DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx
DOCX document 90 KB Posted
- Solicitation number
- W56HZV-20-R-0072
About this file
This document provides details on a federal contract opportunity for the Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On production contract. The Joint Program Office JLTV intends to competitively award a single-award, five-year requirements contract with five additional one-year options for the production of JLTV vehicles. An industry day will be held on February 24-25, 2020 at Selfridge Air National Guard Base in Michigan to provide an overview of the contract strategy and JLTV design. One-on-one meetings with interested prime contractors will also be conducted on February 25th to obtain feedback on the draft RFP. The current technical data package and first draft RFP will be made available in March 2020. Questions regarding the opportunity must be submitted by February 14th, and responses will be posted by April 30th.
View the file
Other files
Show 40 more
Latest 50 of 167 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0142
Content Selection Matrix TABLE A-VII DMWR/NMWR Requirements Matrix October 2021
Distribution Statement A – Approved for Public Release; distribution unlimited
DMWR/NMWR Content
DMWR
with RPSTL
NMWR
with RPSTL
MIL-STD-40051- 2B
Reference
Element Name
FRONT MATTER
| R |
| 5.2.1 |
| <paper.frnt> |
Front cover
| R |
| 5.2.1.1 |
| <frntcover> |
(MC) Promulgation letter
| 5.2.1.3 |
| <promulgation> |
Warning summary
| 5.2.1.4 |
| <warnsum> |
Change transmittal page
| 5.2.1.5 |
| <chgsheet> |
List of effective pages/work packages
| R |
| 5.2.1.6 |
| <loepwp> |
Title page
| R |
| 5.2.1.7 |
| <titleblk> |
Table of contents
| R |
| 5.2.1.9 |
| <contents> |
CHAPTER 1.
GENERAL INFORMATION, EQUIPMENT DESCRIPTION, AND THEORY OF OPERATION
| R |
| APPENDIX B |
| <gim> |
GENERAL INFORMATION WORK PACKAGE
| R |
| B.5.2 |
| <ginfowp> |
Scope
| R |
| B.5.2.3 |
| <scope> |
Maintenance forms, records, and reports
| R |
| B.5.2.4 |
| <mfrr> |
Reporting Equipment Improvement Recommendations (EIR)
| R |
| B.5.2.5 |
| <eir> |
Hand receipt (HR)
| B.5.2.6 |
| <handreceipt> |
Corrosion Prevention and Control (CPC)
| R |
| B.5.2.7 |
| <cpcdata> |
Ozone Depleting Substances (ODS)
| B.5.2.8 |
| <odsdata> |
Destruction of Army materiel to prevent enemy use
| R |
| B.5.2.9 |
| <destructmat> |
Preparation for storage or shipment
| R |
| B.5.2.10 |
| <pssref> |
Warranty information
| B.5.2.11 |
| <wrntyref> |
Nomenclature cross-reference list
| B.5.2.12 |
| <nomenreflist> |
List of abbreviations/acronyms
| R |
| B.5.2.13 |
| <loa> |
Quality Assurance (QA)
| B.5.2.14 |
| <qainfo> |
Quality of material
| R |
| B.5.2.15 |
| <qual.mat.info> |
Safety, care, and handling
| B.5.2.16 |
| <sftyinfo> |
Nuclear hardness
| B.5.2.17 |
| <hcp> |
Calibration
| B.5.2.18 |
| <calref> |
Item unique identification (IUID)
| B.5.2.19 |
| <iuid> |
TABLE A-VII. DMWR/NMWR requirements matrix for
DMWR
with RPSTL
NMWR
with RPSTL
Engineering Change Proposals (ECP)
| R |
| B.5.2.20 |
| <ecp> |
Modifications
| B.5.2.21 |
| <modification> |
Deviations and exceptions
| R |
| B.5.2.22 |
| <deviation> |
Mobilization requirements
| R |
| B.5.2.23 |
| <mobreq> |
Critical Safety Items (CSI) (Aircraft only)
| B.5.2.24 |
| <csireq> |
Cost considerations
| R |
| B.5.2.25 |
| <cost> |
Supporting information for repair parts, special tools, TMDE, and support equipment
| B.5.2.26 |
| <supdata> |
Copyright credit line
| B.5.2.27 |
| <copyrt> |
EQUIPMENT DESCRIPTION AND DATA WORK PACKAGE
| R |
| B.5.3 |
| <descwp> |
Equipment characteristics, capabilities, and features
| R |
| B.5.3.3 |
| <eqpinfo> |
Location and description of major components
| R |
| B.5.3.4 |
| <locdesc> |
Differences between models
| B.5.3.5 |
| <eqpdiff> |
