This document outlines requirements for the development of a Long Life Reusable Container (LLRC) to transport the ___ Assembly. Vendors will submit proposals to provide design, prototype, testing, and validation of a reusable shipping container meeting size, durability, and humidity control standards. Proposals are due within the schedule provided and must include separate line items for design, review, prototype, testing, and data package. The selected vendor will deliver one container prototype and technical data package to the Army Tank Automotive Command (TACOM) for testing and evaluation. Exceptions to certain standards within SAE ARP 1967B are defined. The container must withstand various durability tests including drops, impacts, and loads.

The related federal contract opportunity announces an Industry Day on February 24-25, 2020 to provide information on the Joint Light Tactical Vehicle (JLTV) Family of Vehicles follow-on production contract. The Department of the Army Materiel Command TACOM Life Cycle Management Command plans to competitively award a five-year contract with five one-year options. The Industry Day will include overviews, one-on-one sessions with contractors, and a static vehicle display. Access requests and security procedures are defined. Questions must be submitted by specified dates and will be posted online, excluding proprietary information.

View the file

Other files

File Type Posted
220121_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A).pdf PDF
JLTV FOC - Industry Day for DRAFT RFP3.pptx PPTX presentation
2021 SANG Vetting Form A2 Static Display.xlsx XLSX spreadsheet
DRAFT Attachment 0107 - Project Expenditure Report(3).xlsx XLSX spreadsheet
DRAFT Attachment 0151 - EDFP Data Righs.pdf PDF
DRAFT Attachment 0144 - Data Requirements Form for Acquisition Requirement Package (ARP).pdf PDF
DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx DOCX document
DRAFT Attachment 0179 - Small Business Participation Cert.pdf PDF
DRAFT Attachment 0173 - Production Process Site Visit Plan.docx DOCX document
DRAFT Attachment 0122 - JLTV FoV Master Task List.xlsx XLSX spreadsheet
DRAFT Attachment 0117 - HMMR Format Example.xlsx XLSX spreadsheet
DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx XLSX spreadsheet
DRAFT Attachment 0177 - Small Business Participation Factor WB.xlsx XLSX spreadsheet
DRAFT Attachment 0148 - CDRS Search.pdf PDF
DRAFT Attachment 0113 - M and S Input Data Sheets.xlsx XLSX spreadsheet
DRAFT Attachment 0172 -Technology Enhancement TDP Proposal.xlsx XLSX spreadsheet
DRAFT Attachment 0118 - Hazard Tracking Log(3).xls XLS spreadsheet
Draft Section E - Inspection and Acceptance(3).docx DOCX document
DRAFT Attachment 0159 - Welding Standards(3).doc DOC document
DRAFT Attachment 0119 - Exceptions to Hazardous Materials Requirements(3).doc DOC document
DRAFT Attachment 0127 - GFP_GFI List.XLSX XLSX spreadsheet
DRAFT Attachment 0125 - Windchill User Guide.pdf PDF
DRAFT Attachment 0116 - Risk Management Scoring Criteria Template.xlsx XLSX spreadsheet
DRAFT Attachment 0120 - ECP and VECP.docx DOCX document
DRAFT Attachment 0133 - New Equipment Training(3).pdf PDF
DRAFT Attachment 0178 - Small Business Participation Factor WB Instructions.docx DOCX document
DRAFT Attachment 0137 - Design Review Checklist.xlsx XLSX spreadsheet
DRAFT Attachment 0176 - Production Process Attribute Rating Criteria.xlsx XLSX spreadsheet
Draft Section C - SOW(3).docx DOCX document
DRAFT Attachment 0121 - Request for Variance (RFV).docx DOCX document
DRAFT Attachment 0134 - Deprocessing Checklist(3).docx DOCX document
DRAFT Attachment 0106 - STA Form 7114-2.pdf PDF
DRAFT Attachment 0132 - STS Phase 1 WD Process List(3).xlsx XLSX spreadsheet
DRAFT Attachment 0115 - SIL Configuration and Verification Audit (SCAVA).docx DOCX document
Draft Section H - Special Contract Requirements(3).docx DOCX document
DRAFT Attachment 0147 - ATPD 2232 Engines - Preparation for Shipment and Storage.pdf PDF
DRAFT Attachment 0153 - Pre-TRR Checklist(3).docx DOCX document
DRAFT Attachment 0123 - TDP Option Selection Worksheet.docx DOCX document
Draft Section L - Instr., Conditions, and Notices(3).docx DOCX document
DRAFT Attachment 0128 - Supplier RFI Form(3).xlsx XLSX spreadsheet
DRAFT Attachment 0146 - Incoming Transaction Format(3).docx DOCX document
DRAFT Attachment 0163 - JLTV Special Characteristics(3).docx DOCX document
DRAFT Attachment 0168 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf PDF
DRAFT Attachment 0145 - Packaging Data Products(3).docx DOCX document
DRAFT Attachment 0152 - Provisioning Requirements LSA-036.xlsx XLSX spreadsheet
DRAFT Attachment 0164 - JLTV PPAP Requirements(3).docx DOCX document
DRAFT Attachment 0135 - FMECA Requirements.pdf PDF
DRAFT Attachment 0174 - Assertion of Restrictions.xlsx XLSX spreadsheet
DRAFT Attachment 0111 - FPVI Requirements List.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 167 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment 0149 Long Life Reusable Container (LLRC)

