This technical exhibit outlines grounding point maintenance requirements for various facilities at Fort Huachuca, Arizona. The contractor shall perform semi-annual ground readings and inspections at ammunition storage areas to ensure ground rods have a maximum resistance of 23 ohms to earth and ground points have a resistance of 10 ohms or less. Annual inspections are also required for Building 61801 and aviation facilities, checking grounding electrode and point resistances. In addition, annual inspections of petroleum, oil and lubricants facilities must be done to verify ground point resistances of 23 ohms or less to earth. The contractor must correct any discrepancies within three days and submit completed inspection logs to the Directorate of Public Works within five days.

View the file

Other files

File Type Posted
Att 11 Residential CWR AZ20230004.pdf PDF
TE_15_PaintBoothLog.docx DOCX document
TE_26_PropaneTanks.docx DOCX document
Annex S - Portable Latrine Services (504).docx DOCX document
Annex M - Pest Management (510).docx DOCX document
Att 9 Pricing Matrix LCAT 10-25-23.xlsx XLSX spreadsheet
Att 14 - Site Access Information.docx DOCX document
Att 8 Pricing Matrix - Worksheet 10-27-2023.xlsx XLSX spreadsheet
Annex P - Facilities Engineering Services Management (400).docx DOCX document
TE_53_FHMoldIdentificationandRemediationSOP.pdf PDF
TE_48_WorkloadIW37NA001A004CombinedData(Master).xlsx XLSX spreadsheet
Att 12 SCA WD 2015-5719 Rev 20.pdf PDF
TE_10_AdverseWeatherPlan.docx DOCX document
TE_31_HVACMaintenanceandReports(ACVent).docx DOCX document
TE_12_Asbestos.docx DOCX document
Att 17 Quality Assurance Surveillance Plan 2023.docx DOCX document
Annex L - Wastewater Services (503).docx DOCX document
TE_22_EmergencyElevatorService.docx DOCX document
Att 15 - DD Form 254.pdf PDF
TE_46_WorkloadNon-recurringIJO2019-2023.xlsx XLSX spreadsheet
TE_37_FHDiggingExcavationPermit.pdf PDF
TE_28_WaterGasMeters.docx DOCX document
TE_21_GroundsSafetyLog.docx DOCX document
TE_41_DAForm4283.pdf PDF
TE_45_PortableLatrineList.xlsx XLSX spreadsheet
Annex J - Maintenance - Surfaced and Unsurfaced Areas (420) .docx DOCX document
TE_25_NaturalGasEmergency.docx DOCX document
TE_23_FireAlarms.docx DOCX document
Att 5 Past Performance Reference List (PART A).docx DOCX document
Att 7 Past Performance Questionnaire (PPQ).docx DOCX document
TE_30_FireSprinkler.docx DOCX document
Annex T - Environmental ENRD (505).docx DOCX document
TE_18_90DayPM.docx DOCX document
TE_14_GreaseTrap.docx DOCX document
TE_17_BarracksLocks.docx DOCX document
TE_06_WOPriorityCalcTable.docx DOCX document
Annex E - Solid Waste Management (403).docx DOCX document
TE_04_DirectivesandPublications.docx DOCX document
Annex H - Facilities Maintenance (411).docx DOCX document
Att 3 - Staffing Matrix.xlsx XLSX spreadsheet
Att 11 Heavy CWR AZ20230037.pdf PDF
Annex G - Snow_Ice_and Sand Removal (408).docx DOCX document
TE_05_DeliverablesList.docx DOCX document
TE_55_Integrated Wildland and Fire Management Plan.pdf PDF
Annex F - Maintenance - Grounds (404).docx DOCX document
Att 10 CBA and Addendum 1 -17.pdf PDF
TE_57 Project Stock Movements.xlsx XLSX spreadsheet
TE_34_GovtFurnishedBldgs.docx DOCX document
TE_07_NTP.docx DOCX document
TE_01_TechnicalExhibitList.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Operations (BASOPS) Performance Work Statement Technical Exhibit 36 – Grounding Points

1. The contractor shall repair, maintain, install and test interior electrical grounds and grounding systems IAW the following:

NEC

NFPA-99

NFPA-101

Types of components include: ground rods; grounding conductors; ground clamps;

ground wells; ground lanes; aircraft tie downs; and fueling ground points at petroleum oils and lubricants (POLs) and airfields. The contractor shall perform ground point maintenance on grounds listed upon receipt of a valid work document.