Equipment data
| R |
| B.5.3.6 |
| <eqpdata> |
THEORY OF OPERATION WORK PACKAGE
| B.5.4 |
| <thrywp> |
CHAPTER X. DMWR/NMWR TROUBLESHOOTING PROCEDURES
NOTE
The notation (*) indicates that at least one of the these content items shall be included
| R |
| APPENDIX D D.5.4.3 |
| <tim> |
<troubledmwrnmwrcategory>
INTRODUCTION WORK PACKAGE
| D.5.5.3 |
| <tsintrowp> |
TROUBLESHOOTING INDEX WORK PACKAGE
| D.5.5.5 |
| <tsindxwp> |
PRESHOP ANALYSIS WORK PACKAGE
| R |
| D.5.5.6 |
| <pshopanalwp> |
COMPONENT CHECKLIST WORK PACKAGE
| D.5.5.7 |
| <compchklistwp> |
DMWR DMWR
with
RPSTL
NMWR NMWR
with
RPSTL
*OPERATIONAL CHECKOUT WORK PACKAGES
| D.5.5.8.3 |
| <opcheckwp> |
*TROUBLESHOOTING WORK PACKAGES
| D.5.5.8.4 |
| <tswp> |
*COMBINED OPERATIONAL CHECKOUT AND TROUBLESHOOTING WORK PACKAGES
| D.5.5.8.5 |
| <opcheck-tswp> |
CHAPTER X. DEPOT
MAINTENANCE INSTRUCTIONS
| R |
| APPENDIX E E.5.2.4 |
| <mim> |
<depotcategory>
MAINTENANCE WORK PACKAGES
| R |
| E.5.3.5 |
| <maintwp> |
Maintenance tasks
| R |
| E.5.3.5.3 |
| <maintsk> |
Inspect
| E.5.3.5.3.2 |
| <inspect> |
Test
| E.5.3.5.3.3 |
| <test> |
Service
| E.5.3.5.3.4 |
| <service> |
Adjust
| E.5.3.5.3.5 |
| <adjust> |
Align
| E.5.3.5.3.6 |
| <align> |
Calibrate
| E.5.3.5.3.7 |
| <calibration> |
Remove
| E.5.3.5.3.8 |
| <remove> |
Install
| E.5.3.5.3.9 |
| <install> |
Replace
| E.5.3.5.3.10 |
| <replace> |
Repair
| E.5.3.5.3.11 |
| <repair> |
Paint
| E.5.3.5.3.12 |
| <paint> |
Overhaul
| E.5.3.5.3.13 |
| <overhaul> |
Rebuild
| E.5.3.5.3.14 |
| <rebuild> |
Lubricate
| E.5.3.5.3.15 |
| <lube> |
Mark
| E.5.3.5.3.16 |
| <mark> |
Pack
| E.5.3.5.3.17 |
| <pack> |
Unpack
| E.5.3.5.3.18 |
| <unpack> |
Preserve
| E.5.3.5.3.19 |
| <preserv> |
Prepare for use
| E.5.3.5.3.20 |
| <prepforuse> |
Assemble
| E.5.3.5.3.21 |
| <assem> |
Disassemble
| E.5.3.5.3.22 |
| <disassem> |
Clean
| E.5.3.5.3.23 |
| <clean> |
Nondestructive inspection
| E.5.3.5.3.24 |
| <ndi> |
Radio interference suppression
| E.5.3.5.3.25 |
| <ris> |
DMWR DMWR
with
RPSTL
NMWR NMWR
with
RPSTL
Place in service
| E.5.3.5.3.26 |
| <pis> |
Towing
| E.5.3.5.3.27 |
| <tow> |
Jacking
| E.5.3.5.3.28 |
| <jack> |
Parking
| E.5.3.5.3.29 |
| <park> |
Mooring
| E.5.3.5.3.30 |
| <moor> |
Covering
| E.5.3.5.3.31 |
| <cover> |
Hoisting
| E.5.3.5.3.32 |
| <hoist> |
Sling loading
| E.5.3.5.3.33 |
| <sling> |
External power
| E.5.3.5.3.34 |
| <extpwr> |
Preparation for shipment and storage
| E.5.3.5.3.35 |
| <pss> |
Arm
| E.5.3.5.3.36 |
| <arm> |
Load
| E.5.3.5.3.37 |
| <load> |
Unload
| E.5.3.5.3.38 |
| <unload> |
Software maintenance
| E.5.3.5.3.39 |
| <softwaremaint> |
Additional maintenance task
| E.5.3.5.3.40 |
| <other.maintsk> |
Follow-on maintenance
| E.5.3.5.3.41 |
| <followon.maintsk> |
GENERAL MAINTENANCE WORK PACKAGE
| E.5.3.7 |
| <gen.maintwp> |
LUBRICATION INSTRUCTIONS WORK PACKAGE
| E.5.3.8 |
| <lubewp> |
PRESERVATION, PACKAGING, AND MARKING GENERAL INFORMATION WORK PACKAGE
| R |
| E.5.3.9.1 |
| <ppmgeninfowp> |
FACILITIES WORK PACKAGE
| E.5.3.9.2 |
| <facilwp> |
OVERHAUL INSPECTION PROCEDURES WORK PACKAGE
| E.5.3.9.3 |
| <oipwp> |
DEPOT MOBILIZATION REQUIREMENTS WORK PACKAGE
| E.5.3.9.4 |
| <mobilwp> |
QUALITY ASSURANCE REQUIREMENTS WORK PACKAGE
| R |
| E.5.3.9.5 |
| <qawp> |
ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE
E.5.3.10
DMWR
with RPSTL
NMWR
with RPSTL
Illustrated list of manufactured items introduction work package
| E.5.3.10.1 |
| <manu_items_introwp> |
Manufacturing procedures work package
| E.5.3.10.2 |
| <manuwp> |
TORQUE LIMITS WORK PACKAGE
| E.5.3.11 |
| <torquewp> |
AIRCRAFT INVENTORY MASTER GUIDE WORK PACKAGE (AIRCRAFT ONLY)
| E.5.3.13.2 |
| <inventorywp> |
STORAGE OF AIRCRAFT WORK PACKAGE WORK PACKAGE (AIRCRAFT ONLY)
| E.5.3.13.3 |
| <storagewp> |
WIRING DIAGRAMS WORK PACKAGE
| E.5.3.12 |
| <wiringwp> |
CHAPTER X.