Proposal Format

October 2021

Distribution Statement A – Approved for Public Release; distribution unlimited

Attachment 0149

LLRC DESIGN PROPOSAL FORMAT

Develop Long Life Reusable Containers (LLRC) for the _____

1.0 PURPOSE

The ___ Assembly (part number ____) requires the development, validation, and documentation of a new reusable shipping and storage container due to its unique dimensions and Government requirements described within this document. Upon completion of the efforts described within this document, the new reusable shipment and storage container will be implemented for the spare and repair part packaging, handling, storage, and transportability requirements of the ___ Assembly. The container will be designed to accommodate the ___ Assembly only. The Government requirements of the container are contained in SAE ARP 1967B with the exceptions listed in Appendix A of this document.

2.0 REUSABLE CONTAINER DEVELOPMENT

The LLRC vendor shall provide a reusable container for the ___ Assembly (part number ___) in accordance with SAE ARP 1967B. Exceptions from this practice are noted in Appendix A. The effort includes cost for development, design prototype construction, validation, and completion of the technical data package for competitive procurement.

This container shall only be fabricated from steel or composite material and must be Chemical Agent Resistant Coatings (CARC) finished as defined in SAE ARP 1967B. The use of wood in the design and fabrication of this reusable container is forbidden except for the container skids. This container should, as required, incorporate energy absorbing systems, dehumidification systems, and other special features to ensure protection of the item. This container should be capable of being repaired and/or retrofitted to prolong container service life or modified to adapt reusable container for shipment of the items other than for which it was originally intended. TB 9-289, Technical Bulletin for the Reconditioning of Type I and Type II Reusable Metal Containers, shall be used as a guide.

The container size shall be of the minimum, consistent with the size of the contents and the performance requirements of SAE ARP 1967B. During the life of the container, it will experience multi-model transportation (truck, rail, air, and ocean) so size considerations shall include all modes of transportation.

3.0 DEVELOPMENT PROCESS

· _______ will solicit LLRC vendors with Request For Quote (RFQ).

· LLRC vendors to submit an itemized proposal with line item pricing to include, but not limited to, the following items:

1. Produce Design Concept (drawing package or 3-D model) for Approval.

2. Host the Design Review.

3. Construct the Prototype Container.

4. Develop and Submit Test Plan for Approval.

5. Validation of Container for Approval.

6. Develop and Deliver Technical Data Package for Approval.

· ______ to select LLRC vendors and award a purchase order.

· LLRC vendor to provide design concept to _____

· Design review and acceptance.

· ___ to authorize LLRC vendor to build prototype.

· LLRC vendor to submit test plan to _____ for acceptance.

· LLRC vendor to validate/test the prototype and receive acceptance from __

· LLRC vendor to develop technical data package and submit to _____ for acceptance.

4.0 VALIDATION

Upon receiving _____ approval of the reusable container design test report, the LLRC vendor shall provide a complete Technical Data Package (TDP) for the reusable shipping and storage container. The TDP shall include engineering drawings and associated lists in sufficient detail to provide for a competitive procurement. _____ will supply Army part numbers and/or drawing numbers for the new parts and drawings. Engineering drawings shall comply with ASME-Y14.100 2000 and ASME-Y14.5M 1984. Configuration management data shall comply with MIL-HDBK-61. Electronic drawing file format shall be PRT, IGES, and PDF.

