Bldg 5 East Truck Lock Receiving.pdf

PDF 950 KB Posted

Attached to
Environmental Test and Integration Services (ETIS) IV - eLibrary
Solicitation number
Not on record
Issued by

About this file

This is a NASA Work Instruction (WI) document that outlines the receiving procedure for the Building 5 East Truck Lock at the Goddard Space Flight Center's Advanced Manufacturing Branch. The document details mandatory compliance procedures for receiving and processing products through the truck lock facility.

The work instruction specifies that Logistics Personnel must follow traveler events when receiving products, perform inspections within 1.5 working days, and complete specific tasks including entering delivery information into electronic databases, forwarding paperwork to the Manufacturing Engineering Group (MEG), and conducting Kind, Count, and Condition inspections. For flight/critical GSE parts, special procedures are required if items fail inspection, including documentation and routing to metrology. The document requires specific tools and equipment (forklift, crane, safety shoes, protective gloves), certifications (forklift, crane, hazard communication training), and maintains records through the NASA Records Retention Schedule. The instruction has undergone multiple revisions since its initial release in 1998, with the latest revision K becoming effective October 18, 2023 and expiring October 18, 2028.

View the file

Other files

File Type Posted
Lifting Standard.pdf PDF
Optical System Design of the GEDI.pdf PDF
ETIS IV - eLibrary Document Listing 3.pdf PDF
ETIF_Handbook_FINAL_.pdf PDF
Thermal Vacuum Manuals.pdf PDF
NPR 8715 3D.pdf PDF
Acoustic Facility Operating Manual.pdf PDF
MSD Safety Manual.pdf PDF
Mass Properties Fac Manual.pdf PDF
Harness-Cable Fab Support.pdf PDF
547-WI-4520.2.2G Current.pdf PDF
549-PG-8700.1.1I Current.pdf PDF
ETIS IV - Document Listing 2.pdf PDF
GSFC Mgmt System Manual.pdf PDF
Cryogenic Safety.pdf PDF
547-WI-8072.1.2F.pdf PDF
547-WI-8072.1.1F Current.pdf PDF
Contamination Control.pdf PDF
EMI Lab Manuals.pdf PDF
ETD Safety Manual.pdf PDF
Thermal Blanket Support Process.pdf PDF
GPR-8719.1D Current.pdf PDF
549-PG-1410.2.1F.pdf PDF
ASNT-SNT-TC-1A.pdf PDF
TO 1 - CY5 ET SOW Mod 1 Rev 1.pdf PDF
TO 5 - CY 5 Facility Maintenance SOW Mod 0.pdf PDF
TO 10 - CY5 Engineering Support SOW Mod 0.pdf PDF
TO 10-5 ST 1-0 SOW.pdf PDF
TO 10-5 ST 3-5 - SOW.pdf PDF
TO 9 - CY5 Info Sys Mgmt SOW Mod0 Rev1.pdf PDF
ETIS IV - Document Listing 1.pdf PDF
TO 2 - CY5 Mechanical Integration SOW_Mod 1.pdf PDF
TO 3 - CY5 Optical Integration SOW Mod1.pdf PDF
TO 4 - CY5 Cable Harness SOW - Mod 0_Rev1.pdf PDF
TO 6 - CY5 Contamination Control SOW Mod 1.pdf PDF
TO 7 - CY5 Advanced Manufacturing SOW Mod 3.pdf PDF
80GSFC19C0060 - ETIS III Contract Award.pdf PDF
ETIS III - Modification Log.pdf PDF
Attachment A - Statement of Work.pdf PDF
ETIS III Source Selection Statement.pdf PDF
TO 8 - CY5 Facility Engineering SOW Mod 1.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .