Att 17 Quality Assurance Surveillance Plan 2023.docx

DOCX document 437 KB Posted

Attached to
DRAFT Solicitation for Base Operations and Maintenance Services, Fort Huachuca, Arizona 20231115
Solicitation number
W9124A23R0005
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for base operations and maintenance services at Fort Huachuca, Arizona. The QASP outlines performance standards and inspection procedures to evaluate a contractor's performance in areas such as service orders, preventive maintenance, supply operations, and plant operations. Acceptable performance is defined as maintaining standards below the Minimum Acceptable Standards of Performance in each functional area. Inspections will utilize random and planned sampling methods. Deficiencies may result in unsatisfactory inspection reports, contract discrepancy reports, or invoice deductions up to specified percentages for the associated contract line items when minimum standards are exceeded. The QASP details inspection checklists, sampling guides, and procedures for deductions to encourage contractor accountability and continuous quality improvement in fulfilling the requirements of the performance work statement.

View the file

Other files

File Type Posted
Att 11 Residential CWR AZ20230004.pdf PDF
TE_15_PaintBoothLog.docx DOCX document
TE_26_PropaneTanks.docx DOCX document
Annex S - Portable Latrine Services (504).docx DOCX document
Annex M - Pest Management (510).docx DOCX document
Att 9 Pricing Matrix LCAT 10-25-23.xlsx XLSX spreadsheet
Att 14 - Site Access Information.docx DOCX document
Att 8 Pricing Matrix - Worksheet 10-27-2023.xlsx XLSX spreadsheet
Annex P - Facilities Engineering Services Management (400).docx DOCX document
TE_53_FHMoldIdentificationandRemediationSOP.pdf PDF
TE_48_WorkloadIW37NA001A004CombinedData(Master).xlsx XLSX spreadsheet
Att 12 SCA WD 2015-5719 Rev 20.pdf PDF
TE_10_AdverseWeatherPlan.docx DOCX document
TE_31_HVACMaintenanceandReports(ACVent).docx DOCX document
TE_12_Asbestos.docx DOCX document
Annex L - Wastewater Services (503).docx DOCX document
TE_22_EmergencyElevatorService.docx DOCX document
Att 15 - DD Form 254.pdf PDF
TE_46_WorkloadNon-recurringIJO2019-2023.xlsx XLSX spreadsheet
TE_37_FHDiggingExcavationPermit.pdf PDF
TE_28_WaterGasMeters.docx DOCX document
TE_21_GroundsSafetyLog.docx DOCX document
TE_41_DAForm4283.pdf PDF
TE_45_PortableLatrineList.xlsx XLSX spreadsheet
Annex J - Maintenance - Surfaced and Unsurfaced Areas (420) .docx DOCX document
TE_25_NaturalGasEmergency.docx DOCX document
TE_23_FireAlarms.docx DOCX document
Att 5 Past Performance Reference List (PART A).docx DOCX document
Att 7 Past Performance Questionnaire (PPQ).docx DOCX document
TE_30_FireSprinkler.docx DOCX document
Annex T - Environmental ENRD (505).docx DOCX document
TE_18_90DayPM.docx DOCX document
TE_14_GreaseTrap.docx DOCX document
TE_17_BarracksLocks.docx DOCX document
TE_06_WOPriorityCalcTable.docx DOCX document
Annex E - Solid Waste Management (403).docx DOCX document
TE_04_DirectivesandPublications.docx DOCX document
Annex H - Facilities Maintenance (411).docx DOCX document
Att 3 - Staffing Matrix.xlsx XLSX spreadsheet
Att 11 Heavy CWR AZ20230037.pdf PDF
Annex G - Snow_Ice_and Sand Removal (408).docx DOCX document
TE_05_DeliverablesList.docx DOCX document
TE_55_Integrated Wildland and Fire Management Plan.pdf PDF
Annex F - Maintenance - Grounds (404).docx DOCX document
Att 10 CBA and Addendum 1 -17.pdf PDF
TE_57 Project Stock Movements.xlsx XLSX spreadsheet
TE_34_GovtFurnishedBldgs.docx DOCX document
TE_07_NTP.docx DOCX document
TE_01_TechnicalExhibitList.docx DOCX document
Att 13 Site Visit Registration Form.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