5.0 ITEMS PROVIDED BY ______

Upon purchase order acceptance, _____ will provide the LLRC vendor with one ___ Assembly (part number ___), drawings, and other relevant information. ___ will pay shipping cost for shipping the item to the LLRC vendor. The LLRC vendor will pay shipping cost for returning the item together with the prototype LLRC to ____.

6.0 ITEMS PROVIDED BY LLRC VENDOR

Upon purchase order acceptance, the LLRC vendor will provide the following;

· Project Management (showing project cost and schedule).

· Design concept/report (drawing package or 3-D model).

· Prototype container.

· Validation testing plan, perform testing, and validation test report including instrument record data.

· Technical Data Package (TDP).

7.0 DATES

Included in the proposal shall be a detailed schedule. The schedule shall include, but is not limited to, the following dates:

· Provide design concept and host design concept review.

· Completion of prototype, validation testing plan, and perform testing.

· Validation test report and records are due 30 days after validation.

· Completion of TDP provided to ___.

8.0 ___ TECHNICAL CONTACT

Appendix A Revisions and Exceptions to SAE ARP 1967B The below listed paragraphs are exceptions to SAE ARP 1976B as requested by the U.S. Army Tank Automotive Command (TACOM) and shall be included with the container development/design effort. The exceptions listed apply to the specific paragraph noted and do not flow down to the sub-paragraphs in each section.

3.1.2 – N/A. This paragraph is not applicable to this requirement.

3.3.1.3 – Replace paragraph with the following:

Vibration and Shock Isolation: The container shall be designed so as to prevent damage to the item resulting from the tests of section 4. Elastomeric isolators shall have a transmissibility of no more than 5 to 1, and transmit no more than 15 G’s to the item during drop testing. If consistent with the shock requirements and other design considerations, the resonant frequency of the loaded suspended system in the major translational modes of vibration shall be above 7.0 Hz.

3.3.1.3.1 – Replace paragraph with the following:

Elastomeric Isolators: If elastomeric isolators are used each isolator shall be marked with its date of manufacture. The date shall be visible when the mount is installed. Elastomeric isolators shall meet the requirements of A-A-52486. Elastomeric isolators shall not exceed 18 months old when first installed.

3.3.2 – The last sentence does not apply.

3.3.3.2.2 – Replace the first sentence with:

All sealing surfaces shall be such to ensure sealing under performance requirements of this specification at 20.68 kPa (3.0 psig) positive pressure.

3.3.3.2.3 – Replace paragraph with the following:

The time required to open the container, remove the item, reinstall the item and to close the container for shipment shall not exceed two man hours.

3.3.4.2 – N/A. This paragraph is not applicable to this requirement.

3.3.4.1 – Replace the first sentence with:

Lifting rings, eyes or lugs capable of withstanding the tests prescribed herein, without failure or visible permanent distortion, will be provided for lifting the container and cover individually with chains, hooks, or by a single overhead hook.

3.3.5.2- Replace paragraph with the following:

The container shall incorporate 30-40-50 percent relative humidity indicator conforming to AS26860. The inside of the container will be configured to provide free access of the enclosed air to the indicator. The indicator will be placed as far as practical away from the desiccant receptacle but on the same container face for convenient observation and replacement purposes.

3.3.5.3 – N/A. This paragraph is not applicable to this requirement.

3.3.5.5 – N/A. This paragraph is not applicable to this requirement.

3.3.5.6 – N/A. This paragraph is not applicable to this requirement.

3.3.5.9 – N/A. This paragraph is not applicable to this requirement.

3.7.2- Replace paragraph with the following:

Color: Unless otherwise specified (see Section 6) the interior and exterior of the containers shall be primed and painted.

3.7.3 - Replace paragraph with the following:

Chemical Agent Resistant Coating (CARC): When specified (see Section 6) containers requiring CARC shall be in accordance with MIL-C-53072. All steel surfaces, except threaded and other working surfaces, shall be finished IAW the requirements of TACOM drawing 12369003. All aluminum alloy surfaces, except threaded and other working surfaces, shall be finished IAW the requirements of TACOM drawing 12369001. In addition to the marking requirements of 3.9, “CARC” shall be marked in 25 mm (1 in) letters in an area as near as practicable to the nameplate. Topcoat conforming to the requirements of TACOM drawing 12369003 or TACOM drawing 12369001, as applicable, color black (37030 or 37083), shall be used for all marking.

