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 105 and storage arrangements contained within each space. Information needed for these analyses was not available with sufficient time to make determinations and perform the associated hydraulic verification calculations.
This will be the next step taken after the 65% submission.
Sprinkler system shall be designed to meet Seismic Design Category B and in accordance with NFPA 13. As a Seismic Design Category B, seismic bracing of sprinkler piping is not required.
9.6.2 Fire Extinguishers
Portable (and wheeled) fire extinguishers must be provided in accordance with UFC 4-211-01, NFPA 409, and NFPA 10.
9.7 MASS NOTIFICATION, FIRE ALARM DETECTION, REPORTING AND
COMMUNICATION
9.7.1 Mass Notification System
A mass notification will be provided for the BACH. The system will consist of combination fire alarm/mass notification speakers located to provide audible / intelligible instructions at all locations in and around the buildings. Strobes will also be provided to alert the hearing-impaired occupants of the facility. All devices will be tied into a control unit with a battery backup supply that will be connected to the building Fire Alarm System. There will be local operator consoles located within the buildings for voice warning and control.
9.7.2 Fire Alarm System
There will be a combined FACU/MNCP installed in an electrical room. A fully addressable fire alarm system will be provided for the BACH in accordance with NFPA 72, UFC 3-600-01, and UFC 4-211-01. The annunciation system will consist of combination fire alarm / mass notification speakers, speaker / strobes, strobes, exterior speakers, exterior strobes, and remote annunciator panel / local operator consoles. HyperSpike (or alternative) high-fidelity notification is proposed for the hangar bay area to increase audibility and intelligibility in the open expanse. The initiation system will consist of manual fire alarm boxes, spot-type smoke and heat detectors located as required by code, duct-type smoke detectors, optical flame detection, waterflow switches, tamper switches, and other fire suppression supervision. The presence of gas burning appliances requires carbon monoxide (CO) detection in some, but not all, rooms where such equipment is contained. The size of the room and the height of the ceiling are factors in these design element decisions in accordance with UFC 3-600-01, Section 9-19.
The fire alarm reporting system shall have the capability to report to the base fire department / monitoring station in accordance with local base requirements.
9.8 DRAFT CURTAINS
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 106
UFC 4-211-01 requires draft curtains in accordance with NFPA 409. The draft curtains are proposed of steel construction (26-gauge or thicker) and arranged to create rectangular areas no larger than 7,500 SF. The BACH draft curtain depth (dmin) must be at least as deep as the Hmax divided by 8, where Hmax is the Maximum Roof Height as measure from the finished floor.
dmin: 109’-6” ÷ 8 = 13’-8¼"
9.9 FIRE AND SMOKE DAMPERS
Approved fire dampers shall be provided where air ducts penetrate or terminate at openings in walls or partitions required to have a fire resistance rating of 2 hours or more. (NFPA 90A §3.3.1.1, IBC §706, and IBC §711.3.3)
Approved fire dampers shall be provided in all air transfer openings in partitions that are required to have a fire resistance rating and in which other openings are required to be protected. (NFPA 90A §3.3.1.2, IBC §708)
Smoke dampers are not required.
9.10 INTERIOR FINISHES
Interior Finish Egress Corridors: Class A or Class B Interior Finish Materials Requirements (NFPA 101 §7.1.4)
Typical Rooms: Class A, Class B or Class C Interior Finish Materials (NFPA 101 §10.2)
Typical Floors: Class I or Class II (NFPA 101 §10.2)
9.11 ILLUMINATION OF MEANS OF EGRESS
Illuminated emergency remote heads powered through battery packs will be located on the exterior of the building at each exit door (NFPA 101 §7.8).
9.12 EMERGENCY LIGHTING
Reference the electrical lighting paragraph 7.3.3 that specifies egress and emergency lighting (NFPA 101 §7.9).
9.13 MARKING MEANS OF EGRESS
All exist and passageways leading to an exit will be provided with illuminated emergency exit signs with emergency battery backup (NFPA 101 §7.10).
9.14 ELEVATORS
The elevator, shaft, and associated machine room will be protected from the remainder of the BACH by 1-hour fire resistance-rated construction. Fire sprinkler protection and fire alarm interface with the elevator will be in accordance with NFPA 13, NFPA 72, and UFC 3-600-01.
