TO 10 - CY5 Engineering Support SOW Mod 0.pdf

PDF 691 KB Posted

Attached to
Environmental Test and Integration Services (ETIS) IV - eLibrary
Solicitation number
Not on record
Issued by

About this file

This is a Statement of Work (SOW) for Task Order 10-5 under the ETIS III Contract #80GSFC19C0060 for Year 5 engineering support at NASA Goddard Space Flight Center. The period of performance is October 1, 2023 through September 30, 2024.

The contractor must provide engineering support for four key subtasks: RST MGSE Development, RST Thermal GSE Development, OCI I&T Support, and JWST Ground Segment and Operations Support. The work requires responding to both planned and unplanned activities outside standard working hours with minimal notice. The contractor must provide monthly status reports to the Task Order Monitor and will be evaluated on subcontract management effectiveness, financial management quality and timeliness, communication abilities, and technical performance. Work will be performed at Goddard Space Flight Center and other locations specified in subtask SOWs. The contractor must comply with the Quality Assurance Plan outlined in contract attachment F, with specific management requirements defined in Section 1.4 of Attachment A.

View the file

Other files

File Type Posted
Lifting Standard.pdf PDF
ETIF_Handbook_FINAL_.pdf PDF
Optical System Design of the GEDI.pdf PDF
ETIS IV - eLibrary Document Listing 3.pdf PDF
Thermal Vacuum Manuals.pdf PDF
NPR 8715 3D.pdf PDF
Acoustic Facility Operating Manual.pdf PDF
MSD Safety Manual.pdf PDF
EMI Lab Manuals.pdf PDF
ETD Safety Manual.pdf PDF
Thermal Blanket Support Process.pdf PDF
GPR-8719.1D Current.pdf PDF
549-PG-1410.2.1F.pdf PDF
ASNT-SNT-TC-1A.pdf PDF
Mass Properties Fac Manual.pdf PDF
Bldg 5 East Truck Lock Receiving.pdf PDF
Harness-Cable Fab Support.pdf PDF
547-WI-4520.2.2G Current.pdf PDF
549-PG-8700.1.1I Current.pdf PDF
ETIS IV - Document Listing 2.pdf PDF
GSFC Mgmt System Manual.pdf PDF
Cryogenic Safety.pdf PDF
547-WI-8072.1.2F.pdf PDF
547-WI-8072.1.1F Current.pdf PDF
Contamination Control.pdf PDF
TO 1 - CY5 ET SOW Mod 1 Rev 1.pdf PDF
TO 5 - CY 5 Facility Maintenance SOW Mod 0.pdf PDF
TO 10-5 ST 1-0 SOW.pdf PDF
TO 10-5 ST 3-5 - SOW.pdf PDF
80GSFC19C0060 - ETIS III Contract Award.pdf PDF
ETIS III - Modification Log.pdf PDF
Attachment A - Statement of Work.pdf PDF
ETIS III Source Selection Statement.pdf PDF
TO 8 - CY5 Facility Engineering SOW Mod 1.pdf PDF
TO 9 - CY5 Info Sys Mgmt SOW Mod0 Rev1.pdf PDF
ETIS IV - Document Listing 1.pdf PDF
TO 2 - CY5 Mechanical Integration SOW_Mod 1.pdf PDF
TO 3 - CY5 Optical Integration SOW Mod1.pdf PDF
TO 4 - CY5 Cable Harness SOW - Mod 0_Rev1.pdf PDF
TO 6 - CY5 Contamination Control SOW Mod 1.pdf PDF
TO 7 - CY5 Advanced Manufacturing SOW Mod 3.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ETIS III Contract #80GSFC19C0060

ETIS III Contract Year 5 Statement of Work

Task: Engineering Support Task Order: 10-5 Task Modification: 0

I. Summary of Changes in this Task Modification

MOD/0 Change Record:

1) Initial release.

II. Summary of Work

The contractor shall provide engineering support in accordance with the requirements of the ETIS III Contract, Attachment A, Statement of Work for specific project support. Engineering tasks for services or deliverables are identified in the Work Breakdown Structure (WBS) element descriptions in Attachment A.

III. Period of Performance (POP)

The period during which the work for this task shall be performed is between October 1, 2023and September 30, 2024.

IV. Task Requirements

The contractor will be expected to support planned and unplanned activities levied by Project and Code 549 customers that are not during standard working hours with little or no notice.

The contractor should be ready to respond to all requests.

The following list of subtasks are expected to need support during the Task Order Period of Performance (POP). A statement of Work (SOW will be provided for each subtask. Subtasks may be modified and additional subtasks may be added as new work is identified.

1. RST MGSE Development

2. RST Thermal GSE Development

3. OCI I&T Support

4. JWST Ground Segment and Operations (GSO) Support

V. Deliverable Items and Schedules The contractor shall provide regular subtask status to the Task Order Monitor. The status should be provided on a monthly basis as a minimum.

VI. Management Approach

The contractor shall provide a management staff and structure to efficiently implement the requirements of this SOW. Management requirements are defined in 80GSFC19C0060, Section J, Attachment A. Statement of Work, Section 1.4.

The work performed for this task will be evaluated by the Technical Monitor based on:

a. The contractor’s overall effectiveness to manage subcontracts

b. The quality and timeliness of the financial management of the subtasks

c. The ability to maintain good communication within its organization and with the Government

d. Effective and efficient performance to meet the technical requirements and schedules as described in each subtask SOW

VII. Travel/ODCs

Travel and ODCs are defined in the subtask SOWs.

VIII. Work Location

Work shall be performed at the Goddard Space Flight Center and other locations as defined in the subtask SOWs.

IX. Higher Level Contract Quality Requirements:

The Contractor shall comply with the higher-level quality standard(s) below:

a. 80GSFC19C0060, Section J, Attachment F, Quality Assurance Plan

X. References

a. 80GSFC19C0060, Section J, Attachment A. Statement of Work

File details come from the government source that posted it. Updated .