TO 6 - CY5 Contamination Control SOW Mod 1.pdf

PDF 180 KB Posted

Attached to
Environmental Test and Integration Services (ETIS) IV - eLibrary
Solicitation number
Not on record
Issued by

About this file

This is a Statement of Work (SOW) modification for Task Order 6-5 under the ETIS III Contract #80GSFC19C0060 at NASA Goddard Space Flight Center, covering contamination control and logistics services for the period October 1, 2023 through September 30, 2024. The modification adds support for DraMS/Dragonfly with a maximum of 1.5 WYE in Buildings 34 and 37.

The contractor must provide contamination control services for ISO cleanrooms and benches, including routine cleaning, bi-annual ISO 14644-1 certification, construction input, cleanliness reports, and particle count monitoring. Support is required for multiple flight projects including OSAM-1, PACE, RST, XRISM/RESOLVE, HERMES, DraMS/Dragonfly, and ILLUMA-T. Additional services include pre-cleaning and precision cleaning support, consumables management, lab testing services (FTIR, GCMS, witness plate analysis), and logistics support for staging and storage across buildings 7, 10, 15, and 29. Non-local travel to Wallops Flight Facility, Johnson Space Center, and Kennedy Space Center is anticipated. The contractor must respond to support requests within 48 hours and maintain appropriate staffing for both regular and overtime hours.

View the file

Other files

File Type Posted
Lifting Standard.pdf PDF
ETIF_Handbook_FINAL_.pdf PDF
ETIS IV - eLibrary Document Listing 3.pdf PDF
Optical System Design of the GEDI.pdf PDF
Thermal Vacuum Manuals.pdf PDF
NPR 8715 3D.pdf PDF
Acoustic Facility Operating Manual.pdf PDF
MSD Safety Manual.pdf PDF
EMI Lab Manuals.pdf PDF
ETD Safety Manual.pdf PDF
Thermal Blanket Support Process.pdf PDF
GPR-8719.1D Current.pdf PDF
549-PG-1410.2.1F.pdf PDF
ASNT-SNT-TC-1A.pdf PDF
ETIS IV - Document Listing 2.pdf PDF
GSFC Mgmt System Manual.pdf PDF
Cryogenic Safety.pdf PDF
547-WI-8072.1.2F.pdf PDF
547-WI-8072.1.1F Current.pdf PDF
Contamination Control.pdf PDF
Mass Properties Fac Manual.pdf PDF
Bldg 5 East Truck Lock Receiving.pdf PDF
Harness-Cable Fab Support.pdf PDF
547-WI-4520.2.2G Current.pdf PDF
549-PG-8700.1.1I Current.pdf PDF
TO 1 - CY5 ET SOW Mod 1 Rev 1.pdf PDF
TO 5 - CY 5 Facility Maintenance SOW Mod 0.pdf PDF
TO 10 - CY5 Engineering Support SOW Mod 0.pdf PDF
TO 10-5 ST 1-0 SOW.pdf PDF
TO 10-5 ST 3-5 - SOW.pdf PDF
80GSFC19C0060 - ETIS III Contract Award.pdf PDF
ETIS III - Modification Log.pdf PDF
Attachment A - Statement of Work.pdf PDF
ETIS III Source Selection Statement.pdf PDF
TO 8 - CY5 Facility Engineering SOW Mod 1.pdf PDF
ETIS IV - Document Listing 1.pdf PDF
TO 2 - CY5 Mechanical Integration SOW_Mod 1.pdf PDF
TO 3 - CY5 Optical Integration SOW Mod1.pdf PDF
TO 4 - CY5 Cable Harness SOW - Mod 0_Rev1.pdf PDF
TO 7 - CY5 Advanced Manufacturing SOW Mod 3.pdf PDF
TO 9 - CY5 Info Sys Mgmt SOW Mod0 Rev1.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ETIS III

Contract # 80GSFC19C0060

ETIS III Contract Year 5 Statement of Work

Task: Contamination Control and Logistics Task Order: 6-5

Task Modification: 1

I. Summary of Changes in this Task Modification

MOD/0 Change Record:

1) Initial release.

MOD/1 Change Record:

1) Change support needed for DraMS/Dragonfly

II. Summary of Work

The contractor shall provide the technical, engineering, and management staff to maintain, operate, and provide contamination control services for the following facilities in accordance with the requirements of 1.3.2.3, 1.3.4, and 1.3.5 of the contract Statement of Work.

III. Period of Performance

The period during which the work for this task shall be performed is between October 1, 2023, and September 30, 2024.

