DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf
PDF 3 MB Posted
- Solicitation number
- W56HZV-20-R-0072
About this file
This document outlines the provisioning requirements for a federal contract to supply Joint Light Tactical Vehicles (JLTV). Key requirements include conducting a Guidance Conference within 30 days of award to provide clarification and establish a schedule. Engineering data, manuals, and provisioning documentation are required, with interim submissions authorized. Tools and test equipment will be included in the provisioning parts list. The contractor must have samples at the Provisioning Conference and conduct provisioning screening.
A related opportunity notice provides details for the JLTV Family of Vehicles Follow-On production contract. The Department of the Army Materiel Command intends to award a single five-year contract with five one-year options. An Industry Day will be held on February 24-25, 2020 to overview the strategy and conduct one-on-one sessions. Draft RFP documents and the Technical Data Package will be available in March 2020. Questions are due by specified dates and will be posted with answers by April 30, 2020.
View the file
Other files
Show 40 more
Latest 50 of 167 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0143
Provisioning Requirements Statement
October 2021
Distribution Statement A – Approved for Public Release; distribution unlimited
UNCLASSIFIED
UNCLASSIFIED
DRAFT
I Provisioning SOP and Desktop Guide
Volume I
I I
Provisioning Requirements Statement (ARP) I I I (Provisioning Screening required)
Provisioning Requirements Statement IARP NO.:
I Title of ARP
Provisioning Activity (address and zip code)
USA TACOM LCMC,
I ATTN:@ I
A. This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with Statement of Work (SOW). Deliverable Provisioning Technical Documentation (PTO) and Engineering Data for Provisioning (EDFP) Requirements will be specified on Contract Data Requirements List (CORL).
B. When the PRS is furnished after contract award the Contractor shall submit a priced proposal within 30 days after receipt of this PRS. This PRS may be modified or changed by a supplemental agreement to the contract.
C. A Statement of Prior Submission (SPS) submitted in accordance with SOW result in reduction or elimination of PTO and EDFP requirements specified on CORL and conference requirements of this PRS.
Provisioning Reguirements
Ii
1. Guid Conf ~ MAY BE REQ'D - IS NOT REQ'D. IF REQ'D CONF WILL BE HELD
AT
a. Place b. Date
TBD SEE BLOCK 16, NOTE 1
c. Time d. Estimated No. of Days
TBD 3
2. Prov Conf __x_ IS REQ'D - IS NOT REQ'D. IF REQ'D CONF WILL BE HELD AT
a. Place b. Date
CONTRACTOR'S FACILITY SEE BLOCK 16, NOTE 2
c . Time d. Estimated No. of Days
TBD TBD
I e. The Contractor ...X. IS REQ'D - IS NOT REQ'D. TO HAVE A SAMPLE OF THE
COMPONENT/END ITEM AT THE CONFERENCE
SAMPLE ARTICLE WILL BE VIEWED x WILL BE DISASSEMBLED AT -
CONFERENCE
3. Provisioning Preparedness Review Conference
- IS REQ'D ~ IS NOT REQ'D
I 4. Manufacturers or Commercial Manuals
I - ARE REQ'D ~ ARE NOT REQ'D
I 5 . Incremental Submission of PTO I x IS AUTHORIZED IS NOT AUTH -
6. Provisioning Screening _x_ is required _ is not required
RESULTS ~ ARE REQ'D - ARE NOT REQ'D TO BE ON THE PPL
I I I
Provisioning SOP and Desktop Guide 29 I
UNCLASSIFIED
UNCLASSIFIED
DRAFT
Keith.Barthlow Highlight
Provisioning SOP and Desktop Guide
Volume I I
7. Resident Provisioning Team (RPT)
I WILL BE ESTABLISHED ~ WILL NOT BE ESTABLISHED - !
8. Interim Release
- IS AUTHORIZED ~ IS NOT AUTHORIZED
9.EDFP
- HARDCOPY ~DIGITAL FORMAT
10. EDFP will be sequenced by:
X_ PLISN ~_REFERENCE NUMBER - REFERENCE DESIGNATION - OTHER
11. THE INITIAL PIO WILL BE SUBMITTED WITHIN -N/A DAYS AFTER APPROVAL OF EDFP OR
WITHIN N/A DAYS AFTER COMPLETION OF PROVISIONING CONFERENCE OR WITHIN N/A
DAYS AFTER ACCEPTANCE OF THE PPL
12. Tools and Test Equipment
.x. WILL BE - WILL NOT BE INCLUDED IN PPL (SEE BLK 16, NOTE 6)
13. PPS
I I
_x_ is - IS NOT REQUIRED (SEE BLK 16, NOTE 7)
14. Repair Kits and Repair Part Sets
.x. WILL BE - WILL NOT BE INCLUDED IN THE PPL
15. Common and Bulk Items List
(SEE BLK 16, NOTE 8)
16. NOTES:
1. Within 30 days after contract award, the contractor shall contact the PCO at USA TACOM LCMC, to establish a date for the Guidance Conference for further clarification of the requirements.
The Contractor shall prepare and present at the Guidance Conference a delivery schedule in Milestone Chart format for:
a. Engineering Data For Provisioning (EDFP) e. Technical Manuals (TMs)
I
b. Maintenance Allocation Chart (MAC) f. Packaging Instructions
c. Provisioning Parts List (PPL) g. Conferences/IPRs
d. Repair Parts and Special Tools List (RPSTL)
2. IPR/Provisioning Conference dates and duration will be established at the Guidance Conference. I
3. When multiple PCCNS are required for Provisioning, the submission of completed individual PCCNS before the final delivery date is encouraged.
4. Digital Format is required for all EDFP submissions.
5. For EDFP submissions, PLISN sequence is used in provisioning; reference number sequence, for cataloging.
6. Only SPECIAL TOOLS and TEST EQUIPMENT will be listed.
7. PPS will be finalized at the Guidance Conference.
8. Only BULK MATERIAL required for the fabrication of items in the PPL which are source coded "M" (MAKE) will be listed.
BULK MATERIAL source coded "P" (PROCURED) will be listed at the end of the PPL.
DICTIONARY OF ABBREVIATIONS
CONF .... ....... CONFERENCE PIO ............... PROVISIONED ITEM ORDER I CNTR ........... CONTRACTOR PL ................. PARTS LIST ORF .......... .... DATA REQUIREMENT FORM PPL ............ .. PROVISIONING PARTS LIST
GUID ............ GUIDANCE PPS .............. PROVISIONING PERFORMANCE SCHEDULE
I
IPR .............. IN-PROCESS REVIEW PROV .......... .PROVISIONING
NR ............... NUMBER REQ'D .......... REQUIRED I
I PAR ............. PARAGRAPH PRS ...... ........ PROVISIONING REQUIREMENT STATEMENT
I I
PCL .... ...... ... POST CONFERENCE LIST
Provisioning SOP and Desktop Guide 30
UNCLASSIFIED
UNCLASSIFIED
DRAFT
Keith.Barthlow Highlight
| Attachment 0043 Provisioning Requirements Statement |
| Attachment SOWC-4223 Provisioning Requirements Statement.pdf |
| Provisioning Requirements Data Requirements Form.pdf |
| Attachment SOWC-4251.1 Provisioning Requirements Statement.pdf |
| Attachment SOWC-4223 Provisioning Requirements Statement.pdf |
| Provisioning Requirements Data Requirements Form.pdf |
File details come from the government source that posted it. Updated .