2. Types of Facilities-

2.1 Ammunition Storage Facilities: The contractor shall perform ground readings at the ammunition storage areas every 180 calendar days. The contractor shall conduct the tests using a grounding electrode (ground rod) as a reference ground. The maximum allowable resistance of the grounding electrode shall be 23 ohms to earth. The maximum allowable reading on any of the ground points listed below shall be 10 ohms. The contractor shall correct all discrepancies within 3 working days. The contractor shall prepare a Ground Safety Check Log (Forms). Detailing the locations of ground points, the type of ground point, the reading taken, any discrepancies found, and the corrective action performed. The contractor shall deliver the completed Ground Safety Check Log to the DPW within 5 working days of the completion of the ground point checks. The contractor shall take readings on the following points on each of the 15 facilities listed below: door; antenna 1, antenna 2, antenna 3, vent body; vent cover; and ground to ground.

13501, 13511, 13521, 13503, 13513, 13523, 13505, 13515, 13525, 13507, 13517, 13527, 13509, 13519, 13529

In addition, a ground reading shall be taken from the ground electrodes to the perimeter fence..

2.2 Building 61801, Rooms 1508, 1508A, 1516B, 1510, and 1510B:

The contractor shall accomplish ground readings at 12-month intervals on a total of 22 points in the above rooms normally in April. The contractor shall assure continuity of all grounding points to a grounding electrode using a volt meter or equivalent. The resistance measured from the facilities most remote grounding point to each grounding electrode shall be less than 2 ohms. The contractor shall assure that the maximum resistance of the grounding electrode to earth shall be 23 ohms or less. The contractor shall establish a grounding electrode that does not exceed a maximum resistance to ground of 23 ohms IAW the following:

NEC

The contractor shall correct all discrepancies found within 3 working days. The contractor shall prepare a Ground Safety Check Log . Detailing the locations of ground points, the type of ground point, the reading taken, and noting any discrepancies found and the corrective action preformed. The contractor shall deliver the completed Ground Safety Check Log (Form) to the DPW within 5 working days of the completion of the ground point checks.

2.3 Aviation Related Ground Point Checks:

When requested, the contractor shall perform ground point readings on all aviation related ground points listed below. The contractor shall take ground readings from a ground, with a resistance of 23 ohms or less to earth to the individual points. The contractor shall take readings with a volt meter or equivalent. The contractor shall correct all discrepancies found within 3 working days. The contractor shall prepare a Ground Safety Check Log. Detailing the locations of ground points, the type of ground point, the reading taken, and noting any discrepancies found and the corrective action performed. The contractor shall deliver the completed Ground Safety Check Log (Form) to the DPW within 5 working days of the completion of the ground point checks.

Location
Number
South Ramp, W end
184
South Ramp, E end
159
Main Ramp, in front of hangars,S edge
102
Main Ramp 623
623
Main Ramp, N edge
91
Secure Ramp
272
West Ramp
145
Pol Farm and hangars
42
Taxiway (40 each)
40

2.4 Petroleum Oil and Lubricants (POL) Ground Points:

The contractor shall perform ground point readings at 12-month intervals, presently being accomplished in April, on all POL ground points listed below. The contractor shall take ground readings from a ground, with a resistance of 23 ohms or less to earth, to the individual points. Readings shall be taken with a ZM-21/V 500 volt meter or equivalent. The contractor shall correct all discrepancies found within 3 working days.

The contractor shall prepare a Ground Safety Check Log (Form). Detailing the locations of ground points, the type of ground point, the reading taken, and noting any discrepancies found and the corrective action performed. The contractor shall deliver the completed Ground Safety Check Log to the DPW within 5 working days of the completion of the ground point checks.

Location
Number
86001/UF860
16
87834/UF878
15
Libby/GZFN1
--