Annex G - Snow_Ice_and Sand Removal (408).docx

DOCX document 40 KB Posted

Attached to
DRAFT Solicitation for Base Operations and Maintenance Services, Fort Huachuca, Arizona 20231115
Solicitation number
W9124A23R0005
Issued by

About this file

This annex document outlines snow, ice and sand removal services required for a base operations and maintenance services contract at Fort Huachuca, Arizona. The contractor must provide pavement clearing for roads, access control points, shoulders, driveways and parking areas when accumulations reach one inch or more. Services include plowing, sweeping, de-icing with sand only, and stockpile removal. Sidewalks require snow shoveling and ice melt application. Catch basins, hydrants, dumpsters and HVAC units also need clearing. The contractor must update an adverse weather plan annually and notify emergency services when operations begin or end. Pavement sweeping is due within two days of storm completion to remove excess sand. Safety procedures and inoperable vehicle policies are also defined.

View the file

Other files

File Type Posted
Att 11 Residential CWR AZ20230004.pdf PDF
TE_15_PaintBoothLog.docx DOCX document
TE_26_PropaneTanks.docx DOCX document
Annex S - Portable Latrine Services (504).docx DOCX document
Annex M - Pest Management (510).docx DOCX document
Att 9 Pricing Matrix LCAT 10-25-23.xlsx XLSX spreadsheet
Att 14 - Site Access Information.docx DOCX document
Att 8 Pricing Matrix - Worksheet 10-27-2023.xlsx XLSX spreadsheet
Annex P - Facilities Engineering Services Management (400).docx DOCX document
TE_53_FHMoldIdentificationandRemediationSOP.pdf PDF
TE_48_WorkloadIW37NA001A004CombinedData(Master).xlsx XLSX spreadsheet
Att 12 SCA WD 2015-5719 Rev 20.pdf PDF
TE_10_AdverseWeatherPlan.docx DOCX document
TE_31_HVACMaintenanceandReports(ACVent).docx DOCX document
TE_12_Asbestos.docx DOCX document
Att 17 Quality Assurance Surveillance Plan 2023.docx DOCX document
Annex L - Wastewater Services (503).docx DOCX document
TE_22_EmergencyElevatorService.docx DOCX document
Att 15 - DD Form 254.pdf PDF
TE_46_WorkloadNon-recurringIJO2019-2023.xlsx XLSX spreadsheet
TE_37_FHDiggingExcavationPermit.pdf PDF
TE_28_WaterGasMeters.docx DOCX document
TE_21_GroundsSafetyLog.docx DOCX document
TE_41_DAForm4283.pdf PDF
TE_45_PortableLatrineList.xlsx XLSX spreadsheet
Annex J - Maintenance - Surfaced and Unsurfaced Areas (420) .docx DOCX document
TE_25_NaturalGasEmergency.docx DOCX document
TE_23_FireAlarms.docx DOCX document
Att 5 Past Performance Reference List (PART A).docx DOCX document
Att 7 Past Performance Questionnaire (PPQ).docx DOCX document
TE_30_FireSprinkler.docx DOCX document
Annex T - Environmental ENRD (505).docx DOCX document
TE_18_90DayPM.docx DOCX document
TE_14_GreaseTrap.docx DOCX document
TE_17_BarracksLocks.docx DOCX document
TE_06_WOPriorityCalcTable.docx DOCX document
Annex E - Solid Waste Management (403).docx DOCX document
TE_04_DirectivesandPublications.docx DOCX document
Annex H - Facilities Maintenance (411).docx DOCX document
Att 3 - Staffing Matrix.xlsx XLSX spreadsheet
Att 11 Heavy CWR AZ20230037.pdf PDF
TE_05_DeliverablesList.docx DOCX document
TE_55_Integrated Wildland and Fire Management Plan.pdf PDF
Annex F - Maintenance - Grounds (404).docx DOCX document
Att 10 CBA and Addendum 1 -17.pdf PDF
TE_57 Project Stock Movements.xlsx XLSX spreadsheet
TE_34_GovtFurnishedBldgs.docx DOCX document
TE_07_NTP.docx DOCX document
TE_01_TechnicalExhibitList.docx DOCX document
Att 13 Site Visit Registration Form.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex G Snow, Ice, and Sand Removal (408)

Annex G – Snow, Ice and Sand Removal (408) (U) Annex G – Snow, Ice and Sand Removal (408) (U)

Table of Contents

1.0 GENERAL INFORMATION1
1.1 Overview1
1.2 Snow, Ice, and Sand Removal Plan1
2.0 DESCRIPTION OF SERVICES1
2.1 Scope1
2.1.1 Specialized Locations2
2.1.2 Sidewalks2
2.2 Removal Priorities3
2.3 Pre-treatment and Clearing3
2.3.1 De-icing Material/Sand3
2.4 Pavement Sweeping3
2.5 Inoperable Vehicles3
2.6 Safety3

GENERAL INFORMATION

Overview . The Contractor shall provide pavement clearing services, to include street sweeping and snow, ice, and sand removal services, on paved driving/parking areas and side roads, as annotated starting on TE 10, Adverse Weather Plan. Services shall commence when snow or sand height exceeds one (1) inch, or when forecasted low ambient temperatures and moisture levels could cause ice accumulation or when ice begins to accumulate. Removal and treatment priorities shall take place in accordance with (IAW) the installation’s Snow, Ice and Sand Removal Plan or as directed by the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). Services shall continue as weather conditions dictate.

