DRAFT Attachment 0131 - As_Built Configuration List(3).docx

DOCX document 26 KB Posted

Attached to
Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On
Solicitation number
W56HZV-20-R-0072
Issued by

About this file

This document outlines requirements for an As-Built Configuration List to be provided under a federal contract. The As-Built Configuration List must include key product details down to the lowest procured level for all items delivered under the contract, including nomenclature, part numbers, serial numbers, manufacturer and other relevant tracing data. It must also include software details, National Stock Numbers, quantities, Work Breakdown Structure names and other configuration management information.

A separate document provides details for an upcoming federal contract opportunity to procure additional Joint Light Tactical Vehicles. The Joint Program Office plans to release a draft RFP in March 2020 and competitively award a five-year contract with five one-year options for follow-on production of the vehicle family. An industry day with presentations is scheduled for February 24-25, 2020 to provide details on the acquisition approach and technical data package. One-on-one discussion sessions and a static vehicle display will also be held on the 25th. Questions are due by specified dates in February and the agency plans to post answers by April 30, 2020.

View the file

Other files

File Type Posted
220121_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A).pdf PDF
JLTV FOC - Industry Day for DRAFT RFP3.pptx PPTX presentation
2021 SANG Vetting Form A2 Static Display.xlsx XLSX spreadsheet
DRAFT Attachment 0107 - Project Expenditure Report(3).xlsx XLSX spreadsheet
DRAFT Attachment 0151 - EDFP Data Righs.pdf PDF
DRAFT Attachment 0144 - Data Requirements Form for Acquisition Requirement Package (ARP).pdf PDF
DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx DOCX document
DRAFT Attachment 0179 - Small Business Participation Cert.pdf PDF
DRAFT Attachment 0173 - Production Process Site Visit Plan.docx DOCX document
DRAFT Attachment 0122 - JLTV FoV Master Task List.xlsx XLSX spreadsheet
DRAFT Attachment 0117 - HMMR Format Example.xlsx XLSX spreadsheet
DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx XLSX spreadsheet
DRAFT Attachment 0177 - Small Business Participation Factor WB.xlsx XLSX spreadsheet
DRAFT Attachment 0148 - CDRS Search.pdf PDF
DRAFT Attachment 0113 - M and S Input Data Sheets.xlsx XLSX spreadsheet
DRAFT Attachment 0172 -Technology Enhancement TDP Proposal.xlsx XLSX spreadsheet
DRAFT Attachment 0118 - Hazard Tracking Log(3).xls XLS spreadsheet
Draft Section E - Inspection and Acceptance(3).docx DOCX document
DRAFT Attachment 0159 - Welding Standards(3).doc DOC document
DRAFT Attachment 0119 - Exceptions to Hazardous Materials Requirements(3).doc DOC document
DRAFT Attachment 0127 - GFP_GFI List.XLSX XLSX spreadsheet
DRAFT Attachment 0125 - Windchill User Guide.pdf PDF
DRAFT Attachment 0149 - LLRC Proposal Format.DOC DOC document
DRAFT Attachment 0116 - Risk Management Scoring Criteria Template.xlsx XLSX spreadsheet
DRAFT Attachment 0120 - ECP and VECP.docx DOCX document
DRAFT Attachment 0133 - New Equipment Training(3).pdf PDF
DRAFT Attachment 0178 - Small Business Participation Factor WB Instructions.docx DOCX document
DRAFT Attachment 0137 - Design Review Checklist.xlsx XLSX spreadsheet
DRAFT Attachment 0176 - Production Process Attribute Rating Criteria.xlsx XLSX spreadsheet
Draft Section C - SOW(3).docx DOCX document
DRAFT Attachment 0121 - Request for Variance (RFV).docx DOCX document
DRAFT Attachment 0134 - Deprocessing Checklist(3).docx DOCX document
DRAFT Attachment 0106 - STA Form 7114-2.pdf PDF
DRAFT Attachment 0132 - STS Phase 1 WD Process List(3).xlsx XLSX spreadsheet
DRAFT Attachment 0115 - SIL Configuration and Verification Audit (SCAVA).docx DOCX document
Draft Section H - Special Contract Requirements(3).docx DOCX document
DRAFT Attachment 0147 - ATPD 2232 Engines - Preparation for Shipment and Storage.pdf PDF
DRAFT Attachment 0153 - Pre-TRR Checklist(3).docx DOCX document
DRAFT Attachment 0123 - TDP Option Selection Worksheet.docx DOCX document
Draft Section L - Instr., Conditions, and Notices(3).docx DOCX document
DRAFT Attachment 0128 - Supplier RFI Form(3).xlsx XLSX spreadsheet
DRAFT Attachment 0146 - Incoming Transaction Format(3).docx DOCX document
DRAFT Attachment 0163 - JLTV Special Characteristics(3).docx DOCX document
DRAFT Attachment 0168 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf PDF
DRAFT Attachment 0145 - Packaging Data Products(3).docx DOCX document
DRAFT Attachment 0152 - Provisioning Requirements LSA-036.xlsx XLSX spreadsheet
DRAFT Attachment 0164 - JLTV PPAP Requirements(3).docx DOCX document
DRAFT Attachment 0135 - FMECA Requirements.pdf PDF
DRAFT Attachment 0174 - Assertion of Restrictions.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 167 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0131

AS-BUILT CONFIGURATION LIST (ABCL)

October 2021

Distribution Statement A – Approved for Public Release; distribution unlimited

UNCLASSIFIED

UNCLASSIFIED

AS-BUILT CONFIGURATION LIST (ABCL)

Requirements:

Reference Documents:

The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Content:

The As-Built Configuration List (ABCL) shall be prepared in Contractor format. The ABCL will go down to the lowest level procured by the Contractor, plus part numbers for repairable or consumable items, excluding Petroleum, Oil and Lubricants (POL).

The report shall contain the following:

1. Nomenclature

2. Part number and revision with release authorization number (e.g. Change Order, Change Notice, ERR)

3. Serial Number

4. Lot Number

5. Registration Number

6. CLIN

7. Status (Shipped/ Shipped In-Place)

8. TCN

9. Model

10. Build Date

11. DD 250 Date

12. DD 250 Number

13. Ship Data

14. Manufacture Date

15. Manufacturer (CAGE Code and/or Name)

16. IUID Tag Date for each marked component (parent/child)

17. Branch of Service (AR-Army, MC-USMC)

18. GBL # Ship to City/State

19. CFE/GFE Installed

20. Contractor contract number

21. Next Higher Assembly Part Number and Serial Number

22. Indenture Level

23. Approved Request for Variance (RFVs)

24. Software part number and revision as applicable

25. National Stock Number (NSN) – Self-explanatory and as applicable

26. Unit of Measure – Self-explanatory

27. Quantity by Part Number – At level of assembly

28. WBS Name - The name of the lowest applicable level Product Orientated WBS element from the CSDR Plan (reference Attachment 0108, CSDR (DD Form 2794)) that corresponds with the level of assembly

29. PBI Element - The PBI element level that corresponds with the level of assembly

File details come from the government source that posted it. Updated .