This document provides information about an upcoming industry day event for the Joint Light Tactical Vehicle (JLTV) Family of Vehicles Follow-On production contract. The U.S. Army intends to award a single, five-year requirements contract with additional one-year options. Eligible contractors will have the opportunity to participate in one-on-one sessions, view static displays of JLTV variants and components, and submit questions. The Army will release the first draft request for proposal and current technical data package in March 2020. Interested parties must submit requests by mid-February to attend the industry day, which includes an overview on February 24th and additional events on February 25th at Selfridge Air National Guard Base in Michigan. Attendees will be limited to five individuals per company.
View the file
Other files
Show 40 more
Latest 50 of 167 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID Subject / RFP Reference DRAFT RFP Verbaige Question Government Response
1 ID - A2
Is the engine development being done under the current STS contract?
Yes, the engine integration Engineering Change Proposal is being executed under the current JLTV FoV contract W56HZV- 15-C-0095.
2 ID - A2
What visibility will we have of the TDP before it is finalized in 2021?
The Government will release the latest version of the JLTV TDP to offerors with each Draft RFP. Up until the A2 TDP is available, the TDP's are planned to represent the latest JLTV A1 TDP which has been released at that time. The Government is considering draft releases of the A2 TDP as it is delivered to the Government ahead of the final release in
Q4FY21.
3 ID - A2
Concern with 6 months with A2 TDP vs. what incumbent would have The Government will provide as much information to industry that is possible in the earliest timeframe that is reasonable.
4 ID - A2
Was it performance issues that drove the engine change or was it a new configuration? The Government is resolving a configuration management concern due to a known obsolecence issue. The Government seeks to ensure a stable design and maintain the current performance of the A1 engine.
5 ID - Contract Does PM office intend on awarding only one OEM for the 5 yr. award? Yes, the Government will award a single five year requirements contract with five one year options for the JLTV FoV
6 ID - Contract Concerned with how we can position within program and do we have a legitimate possibility to compete. The Government is committed to full and open competition and continues to seek opportunities to ensure all interested contractors have adequate time and all pertinent information to compete competitively.
7 ID - Contract
Given the contract structure, a five-year contract and five one-year options, can the Government re-compete the program again after the initial five years?
Yes, the Government may make a determination not to exercise an option year. In the event an option year is not exercised the contract ordering period will expire and no future option years may be exercised. The Government may start the acquistion planning process and Request for Proposal (RFP) release prior to making a determination not to exercise an option year.
8 ID - Contract
What is lead time for trailer and vehicles?
Hardware Production Lead Times:
First Article Test deliverables 10 Months from Contract Award Vehicles and associated kits Begin 10 months after issuance of delivery order(s) and end no later than 22 months after issuance of delivery order(s), unless mutually agreed upon by the parties Trailers and associated kits Begin 6 months after issuance of delivery order(s) and end no later than 18 months after issuance of delivery order(s), unless mutually agreed upon by the parties
9 ID - Contract When would you anticipate (after contract award) PDR? The Government will conduct a start of work meeting with the winning vendor, but given the build-to-print nature of the solicitation, the Government would not require a PDR.
10 ID - Contract Why did the Government decide to do a 5 year contract, with 5 (1 year) option periods vs a straight 10 year contract?
This decision was based on considering DFARS 217.204(e)(i). In addition, this strategy provides the Government with flexibility and ensures the Government achieves the best value over a ten year period of time through competition.
11 ID - Cyber What about CMMI? The Government requires further clarification in order to provide a comprehensive response.
12 ID - Cyber What level of comma Cyber security, will be required?
The Government has not made a final determination on the Cybersecurity Maturity Model Certification (CMMC). If the Government determines that CMMC is required, it will be included in future releases of the Scope Of Work.
13 ID - Cyber Is the Government going to make CMMI a requirement of this contract
The Government has not made a final determination on the Capability Maturity Model Integration (CMMI). If the Government determines a requirement for CMMI, the Government will include it in future releases of the SOW.
14 ID - Display It is understood that If you are not a potential prime, you can’t get one-on-one session but are we able to visit the static display? Yes, the Government welcomes both prime and sub-contractors at the static display. Further, we will have a packaged kit display starting in June to allow subs and primes an opportunity to see the JLTV FoV kits
15 ID - Display 30 days advance warning to see static displays, Kits? Yes, the Government welcomes both prime and sub-contractors at the static display. Further, we will have a packaged kit display starting in June to allow subs and primes an opportunity to see the JLTV FoV kits 16 ID - Display Picture request: 1. Trailer (side view) & 2. Wheel/hub (corner view of vehicle) The Government will provide pictures of the JLTV and JLTV-T prior to the end of April 2020.
17 ID - Event Will slides be available on SAM? Yes, slides were posted to beta.SAM.gov on 26 February 2020
18 ID - Event Will the list of attendees be available? The Government does not plan on releasing a list of attendees from this Industry Day, however, the Government intends to post a list of interested subcontractors on beta.SAM.gov
19 ID - Event
Will everything be in same location on Beta SAM?
Yes, the intention is to continue to post everything in the same location on beta.SAM.gov. However, there is a charector limit within the website. Therefore, the Government may have to create an archive attachment and post it to the website versus including all updates within the description section of the posting.
