DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx
XLSX spreadsheet 42 KB Posted
- Solicitation number
- W56HZV-20-R-0072
About this file
This document provides details for an upcoming Joint Light Tactical Vehicle (JLTV) Family of Vehicles production contract opportunity. The Department of the Army Materiel Command TACOM Life Cycle Management Command intends to competitively award a single-award, five-year requirements contract with five additional one-year options for JLTV Family of Vehicles production. Interested offerors are invited to attend an industry day on February 24-25, 2020 at Selfridge Air National Guard Base in Michigan to learn about contract requirements. The draft RFP and technical data package will be released in March 2020. One-on-one meetings will also be held on February 25 for offerors to ask questions about the draft RFP. The final RFP and contract award are expected later in 2020.
View the file
Other files
Show 40 more
Latest 50 of 167 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
UNCLASSIFIED
Draft Attachment 0126
Design Verification Plan & Report (DVP&R)
"Distribution Statement A – Approved for Public Release; distribution unlimited"
UNCLASSIFIED
Change Log
| UNCLASSIFIED | |
| Date | Description of Change |
UNCLASSIFIED
DVP&R Sample
| DESIGN VERIFICATION PLAN AND REPORT | |||||
| Contractor Name | Program Name | Part Number | Item Description | ||
| Rev Level | Revison Date | Engineer |
| Specification & Method | Test Description | Acceptance Criteria | Test Stage | Target Requirements | Sample Type | Sample Level | Actual Results | Additional Notes | |||||||||
| Specification | Provide a brief description | Specify test targets and/or | FPUI = First Production Unit Inspection | State required probability | Describe the | A = Prototype (Handmade) | List results in terms | Describe or | |||||||||
| governing test | of each test. Specify component | pass/not pass criteria. | PVT = Production Verification Test | or reliability and confidence | sample to be | B = Prototype (Tooled) | of reliability or | elaborate on | |||||||||
| & test method used | level (bench) or system level (vehicle). | e.g. cycles, miles, volts, | DT = Developmental Test | of meeting acceptance | tested (see | C = Production Tool (Not Process) | probability as appropriate | sub-phases | |||||||||
| (if applicable). | Include SC/CC/KPC Symbol | minimum value, no | CT = Control Test | criteria, e.g. R90 C90, or | sample level) | D = Production Tool and Process | |||||||||||
| List the Customer or | breakage, etc. | FPT/FOT = Follow-on Production Test | All must pass, or X% pass | Test Responsibility | TIR# | ||||||||||||
| designated symbol | OT = Operational Test | Government | List Test Incident Report (TIR) number | ||||||||||||||
| if applic., e.g. KPC | PQT = Production Qualification Test | Contractor | if applicable | ||||||||||||||
| Test Plan | Test Report | ||||||||||||||||
| Test | Specification | Test Description | Acceptance | Test | Target | Test | Timing Est. | Sample | Timing | Sample | Pass/ | Actual | Additional | ||||
| ID | & Test Method | Criteria | Stage | Requirements | Responsibility | Start | Comp. | Qty | Type | Act. Comp. | No | Level | Not Pass | Results | TIR # | Notes |
image1.emf
File details come from the government source that posted it. Updated .