9.15 ACCESSIBILITY REQUIREMENTS
Accessibility design follows the guidelines established in DOD Policy Letter
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 107
31 Oct 2008-- OSD 09758 08 Access for People with Disabilities. This document cites Americans with Disabilities Act – Accessibility Guidelines (ADAAG) as issued 31 October 2008.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 108
SECTION 10 - ANTITERRORISM / FORCE PROTECTION
10.1 APPLICABLE CODES AND STANDARDS
Refer to Section GENERAL, Subsection "General Design Guidance and Criteria" located at the beginning of this Design Analysis narrative.
Physical Security and
AT/FP
UFC 4-021-02 w/ Chg 1 Electronic Security Systems, 1 October 2013 with Change 1, 11 September 2019
* And those listed under "All Design Disciplines" above.
10.2 PERIMETER AND ENTRANCES
10.2.1 Building Perimeter
The Bomber Agile Common Hangar (BACH) is to be constructed within the secure perimeter of Tinker AFB which has a guarded gate manned 24 hours per day. Permanent fencing is required for this project. Temporary construction fencing and access control will be required to allow the contractors access for construction while keeping the existing facilities accessible, yet secure from construction personnel.
10.2.2 Building Entrances
Security access control will be provided at the construction access points during project construction work.
10.2.3 Clear Zones
10.2.4 Restricted Areas
10.2.5 Patrol Roads
10.2.6 Fencing
The entire facility is to be surrounded by fencing. The existing perimeter fence will be extended around the new construction of the Hangar and apron expansion to bring the entire site inside the secure perimeter. The only gates are at the POV entrance and the Tow Way entrance.
10.3 MASS NOTIFICATION
Refer to SECTION 9 – LIFE SAFETY – FIRE PROTECTION of this Design Analysis.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 109
10.4 ANTI-TERRORISM / FORCE PROTECTION
10.4.1 Building Category Per UFC 4-010-01
The BACH is considered by UFC 4-010-01 to have a building category of “Inhabited” because the occupancy exceeds 11 personnel and the population density is greater than the threshold of one person per 430 gross square feet.
10.4.2 Standoff Distance and Applicable Explosive Weight
The facility is within a controlled perimeter, and per the standards of the recently revised UFC 4-010-01 (12 December 2018) standoff distances and explosive weights need not be considered for buildings within an installation perimeter unless specifically required by and elevated Design Basis Threat.
As a Design Basis Threat has not been established for this building by the installation in accordance with Section 1-15.1 of UFC 4-010-01, only the minimum standards will apply.
10.4.3 Applicable Standards
UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, 12 Dec 2018.
The BACH is new construction and shall comply with UFC 4-010-01.
10.4.4 Chapter 3 Standards
• Standard 1. Standoff Distances
The building is within the installation perimeter of Tinker AFB;
therefore, standoff distances do not apply.
o Minimum Standoff Distance
The building is not near an installation perimeter; therefore, the minimum standoff of 50’ to the installation perimeter does not apply.
o Clear Zone
N/A. Building is not near the clear zone at an installation perimeter.
• Standard 2. Unobstructed Space
Unobstructed space will extend 33 ft out from the building.
Obstructions will be avoided that would allow concealment from observation of devices with dimensions of no less than 6”. Will ensure that trees and shrubs have no foliage extending lower than 3 ft above the ground.
o Concealment
Devices will be observable from at least one direction.
o Trash Containers
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 110
Trash containers will not be within the unobstructed space.
o Electrical and Mechanical Equipment
Equipment located within unobstructed spaces will not provide opportunities for concealment of explosives.
o Fuel Tanks
N/A. No fuel tanks.
o Enclosures
N/A. No equipment enclosures necessary.
o Walls and Screens
N/A. No walls or screens will be located within the unobstructed space.
o Parking within Unobstructed Spaces
Parking is allowed within the unobstructed space.
o Adjacent Existing Buildings
There are no existing buildings located within 33ft of the building.
• Standard 3. Drive-Up/Drop-Off Areas
N/A in current UFC.
• Standard 4. Access Roads
N/A in current UFC.
• Standard 5. Parking Beneath Buildings or on Rooftops
N/A. There will be no parking beneath the building or on the rooftop.
• Standard 6. Progressive Collapse Resistance
N/A. Building is not 3 stories; therefore, the requirements of UFC 4- 023-03 do not apply.
• Standard 7. Structural Isolation o Building Additions
N/A. No building additions.
o Portions of Buildings
N/A. No portions of the building are considered Low Occupancy.
• Standard 8. Building Overhangs and Breezeways
N/A. No Overhangs or Breezeways.