In the event the Government changes the location of future postings the Government will make Industry aware of the chnge and will update the current posting to include a link to the new posting location.
20 ID - FO Contract
Does split procurement mean contract runs out & new contract awarded to one vendor? Or will Oshkosh receive contract for some & another vendor will supply some
This is not a split contract. The Government will compete the follow-on contract through full and open competition and award to only one contractor. However, the Government is planning a "transition period" where it intends to continue ordering vehicles off of the current production contract even after the award of the follow-on requirements contract to avoid a break in deliveries and allow for an orderly ramp up. Therefore, if the Government awards to a vendor other than Oshkosh for the follow-on contract, feasibly Oshkosh may continue to receive vehicle orders for a defined period of time.
The transition provision will be included in a future RFP draft.
21 ID - GFE/CFE
Are there any items that are CFE now and were through the first phases of the competition that will be Government directed for this new competition?
The Government requires further clarification in order to provide a comprehensive response.
22 ID - GFE/CFE How important to the PEO to have all (or majority of) of LRU’s to be controlled/managed and maintain from central unit? The Government requires further clarification in order to provide a comprehensive response.
23 ID - L&M
Intent is build to print and no prototypes, (ECPs may affect performance and ballistics) how will paper evaluation be made against full system performance?
Section L&M will inform this question. Draft L&M will be available Dec 2020.
24 ID - L&M Will increased log changes to offered design changes be evaluated as part of VATEP? Section L&M will inform this question. Draft L&M will be available Dec 2020.
25 ID - L&M
Evaluation criteria, Past Performance. What will Government be looking for in past performance? Will you be looking for specific experience with JLTV?
Section L&M will inform this question. Draft L&M will be available Dec 2020.
26 ID - L&M When will evaluation criteria be available? Section L&M will inform this question. Draft L&M will be available Dec 2020.
27 ID - L&M
The Industry Day presentation noted that the evaluation criteria will consider whether or not an offeror has OEM has source-controlled content within the TDP for the technology enhancement items. Will the evaluation criteria also evaluate if the offer has content source-controlled to them (or any affiliated parent or sister company) within the rest of the TDP?
Section L&M will inform this question. Draft L&M will be available Dec 2020.
28 ID - L&M
Is Government going to manage engine price to be the same for each prime (control supplier price to each prime). Example: build to print TDP. Source control transmission to X company. Is Government going to make sure x company provides each prime the same price? Ask a different way...Typically Gov has an evaluated price. Point is not to force X company to sell at certain price, is Gov going to consider a way to equalize this in the evaluation criteria?
The Government is not going to manage the price of the engine (or any other component(s) or subcomponent(s)) for the interested prime contractors. The engine (or any other component(s) or subcomponent(s)) price shall be managed by the interested prime contractors. The Government cannot guarantee, control, or restrict terms of contracts between private organizations.
Section L&M will inform a portion of this question. Draft L&M will be available Dec 2020
29 ID - L&M
Anticipated evaluation criteria will be release in Dec 2020…anything available beyond what was briefed between now and Dec 2020? Section L&M will inform this question. Draft L&M will be available Dec 2020.
Industry Release Section
30 ID - L&M Will the solicitation be awarded based only on the provided TDP? Section L&M will inform this question. Draft L&M will be available Dec 2020.
31 ID - L&M Explain the technical evaluation criteria Section L&M will inform this question. Draft L&M will be available Dec 2020.
32 ID - L&M Will non price factors be significantly more than price? Section L&M will inform this question. The Government will provide a Draft L&M late Dec 2020.
33 ID - L&M Will quality management systems be a source selection criteria Section L&M will inform this question. The Government will provide a Draft L&M late Dec 2020.
34 ID - Lease Are lease vehicles both A1? Both within most recent production year? As of 31 May 2020 the most recent production A1 variants are the General Purpose (GP) and JLTV Utility (UTL) vehicles.
35 ID - Lease Is cost of lease representative of the vehicle unit price?
The Government based the replacement cost of the lease vehicles on converting BY11$ to TY23$. The Government utilized the AUMC KSA of $250,000 BY11$ for replacement costs in the lease agreement, not the unit prices from the existing contract.
36 ID - Lease Application period for the Lease is?
26 February 2020 - 12 March 2020. The Government requires interested prime contractors to respond to this request prior to 4:00pm local Warren, MI time on 12 March 2020. It is the responsibility of the interested prime contractor to ensure the Government receives their request by the date and time specified above.
37 ID - Lease
The $900 fee is to submit application and remaining amount is due when? When can I walk away with only $900 fee…not commit to lease agreement/payment.
Lease rental payments are in accordance with Schedule B of the SF-26 Lease Agreement. The Government shall be reimbursed the amount shown in Schedule B, entitled "Lease Cost". Contractor must reimburse the Government in the form of a Certified Check made payable to the U.S. Treasury at the conclusion of this lease.
The Contractor can submit a check for $900 to support the application process then decide not to sign the SF-26 and enter into a lease. In the event the Contractor decided not to enter into the lease agreement no rental payments would be required.
38 ID - Lease
Lease vehicle, is it the same vehicle or do you rotate the different variances?
