DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx

DOCX document 90 KB Posted

Attached to
Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On
Solicitation number
W56HZV-20-R-0072
Issued by

About this file

This document provides details on a federal contract opportunity for the Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On production contract. The Joint Program Office JLTV intends to competitively award a single-award, five-year requirements contract with five additional one-year options for the production of JLTV vehicles. An industry day will be held on February 24-25, 2020 at Selfridge Air National Guard Base in Michigan to provide an overview of the contract strategy and JLTV design. One-on-one meetings with interested prime contractors will also be conducted on February 25th to obtain feedback on the draft RFP. The current technical data package and first draft RFP will be made available in March 2020. Questions regarding the opportunity must be submitted by February 14th, and responses will be posted by April 30th.

View the file

Other files

File Type Posted
220121_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A).pdf PDF
JLTV FOC - Industry Day for DRAFT RFP3.pptx PPTX presentation
2021 SANG Vetting Form A2 Static Display.xlsx XLSX spreadsheet
DRAFT Attachment 0107 - Project Expenditure Report(3).xlsx XLSX spreadsheet
DRAFT Attachment 0151 - EDFP Data Righs.pdf PDF
DRAFT Attachment 0144 - Data Requirements Form for Acquisition Requirement Package (ARP).pdf PDF
DRAFT Attachment 0179 - Small Business Participation Cert.pdf PDF
DRAFT Attachment 0173 - Production Process Site Visit Plan.docx DOCX document
DRAFT Attachment 0122 - JLTV FoV Master Task List.xlsx XLSX spreadsheet
DRAFT Attachment 0117 - HMMR Format Example.xlsx XLSX spreadsheet
DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx XLSX spreadsheet
DRAFT Attachment 0177 - Small Business Participation Factor WB.xlsx XLSX spreadsheet
DRAFT Attachment 0148 - CDRS Search.pdf PDF
DRAFT Attachment 0113 - M and S Input Data Sheets.xlsx XLSX spreadsheet
DRAFT Attachment 0172 -Technology Enhancement TDP Proposal.xlsx XLSX spreadsheet
DRAFT Attachment 0118 - Hazard Tracking Log(3).xls XLS spreadsheet
Draft Section E - Inspection and Acceptance(3).docx DOCX document
DRAFT Attachment 0159 - Welding Standards(3).doc DOC document
DRAFT Attachment 0119 - Exceptions to Hazardous Materials Requirements(3).doc DOC document
DRAFT Attachment 0127 - GFP_GFI List.XLSX XLSX spreadsheet
DRAFT Attachment 0125 - Windchill User Guide.pdf PDF
DRAFT Attachment 0149 - LLRC Proposal Format.DOC DOC document
DRAFT Attachment 0116 - Risk Management Scoring Criteria Template.xlsx XLSX spreadsheet
DRAFT Attachment 0120 - ECP and VECP.docx DOCX document
DRAFT Attachment 0133 - New Equipment Training(3).pdf PDF
DRAFT Attachment 0178 - Small Business Participation Factor WB Instructions.docx DOCX document
DRAFT Attachment 0137 - Design Review Checklist.xlsx XLSX spreadsheet
DRAFT Attachment 0176 - Production Process Attribute Rating Criteria.xlsx XLSX spreadsheet
Draft Section C - SOW(3).docx DOCX document
DRAFT Attachment 0121 - Request for Variance (RFV).docx DOCX document
DRAFT Attachment 0134 - Deprocessing Checklist(3).docx DOCX document
DRAFT Attachment 0106 - STA Form 7114-2.pdf PDF
DRAFT Attachment 0132 - STS Phase 1 WD Process List(3).xlsx XLSX spreadsheet
DRAFT Attachment 0115 - SIL Configuration and Verification Audit (SCAVA).docx DOCX document
Draft Section H - Special Contract Requirements(3).docx DOCX document
DRAFT Attachment 0147 - ATPD 2232 Engines - Preparation for Shipment and Storage.pdf PDF
DRAFT Attachment 0153 - Pre-TRR Checklist(3).docx DOCX document
DRAFT Attachment 0123 - TDP Option Selection Worksheet.docx DOCX document
Draft Section L - Instr., Conditions, and Notices(3).docx DOCX document
DRAFT Attachment 0128 - Supplier RFI Form(3).xlsx XLSX spreadsheet
DRAFT Attachment 0146 - Incoming Transaction Format(3).docx DOCX document
DRAFT Attachment 0163 - JLTV Special Characteristics(3).docx DOCX document
DRAFT Attachment 0168 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf PDF
DRAFT Attachment 0145 - Packaging Data Products(3).docx DOCX document
DRAFT Attachment 0152 - Provisioning Requirements LSA-036.xlsx XLSX spreadsheet
DRAFT Attachment 0164 - JLTV PPAP Requirements(3).docx DOCX document
DRAFT Attachment 0135 - FMECA Requirements.pdf PDF
DRAFT Attachment 0174 - Assertion of Restrictions.xlsx XLSX spreadsheet
DRAFT Attachment 0111 - FPVI Requirements List.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 167 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment 0142