FORT HUACHUCA, ARIZONA

CONTRACT NUMBER

W9124A-xx-C-xxxx

Nov 14, 2023

QUALITY ASSURANCE SURVEILLANCE PLAN

Directorate of Public Works

This Quality Assurance Surveillance Plan (QASP) is not part of the Request for Proposal or Invitation for Bids, nor will it be made part of any resulting contract. It is provided so that the Contractor is aware that the Government will perform Quality Assurance (QA) on contract services.

A. Introduction:

1. This QASP implements the Government Quality Assurance Program. It is designed to help the Contracting Officer's Representative (COR) effectively monitor and evaluate the Contractor’s performance. Its intent is to facilitate Contractor accountability and encourage the Contractor to control and continuously improve quality. The QASP provides for monitoring and surveilling through a combination of methods including:

a. Random and Planned Sampling.
b. 100 Percent Inspection (Inspection Checklists 2 & 5 Only).
c. Inspection Checklists.
d. Management Information System (MIS) Surveillance.
e. Customer Complaints.
f. Observations.
g. COR observations.
h. Unscheduled Inspection.

2. The Government is primarily focused on the final product or service the Contractor provides and not on the details of the Contractor’s methods of work.

a. Random Sampling is the principal method of surveillance. Sampling Guides are included in this QASP.

b. When Contractor actions are critical in nature, a 100% Inspection may be used as the method of surveillance.

c. A Surveillance Inspection Checklist may be used for surveillance of Contractor actions that are required in the Performance Work Statement (PWS) but not listed in the Performance Requirements Summary (PRS). This method of surveillance may also be used for in-depth surveillance of Contractor actions listed in the PRS when the Government suspects problems or has reason to be concerned. A Surveillance Inspection Checklist may be used for Unscheduled Inspections.

d. The General Fund Enterprise Business System (GFEBS) is the Army’s system of record and the data contained therein shall be used by the Government to evaluate the Contractor’s performance. Therefore, it is incumbent upon the Contractor to ensure that data is accurately entered and maintained in GFEBS per the PWS. Evaluating the Contractor's ability to use GFEBS will be accomplished using random, planned, or unscheduled surveillance methods.

e. The Government has the right to inspect and test all the services performed by the Contractor, to the maximum extent practicable, during the term of the contract. Therefore, observations of the Contractor’s work by a Government Quality Assurance Evaluator (QAE) will provide an additional basis for evaluating the Contractor's performance.

f. Observations of Contractor activities by the COR will also be used to evaluate of Contractor performance.

B. How to Use the Quality Assurance Surveillance Plan:

1. This plan has been developed for use by the COR, through QAEs, to evaluate Contractor performance. The COR shall accomplish this by assigning specific duties to each QAE. It is also the COR’s responsibility to ensure that Inspection Checklist inspections are conducted as required and that Customer Complaints are investigated.

2. Methods of Surveillance.

a. Random/Planned Sampling:

(1) Random Sampling: The QAEs will query GFEBS for Contractor completed work and assign a sequential number to each work document line item. Then, using the random table from ANSI/ASQC Z1.4-2003 or equivalent, based on population, determine which line items are to be inspected. The results will be recorded and maintained.

(2) Planned Sampling: The QAEs will select work to be inspected based on varying subjective criteria such as the specific type of work or the facility affected. Planned sampling may also involve only specific features of the work.

(3) For each inspection cycle, the tally of observations and defects shall be compared to the accept/reject criteria in the Sampling Guide.

(4) An auditor should be able to track from the surveillance activity to the Contracting Officer's actions described in a Contract Discrepancy Report (CDR).

(5) Unsatisfactory Inspections: Whenever an inspection result is unsatisfactory, an Unsatisfactory Inspection Report (UIR) shall be prepared by the QAE.

(6) If the Sampling Guide’s Minimum Acceptable Standards of Performance (MASP) is exceeded, the Contractor's performance is unsatisfactory for that cycle in the applicable functional area.

(7) If performance for any functional area is determined unsatisfactory for the lot, the COR shall generate a Contract Discrepancy Report (CDR).

(8) The CDR, along with the Inspection Checklist, is the documentation required to support a contract action.

(9) Any deficiencies or defects found during any surveillance activity, even if they do not render the service unsatisfactory, shall be corrected by the Contractor at no cost to the government.

b. 100 Percent Inspection (Inspection Checklists 2 & 5 Only)

c. Inspection Checklists:

(1) An Inspection Checklist shall be the basis for, and the record of, an inspection. The QAE will inspect each Contractor action for that PRS line item and enter the results on the Inspection Checklist. The QAE will also prepare an Unsatisfactory Inspection Report (UIR) for each unsatisfactory inspection.

d. MIS Surveillance: The QAE will use GFEBS to perform the inspection and enter the results of the inspection on the Inspection Checklist and determine if the inspection is satisfactory or unsatisfactory.

e. Customer Feedback: Customer feedback is an important method of detecting both satisfactory and unsatisfactory Contractor performance.

(1) The COR may receive feedback from customers about the quality of service provided by the Contractor. Complaints must be investigated and validated or rejected. If a complaint is found to be valid, that validation activity will be considered an unscheduled inspection, but will not a factor in determining whether the Contractor has exceeded the MASP for the inspection cycle.

f. Observations: The COR and QAE’s will observe Contractor performance on a regular basis as part of their normal work activities. Such observations may be documented and reported as Unscheduled inspection reports and the Contractor will be informed of these observations. These observations will not be counted toward the MASP for that inspection cycle.

3. Contractor Performance:

a. Good Performance: When a Contractor's Quality Control Program works, good performance results. If the results of the COR's surveillance shows consistently good performance, the amount of surveillance can be decreased.

(1) Reduced Inspection: Reduced inspection can be used when the following conditions have been met for a Sampling Guide:

(a) The preceding 4 lots, i.e. last 4 inspection cycles have been acceptable.

(b) The number of defects in each of the preceding 4 lots is less than one half of the acceptance number. For example, with a MASP of 10 percent and a sample size of 30, the acceptance number is 5, if two or less defects were found in each of the last 4 lots, reduced inspection could be used.

(c) The normal sample size is being used.

(d) The Contracting Officer and the COR agree to use reduced inspection.

(2) Reduced Sample Size and Acceptance/Rejection Numbers: Reduced inspection decreases the sample size. In addition, the acceptance and rejection numbers may change. In order to make the changes to the existing Sampling Guide, the following steps shall be used:

(a) Find the new sample size. Take the lot size and find the reduced sample size using the appropriate table in ANSI/ASQC Z1.4-2003 for reduced sampling.

(b) Use the MASP in the Sampling Guide and the new reduced sample size for the new acceptance and rejection numbers. Note that there is a gap between the acceptance and rejection numbers, e.g. sample size is 20 and MASP is 10 percent, accept is 5 and reject is 8, this means that the lot would not be rejected unless 8 defects were found. However, a number of defects greater than 5 will be cause for returning to normal inspection, e.g. return to the sample size and acceptance and rejection numbers used in the original Sampling Guide.

(3) Returning to Normal Inspection: When reduced inspection is in effect, return to normal inspection the next lot under the following conditions:

(a) When the number of defects exceeds the acceptance number under reduced sampling, or,

(b) The Contracting Officer and the COR deem it necessary to return to normal inspection.