The lease will not rotate between different variants. Each lease agreement will provide the lessee with one (1) each Joint Light Tactical Vehicle (JLTV), General Purpose (GP) Mission Package Configuration (MPC) and (1) each JLTV Utility (UTL) MPC, each vehicle will have an installed JLTV Baseline Integration Kit (BIK). Lastly each lease agreement will provide a JLTV B-Kit Armor (4-door) packaged kit.
39 ID - Lease Respond by when for the lease?
The Government requires interested prime contractors to respond to this request prior to 4:00pm local Warren, MI time on 12 March 2020. The interested prime contractor must assure that the Government receives the contractors request no later than the time specified above.
40 ID - Lease
How do we get the lease vehicle, does the Government deliver it?
The Government will deliver vehicles and kits to the Contractor at no cost to the Contractor. The Lessee shall be responsible for return transportation costs and arrangements associated with shipping the vehicles and kits to back to Selfridge Air National Gaurd Base (destination subject to change) upon completion of the lease. The contractor shall fax/email the Certificate of Receipt to AMSTA-LCL-IFL within 30 days of receipt.
41 ID - Lease What are the requirements to keep the vehicle. The contractor must return the vehicles to the Government within 120 days of the Lease Agreement expiration date
42 ID - Lease
Timeframe for Lease vehicle
The timeframe/term of this Lease shall commence on the date of signed lease award (SF-26) and the Government shall determine expiration using the following events based on which event happens first:
• 120 days after the award of the JLTV FoV follow-on contract;
• 120 days after the subject Contractor is eliminated from competition of the JLTV FoV follow-on contract;
• 120 days after the subject Contractor informs the Government they are no longer an Interested Prime Contractor in support of the JLTV FoV follow-on contract; or
• 120 days after the subject Contractor informs the Government of the decision to end the lease agreement.
43 ID - Log Will DLA be handling sustainment? If so when will we see those being issued? DLA is currently managing all provisioning (consumable) parts. If you require further clarification, please contact DLA.
44 ID - Log DLA notice regarding JLTV? The Government requires further clarification in order to provide a comprehensive response.
45 ID - Quality Will the IATF16949 be required for subcontractors? The Government will encourage IATF 16949 certification requirements for subcontractors, but not require it. However, all suppliers must certify to ISO 9001 at a minimum.
46 ID - Quality Do you currently PPAP every component Yes, the Government requires Level 3 PPAP's for all components. This scope will be included within the upcoing DRAFT
RFP release.
47 ID - Quality Can we get PPAP results No. The Government does not require the delivery of all PPAPs and therefore does not have them to provide them to industry.
48 ID - Quality
How is Government going evaluate PPAP
PPAP after contract award: The Contractor will be required to execute PPAP in accordance with the requirements identified within Section E and the JLTV PPAP Customer Specific Requirements Document. The Government will provided in the upcoming DRAFT RFP release.
PPAP evaluation criteria within Section L&M: Section L&M will inform this question. Draft L&M will be available Dec 2020.
49 ID - Quality
Do you expect 16949 requirement to be by facility or company
IATF 16949 certification will apply to all prime contractor facilities performing manufacturing/support operations for JLTV product, including but not limited to final assembly, fabrication, welding, painting/finishing, production testing, and final inspection. The Government recommends that each offeror review the rules for obtaining IATF 16949 certification (available on the IATF website).
50 ID - Quality What was the Specific Automotive standard from briefing IATF16949
51 ID - Req Doc Do we have access to KPPs and KSAs? The Government will not release KPPs and KSAs, however, the Government will identify the Performance Specification requirements derived from the KPPs and KSAs in the upcoming DRAFT RFP release.
52 ID - Req Doc PSPEC - Can we have access to. Will it stay constant between A1 and A2 The Government will provide Performance Specification with the upcoming DRAFT RFP release. Changes between A1 and
A2 have not yet been determined.
53 ID - RFP
Is there a clear list what items are considered GFE and not going to change? The Government will provide a clear list of GFE items in the solicitation, however, at this time and with the requested contractor feedback, the Government does not have a finalized GFE list.
54 ID - RFP
Mention removing max qty of vehicles in program…Will there be a minimal number of vehicles? Want to understand for ROI. What kind assurances can you give on number of vehicles?
At this time the Government is projecting a base award of 340 vehicles. The requirements contract will not define minimum quantities within each ordering period.
55 ID - RFP
Draft RFP scope, 10 yr. 5/5, Army USMC, FMS. Describe conus and oculus fielding requirement (does that include allied?) The Government intends to field to both CONUS and OCONUS units throughout the life of the contract. The DRAFT RFP will not specify areas or units.
56 ID - RFP
When will a full timeline be published?
The Government has provided a high level schedule with the Industry Day charts and will continue to update the schedule at each DRAFT RFP release. The Government will provide the A2 STS WD timeline in May 2020.
57 ID - RFP
Will a tech demonstrator / bid sample be required with submission?
a. How many?
b. Will they be ground up, or adaptations of vehicles supplied by the USG?
c. What are the key attributes and risks you are looking to mitigate with this effort?
A tech demonstrator / bid sample will not be required with proposal submission. Therefore, questions a, b and c are not applicable.