Snow, Ice, and Sand Removal Plan . The Contractor shall review the provided TE 10, Adverse Weather Plan, and submit any revisions to the COR/ACOR for approval within sixty (60) days of contract award. The Contractor shall update TE 10, Adverse Weather Plan annually, not later than (NLT) 30 September. Revision shall include updates to Access Control Points (ACP) closures or openings and re-prioritization of roads per input from DES or DPW.

The Contractor's plan shall include the following:

· an inventory of materials for snow, ice, or sand removal

· traffic and parking control procedures, communication channels, and priorities between road users, the snow control center, and equipment operating crews

· designated areas from which snow, ice, or sand shall be hauled away when accumulation reaches an established level

· procedures for adding additional crews and equipment in the event of unusual storm/weather events

The Contractor shall shovel snow from steps and spread sand on steps and walkways according to the snow and ice emergency plan or as directed by the Government. The Contractor is required to have a snow and ice emergency plan included in their contingency plan. Salt shall not be used. The DPW, Fort Huachuca Operation Center (EOC) and Directorate of Emergency Services (DES) shall be notified when deicing and snow removal operations are started and shall be updated hourly for the duration of the operation. The Contractor shall respond to road snow, ice, and sand removal requests from the DES.

DESCRIPTION OF SERVICES

Scope . Pavement clearance includes, but is not limited to, the following: plowing and sweeping of sand or snow from roads, access control points (ACP), shoulders, driveways, and parking areas by pushing and piling the snow into adjacent areas or by collecting and removing sand. The Contractor shall begin clearing from areas identified in TE 6 when accumulations have reached one (1) inch or within one (1) hour of notification by the Directorate of Emergency Services or the COR/ACOR. Snow sand or ice removal shall be cleared from walkways, doorways, and gates to provide full opening and safe access for personnel and equipment. Snow, sand, or ice piles shall not be left in the plowed or swept areas. The Contractor shall perform deicing services to maintain steps, handicapped ramps, fire hydrants and access to buildings and essential facilities free from hazards.

Specialized Locations

Paved Roads and Access Control Points (ACP) . The Contractor shall clear roads and ACPs. The Contractor shall clear primary roads to support the safe movement of emergency vehicles. The Contractor shall ensure all opened ACPs are always accessible/operational, regardless of storm intensity. The Contractor shall deploy the assets necessary to ensure the road network is trafficable IAW the Snow, Ice, and Sand Removal Plan. Once removal operations commence, the Contractor shall continue these operations until snow, ice, or sand is removed from the full width of roads, including intersections. The Contractor shall clear all primary roads NLT 0600 hours. The COR/ACOR will inform the Contractor of the revised clearance times, should there be a delay in opening or closure.

Parking Areas . The Contractor shall clear parking areas. Snow, ice, or sand shall be removed from the full width of the parking areas and pushed to designated locations. The Contractor shall clear parking areas of snow, ice, or sand.

Sidewalks

Snow Shoveling and Ice Removal . The Contractor shall snow shovel stairs and apply ice melt as needed for each building. Ice melts (sand only) shall be placed on stairs and sidewalks for each building.

Catch Basins . This applies in rare instances where the snow accumulates and prevents draining. The Contractor shall remove snow from all catch basins to allow free drainage.

Hydrants . The Contractor shall remove snow from and around the hydrants to ensure access. The cleared area shall be, at a minimum, approximately three (3) feet in radius from the hydrant. The Contractor shall clear access to hydrants at the end of each snowstorm.

Dumpsters . This applies in rare instances where the snow accumulates and prevents access. The Contractor shall remove snow from and around the dumpsters to allow for pedestrian access to dispose of refuse. The Contractor shall clear access to dumpsters at the end of each snowstorm.

HVAC Clearing . The Contractor shall ensure HVAC units are kept clear of snow and ice and all control panels are accessible from all sides. This shall be accomplished by means other than plowing (e.g., snow blowing or hand shoveling).

Sand or Snow Stockpile Removal . When specifically authorized by the COR/ACOR, the Contractor shall remove snow, ice, or sand stock- piles to designated on-post locations.

Removal Priorities . The priority of pavement clearance shall be IAW the primary and secondary road list in TE 10, Adverse Weather Plan.

Pre-treatment and Clearing

De-icing Material/Sand . The use of sand only, shall be used IAW local regulations and local policy. The Contractor shall ensure all materials used follow local procedures and is acceptable to the COR/ACOR. The allowable amount of material passing a No. 200 sieve as determined by the American Association of State Highway and Transportation Officials (AASHTO) -T11, Standard Method of Test for Materials Finer Than 75-μm (No.200) in Mineral Aggregates by Washing, shall not exceed 10% by weight. The maximum particle size for sand borrow shall be M1.04.0 Type A, one-fourth inch (¼”). At the end of the snow event, the Contractor shall remove excess sand from sidewalks and parking lots.

Pavement Sweeping . No later than two (2) business days after completion of snow and ice removal operations, the Contractor shall begin the removal of excess ice control abrasive (sand) material previously applied on the pavement areas specified in TE 10, Adverse Weather Plan Priority List using vacuum sweepers. Areas to be swept include, but are not limited to paved roads, parking areas, sidewalks, runways and shoulders, taxiways, aprons, etc.

Inoperable Vehicles . The Contractor shall coordinate with DES to move all vehicles interfering with snow removal or ice control operations. The Contractor shall assume liability for damages to vehicles caused by Contractor employee negligence.

Safety . The Contractor shall ensure snow, ice, or sand removal equipment that is slow moving or otherwise creates an unsafe condition are clearly visible to oncoming traffic and bystanders (e.g., equipped with rotating or flashing amber lights).

G-1