(4) Returning to Reduced Inspection: If during the first month normal inspection has been resumed, the number of defects again found is less than 50 percent of the reject level, a return to reduced inspection may be done the next inspection cycle. If the number of defects is over 50 percent of the reject level, then normal sampling must be accomplished until 4 inspection cycles of less than 50 percent of reject level defects is found.

b. Poor Performance: When a Contractor's Quality Control Program is not working, poor performance is the result. If the COR's surveillance shows consistently poor performance, the surveillance criteria may be tightened.

(1) Tightened Inspections: Tightened inspection can be used when the following conditions have occurred:

(a) The MASP has been exceeded for two out of three consecutive inspection cycles.

(b) The normal sample size is being used.

(c) The Contracting Officer and the COR agree to use tightened inspection.

(2) Tightened Sample Size and Acceptance/Rejection Numbers: Tightened inspection does not increase the sample size; however, the acceptance and rejection numbers do change. In order to make the changes to the existing Sampling Guide, use the MASP in the Sampling Guide to determine the new acceptance and rejection numbers from ANSI/ASQC Z1.4-2003 from the tables for increased inspection.

(3) Returning to Normal Inspection: When tightened inspection is in effect, return to normal inspection the next inspection cycle under the following conditions:

(a) The number of defects falls within the acceptance range under tightened inspection for five consecutive inspection cycles.

(b) The Contracting Officer and the COR approve returning to normal inspection.

c. When a defect is found, the QAE performing the inspection shall contact the Contractor's shop lead or manager of that functional area and inform the shop lead or manager of what was found to be defective.

d. If the COR's surveillance shows that the Contractor's performance is unsatisfactory (MASP exceeded), as described in this plan, all documentation supporting this decision must be sent to the Contracting Officer within three working days of the end of the surveillance period ends.

e. The COR will record all surveillance observations, inspection results, and actions taken on the appropriate documents. These documents shall be stored in an established contract file for the term of the contract.

f. When the COR observes that the Contractor's work is unsatisfactory, the COR must take action to encourage the Contractor to correct the unsatisfactory performance. The most common actions available to the COR are:

(1) Verbal Unwritten Communications with the Contractor, normally the Contractor's Project Manager, for minor discrepancies which do not cause delay, prevent or hinder an operation or a service, which can be corrected, onthespot, within a few minutes without additional parts or materials. The COR will make a Memorandum for Record of the discrepancy for the contract file and will furnish a copy of the Memorandum for Record to the Contracting Officer. Repeated minor discrepancies may warrant issuance of a CDR.

(2) Written Communications with the Contractor, normally the Project Manager, for repeated minor discrepancies. The COR will place a copy of the communications in the contract file and will provide an information copy to the Contracting Officer. Continued minor discrepancies may warrant issuance of a CDR.

(3) Unsatisfactory Inspection Report: An UIR will be sent to the contract Project Manager for each inspection of services which results in a failed inspection. The report will be sent by the COR within two working days following the date of the inspection. The UIR will serve as formal notification to the Contractor of the deficiency. The Contractor will return the UIR to the COR within two working days detailing the Contractor's actions to correct the unsatisfactory condition.

(4) Contract Discrepancy Report: When the Contractor's performance of work is unsatisfactory, the COR will issue the Contractor a CDR with a copy furnished to the Contracting Officer. The COR will issue the Contractor a CDR when:

(a) The UIR exceeds the MASP in any functional area.

(b) Necessary to correct deficiencies in Contractor's performance not directly related to inspections.

The COR will prepare and forward the CDR to the Contractor, the Contractor shall correct the discrepancy, if possible, and enter the corrective actions taken on the CDR, enter what actions the Contractor will take to prevent recurrence of the deficiency in the future, and return the CDR to the COR with copy to the Contracting Officer.

(5) Contracting Officer's Monthly Report: In a Fixed Price contract, the COR provides a monthly report to the Contracting Officer on the Contractor's performance. The COR will base the monthly report on the observed performance of Contractor actions as surveyed by Random/Planned Sampling, 100 percent review and 10 percent Inspection (inspection checklists # 2 & 5 only), Surveillance Inspection Checklists, Customer Complaints, and the COR's personal observations. The COR's report will be based on a descriptive evaluation provided by the QAE for the QAE's functional area(s) of responsibility, at the end of each month.