58 ID - RFP Is the USG considered using OTA's to have industry build a JLTV based on the TDP? No
59 ID - RFP
Is the USG considering using OTA’s to investigate adding new capabilities such as electrification, drive by wire, autonomy, increased protection, etc.?
No
60 ID - RFP
Will there be a site survey. How ready do we have to be when RFP is released.
At this time the Government may conduct a cite visit for any of the following events:
Event 1: To support the approval of a Facility Security Clearance request.
Event 2: To support a Pre-Award Contractor Responsibility Determination in support of FAR 9.104.
Event 3: Proposal Evaluation. Section L&M will inform this. Draft L&M will be available Dec 2020 61 ID - RFP Every time you release a draft RFP can industry submit questions. You can submit questions anytime. The Government will constantly respond and update BETA SAM.
62 ID - TDP
Will there be any sole source or directed source product to the incumbent? No, the Technical Data Package and Software Data package does not contain any drawings that are source controlled to the incumbent.
63 ID - TDP
Are the competing OEM’a obligated to use the same subsystem vendors that were qualified with the initial vehicle designed that is not part of GFE?
Only for source controlled components where the approved source is directed by the TDP. However, interested parties can work with the TACOM Competition Management Office to qualify additional sources.
64 ID - TDP Timing of TDP release (draft RFP) (interested in supplier list)? The Government is projecting the next release of the TDP by the end of the month.
65 ID - TDP
TDP - options for different suppliers/sources that are not approved today? Suppliers wishing to qualify for any source controlled components in the TDP must contact the TACOM Competition
Management Office
66 ID - TDP
Next TDP release will consist of? Will it have current Duramax engine? The next TDP release will include all JLTV A1 vehicles, the JLTV Trailer, and all kits. Yes, this TDP will include the current
Duramax engine.
67 ID - TDP
Will A1 TDP match the configuration of the vehicles being provided in support of the Lease Agreement? Due to the processing of routine ECP's the lease vehicles may not match the released TDP exactly, however, the
Government expects extremely limited differnces between the TDP and the lease vehicles.
68 ID - TDP
Request TDP that matches close as possible The next TDP release will reflect the latest released content at the time it is compiled for release (within one month of release).
69 ID - TDP
Will Aug 21 release have a different TDP...will Engine specifically be one of the changes? About 16 months to develop new engine. How many engines looking at and has down select been completed. When will we be able to get a production representative of the A2 engine?
Yes, the August 2021 TDP will include the JLTV A2 TDP featuring the new engine. The research through the STS work directive shows several commercially available engines for JLTV A2. The Government has not currently selected the JLTV A2 engine, but projects to select it in March 2020. When selected, the Government will notify all interested offerors of the selected vendor so that they can establish contact. The Government projects to send JLTV A2 prototypes for inspection at SANGB in mid-2021.
70 ID - TDP
How will we get access to the A2 configuration? Are there any ECPs outstanding?
Starting in mid 2021 the Government should have the A2 JLTV available for display. The Government will release TDP drawings of the A2 in Q4FY21. The follow-on contract proposal will contain the A2 final design, to include all ECPs that will be included as part of the competition.
71 ID - TDP
How soon can we begin qualifying suppliers? Would like qualified suppliers with proposal. Is there an opportunity to do that? Can we start engaging Government to qualify supplies?
The Government will support efforts on the part of the offeror to qualify new suppliers for existing components within the JLTV TDP. Offerors are free to begin these activities at any point. Please have the offeror notify the Government of any specific requests regarding interest in qualify specific components. Interested parties can work with the TACOM Competition Management Office to qualify additional sources.
72 ID - TDP TDP include process work instructions? The TDP does not include process work instructions.
73 ID - TDP
Will supplier information be provided?
The Government does not intend to provide a comprehensive list of current suppliers for JLTV. It is the responsibility of the contractor to manage their supply base. The JLTV TDP provides approved sources of supply on source controlled drawings and vendor control drawings list the suggested sources of supply.
74 ID - TDP
Is any portion of the current JLTV supply chain locked into OSK?
At this time, the Government will require the contractor to purchase components in accordance with the approved sources identified on the Source Controlled drawings in the TDP. If the offeror encounters a scenario where it cannot procure from these sources, the Government requests that the offeror provide that information and correspondence so the Government can research it further. Interested parties can work with the TACOM Competition Management Office to qualify additional sources.
75 ID - TDP Aware of any IP or patents that would hamper and/or preclude building? Question 75 will be answered in a later posting on beta.SAM
76 ID - TDP
If ECP’s are expected, how will the requirements be communicated to offerors and the solutions evaluated?
The Government has a number of ongoing STS efforts that will be included in the final A2 TDP release. Further, the government intends to release the JLTV A1 with on-going ECPs in March 2021, this will provide offerors insights into the on-going ECPs on the JLTV.
77 ID - TDP
Are there any performance or operational deficiencies with the JLTV that are expected to be resolved with this acquisition? What data and specifications will be provided to guide and enable the offerors?
The system has proven performance to updated Performance Description requirements, the JLTV will be produced IAW the TDP requirements and contract quality provisions.
