DRAFT Attachment 0153 - Pre-TRR Checklist(3).docx

DOCX document 40 KB Posted

Attached to
Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On
Solicitation number
W56HZV-20-R-0072
Issued by

About this file

This document outlines a pre-test readiness review checklist for the Joint Light Tactical Vehicle program. The checklist will be used to assess whether JLTV test vehicles, personnel, ranges, and other resources are ready for formal government testing. It includes sections to verify vehicle configuration, status of contract data requirements lists, results of break-in testing and corrective actions, inspection results and certifications, system delivery schedule, test support resources, and safety assessment reports. Completion of the checklist requires satisfactory completion of all items, resolution of all key issues, and no outstanding action items.

View the file

Other files

File Type Posted
220121_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A).pdf PDF
JLTV FOC - Industry Day for DRAFT RFP3.pptx PPTX presentation
2021 SANG Vetting Form A2 Static Display.xlsx XLSX spreadsheet
DRAFT Attachment 0107 - Project Expenditure Report(3).xlsx XLSX spreadsheet
DRAFT Attachment 0151 - EDFP Data Righs.pdf PDF
DRAFT Attachment 0144 - Data Requirements Form for Acquisition Requirement Package (ARP).pdf PDF
DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx DOCX document
DRAFT Attachment 0179 - Small Business Participation Cert.pdf PDF
DRAFT Attachment 0173 - Production Process Site Visit Plan.docx DOCX document
DRAFT Attachment 0122 - JLTV FoV Master Task List.xlsx XLSX spreadsheet
DRAFT Attachment 0117 - HMMR Format Example.xlsx XLSX spreadsheet
DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx XLSX spreadsheet
DRAFT Attachment 0177 - Small Business Participation Factor WB.xlsx XLSX spreadsheet
DRAFT Attachment 0148 - CDRS Search.pdf PDF
DRAFT Attachment 0113 - M and S Input Data Sheets.xlsx XLSX spreadsheet
DRAFT Attachment 0172 -Technology Enhancement TDP Proposal.xlsx XLSX spreadsheet
DRAFT Attachment 0118 - Hazard Tracking Log(3).xls XLS spreadsheet
Draft Section E - Inspection and Acceptance(3).docx DOCX document
DRAFT Attachment 0159 - Welding Standards(3).doc DOC document
DRAFT Attachment 0119 - Exceptions to Hazardous Materials Requirements(3).doc DOC document
DRAFT Attachment 0127 - GFP_GFI List.XLSX XLSX spreadsheet
DRAFT Attachment 0125 - Windchill User Guide.pdf PDF
DRAFT Attachment 0149 - LLRC Proposal Format.DOC DOC document
DRAFT Attachment 0116 - Risk Management Scoring Criteria Template.xlsx XLSX spreadsheet
DRAFT Attachment 0120 - ECP and VECP.docx DOCX document
DRAFT Attachment 0133 - New Equipment Training(3).pdf PDF
DRAFT Attachment 0178 - Small Business Participation Factor WB Instructions.docx DOCX document
DRAFT Attachment 0137 - Design Review Checklist.xlsx XLSX spreadsheet
DRAFT Attachment 0176 - Production Process Attribute Rating Criteria.xlsx XLSX spreadsheet
Draft Section C - SOW(3).docx DOCX document
DRAFT Attachment 0121 - Request for Variance (RFV).docx DOCX document
DRAFT Attachment 0134 - Deprocessing Checklist(3).docx DOCX document
DRAFT Attachment 0106 - STA Form 7114-2.pdf PDF
DRAFT Attachment 0132 - STS Phase 1 WD Process List(3).xlsx XLSX spreadsheet
DRAFT Attachment 0115 - SIL Configuration and Verification Audit (SCAVA).docx DOCX document
Draft Section H - Special Contract Requirements(3).docx DOCX document
DRAFT Attachment 0147 - ATPD 2232 Engines - Preparation for Shipment and Storage.pdf PDF
DRAFT Attachment 0123 - TDP Option Selection Worksheet.docx DOCX document
Draft Section L - Instr., Conditions, and Notices(3).docx DOCX document
DRAFT Attachment 0128 - Supplier RFI Form(3).xlsx XLSX spreadsheet
DRAFT Attachment 0146 - Incoming Transaction Format(3).docx DOCX document
DRAFT Attachment 0163 - JLTV Special Characteristics(3).docx DOCX document
DRAFT Attachment 0168 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf PDF
DRAFT Attachment 0145 - Packaging Data Products(3).docx DOCX document
DRAFT Attachment 0152 - Provisioning Requirements LSA-036.xlsx XLSX spreadsheet
DRAFT Attachment 0164 - JLTV PPAP Requirements(3).docx DOCX document
DRAFT Attachment 0135 - FMECA Requirements.pdf PDF
DRAFT Attachment 0174 - Assertion of Restrictions.xlsx XLSX spreadsheet
DRAFT Attachment 0111 - FPVI Requirements List.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 167 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0153

