This document is an e-library document listing for the ETIS IV (Environmental Test and Integration Services IV) contract opportunity (DRFP 80GSFC24R0012) from NASA Goddard Space Flight Center. The listing contains 40 reference documents divided into two main sections: ETIS III Historical Contract Documents and Technical Documents.
The historical documents section includes the previous ETIS III contract award (80GSFC19C0060), modification log, statement of work, source selection statement, and 10 task order SOWs covering areas like environmental testing, mechanical integration, optical integration, cable harness/thermal blankets, facility maintenance, contamination control, advanced manufacturing, facility engineering, information systems management, and engineering support. The technical documents section contains 24 documents related to NASA procedures, safety manuals, and facility operations, including materials testing procedures, aerospace fabrication equipment maintenance, configuration management plans, laboratory operating manuals, safety requirements, and specialized facility handbooks for areas like thermal vacuum testing, EMI labs, and cryogenic operations.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ETIS IV E-LIBRARY DOCUMENT LISTING
DRFP 80GSFC24R0012
CONTRACT TBD
ETIS III Historical Contract Documents Document Title File Name
1 80GSFC19C0060 – ETIS III Contract Award 80GSFC19C0060 – ETIS III Contract Award.pdf
2 ETIS III – Modification Log ETIS III – Modification Log.pdf 3 ETIS III – Attachment A – Statement of
Work (SOW) Attachment A – Statement of Work.pdf
4 ETIS III – Source Selection Statement ETIS III Source Selection Statement.pdf
5 ETIS III - Task Order 1 – Environmental Test SOW Mod 1 Rev 1
TO 1 – CY5 ET SOW Mod 1 Rev 1.pdf
6 ETIS III – Task Order 2 – Mechanical Integration SOW Mod 1
TO 2 – CY5 Mechanical Integration SOW_Mod 1.pdf
7 ETIS III – Task Order 3 – Optical Integration SOW Mod 1
TO 3 – CY5 Optical Integration SOW Mod 1.pdf
8 ETIS III – Task Order 4 - Electrical Cable Harness and Thermal Blankets SOW Mod 0 Rev 1
TO 4 – CY5 Cable Harness SOW – Mod 0_Rev1.pdf
9 ETIS III – Task Order 5 – Facility Maintenance SOW Mod 0
TO 5 – CY 5 Facility Maintenance SOW Mod 0.pdf
10 ETIS III – Task Order 6 – Contamination Control SOW Mod 1
TO 6 – CY5 Contamination Control SOW Mod 1.pdf
11 ETIS III – Task Order 7 – Advanced Manufacturing SOW Mod 3
TO 7 – CY5 Advanced Manufacturing SOW Mod 3.pdf
12 ETIS III – Task Order 8 – Facility Engineering SOW Mod 1
TO 8 – CY5 Facility Engineering SOW Mod 1.pdf
13 ETIS III – Task Order 9 – Information Systems Management SOW Mod 0 Rev 1
TO 9 – CY5 Info Sys Mgmt SOW Mod0 Rev1.pdf
14 ETIS III – Task Order 10 – Engineering Support SOW Mod 0
TO 10 – CY5 Engineering Support SOW Mod 0.pdf
15 ETIS III – Task Order 10 Subtask 1 SOW Mod 0
TO 10-5 ST 1-0 SOW.pdf
16 ETIS III – Task Order 10 Subtask 3 SOW Mod 0
TO 10-5 ST 3-5 – SOW.pdf
Technical Documents 17 Receipt, Verification, Testing and Storage of
Raw Materials 547-WI-4520.2.2G Current.pdf
18 Preventative Maintenance of Aerospace Fabrication Equipment
547-WI-8072.1.1F Current.pdf
19 Corrective Maintenance of Aerospace Fabrication Equipment
547-WI-8072.1.2F.pdf
20 Code 549 Configuration Management Plan 549-PG-1410.2.1F.pdf 21 Environmental Test Engineering and
Integration Process 549-PG-8700.1.1I Current.pdf
22 Acoustic Facility Operating Manual Acoustic Facility Operating Manual.pdf 23 Personnel Qualification and Certification in
Nondestructive Testing ASNT-SNT-TC-1A.pdf
24 Building 7 Vibration Laboratory Manual B7 Vib Lab Operating Manual.pdf
25 Building 5 East Truck Lock Receiving Procedure (547-WI-4520.2.1K)
Bldg 5 East Truck Lock Receiving.pdf
26 Contamination Control (549-PG-8700.0.1D) Contamination Control.pdf 27 Cryogenic Safety (GPR 8710.7C) Cryogenic Safety.pdf 28 EMI Lab Manuals EMI Lab Manuals.pdf 29 Engineering and Technology Directorate
Safety Manual (500-PG-8715.1.2D) ETD Safety Manual.pdf
30 Lifting Devices and Equipment (LDE) Certifications and Operations
GPR 8719.1D Current.pdf
31 The GSFC Management System Manual
(GPR 1280.1H)
GSFC Mgmt System Manual.pdf
32 Harness/Cable Fabrication Support (549-PG- 8072.0.1A)
Harness-Cable Fab Support.pdf
33 Mass Properties Measurement Facility Operating Manual
Mass Properties Fac Manual.pdf
34 Mechanical Systems Division Safety Manual
(540-PG-8715.1.2E)
MSD Safety Manual.pdf
35 NASA General Safety Program Requirements
NPR 8715.3D.pdf
36 Thermal Blanket Support Process (549-PG- 8071.0.2B)
Thermal Blanket Support Process.pdf
37 Thermal Vacuum Manuals Thermal Vacuum Manuals.pdf 38 Lifting Standard (NASA-STD-8719.9B) Lifting Standard.pdf 39 Environmental Test and Integrations
Facilities Handbook ETIF_Handbook_FINAL.pdf
40 Optical System Design of the GEDI Optical System Design of the GEDI.pdf