3.7.4 – N/A. This paragraph is not applicable to this requirement.

3.8.2- Replace the last sentence with:

Shock loads transmitted to the item shall not exceed 15 G’s. To demonstrate this requirement, longitudinal, vertical and lateral accelerations shall be measured by accelerometers mounted as close as possible to the center of gravity of the item. Permanent recordings of the accelerometer readings shall be made on a device having a range from one to 100 cycles per second (CPS).

3.9- Replace paragraph with the following:

Markings: When specified (see Section 6) for containers requiring CARC, markings shall be clearly visible using topcoat conforming to the requirements of TACOM drawing 12369003 or TACOM drawing 12369001, as applicable, color black (37030 or 37083). The following markings shall be applied to all containers at the locations and in the sizes indicated unless impractical, in which case markings may be reduced or increased in proportion to the size of the container.

3.9 a. – Replace paragraph with the following:

Adjacent to the container cover lifting rings, eyes or lugs in 45 to 51mm (1.0 inch) letters:

LIFT HERE

3.9 b. – Replace 45 to 51mm (1.75 to 2.0 inches) with (1.0 inch).

3.9 c. – Replace (1.0 inch) with (0.5 inch).

3.9 d. – Replace (1.0 inch) with (0.5 inch).

3.9 e. – Replace (1.0 inch) with (0.5 inch).

3.9 f. – Replace paragraph with the following:

At the loaded center of balance at fork lift entries, a vertical line 1.52 mm (6.0 in) long and 25 mm (1.0 in) wide with the marking adjacent in 25 (1.0 in) letters:

LOADED CENTER OF BALANCE

3.9 g. – N/A. This paragraph is not applicable to this requirement.

3.9 h. – Replace (In four places on the shell) with (In two places on the sides of the shell).

3.9 i. – N/A. This paragraph is not applicable to this requirement.

3.9 l. – Replace (1.0 inch) with (0.5 inch).

3.9 m. – N/A. This paragraph is not applicable to this requirement.

3.9 n. – N/A. This paragraph is not applicable to this requirement.

3.11 Replace paragraph with the following:

Each container will be accompanied by an installation instructions bonded to the outer wall of the container cover. The instruction will be waterproof. Instructions will include a step-by-step procedure for installing and removing the contained item, including units of desiccant required. Torque values and torque sequence for mounting and closure hardware will be shown on the installation instructions when applicable.

4.2.2 – N/A. This paragraph is not applicable to this requirement.

4.5.2.1 – Replace paragraph with the following:

The container will be examined for leakage when assembled, loaded with an actual item or appropriate mass simulator, and sealed in the same manner as it will be prepared for shipment, except that the relief valve will be blocked off. The container will be tested at 20.68 kPa (3.0 psig) pressure. The container will be pressurized and allowed to stabilize for at least 15 minutes before starting the test. The test will be conducted in an enclosed area with constant temperature, no drafts and no solar load. The pressure will show no more than 0.2 kPa (0.029 psig) change in 30 minutes. This test will be conducted before and after all other tests are completed.

4.5.2.2 – N/A. This paragraph is not applicable to this requirement.

4.5.2.3 – N/A. This paragraph is not applicable to this requirement.

4.5.3 – Replace paragraph with the following:

Drop Test: Each container will be subjected to the following drop tests at ambient temperatures.

4.5.3.1- Replace paragraph with the following:

Edgewise Drop Test: The loaded container shall be supported at one end of its base on a wood sill nominally six inches high, placed perpendicular to the skids. The opposite end of the container shall be raised and allowed to fall freely from heights of 6, 12, 18, 24, 30 and 36 inches successively to a concrete or similarly hard surface. Two drops shall be made from the 36 inch height. This test shall be applied to the other end of the container. If the size of the container and the location of the center of gravity are such that drop tests cannot be made from all of the prescribed heights, the greatest attainable height shall be repeated for a total of six drops.