AUXILIARY EQUIPMENT MAINTENANCE INSTRUCTIONS
| APPENDIX E E.5.2.6 |
| <mim> |
<auxiliarycategory>
AUXILIARY EQUIPMENT MAINTENANCE WORK PACKAGE
| E.5.3.14 |
| <auxeqpwp> |
ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE
E.5.3.10
Illustrated list of manufactured items introduction work package
| E.5.3.10.1 |
| <manu_items_introwp> |
Manufacturing procedures work package
| E.5.3.10.2 |
| <manuwp> |
TORQUE LIMITS WORK PACKAGE
| E.5.3.11 |
| <torquewp> |
WIRING DIAGRAMS WORK PACKAGE
| E.5.3.12 |
| <wiringwp> |
CHAPTER X. AMMUNITION
MAINTENANCE INSTRUCTIONS
| APPENDIX E E.5.2.7 |
| <mim> |
<ammunitioncategory>
AMMUNITION MAINTENANCE WORK PACKAGE
| E.5.3.15.1 |
| <ammowp> |
DMWR
with RPSTL
NMWR
with RPSTL
AMMUNITION MARKING INFORMATION WORK PACKAGE
| E.5.3.15.2 |
| <ammo.markingwp> |
FOREIGN AMMUNITION (NATO) WORK PACKAGE
| E.5.3.15.3 |
| <natowp> |
CHAPTER X.
PARTS INFORMATION
(DMWR, NMWR)
(DMWR WITH RPSTL, NMWR WITH RPSTL)
R
| APPENDIX F |
| <pim> |
INTRODUCTION WORK PACKAGE
| R |
| F.5.3.5 |
| <introwp> |
REPAIR PARTS LIST WORK PACKAGE
| R |
| F.5.3.6 |
| <plwp> |
REPAIR PARTS FOR SPECIAL TOOLS WORK PACKAGE
| F.5.3.7 |
| <stl_partswp> |
KIT PARTS LIST WORK PACKAGE
| F.5.3.8 |
| <kitswp> |
BULK ITEMS WORK PACKAGE
| F.5.3.9 |
| <bulk_itemswp> |
SPECIAL TOOLS LIST WORK PACKAGE
| F.5.3.10 |
| <stlwp> |
NSN INDEX WORK PACKAGE
| R |
| F.5.3.11.1 |
| <nsnindxwp> |
P/N INDEX WORK PACKAGE
| R |
| F.5.3.11.2 |
| <pnindxwp> |
REFERENCE DESIGNATOR INDEX WORK PACKAGE
| F.5.3.11.3 |
| <refdesindxwp> |
CHAPTER X.
SUPPORTING INFORMATION
NOTE
Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.
| R |
| APPENDIX G |
| <sim> |
REFERENCES WORK PACKAGE
| R |
| G.5.2 |
| <refwp> |
EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE
| R |
| G.5.6 |
| <explistwp> |
TOOL IDENTIFICATION LIST WORK PACKAGE
| G.5.7 |
| <toolidwp> |
DMWR
with RPSTL
NMWR
with RPSTL
MANDATORY REPLACEMENT PARTS WORK PACKAGE
| G.5.8 |
| <mrplwp> |
CRITICAL SAFETY ITEMS (CSI) WORK PACKAGE (AIRCRAFT ONLY)
| G.5.9 |
| <csi.wp> |
SUPPORT ITEMS WORK PACKAGE
| G.5.10 |
| <supitemwp> |
ADDITIONAL SUPPORTING WORK PACKAGES
| G.5.11 |
| <genwp> |
REAR MATTER
| R |
| 5.2.3 |
| <rear> |
Glossary
| 5.2.3.1 |
| <glossary> |
Alphabetical index
| 5.2.3.2 |
| <aindx> |
DA Form 2028
| R |
| 5.2.3.3 |
| <da2028> |
Authentication page
| R |
| 5.2.3.4 |
| <authent> |
Foldout pages
| 5.2.3.5 |
| <foldsect> |
Back cover
| R |
| 5.2.3.6 |
| <back> |
Legend R - Required P - Prohibited Shaded - As Required
File details come from the government source that posted it. Updated .