• Standard 9. Exterior Masonry Walls
N/A. No exterior masonry walls.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 111
• Standard 10. Glazing
Glazing in compliance with the current UFC is not required to be designed or constructed for blast resistance.
o Glazing
The minimum laminated glazing makeup will be provided of ¼” outer lite and a ¼” laminated lite consisting of two nominal 1/8” panes bonded together with a minimum of 0.030” PVB interlayer.
Frame bite will be in accordance with ASTM F2248.
o Exterior Stairwells, Vestibules, and Covered or Enclosed Walkways
Any glazing in stairwells, vestibules, or covered or enclosed walkways will meet the provisions of the UFC.
o Replacement with Wall or Roof Systems
N/A. No infill of existing windows or skylights.
o Alternative Window Treatments
N/A. New building; therefore, no window retrofits.
• Standard 11. Building Entrance Layout
N/A. Building is not outside of an installation perimeter and the entrance does not face an installation perimeter.
o New Construction
Main entrance does not face an uncontrolled vantage point.
o Existing Buildings
N/A. Not an existing building.
• Standard 12. Exterior Doors
Exterior doors will open outwards.
o Glazed Doors
Glazing in and around doors will meet Standard 10.
o Sliding Glass Doors and Revolving Doors
N/A. Not used.
o Overhead Doors
N/A. No AT requirements for overhead doors.
• Standard 13. Mail Rooms and Loading Docks
This standard is not required for the loading dock. All supplies being delivered to the facility will be initially screened at a central mail or supplies handling facility.
o Location
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 112
N/A o Proximity
N/A
• Standard 14. Roof Access o New Construction
No external roof access.
o Existing Buildings
N/A.
• Standard 15. Overhead Mounted Architectural Features
Overhead items weighing more than 31 lbs will be designed to resist a force in the horizontal direction equal to 0.5 times the component weight and 1.5 times the component weight in the downward direction.
• Standard 16. Air Intakes o New Construction
All air intake louvers are located at least 10 ft above the ground.
o Existing Buildings
N/A.
• Standard 17. Mail Room and Loading Dock Ventilation
This standard is not required for the loading dock. All supplies being delivered to the facility will be initially screened at a central mail or supplies handling facility.
o Other Heating and Cooling Systems
N/A.
o Dedicated Exhaust Systems
N/A.
o Outside Intakes, Relief, and Exhausts
N/A.
o Isolation Controls
N/A.
o Walls and Ceiling Joints and Doors
N/A.
• Standard 18. Emergency Air Distribution Shutoff
An emergency shutoff switch for the HVAC system is provided.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 113 o Outside Air Intakes, Relief Air, and Exhausts
Low leakage dampers are provided.
o Critical Areas
N/A.
o Unoccupied Areas
N/A.
o Fan Coil Units and Air Conditioners
Will be controlled by emergency shut off switch.
• Standard 19. Equipment Bracing
All overhead utilities and fixtures weighing more than 31 lbs, excluding distributed systems, will be braced. Mountings will resist a horizontal force equal to 0.5 times the equipment weight and a downward force of 1.5 times the equipment weight.
• Standard 20. Under Building Access
N/A. No crawl space or utility tunnels provided.
• Standard 21. Mass Notification
Mass Notification in accordance with UFC 4-021-01 is provided.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 114
SECTION 11 - CYBERSECURITY
11.1 GENERAL
This narrative describes the process and requirements for implementing the Risk Management Framework (RMF) for cybersecurity of Facility-Related Control Systems (FRCS) for The Bomber Agile Common Hanger, at Tinker Air Force Base, Oklahoma. Further requirements are included in UFC 4-010- 06: Cybersecurity of Facility-Related Control Systems, and other references listed below. The Systems identified below are anticipated and additional systems could be identified later in the design process. Refer to the associated sections in this document for additional information on FRCS.
11.2 DESIGN CRITERIA
Refer to separate Section GENERAL, Subsection "General Design Guidance and Criteria" located at the beginning of this Design Analysis narrative.
11.3 CONTROL SYSTEMS
11.3.1 Fire Alarm/Mass Notification System (FAMNS)
All building management control systems (BMCS) and the fire alert/suppression/mass notification system will include a comprehensive cybersecurity design. The fire suppression/mass notification system communicates to the central alarm center via Monico BT-XM radio transceiver/receiver operating on a narrowband frequency and will be fully compatible with the Monico D-21 Central Receiving System. The vendor will be responsible for ensuring the controls installed meet or exceed Unified Facilities Criteria 4-010-06 or current policy.