IV. Task Requirements

The contractor shall support planned and unplanned activities levied by projects with issued Work Directives and Code 549 customers that are not during standard working hours with little or no notice. It is an inherent part of I&T activities. The contractor shall respond to all requests within 48 hours.

The contractor shall provide contamination control services in all the contractor managed ISO cleanrooms and benches including, but not limited to:

• Routine and special requested cleaning

• Bi-annual certification per ISO 14644-1 (latest version)

• Construction input per ISO 14644-4 (latest version)

• Provide cleanliness reports as requested

• Live particle counts in B29: 140 SSDIF. Particle counter data shall be submitted to 549 monthly.

The contractor shall provide pre-clean and precision cleaning technician and engineering support for flight projects who have funded these services. Support shall include, but not limited to, cleaning hardware per 549-WI-8072.0.29.

The contractor shall provide consumable management per 549-WI.8072.0.31 for all cleanrooms managed by 549. Support shall include gowning and consumable support.

The contractor shall provide lab services to flight projects and MPRB including, but not limited to:

• Routine analysis of witness plates monthly.

• Test all consumables by lot number per 549-WI.8072.0.31

• FTIR and GCMS testing as requested.

• Ambient pressure off-gassing testing as requested.

Project Support

Project support shall be rendered if individual projects and/or subsystems have an issued Work Directive with 549. The current flight projects that have requested contamination control support and location include:

• OSAM-1 – All locations.

• PACE – All locations and launch support.

• RST – All locations.

• XRISM/RESOLVE – All locations

• HERMES – All locations

• DraMS/Dragonfly – Support a maximum of 1.5 WYE in B34 and B37.

• ILLUMA-T – All locations and launch support

Logistics

The contractor shall perform the following logistic support services on an on-going basis.

The contractor shall manage the staging of incoming, outgoing, and temporary storage of test hardware and support equipment. This function includes controlling and directing the utilization of floor space throughout the building 7, 10, 15, and 29 high bays. Support coordination activities for clean tent and facility use.

V. Deliverable Items and Schedules

The contractor shall manage the stock levels of supplies and materials required to meet normal operational demands, utilizing the GSFC stores stock system when possible. The contractor shall inspect all incoming purchases or subcontracted items to ensure compliance with quality standards.

• Provide upgraded ESD Garments (Meet ESD Level 0) for miscellaneous projects and facilities on Center.

VI. Acceptance

Acceptance shall be at the work directive level.

VII. Management Approach

The contractor shall provide a management staff and structure to efficiently implement the requirements of this SOW. Management requirements are defined in Contract 80GSFC19C0060, Section J, Attachment A. Statement of Work, Section 1.4.

In addition:

a. Staff Allocation, Expertise, and Skill Mix: The contractor shall maintain a staff with the appropriate skill mix, and schedule work in an optimum manner, to provide economical and efficient support during regular and overtime hours for the Task Order.

b. Risk Management and Best Practices: The contractor shall manage schedule, cost, and technical risk through monitoring and reporting of progress and performance metrics, identifying issues well in advance of negative consequences, recommending corrective action to the TM, and implementing corrective actions with the compliance of the TM.

VIII. Travel/ODCs

Non-local travel to Wallops Flight Facility, Johnson Space Center, and Kennedy Space Center is anticipated.

Materials costs include garments and all contamination control related consumables.

IX. Work Location

This work shall be performed primarily on-site at the Goddard Space Flight Center.

The contractor may be required to perform contamination control support at other locations.

X. Reporting Requirements

The contractor shall provide the following reports and reviews:

a. Monthly and semi-annual reports on work assigned for the Task Order

b. A monthly status review of significant work in progress for the Task Order with the Contracting Officer’s Representative (COR)

XI. Higher Level Contract Quality Requirements

The contractor shall follow the GSFC Quality Management system as specified by the GSFC documentation identified throughout this statement of work. The contractor’s Quality System shall be compliant with ISO 14644. Further quality requirements may be specified in flight project Work Order Authorizations and/or Code 540 policies.

a. 80GSFC19C0060, Section J - Attachment F, Quality Assurance Plan

XII. References

a. 80GSFC19C0060, Section J, Attachment A. Statement of Work, Sections 1.3.2.3, 1.3.4, and 1.3.5

b. GPR 1280.1F "The GSFC Management System Manual"

c. GSFC Environmental Test and Integration Facilities Handbook

d. 549-PG-8700.0.1C Contamination Control

e. 549-PG-1410.2.1E Code 549 Configuration Management Plan

f. 549-PG-8072.0.6B Materials & Process Review Board (MPRB) Guidelines

g. 549-WI-8072.0.29 Hardware Cleaning Manual

h. 549-WI-8072.0.31 Consumable Management

File details come from the government source that posted it. Updated .