78 ID - TDP
Will more information be coming on assemblies? Option content?
Do not fully understand the questions. The future TDP will contain all information required for the JLTV. After review, if the contractor requires more detail on assemblies or options, please resubmit your answer with clarifications.
79 ID - TDP
Any Painting required?
Vehicle, Trailer, and Kit Topcoat (Paint) Color. The Government will identify the required topcoat color for end items (vehicles, trailers, or kits) at Delivery Order issuance. The contractor shall deliver the end items in the topcoat color as ordered at the single Firm Fixed Price (FFP) pursuant to the Schedule.
For vehicles (with or without installed kits) and trailers (with or without installed kits), the Government will select one of the final paint color codes (Woodland Camo, Desert Camo, Arctic Camo, Green, or Black) specified in the applicable vehicle or trailer final paint requirements drawing that the vehicle or trailer shall be delivered in. Overspray (meaning an additional application of topcoat to change the color of the component) is not permitted on vehicles or trailers specified to be delivered in Desert Camo, Green, or Black. Overspray is permitted for vehicles or trailers specified to be delivered with Woodland Camo or Arctic Camo in order to achieve the specified camouflage pattern. All requirements specified on the applicable vehicle or trailer final paint requirements drawing apply.
For packaged kits, all topcoated (painted) parts shall be delivered with the topcoat color specified on the Delivery Order unless a single color is specified on the component part drawing in the TDP (example: when a component has been specified to be painted with black topcoat on the component drawing). Overspray (as defined above) is not permitted.
80 ID - TDP parts quality comment, zero missing parts, is that for production build? Yes, a production process may not begin until all parts required for that process are available.
81 ID - TDP software
Who owns the software rights, source code, and IP?
a. What unlimited noncommercial computer software and technical rights did the USG receive?
b. What Government purpose rights for noncommercial computer software and technical rights did the USG receive?
c. What restricted noncommercial computer software and technical rights did the USG receive?
d. Are the commercial rights only for things like operating systems?
e. Does the USG have unlimited rights to software governing mission essential performance (diagnostics, prognostics, ride quality, automotive performance, etc.)?
The Government has a mix of data rights on the JLTV software. Some software/firmware rights are limited due to the commercial nature. The Government will make software and supporting software documentation available with upcoming TDP releases. If the offeror encounters a scenario where the provided data rights, IP, or software content limits their ability to effectively compete, the Government requests that the offeror provide that information and correspondence so the Government can research it further.
82 ID - TDP specs
Any requirement for providing production torque data?
The Government will not have a requirement to routinely deliver production torque data. However, the Government will require critical process traceability for items identified with Special Characteristics (Significant or Critical) in the TDP. The Government will require the contractor to have the ability to audit the data associated with these processes (such as achieved torque values) to rapidly identify suspect populations in the event of a safety recall / safety of use message.
83 ID - TDP suppliers
How will the USG handle proprietary items if issuing a build to print? Will the USG procure them and supply them as Government furnished?
This ties into concern below with the push back received by suppliers
At this time, the Government will require the contractor to purchase components in accordance with the approved sources identified on the Source Controlled drawings in the TDP. If the offeror encounters a scenario where it cannot procure from these sources, the Government requests that the offeror provide that information and correspondence so the Government can research it further. Interested parties can work with the TACOM Competition Management Office to qualify additional sources.
84 ID - TDP suppliers
Current status of the supply base? Clarity of actual supplies for the parts that are existing. Understand what ones are already tooled…what is the supply base currently?
The Government does not have a comprehensive list of current suppliers for JLTV as that responsibility lies with the contractor. The Government has suggested sources of supply on vendor item control drawings and approved sources of supply on source controlled drawings within the JLTV TDP.
85 ID - TDP suppliers sourcing activities. Source control part (ex. Shock absorber) If we openly source it, is there performance characteristics that Government cares about? How open will it be.
At this time, the Government will require the contractor to purchase components in accordance with the approved sources identified on the Source Controlled drawings in the TDP. If the offeror encounters a scenario where it cannot procure from these sources, the Government requests that the offeror provide that information and correspondence so the Government can research it further. Interested parties can work with the TACOM Competition Management Office to qualify additional sources.
86 ID - Tech Enhancement Basically the JLTV has nothing that ties into autonomy, drive by wire, etc. Will the PMO add some technology requirements to this new contract ?
As part of the technology enhancement request for information, autonomous technologies will be considered and reviewed with the USMC and US Army requirements communities.
87 ID - Tech Enhancement
How will enhancements to GFE (e.g. lethality solutions) be handled? Out of the JPO or individual branch PM offices?
The Government is conducting research to determine what technology enhancements will be included as part of the follow on contract. However, at this time the Gvoernment will limit the technology enhancements to the JLTV FoV TDP design and will not include those GFE enhancements integrated onto the JLTV.
88 ID - Tech Enhancement Elaborate on Technology Enhancements? Timeframe of receiving the vehicles?
The Government gave a high level on evaluation criteria, but it does not have criteria developed so the Government cannot provide any further details at this time. Section L&M will inform this question. Draft L&M will be available Dec 2020.
89 ID - Tech Enhancement
Tech Enhancements impact to performance requirements (durability/performance testing?) If going to do production verification testing.