The anticipated level of work is to prepare the building level controls and provide documentation to support the System Owner. Applying cybersecurity to the fire alert/suppression/mass notification system must occur at the following levels per the UFC-04-010-06 Change 1:
• Level 0 (Sensors and Actuators)
• Level 1A (Non-IP Controllers)
• Level 2A (IP-Based Controllers)
• Level 3 (Wireless)
The vendor will not be responsible for the authority to operate (ATO). There is no proposed traditional IT involved in the project for the Fire Alarm. The vendor’s responsibility is to deliver a hardened system in accordance with the UFC and UFGS.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 115
The proposed Confidentiality, Integrity, and Availability (CIA) of the system is Confidentiality – Low, Integrity – Low, Availability – Moderate.
The proposed system owner is to be Tinker Air Force Base Civil Engineering, unless confirmation from the government is received that another system owner exists.
11.3.2 Heating Ventilation and Air Conditioning
All building management control systems (BMCS) will include a comprehensive cybersecurity design. DDC is managed via an operator workstation, via the ethernet, which is connected to the base-wide AFCEC Community of Interest Network Enclave (COINE) network. The base currently has two HVAC systems on their ATO, Honeywell EBI and Tridium ABS. The Bomber Agile Common Hangar will be managed through the Honeywell EBI system. All mechanical equipment will be BACnet compatible and connected through the Honeywell EBI DDC system. The DDC will be capable of connection to the EMCS via the CE VLAN. The vendor will be responsible for ensuring the controls installed meet or exceed Unified Facilities Criteria 4-010-06 or current policy. The anticipated level of work is to prepare the building level controls and provide documentation to support the System Owner. Applying cybersecurity to the DDC/HVAC must occur at the following levels per the UFC-04-010-06 Change 1:
• Level 0 (Sensors and Actuators)
• Level 1A (Non-IP Controllers)
• Level 2A (IP-Based Controllers)
• Level 4B (Workstations)
The vendor will not be responsible for the ATO. The vendor’s responsibility is to deliver a hardened system in accordance with the UFC and UFGS. The construction contractor will be responsible for ensuring all required cybersecurity controls are implemented during installation and the system owners will assume responsibility of cybersecurity posture following the
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 116 installation.
The proposed Confidentiality, Integrity and Availability of the system is Confidentiality – Moderate, Integrity – Moderate, Availability – Moderate.
The proposed system owner is to be Tinker Air Force Base Civil Engineering, unless confirmation from the government is received that another system owner exists.
11.3.3 Lighting Control System
It is anticipated that there will be no traditional IT involved in the Lighting Control System. The primary concern is cybersecurity during construction.
There is no anticipation of the need for an Authority to Operate.
The vendor will be responsible for ensuring the controls installed meet or exceed Unified Facilities Criteria 4-010-06 or current policy. The anticipated level of work is to prepare the building level controls and provide documentation to support the System Owner. The anticipated level of work is at Level 1 and below as illustrated on Figure 2-1 5 Level Control System Architecture in UFC 4-010-06. The vendor will not be responsible for the ATO. The vendor’s responsibility is to deliver a hardened system in accordance with the UFC and UFGS with a baseline set of documentation.
There currently appears to be no need for a CIA Impact Rating or Control Sets for this platform.
Tinker Air Force Base, Oklahoma 65% Design Submittal
Design Analysis - 117
SECTION 12 - ENERGY CONSERVATION
12.1 EXECUTIVE SUMMARY
The United Facilities Criteria (UFC) requires new construction to achieve a 30% energy cost savings over an ASHRAE 90.1-2019 Appendix G baseline while also being Life Cycle Cost Effective (LCCE). The design team analyzed several energy efficiency measures (EEMs) for both energy cost savings and LCCE using energy modeling and Life Cycle Cost Analysis (LCCA) software.
The EEMs analyzed included envelope, electrical, lighting, service hot water, HVAC, and onsite renewable energy improvements. The results of the analysis include recommendations for bundling EEMs together for a design that meets the UFC requirements.
12.2 APPLICABLE CODES AND STANDARDS
UFC 1-200-02 requires commercial buildings to meet the requirements of ASHRAE 90.1-2019 Appendix G and be LCCE. ASHRAE 90.1-2019 Appendix G Performance Rating Method (PRM) requires project designs to have a proposed Performance Cost Index (PCI) that meets or exceeds a baseline Performance Cost Index target (PCIt).