This is a document listing file for the ETIS IV e-Library (solicitation number 80GSFC24R0012) dated June 18, 2024, which provides historical contract documents from the ETIS III contract. The listing contains 16 documents from the previous ETIS III contract (80GSFC19C0060), including the contract award, modification log, and Statement of Work.
The documents cover various task orders from the ETIS III contract, including Environmental Test (TO1), Mechanical Integration (TO2), Optical Integration (TO3), Electrical Cable Harness and Thermal Blankets (TO4), Facility Maintenance (TO5), Contamination Control (TO6), Advanced Manufacturing (TO7), Facility Engineering (TO8), Information Systems Management (TO9), and Engineering Support (TO10). Each task order listing includes its corresponding Statement of Work document and modification status, providing potential offerors with historical information about the scope and evolution of the ETIS program at NASA Goddard Space Flight Center.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ETIS IV E-LIBRARY DOCUMENT LISTING
DRFP 80GSFC24R0012
CONTRACT TBD
June 18, 2024
ETIS III Historical Contract Documents
Document Title File Name 1 80GSFC19C0060 – ETIS III Contract Award 80GSFC19C0060 – ETIS III Contract
Award.pdf
2 ETIS III – Modification Log ETIS III – Modification Log.pdf
3 ETIS III – Attachment A – Statement of
Work (SOW)
Attachment A – Statement of Work.pdf
4 ETIS III – Source Selection Statement ETIS III Source Selection Statement.pdf
5 ETIS III - Task Order 1 – Environmental
Test SOW Mod 1 Rev 1
TO 1 – CY5 ET SOW Mod 1 Rev 1.pdf
6 ETIS III – Task Order 2 – Mechanical
Integration SOW Mod 1
TO 2 – CY5 Mechanical Integration SOW_Mod
1.pdf
7 ETIS III – Task Order 3 – Optical Integration
SOW Mod 1
TO 3 – CY5 Optical Integration SOW Mod
1.pdf
8 ETIS III – Task Order 4 - Electrical Cable
Harness and Thermal Blankets SOW Mod 0
Rev 1
TO 4 – CY5 Cable Harness SOW – Mod
0_Rev1.pdf
9 ETIS III – Task Order 5 – Facility
Maintenance SOW Mod 0
TO 5 – CY 5 Facility Maintenance SOW Mod
0.pdf
10 ETIS III – Task Order 6 – Contamination
Control SOW Mod 1
TO 6 – CY5 Contamination Control SOW Mod
1.pdf
11 ETIS III – Task Order 7 – Advanced
Manufacturing SOW Mod 3
TO 7 – CY5 Advanced Manufacturing SOW
Mod 3.pdf
12 ETIS III – Task Order 8 – Facility
Engineering SOW Mod 1
TO 8 – CY5 Facility Engineering SOW Mod
1.pdf
13 ETIS III – Task Order 9 – Information
Systems Management SOW Mod 0 Rev 1
TO 9 – CY5 Info Sys Mgmt SOW Mod0
Rev1.pdf
14 ETIS III – Task Order 10 – Engineering
Support SOW Mod 0
TO 10 – CY5 Engineering Support SOW Mod
0.pdf
15 ETIS III – Task Order 10 Subtask 1 SOW
Mod 0
TO 10-5 ST 1-0 SOW.pdf
16 ETIS III – Task Order 10 Subtask 3 SOW
Mod 0
TO 10-5 ST 3-5 – SOW.pdf