Would like transparency with test results…does not want to get held to control test without knowing what parameter is. Later this calendar year (2020) the Government will release any test data directly correlated to the final technology/capability enhancement list that will be included as part of the DRAFT Section L&M release.
90 ID - Tech Enhancement ShoShould we stay away from technology Enhancements that impact engine controls, torque?
The Government encourages Industry to provide the Government with potential enhancements. At this time, the Government will not limit the candidate list. Contractor's can find specific details on how to provide feedback on beta-
SAM.
91 ID - Testing
Will Gov support access time at test sites (example Aberdeen)?
No, the Government does not intend to provide support for access time at test sites, as this would require a current contract be in place for Government sponorship. The contractor shall be responsible to coordinate any testing efforts needed at the test site. The Government is willing to sponsor a contractor to facilitate communicaiton with the test centers, contractors will be subject to the current test centers contractor rates and availability.
92 ID - Testing Will the RFP contain testing requirements?
Yes, the Government plans to perform testing. The Government will define specific details in the SOW and Performance Specification.
93 ID - Testing Will cost of FAT be separate from competition?…meaning OSK will not have to do it? Section L&M will inform this question. Draft L&M will be available Dec 2020.
94 ID - Tooling
Can the Government provide any more detailon tooling?
The Government is finalizing its strategy regarding JLTV A2 Engine Integration-specific tooling and will release detailed information to industry as it becomes available. The Government intends to purchase JLTV A2 engine integration-specific tooling to maximize competition. The Government is exploring the possibility of selling the tooling to the winning offerror, however, at a minimum the tooling will be provided as Government Furnished Material under the follow-on contract.
95 ID - Tooling Does the TDP include tooling? The TDP does not include tooling.
96 ID - Tooling
The Government will sell the tooling?
The Government is finalizing its strategy regarding JLTV A2 Engine Integration-specific tooling and will release detailed information to industry as it becomes available. The Government intends to purchase JLTV A2 engine integration-specific tooling to maximize competition. The Government is exploring the possibility of selling the tooling to the winning offerror, however, at a minimum the tooling will be provided as Government Furnished Material under the follow-on contract.
97 ID - Trailers Trailers, how many has Government purchased? and is there a way to lease a trailer? To date, the Government has procured a total of 32 JLTV production Trailers (JLTV-T). The Government will not offer JLTV
Trailer as part of the Lease Agreements
98 ID - Trailers
Is there going to be significant changes to Trailer between now and Feb 22 release?
There are 4 Engineering Change Proposals (ECPs) that improve the producibility of the JLTV-T since the previous JLTV-T TDP release. None of the ECPs significantly impact or change the JLTV-T performance. The subject ECPs will be included in the TDP release scheduled for the end of March 2020. In the event there are future ECPs that impact the JLTV-T design the the Government will continue to openly communicate those changes to Industry via beta.SAM.gov and include the ECPs within the future release of the JLTV-T TDP.
99 ID - Trailers Request Milestone schedule when Trailer TDP and static display become available
The Government intends to release the JLTV-T TDP along with other variants at the end of March, then again in March 2021 and again in September 2021. Starting in June 2020 until March 2021 the Government will provide the JLTV-T and packaged static display in defined amounts of time on a specific date each month.
100 ID - Trailers
Trailers, are we designing?
Design response: The JLTV-T has a TDP, there is no requriement to design the JLTV-T.
Manfucaturing response: The JLTV-T has a TDP, the choice to manufacture the JLTV-T is a make or buy desicion for each individual interested prime contractor.
101 ID -A2
Is the engine going to be COTS
The research through the STS work directive shows several commercially available engines for JLTV A2. The Government has not currently selected the JLTV A2 engine, but projects to select it in March 2020. When selected, the Government will notify all interested offerors of the selected vendor so that they can establish contact. The Government projects to send JLTV A2 prototypes for inspection at SANGB in mid-2021
102 ID -A2
Will we be able to understand timeline of A2 build, milestones to select engine? Milestone to meet current performance requirements?
Would like visibility on A2 TDP before final release.
The Government will provide a milestone schedule associated with the A2 build in May 2020. The Government is considering draft release of the A2 TDP, prior to final release in Q4FY21.
103 ID -A2 When will you advise industry what engine will be the A2? The Government will provide the decision to industry in May 2020 with the milestone schedule.
104 ID -Contract Confirm LRIP Schedule vehicle production ramp up.
The Program has already reached an FRP decision therefore there will be no "LRIP" under the follow-on contract. The projected schedule is designed to meet the operational fielding requirements, the program has built in a two year ramp up period for a new OEM.
105 ID- Contract What is the Cost Reimbursable parts of the contract?
At this time the Government projects the inclusion of System Technical Support (STS), Field Service Representative (FSR) support, Total Package Fielding (TPF) and Log Products/Technical Manuals Updates within the Cost Reimbursable scope of the contract.
ID- Contract-QTY
For two years in a row, the PresBud has shown reductions in projected JLTV Quantities, why does the Government believe this trend will not continue?
The Industry Day presentation showed quantity projections for years 1 through 5. What are the projected quantities per year in years 6 through 10?
Beyond years 1 through 3 that align with the most recent Pres Bud; why does the Government believe the yearly quantities will increase another 1,200 vehicles per year in year 4 and after?
Information below represents the PB21 SAR. Any quantity information beyond that is for planning purposes. The Government budget is subject to change and could result in changes to quantities in all years.
FY21:
4-door = 2,103 2-door = 569 Trailer = 1,412
FY22:
4-door = 1,286 2-door = 880 Trailer = 1,451
FY23:
4-door = 1,453 2-door = 1,005 Trailer = 962
FY24:
4-door = 1,559 2-door = 1,137 Trailer = 1,078
FY25:
4-door = 1,540 2-door = 1,077 Trailer = 1,654
107 ID -Display Is there a timeframe for the static displays?
The Government intends to host monthly static displays for a subset of packaged kits for four hour block of time starting in June 2020. The JLTV A2 should be available for static display NLT Sep 2021.
108 ID -Lease
Leasing arrangements, is it prorated or one shot price? If we lease it for three months does it cost less?
The Government will define full terms and conditions within each lease agreement. The Government did not prorate the $111,290.13 cost associated with the lease agreement. The Government will require the contractor to pay the Total Lease Cost at the end of the Lease Agreement subject to the contractor returning the vehicle in Condition Code A (full terms and conditions defined within the Lease Agreement).
109 ID- Lease
Can we take apart the lease vehicles
The Government and interested prime contractors will enter into lease agreements for the purpose of promoting competition. Feedback from Industry provided in response to the previously released JLTV FoV Market Survey prompted this strategy. The Government is not restricting how the Interested Prime Contractors utilize the vehicles (or kits) provided under the lease agreements. The Contractors shall decide how to utilize the vehicles. The lease agreement will state that the vehicles and kits must be returned to the Government at the conclusion of the Lease Agreement in Condition Code A. If the contractor does not return the vehicles or kits in Condition Code A, the Government will require the contractor to pay the replacement costs defined within Schedule B of the lease Agreement.
110 ID -Log IPS side of award. How will IPS side of contract work. Will it be supported by incumbent or will it be competed?
The Government completed basic IPS. This contract will contain FSR, TPF. Additionally, there will be IPS related to Government and Contractor initiated ECPs under the follow-on contract.
111 ID -Req Doc Will we be releasing classified information before the RFP release and will you sponsor us if you do? Yes, the Government will sponsor interested contractors to receive the classified information in support of submitting a proposal for the JLTV follow on contract.
112 ID -RFP Will a bid sample vehicle be required with RFP submission? No
113 ID -RFP
Will the new OEM have responsibility for Training Aids, Devices, Simulators and Simulation (TADSS)? Yes, The Contractor shall participate in PEO STRI IPT technical interchange meetings (TIM) and in-process reviews (IPR) throughout the life cycle of the JLTV TADSS by PEO STRI.
114 ID -TDP
Will we have access to the Current JLTV commercial supplier list and when will that be? The Government will not provide a comprehensive list of suppliers, however, the TDP does identify suppliers on the vendor item and source controlled drawings.
115 ID -TDP TDP so far has not included any software or source code. Will that be included with the next round of TDP release? The Government intends to provide as much source code to industry as possible.
116 ID -TDP
Aug TDP. Drawings as sole source or only qualified source. Struggle with only qualified source. What is Government going to do to open up more qualified sources? Number of drawings have OSK as only qualified source.
At this time, the Government will require the contractor to purchase components in accordance with the approved sources identified on the Source Controlled drawings in the TDP. If the offeror encounters a scenario where it cannot procure from these sources, the Government requests that the offeror provide that information and correspondence so the Government can research it further. Interested parties can also work with the TACOM Competition Management Office to qualify additional sources.
117 ID -TDP
How many and what types of ECO/ECPs/VECPS are in process? Which ones will be in the final TDP?
The Government has a number of ongoing STS efforts. Significant efforts expected to impact the A2 TDP include: engine changes, lithium ion batteries, new transmission controller, hose and electrical routing improvements, DSDU controlled power distribution and modular BIK (radio cabinet). If, additional STS efforts result in an ECP, the impact will be identified in subsequent releases of the TDP.
118 ID- TDP When will be the next TDP release The Government will release the next TDP on or around 3/24/20.
119 ID -Tech Enhancements Will a copy of all 30 enhancements be available to industry? No, the Government intends to solicit technologies from industry and then work with the requirements communities to pair the list down, the Government will then provided that list to industry
120 ID -Tech Enhancements When will the 35 technology enhancements be available to industry? Are any of these currently in process with the incumbent?
The Government intends to solicit technologies from industry and then work with the requirements communities to pair the list down, the Government will then provided that list to industry. None of these technology enhancements are being worked between the incumbent.
121 ID -Tech Enhancements Concerned that Incumbent has ability to work on enhancements now.
The Government did not shared any information related to Technology Enhancements with the Incumbent prior to Industry Day 24 February 2020 and the Government will not share any information moving forward unless it is part of the release of information to Industry in support of the follow-on competition.
122 ID -Tech Enhancements Will the Government provide testing reports from JLTV to inform tech enhancements? Later this calendar year (2020) the Government will release any test data directly correlated to the final technology/capability enhancement list that will be included as part of the DRAFT Section L&M release.