Content Selection Matrix TABLE A-VII DMWR/NMWR Requirements Matrix October 2021

Distribution Statement A – Approved for Public Release; distribution unlimited

DMWR/NMWR Content

DMWR

with RPSTL

NMWR

with RPSTL

MIL-STD-40051- 2B

Reference

Element Name

FRONT MATTER

R
5.2.1
<paper.frnt>

Front cover

R
5.2.1.1
<frntcover>

(MC) Promulgation letter

5.2.1.3
<promulgation>

Warning summary

5.2.1.4
<warnsum>

Change transmittal page

5.2.1.5
<chgsheet>

List of effective pages/work packages

R
5.2.1.6
<loepwp>

Title page

R
5.2.1.7
<titleblk>

Table of contents

R
5.2.1.9
<contents>

CHAPTER 1.

GENERAL INFORMATION, EQUIPMENT DESCRIPTION, AND THEORY OF OPERATION

R
APPENDIX B
<gim>

GENERAL INFORMATION WORK PACKAGE

R
B.5.2
<ginfowp>

Scope

R
B.5.2.3
<scope>

Maintenance forms, records, and reports

R
B.5.2.4
<mfrr>

Reporting Equipment Improvement Recommendations (EIR)

R
B.5.2.5
<eir>

Hand receipt (HR)

B.5.2.6
<handreceipt>

Corrosion Prevention and Control (CPC)

R
B.5.2.7
<cpcdata>

Ozone Depleting Substances (ODS)

B.5.2.8
<odsdata>

Destruction of Army materiel to prevent enemy use

R
B.5.2.9
<destructmat>

Preparation for storage or shipment

R
B.5.2.10
<pssref>

Warranty information

B.5.2.11
<wrntyref>

Nomenclature cross-reference list

B.5.2.12
<nomenreflist>

List of abbreviations/acronyms

R
B.5.2.13
<loa>

Quality Assurance (QA)

B.5.2.14
<qainfo>

Quality of material

R
B.5.2.15
<qual.mat.info>

Safety, care, and handling

B.5.2.16
<sftyinfo>

Nuclear hardness

B.5.2.17
<hcp>

Calibration

B.5.2.18
<calref>

Item unique identification (IUID)

B.5.2.19
<iuid>

TABLE A-VII. DMWR/NMWR requirements matrix for

DMWR

with RPSTL

NMWR

with RPSTL

Engineering Change Proposals (ECP)

R
B.5.2.20
<ecp>

Modifications

B.5.2.21
<modification>

Deviations and exceptions

R
B.5.2.22
<deviation>

Mobilization requirements

R
B.5.2.23
<mobreq>

Critical Safety Items (CSI) (Aircraft only)

B.5.2.24
<csireq>

Cost considerations

R
B.5.2.25
<cost>

Supporting information for repair parts, special tools, TMDE, and support equipment

B.5.2.26
<supdata>

Copyright credit line

B.5.2.27
<copyrt>

EQUIPMENT DESCRIPTION AND DATA WORK PACKAGE

R
B.5.3
<descwp>

Equipment characteristics, capabilities, and features

R
B.5.3.3
<eqpinfo>

Location and description of major components

R
B.5.3.4
<locdesc>

Differences between models

B.5.3.5
<eqpdiff>

Equipment data

R
B.5.3.6
<eqpdata>

THEORY OF OPERATION WORK PACKAGE

B.5.4
<thrywp>

CHAPTER X. DMWR/NMWR TROUBLESHOOTING PROCEDURES

NOTE

The notation (*) indicates that at least one of the these content items shall be included

R
APPENDIX D D.5.4.3
<tim>

<troubledmwrnmwrcategory>

INTRODUCTION WORK PACKAGE

D.5.5.3
<tsintrowp>

TROUBLESHOOTING INDEX WORK PACKAGE

D.5.5.5
<tsindxwp>

PRESHOP ANALYSIS WORK PACKAGE

R
D.5.5.6
<pshopanalwp>

COMPONENT CHECKLIST WORK PACKAGE

D.5.5.7
<compchklistwp>

DMWR DMWR

with

RPSTL

NMWR NMWR

with

RPSTL

*OPERATIONAL CHECKOUT WORK PACKAGES

D.5.5.8.3
<opcheckwp>

*TROUBLESHOOTING WORK PACKAGES

D.5.5.8.4
<tswp>

*COMBINED OPERATIONAL CHECKOUT AND TROUBLESHOOTING WORK PACKAGES

D.5.5.8.5
<opcheck-tswp>

CHAPTER X. DEPOT

MAINTENANCE INSTRUCTIONS

R
APPENDIX E E.5.2.4
<mim>

<depotcategory>

MAINTENANCE WORK PACKAGES

R
E.5.3.5
<maintwp>

Maintenance tasks

R
E.5.3.5.3
<maintsk>

Inspect

E.5.3.5.3.2
<inspect>

Test

E.5.3.5.3.3
<test>

Service

E.5.3.5.3.4
<service>

Adjust

E.5.3.5.3.5
<adjust>

Align

E.5.3.5.3.6
<align>

Calibrate

E.5.3.5.3.7
<calibration>

Remove

E.5.3.5.3.8
<remove>

Install

E.5.3.5.3.9
<install>

Replace

E.5.3.5.3.10
<replace>

Repair

E.5.3.5.3.11
<repair>

Paint

E.5.3.5.3.12
<paint>

Overhaul

E.5.3.5.3.13
<overhaul>

Rebuild

E.5.3.5.3.14
<rebuild>

Lubricate

E.5.3.5.3.15
<lube>

Mark

E.5.3.5.3.16
<mark>

Pack

E.5.3.5.3.17
<pack>

Unpack

E.5.3.5.3.18
<unpack>

Preserve

E.5.3.5.3.19
<preserv>

Prepare for use

E.5.3.5.3.20
<prepforuse>

Assemble

E.5.3.5.3.21
<assem>

Disassemble

E.5.3.5.3.22
<disassem>

Clean

E.5.3.5.3.23
<clean>

Nondestructive inspection

E.5.3.5.3.24
<ndi>

Radio interference suppression

E.5.3.5.3.25
<ris>

DMWR DMWR

with

RPSTL

NMWR NMWR

with

RPSTL

Place in service

E.5.3.5.3.26
<pis>

Towing

E.5.3.5.3.27
<tow>

Jacking

E.5.3.5.3.28
<jack>

Parking

E.5.3.5.3.29
<park>

Mooring

E.5.3.5.3.30
<moor>

Covering

E.5.3.5.3.31
<cover>

Hoisting

E.5.3.5.3.32
<hoist>

Sling loading

E.5.3.5.3.33
<sling>

External power

E.5.3.5.3.34
<extpwr>

Preparation for shipment and storage

E.5.3.5.3.35
<pss>

Arm

E.5.3.5.3.36
<arm>

Load

E.5.3.5.3.37
<load>

Unload

E.5.3.5.3.38
<unload>

Software maintenance

E.5.3.5.3.39
<softwaremaint>

Additional maintenance task

E.5.3.5.3.40
<other.maintsk>

Follow-on maintenance

E.5.3.5.3.41
<followon.maintsk>

GENERAL MAINTENANCE WORK PACKAGE

E.5.3.7
<gen.maintwp>

LUBRICATION INSTRUCTIONS WORK PACKAGE

E.5.3.8
<lubewp>

PRESERVATION, PACKAGING, AND MARKING GENERAL INFORMATION WORK PACKAGE

R
E.5.3.9.1
<ppmgeninfowp>

FACILITIES WORK PACKAGE

E.5.3.9.2
<facilwp>

OVERHAUL INSPECTION PROCEDURES WORK PACKAGE

E.5.3.9.3
<oipwp>

DEPOT MOBILIZATION REQUIREMENTS WORK PACKAGE

E.5.3.9.4
<mobilwp>

QUALITY ASSURANCE REQUIREMENTS WORK PACKAGE

R
E.5.3.9.5
<qawp>

ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE

E.5.3.10

DMWR

with RPSTL

NMWR

with RPSTL

Illustrated list of manufactured items introduction work package

E.5.3.10.1
<manu_items_introwp>

Manufacturing procedures work package

E.5.3.10.2
<manuwp>

TORQUE LIMITS WORK PACKAGE

E.5.3.11
<torquewp>

AIRCRAFT INVENTORY MASTER GUIDE WORK PACKAGE (AIRCRAFT ONLY)

E.5.3.13.2
<inventorywp>

STORAGE OF AIRCRAFT WORK PACKAGE WORK PACKAGE (AIRCRAFT ONLY)

E.5.3.13.3
<storagewp>

WIRING DIAGRAMS WORK PACKAGE

E.5.3.12
<wiringwp>

CHAPTER X.

AUXILIARY EQUIPMENT MAINTENANCE INSTRUCTIONS

APPENDIX E E.5.2.6
<mim>

<auxiliarycategory>

AUXILIARY EQUIPMENT MAINTENANCE WORK PACKAGE

E.5.3.14
<auxeqpwp>

ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE

E.5.3.10

Illustrated list of manufactured items introduction work package

E.5.3.10.1
<manu_items_introwp>

Manufacturing procedures work package

E.5.3.10.2
<manuwp>

TORQUE LIMITS WORK PACKAGE

E.5.3.11
<torquewp>

WIRING DIAGRAMS WORK PACKAGE

E.5.3.12
<wiringwp>

CHAPTER X. AMMUNITION

MAINTENANCE INSTRUCTIONS

APPENDIX E E.5.2.7
<mim>

<ammunitioncategory>

AMMUNITION MAINTENANCE WORK PACKAGE

E.5.3.15.1
<ammowp>

DMWR

with RPSTL

NMWR

with RPSTL

AMMUNITION MARKING INFORMATION WORK PACKAGE

E.5.3.15.2
<ammo.markingwp>

FOREIGN AMMUNITION (NATO) WORK PACKAGE

E.5.3.15.3
<natowp>

CHAPTER X.

PARTS INFORMATION

(DMWR, NMWR)

(DMWR WITH RPSTL, NMWR WITH RPSTL)

R

APPENDIX F
<pim>

INTRODUCTION WORK PACKAGE

R
F.5.3.5
<introwp>

REPAIR PARTS LIST WORK PACKAGE

R
F.5.3.6
<plwp>

REPAIR PARTS FOR SPECIAL TOOLS WORK PACKAGE

F.5.3.7
<stl_partswp>

KIT PARTS LIST WORK PACKAGE

F.5.3.8
<kitswp>

BULK ITEMS WORK PACKAGE

F.5.3.9
<bulk_itemswp>

SPECIAL TOOLS LIST WORK PACKAGE

F.5.3.10
<stlwp>

NSN INDEX WORK PACKAGE

R
F.5.3.11.1
<nsnindxwp>

P/N INDEX WORK PACKAGE

R
F.5.3.11.2
<pnindxwp>

REFERENCE DESIGNATOR INDEX WORK PACKAGE

F.5.3.11.3
<refdesindxwp>

CHAPTER X.

SUPPORTING INFORMATION

NOTE

Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.

R
APPENDIX G
<sim>

REFERENCES WORK PACKAGE

R
G.5.2
<refwp>

EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE

R
G.5.6
<explistwp>

TOOL IDENTIFICATION LIST WORK PACKAGE

G.5.7
<toolidwp>

DMWR

with RPSTL

NMWR

with RPSTL

MANDATORY REPLACEMENT PARTS WORK PACKAGE

G.5.8
<mrplwp>

CRITICAL SAFETY ITEMS (CSI) WORK PACKAGE (AIRCRAFT ONLY)

G.5.9
<csi.wp>

SUPPORT ITEMS WORK PACKAGE

G.5.10
<supitemwp>

ADDITIONAL SUPPORTING WORK PACKAGES

G.5.11
<genwp>

REAR MATTER

R
5.2.3
<rear>

Glossary

5.2.3.1
<glossary>

Alphabetical index

5.2.3.2
<aindx>

DA Form 2028

R
5.2.3.3
<da2028>

Authentication page

R
5.2.3.4
<authent>

Foldout pages

5.2.3.5
<foldsect>

Back cover

R
5.2.3.6
<back>

Legend R - Required P - Prohibited Shaded - As Required

File details come from the government source that posted it. Updated .