4.5.3.2- Replace paragraph with the following:

Cornerwise Drop Test: The loaded container shall be supported at one corner of its base on a block nominally six inches high. A block nominally 12 inches high shall be placed under the other corner of the same end of the container. The opposite end of the container shall be raised and allowed to fall freely from heights of 6, 12, 18, 24, 30 and 36 inches successively (as measured from the lower of the two corners) to a concrete or similarly hard surface. Two drops shall be made from the 36 inch height. If the size of the container and the center of gravity are such that drop tests cannot be performed from all of the prescribed heights, the greatest attainable height shall be repeated for a total of six drops. This test shall be applied to diagonally opposite corners on each end of the container. If during the testing, the blocks shift more than six inches from the end of the skids, the blocks shall be repositioned at the ends of the skids.

4.5.3.3- N/A. This paragraph is not applicable to this requirement.

4.5.3.4 - Replace paragraph with the following:

Flatwise Drop Test: The container shall be raised in its normal storage position and allowed to fall freely from heights of 6 and 12 inches to land flat on a concrete or similarly hard surface. Container, 5 cubic feet to 25 cubic feet exterior volume, shall be dropped four times at each height. Containers 25 to 50 cubic feet shall be dropped twice from each height. Containers over 50 cubic feet shall be dropped once from each height.

4.5.4- Replace paragraph with the following:

Tipover Test: One of the following tests, whichever is applicable, shall be applied.

Roll-Over Test: This test applies to containers having a gross weight under 1,500 lbs. The container in normal storage position shall be rolled slowly sideways until it falls freely onto its side on a concrete or similarly hard surface. This procedure shall be repeated with a fall from one side to the top, from the top to the other side, and from the other side to the base. This test shall be applied to vertical cylindrical containers. In vertical cylindrical containers the component is mounted from one end with its longitudinal axis perpendicular to the base of the container.

Tip-Over Test: This test applies to containers having a width less than ¼ of the height and large containers with a gross weight over 1,500 lbs. The container in normal storage position on a hard level surface shall be slowly tipped to the one side until it falls freely to the ground. The container shall then be slowly tipped until it is back in the normal storage position. This test shall then be repeated to the other side of the container.

4.5.5 – N/A. This paragraph is not applicable to this requirement.

4.5.6 – Replace paragraph with the following:

Pendulum Impact Test: The container shall be suspended as a pendulum from four chains or cables (two chains or cables shall be used for cylindrical containers with two hoisting devices). The chains or cables shall be of sufficient length to provide a minimum distance of 16 feet from bottom of the container to point of suspension. The impact bumper shall be stationary and vertically flat and may be faced with a minimum nominal two inch thickness hardwood impact surface. The bumper impact surface shall be at least six inches high. The suspended container shall clear the floor or ground surface by two or three inches while swinging. The ends of the skids shall be the point of impact. The suspended container shall be pulled back perpendicularly from the bumper until a height of 18 inches or more than the floor clearance is reached. This measurement shall be taken vertically between a measuring reference point on the container and the floor or ground. The container shall be released to swing freely in a perpendicular line to strike the bumper. One impact shall be made on each end of the container.

4.5.7.1- Replace paragraph with the following:

Superimposed Load Resistance: One of the following tests, whichever is the greater load, shall be applied.

Concentrated Load Resistance: A simulated load equal to twice the weight of the container with its designated contents shall be stacked on top of the container. If the stacked height of three containers does not equal 16 feet, add additional weight until it stimulates containers stacked to a minimum height of 16 feet. Containers shall not be pressurized during this test. Measurements shall be taken to determine if permanent deformation has taken place.

Distributed Load Resistance: A load of 175 pounds per square feet shall be evenly distributed on the top surface of the container. This test shall not be applied to areas with curved or dome shaped cross-section. Containers shall not be pressurized during this test. Measurements shall be taken to determine if permanent deformation has taken place.

4.5.8.1 – Replace paragraph with the following:

Hoisting Test: The loaded container shall be suspended for at least two minutes clear of the ground (or other supports) by one of the hoisting provisions. The hoisting provision shall be capable of withstanding this test without failure or visible permanent deformation. This test shall be applied separately to each individual hoisting eye, ring, lug or bracket. Stationary hoisting devices shall not be positioned to extend beyond the maximum dimensions of the container. The same requirement applies to retractable hoisting devices when not in use.

4.5.8.3.2. – N/A. This paragraph is not applicable to this requirement.

UNCLASSIFIED