(6) Reductions in Invoice Payments: Payments to the Contractor will be reduced for unsatisfactory performance using the following methods:

(a) Contractor performance will be compared to PRS and MASP using the Government Quality Assurance Surveillance Plan.

(b) If the performance in any required service is unsatisfactory, and the poor performance is clearly the fault of the Contractor, an amount of money up to the percentage cost of the service, as stated in the PRS, will be withheld.

(c) The amount of money to be permanently deducted for unsatisfactory service will be computed as follows:

Example

If: Quality of completed work is unsatisfactory (MASP of 4.0 percent exceeded).

And: A=Monthly CLIN Invoiced amount is $100,000.

And: B=Deduction percentage is 10 percent.

And: C=Sample size is 20 units. (Based on AQL, sample size code letter is F)

And: D=Number of defects in the sample is 3 (Reject number is 3).

And: E=3 represents .15 percent of the sample size. (3 divided into 20 = .15)

Then: Deduction from the current month’s CLIN invoice is:

Formula = A x B x E = Deduction

Example:

Monthly CLIN Invoiced price (A)$100,000
X deduction percentage (B).10
$ 10,000
X Representative Units defective (reject) (E).15
Deduction$ 1,500

(d) The deduction will be taken from the current monthly CLIN amount invoiced as the CDR/deduction is reviewed and found to be valid.

(7) Re-Performance: The Contractor will be required to re-perform work, tasks or services previously provided to the Government that fall below the MASP of performance, as determined by any inspection method listed in this QASP. Such re-performance will be at no additional costs to the Government. Any re-performance requires re-inspection by the Government to ensure that the minimum acceptable standards have been achieved or that demonstrate compliance with the requirements of the PWS.

C. Revisions to this surveillance plan are the joint responsibility of the QAEs, the COR, and the Contracting Officer.

D. The rights of the Government and remedies described in this QASP are in addition to all other rights and remedies set forth in this solicitation. Specifically, the Government reserves its rights under the Inspection of Services clause and the Termination for Default clause. Any deductions pursuant to the PRS shall reflect the reduced value of services performed hereunder. The Contractor shall not be relieved of the responsibility for full performance of services hereunder.

E. Enclosures: The following pages provide examples of format and content for use in preparing Sampling Guides, Surveillance Inspection Checklists, etc.

Page

11. Unsatisfactory Inspection Report.
12. Contract Discrepancy Report.
13. Unscheduled Inspection Report.
14. Customer Complaint Record.
15. Surveillance Inspection Checklist.
16. Performance Requirements Summary.
17-19. Performance Requirement Summary - Sampling Guides and Inspection Checklists.
54. Invoice Deduction Work sheet.
55. ANSI/ASQC Z1.4-2003 Table I Sample size code letters.
56. ANSI/ASQC Z1.4-2003 Table IIA Single sampling plans for normal inspection (Master table).
57. CLIN Items (example only).

UNSATISFACTORY INSPECTION REPORT 10%

CONTRACTOR: FSI CONTRACT NUMBER: W9124A-19-C-0002

REPORT DATE: 09 March 2022 INSPECTION DATE: 09 March 2022

PWS PARAGRAPH: C.5.1.7.9.5.3.3. FACILITY: 84402

WORK DOCUMENT NUMBER: FEM00116-9J AREA: C.5.1.7.9.5.3.3.

INSPECTOR: Kali Ewing COR: Thomas J. Whipple

DESCRIPTION:

Project was not completed within the required time.