Pre-TRR Checklist

October 2021

Distribution Statement A – Approved for Public Release; distribution unlimited

UNCLASSIFIED

Purpose The Test Readiness Review (TRR) process for the Joint Light Tactical Vehicle (JLTV) will assess the readiness of the JLTV vehicles and trailers to enter the formal testing event. The Contractor Performed Pre-Test Readiness Review (Pre-TRR) and the TRR will assesses the status of planning for and capability to conduct a given test event, to include available resources and other requirements. This process allows key JLTV leadership and stakeholders to assess whether JLTV test vehicles, personnel, ranges, and test resources are ready to be committed to Government Vehicle Testing with safe and manageable risks. The process begins with a meeting with the Contractor and concludes with a formal Government TRR meeting and a recommendation which is provided to the JLTV Product Managers to proceed (or not) into Government testing.

Completion of Checklist The Pre-TRR Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

UNCLASSIFIED Page 3 of 4

Pre-Test Readiness Review (TRR) Checklist

Vehicle Test Readiness

Section
Criteria
Responsibility
Status
Comment/Mitigation
1.0
Introductions/Purpose
1.1
Test purpose
Gov’t Test Lead
2.0
Vehicle Configuration
Contractor
2.1
Configuration of the system is consistent with the JLTV FoV Technical Data Package and Computer Software Package or Purchase Description
3.0
CDRLs Status
Contractor
3.1
All CDRL submissions and updates impacting test have been delivered.
4.0
Break-In Test Results/Corrective Actions
Contractor
4.1
Break In tests are complete
4.3
All known residual catastrophic failures and safety issues identified during break in testing have been corrected.

5.0

5.1
Government Inspection Results/Certifications
5.2
The vehicles and trailers have been inspected (not tested) for adherence to the requirements in the contract. The vehicles and trailers must pass the inspections for these requirements to be deemed acceptable for test. Some of these inspections will need to occur during build.
DCMA/Contractor
5.3
Vehicles have been configured IAW contract requirements and prepared for shipment.
Contractor
5.4
All non-vehicle hardware. The required timing of deliveries is specified in Section F.
Contractor
5.5
Kits have been inspected, are complete, and ready for shipment.
DCMA/Contractor
5.6
Vehicle, certifications, and analyses have been completed and submitted
DCMA/Contractor
5.7
Unapproved Hazardous Materials are not present in the JLTV, IAW the materials detailed section of the contract addressing Hazardous Materials Management.
DCMA/Contractor

6.0

6.1
Test Support
Contractor
6.2
FSRs /SMEs are identified and ready to support testing at designated locations as identified in Attachment 156 (VEASAM).
6.3
Logistics limitations and risks associated with them have been identified and mitigated.
6.4
All BII items are complete and ready for shipment with the vehicle.
6.5
Tester Training packages/plans have been reviewed, approved and available.
6.6
Operators’ Manuals are complete, delivered, and adequate to support tests.
6.7
Vendor has addressed parts support strategy for each of the test sites identified in the VEASAM.

7.0

7.1
Safety Assessment Reports/Concerns
Contractor
7.2
Contractors Safety Assessment has been completed and accepted by the Program Office
7.3
High voltage electrical safety for testing addressed and covered in both the tester training courses and the operators manuals.

8.0

8.1
System Delivery Schedule
Contractor
8.2
Delivery schedule has been provided and is on track with contract requirements.