123 ID -Tech Enhancements Is the USG interested in autonomy packages that could make the JLTV unmanned and increase its utility? What is the USG’s assessment and prioritization of existing and developing technologies? What is the USG’s TRL of these technologies?
As part of the technology enhancement request for information, the Government will consider and review autonomous technologies with the USMC and US Army requirements communities.
124 ID -Testing With the intent of incorporating ECPs and no prototypes delivered, when will ballistic testing occur to certify vehicle design? The impact of technical enhancement ECP's from a ballistic standpoint will occur during First Article Testing live fire testing.
125 ID -Trailer Does the lease cost include the Trailer? At this time, the trailer is not available for leasing.
126 ID -Testing
How will the Government handle control testing, PVT testing and performance testing of the A2 engine under the follow-on contract if the testing is not complete prior to award of the follow-on contract?
Control Testing of the winning contractor's vehicles is currently planned for well after the Governement's completion of the development effort of an A2 vehicle with new engine. PVT testing (which includes Performance Testing) will be at the system level and is currently planned for almost a year after the last A2 ECP's are valiadated in test.
127 ID - A2
Is there a plan for the Current OEM to manufacture production vehicles with A2 engine prior to the award of the follow-on contract?
The Government does not plan to order any A2 vehicles under the current contract that will be delivered prior to the follow-on contract award.
128 ID - Event
How do get help with obtaining an FCL?
Contractors can go to the Defense Security Service web page to gather information on how to get a Facility Security Clearance (FCL):
FCL verifications will be performed by contacting the DSS Knowledge Center (888-282-7682, then Option #3). Any additional questions not covered on the site or FAQ can be addressed to https://www.dcsa.mil.
ID -Tech Enhancements
1: Section 5 Paragraph D indicates interested prime contractors should reply. Are companies other than prime contractors allowed to respond?
2: Assuming we would be allowed to respond to the RFI with a suggested technology, would it be possible to request a 14 day extension for submission of our proposed technology with new suspension date and time of 8 May, 2020 at 1600 EDT?
1. Yes, other companies other than interested prime contractors are allowed to respond and provide feedback regarding proposed technology enhancements.
2. The Government intends to allow industry to provide information pertaining to the Technology Enhancement submission. The Government wants to ensure it maximizes receipt of information from industry regarding the proposed technology enhancements.
ID -Tech Enhancements
We would like to also provide two videos that demonstrate our proposed technology. However, I am wondering how I will be able to provide then to you due to the large file size.
Will a Web-based file transfer service (Like We-transfer) work with the provided email address?
Is there another method that you can recommend?
1. The Government intends to allow all of industry to provide information pertaining to the Technology Enhancement submission. The Government wants to ensure it maximizes receipt of information from industry regarding the proposed technology enhancements.
2. The updated beta.SAM posting will include a shipping address if an interested offeror would like to provide supporting information that is above and beyond what is provided in the Technology Enhacements template (such as a videos demonstrating the proposed technology)
ID -Lease
In planning the receipt of the lease materials – the two vehicles roll on/roll off the trailer – with no special requirements and are part of the normal process at our our facility I envision that the “B-Kit Armor Package” is coming separately and will most likely be palletized – requiring additional handling and specialized equipment (i.e. fork truck capacity, loading dock, etc?) plus any additional security precautions that maybe required.
Do you know where/who is processing the corresponding B-Kit as part of the lease program – or where I can get the preliminary information to ensure we are prepared to receive? I understand that the lease agreement is tentatively planned for late June/July, but I want to make sure we’ve comprehended the requirements in our plan.
The Government will coordinate the shipping and inform the leasee of the projected delivery date, once it is known. The JLTV B-Kits will be crated and are separate from the vehicles. In order to safely handle the B-Kit Armor package, the Government recommends using a fork lift. Weight and dimension information is provided for the JLTV B-Kits to assist with determining the appropriate specialized equipment (fork lift). In addition, there are no additional special security requirements associated with the JLTV B-Kit.
Weight & Dimension Information:
-Packaged B-Kit Armor (4-door, General Purpose): 5,129 lbs / 90" x 78" x 18"
ID-RFP When will the JPO JLTV release updated milestones? The Follow-On Contract schedule will be modified and updated periodically and will be posted with each successive draft release.
133 ID - Req Doc When is the A1 PSPEC going to be released? The Government is updating the PSPEC and is targeting a release date of 22MAY2020.
ID- Sources Sought
I realize that the subject sources sought was due last September 27th but Company XYZ just recently became aware of the JLTV Follow-on Production solicitation (W56HZV-20-R-0072). If Company XYZ submitted a completed sources sought questionnaire now would the submission be accepted by the USG for considering Company XYZ as an interested prime contractor? If so, I would submit the completed NDA as well as the DD Form 2345 per the sources sought instructions. If not, is a future sources sought planned for the JLTV Production for Company XYZ to throw its hat into the ring?
The Government is not currently seeking additional response to the previously released Sources Sought Notification. In the event a Company failed to respond to the initial Source Sought Notification that Company can still be an interested Prime Contractor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .