DRAFT Attachment 0126 - Design Verification Plan and Report (DVPR).xlsx

XLSX spreadsheet 42 KB Posted

Attached to
Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On
Solicitation number
W56HZV-20-R-0072
Issued by

About this file

This document provides details for an upcoming Joint Light Tactical Vehicle (JLTV) Family of Vehicles production contract opportunity. The Department of the Army Materiel Command TACOM Life Cycle Management Command intends to competitively award a single-award, five-year requirements contract with five additional one-year options for JLTV Family of Vehicles production. Interested offerors are invited to attend an industry day on February 24-25, 2020 at Selfridge Air National Guard Base in Michigan to learn about contract requirements. The draft RFP and technical data package will be released in March 2020. One-on-one meetings will also be held on February 25 for offerors to ask questions about the draft RFP. The final RFP and contract award are expected later in 2020.

View the file

Other files

File Type Posted
220121_JLTV-FoV_Prod_DRAFT-RFP_QAs_(Distribution_A).pdf PDF
JLTV FOC - Industry Day for DRAFT RFP3.pptx PPTX presentation
2021 SANG Vetting Form A2 Static Display.xlsx XLSX spreadsheet
DRAFT Attachment 0107 - Project Expenditure Report(3).xlsx XLSX spreadsheet
DRAFT Attachment 0151 - EDFP Data Righs.pdf PDF
DRAFT Attachment 0144 - Data Requirements Form for Acquisition Requirement Package (ARP).pdf PDF
DRAFT Attachment 0142 - Table A-VII (DMWR_NMWR Requirements Matrix)(3).docx DOCX document
DRAFT Attachment 0179 - Small Business Participation Cert.pdf PDF
DRAFT Attachment 0173 - Production Process Site Visit Plan.docx DOCX document
DRAFT Attachment 0122 - JLTV FoV Master Task List.xlsx XLSX spreadsheet
DRAFT Attachment 0117 - HMMR Format Example.xlsx XLSX spreadsheet
DRAFT Attachment 0177 - Small Business Participation Factor WB.xlsx XLSX spreadsheet
DRAFT Attachment 0148 - CDRS Search.pdf PDF
DRAFT Attachment 0113 - M and S Input Data Sheets.xlsx XLSX spreadsheet
DRAFT Attachment 0172 -Technology Enhancement TDP Proposal.xlsx XLSX spreadsheet
DRAFT Attachment 0118 - Hazard Tracking Log(3).xls XLS spreadsheet
Draft Section E - Inspection and Acceptance(3).docx DOCX document
DRAFT Attachment 0159 - Welding Standards(3).doc DOC document
DRAFT Attachment 0119 - Exceptions to Hazardous Materials Requirements(3).doc DOC document
DRAFT Attachment 0127 - GFP_GFI List.XLSX XLSX spreadsheet
DRAFT Attachment 0125 - Windchill User Guide.pdf PDF
DRAFT Attachment 0149 - LLRC Proposal Format.DOC DOC document
DRAFT Attachment 0116 - Risk Management Scoring Criteria Template.xlsx XLSX spreadsheet
DRAFT Attachment 0120 - ECP and VECP.docx DOCX document
DRAFT Attachment 0133 - New Equipment Training(3).pdf PDF
DRAFT Attachment 0178 - Small Business Participation Factor WB Instructions.docx DOCX document
DRAFT Attachment 0137 - Design Review Checklist.xlsx XLSX spreadsheet
DRAFT Attachment 0176 - Production Process Attribute Rating Criteria.xlsx XLSX spreadsheet
Draft Section C - SOW(3).docx DOCX document
DRAFT Attachment 0121 - Request for Variance (RFV).docx DOCX document
DRAFT Attachment 0134 - Deprocessing Checklist(3).docx DOCX document
DRAFT Attachment 0106 - STA Form 7114-2.pdf PDF
DRAFT Attachment 0132 - STS Phase 1 WD Process List(3).xlsx XLSX spreadsheet
DRAFT Attachment 0115 - SIL Configuration and Verification Audit (SCAVA).docx DOCX document
Draft Section H - Special Contract Requirements(3).docx DOCX document
DRAFT Attachment 0147 - ATPD 2232 Engines - Preparation for Shipment and Storage.pdf PDF
DRAFT Attachment 0153 - Pre-TRR Checklist(3).docx DOCX document
DRAFT Attachment 0123 - TDP Option Selection Worksheet.docx DOCX document
Draft Section L - Instr., Conditions, and Notices(3).docx DOCX document
DRAFT Attachment 0128 - Supplier RFI Form(3).xlsx XLSX spreadsheet
DRAFT Attachment 0146 - Incoming Transaction Format(3).docx DOCX document
DRAFT Attachment 0163 - JLTV Special Characteristics(3).docx DOCX document
DRAFT Attachment 0168 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
DRAFT Attachment 0143 - Provisioning Requirements Statement(3).pdf PDF
DRAFT Attachment 0145 - Packaging Data Products(3).docx DOCX document
DRAFT Attachment 0152 - Provisioning Requirements LSA-036.xlsx XLSX spreadsheet
DRAFT Attachment 0164 - JLTV PPAP Requirements(3).docx DOCX document
DRAFT Attachment 0135 - FMECA Requirements.pdf PDF
DRAFT Attachment 0174 - Assertion of Restrictions.xlsx XLSX spreadsheet
DRAFT Attachment 0111 - FPVI Requirements List.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 167 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

UNCLASSIFIED

Draft Attachment 0126

Design Verification Plan & Report (DVP&R)

"Distribution Statement A – Approved for Public Release; distribution unlimited"

UNCLASSIFIED

Change Log

UNCLASSIFIED
DateDescription of Change

UNCLASSIFIED

DVP&R Sample

DESIGN VERIFICATION PLAN AND REPORT
Contractor NameProgram NamePart NumberItem Description
Rev LevelRevison DateEngineer
Specification & MethodTest DescriptionAcceptance CriteriaTest StageTarget RequirementsSample TypeSample LevelActual ResultsAdditional Notes
SpecificationProvide a brief descriptionSpecify test targets and/orFPUI = First Production Unit InspectionState required probabilityDescribe theA = Prototype (Handmade)List results in termsDescribe or
governing testof each test. Specify componentpass/not pass criteria.PVT = Production Verification Testor reliability and confidencesample to beB = Prototype (Tooled)of reliability orelaborate on
& test method usedlevel (bench) or system level (vehicle).e.g. cycles, miles, volts,DT = Developmental Testof meeting acceptancetested (seeC = Production Tool (Not Process)probability as appropriatesub-phases
(if applicable).Include SC/CC/KPC Symbolminimum value, noCT = Control Testcriteria, e.g. R90 C90, orsample level)D = Production Tool and Process
List the Customer orbreakage, etc.FPT/FOT = Follow-on Production TestAll must pass, or X% passTest ResponsibilityTIR#
designated symbolOT = Operational TestGovernmentList Test Incident Report (TIR) number
if applic., e.g. KPCPQT = Production Qualification TestContractorif applicable
Test PlanTest Report
TestSpecificationTest DescriptionAcceptanceTestTargetTestTiming Est.SampleTimingSamplePass/ActualAdditional
ID& Test MethodCriteriaStageRequirementsResponsibilityStartComp.QtyTypeAct. Comp.NoLevelNot PassResultsTIR #Notes

image1.emf