TO 4 - CY5 Cable Harness SOW - Mod 0_Rev1.pdf
PDF 771 KB Posted
- Solicitation number
- Not on record
About this file
This is a Statement of Work (SOW) for Task Order 4-5 under the ETIS III Contract #80GSFC19C0060 at NASA Goddard Space Flight Center, covering the period from October 1, 2023 to September 30, 2024. The SOW details requirements for electrical cable harness and thermal blanket work across multiple NASA projects.
The contractor must provide flight and ground support system wiring harnesses, cables, and thermal blankets using GSFC facilities and equipment. Key projects include OSAM-1, PACE, JPSS, RST, and other NASA missions. Specific work includes troubleshooting and repair of printed circuit boards, manufacture and testing of electrical assemblies, and design/fabrication of thermal blankets for both test and flight equipment. The contractor must support planned and unplanned activities outside standard working hours, manage Building 7 Thermal Blanket Lab and Building 15 Cable Laboratory, develop Work Order Authorizations, and provide all necessary documentation, certifications, and deliverables. Work will primarily be performed at GSFC with potential travel to test locations and launch sites. The contractor must comply with the Quality Assurance Plan and maintain appropriate staffing levels and expertise.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ETIS III
Contract # 80GSFC19C0060
ETIS III Contract Year 4 Statement of Work
Task: Electrical Cable Harness and Thermal Blankets
Task Order: 4-5
Task Modification: 0
I. Summary of Changes in this Task Modification
MOD/0 Change Record:
1) Initial release.
II. Summary of Work
WBS 1.2.1 Electrical Cable Harness
The contractor shall use GSFC facilities and equipment to provide flight and ground support system wiring harnesses and cables. This work includes design, procurement, fabrication, verification, modification, delivery, and installation.
WBS 1.2.2 Thermal Blankets
The contractor shall use GSFC facilities and equipment to provide flight and ground support system thermal blankets and tape application. This work includes requirements development, design, procurement, fabrication, verification, delivery, and installation.
III. Period of Performance
The period during which the work for this task shall be performed is between October 1, 2023 and September 30, 2024.
IV. Task Requirements
The contractor will be expected to support planned and unplanned activities levied by Project and Code 549 customers that are not during standard working hours with little or no notice. It is an inherent part of I&T activities. The contractor should be ready to respond to all requests.
WBS 1.2.1 Electrical Cable Harness
a. Miscellaneous Projects
Contractor shall provide technician support in troubleshooting and repair of printed circuit boards; in manufacture, repair, testing, and structural bonding of flight and non-flight electrical cable and harnessing; in manufacture, troubleshooting, and repair of electrical assemblies for OSAM-1 , IRAD’s, PACE, JPSS, RST, and other projects and facilities groups for flight and non-flight as required.
b. NASA’s Exploration & In-Space Services (NExIS)
Contractor shall provide electrical harness engineer support to NExIS. This work includes the electrical design, test, and integration of cabling/harnessing for ground support hardware within subsystems and at the mission system level.
WBS 1.2.2 Thermal Blankets
a. Plankton, Aerosol, Cloud, Ocean Ecosystem (PACE)
Contractor shall provide design, template, and fabrication of test or flight blanketing. Support includes blanketing support for GSE test set-ups or flight equipment. Contractor shall develop Work Order Authorizations (WOAs) with Project, all documentation, certifications, schedules, estimates and deliverables.
Include anticipated overtime, and travel support to the launch site. Include material costs.
b. Roman Space Telescope (RST) and Wide Field Instrument (WFI)
Contractor shall provide design, template, and fabrication of test or flight blanketing. Support includes blanketing support for GSE test set-ups or flight equipment. Contractor shall develop Work Order Authorizations (WOAs) with Project, all documentation, certifications, schedules, estimates and deliverables.
Include anticipated overtime, and travel support to the launch site. Include material costs.
c. C a p t u r e , C o n t a i n m e n t , a n d R e t u r n S y s t e m ( CCRS)
Contractor shall provide design, template, and fabrication of test or flight blanketing. Support includes blanketing support for GSE test set-ups or flight equipment. Contractor shall develop Work Order Authorizations (WOAs) with Project, all documentation, certifications, schedules, estimates and deliverables.
Include anticipated overtime, and travel support to the launch site. Include material costs.
d. Miscellaneous Projects
Contractor shall provide design, template, and fabrication of test and flight blanketing for a number of projects including but not limited to: OSAM-1, VIPER , GPS LRA, GOES, IRAD projects and various other Projects. Blanketing support includes GSE test set-ups as well as flight equipment. Include anticipated overtime, and travel support to the test and launch sites. Include material costs.
V. Management Approach
The contractor shall provide a management staff and structure to efficiently implement the requirements of this SOW. Management requirements are defined in 80GSFC19C0060, Section J, Attachment A. Statement of Work, Section 1.4.
In addition:
a. Staff Allocation, Expertise, and Skill Mix: The contractor shall staff this work item with the appropriate skill mix and staffing level for the work.
b. Facilities and Laboratory Management: Provide Laboratory Management (Per GPR 8730.7) for the Building 7 Thermal Blanket Lab, and the Building 15 Cable Laboratory.
c. Risk Management and Best Practices: The contractor shall manage schedule, cost, and technical risk through monitoring and reporting of progress and performance metrics, identifying issues well in advance of negative consequences, recommending corrective action to the TM, and implementing corrective actions with the compliance of the TM.
VI. Travel/ODCs
Materials costs for cable, blanket, and tape material for the various projects. Travel to test sites, integration sites and launch sites as required.
VII. Work Location
This work shall be performed primarily on-site at the Goddard Space Flight Center.
The contractor may be required to perform some work at off-site test locations and launch sites.
VIII. Higher Level Contract Requirements The Contractor shall comply with the higher-level quality standard(s) below:
a. Attachment F, Quality Assurance Plan
IX. References
a. 80GSFC19C0060, Section J, Attachment A. Statement of Work, Section 1.2.
b. GPR 1280.1 “The GSFC Quality Manual”
c. GSFC Environmental Test and Integration Facilities Handbook
d. 549-PG-1410.2.1D “Code 549 Configuration Management Plan”
File details come from the government source that posted it. Updated .