SIGNATURE OF COR: DATE: 09 March 2022

CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION, AND ACTIONS TO PREVENT RECURRENCE:

_____________ SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE

CONTRACT DISCREPANCY REPORT (CDR)

CDR Number: 0004 SUBJECT: MEDDAC Maintenance Personnel

CONTRACTOR: FSI CONTRACT NUMBER: W9124A-19-C-0002 REPORT DATE: 22 APR 22

SAMPLE SIZE: N/A REJECTS: N/A

PWS PARAGRAPH: C.5.9.1.2 CONTRACT LINE NUMBER:

COR: Thomas J. Whipple SIGNATURE:

DATE: 22 APR 22

DISCREPANCY OR PROBLEM:

PWS section C.5.9.1.2 states “MEDDAC Maintenance personnel provided by the Contractor shall have their own in house personnel certified as to not place a burden on the O&M shops not affiliated with MEDDAC maintenance team.” FSI did not use personnel assigned specifically to support MEDDAC.

CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION, AND ACTIONS TO PREVENT RECURRENCE:

SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE:

CONTRACTING OFFICER'S REPRESENTATIVE COMMENTS:

SIGNATURE OF COR: DATE:

CONTRACTING OFFICER'S DECISION: CONCUR |_| NONCONCUR |_|

COMMENTS:

_______________________
CONTRACTING OFFICER'S SIGNATURE:DATE:

UNSCHEDULED INSPECTION REPORT

DATE OF REPORT:

INSPECTED BY:

TIME/DATE OF INSPECTION:

LOCATION OF INSPECTION:

SERVICE REQUIREMENT INSPECTED:

PERFORMANCE STANDARDS:

INSPECTION RESULTS:

ENCL:

COR: SIGNATURE:

DATE:

QUALITY ASSURANCE MONITORIING FORM –

CUSTOMER COMPLAINT INVESTIGATION

SERVICE or STANDARD: DOC #

SURVEY PERIOD:

DATE/TIME COMPLAINT RECEIVED: AM/PM

SOURCE OF COMPLAINT: (NAME)

(ORGANIZATION)

(PHONE NUMBER)

(EMAIL ADDRESS)

NATURE OF COMPLAINT:

RESULTS OF COMPLAINT INVESTIGATION:

DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT: AM/PM

CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:

RECEIVED AND VALIDATED BY:

PREPARED BY: DATE:

Performance Requirements Summary

1. The purpose of this summary is to:

1.1. List the contract requirements considered most critical to acceptable contract performance.

1.2. List where the standard for each requirement is located in the PWS.

1.3. Show the maximum allowable degree of deviation from acceptable performance (AQL) that shall be allowed by the Government before contract performance is considered unsatisfactory.

1.4. List the inspection methods that the Government will use to evaluate the Contractor's performance in meeting the contract requirements.

1.5 List the deduction factor for each item that the Government will use in computing the deduction for unsatisfactory service.

2. The Government's primary quality assurance procedures are based on random and planned sampling of the recurring critical output products of the contract using the concepts of ANSI Z1.4-2003. Most contract requirements will be surveilled by random or planned inspections of Contractor work. Some contract requirements will be surveilled by use of contractor reports and by computer operations on data input into the Government Information System. Additionally, some areas will have 100 percent of the work inspected. Other areas will be reviewed periodically, i.e., monthly, quarterly, semiannually, etc.

3. The criteria for acceptable and unacceptable performance are derived from MIL STD 105e based on the lot size, sample size, and AQL for each contract requirement. When the number of defects in the Contractor's performance exceeds the acceptable level, the Contractor's performance is unsatisfactory.

PERFORMANCE REQUIREMENT SUMMARY

CLIN
REQUIRED SERVICE
STANDARDS
MASP
METHOD
DEDUCTION
NOTE
02
SERVICE ORDERS
TIMELY RESPONSE

CONTINUANCE OF WORK

PERFORMED IAW CODE

PERFORMED IAW PWS

4.0%
RANDOM SAMPLE
10%

5%

RE-PERFORM

RE-PERFORM

05
NON-RECURRING IJO IAW FUNCTIONAL AREA
PLANNING/ESTIMATION/SCHEDULING

PERFORMED & COMPLETED IAW W/ SCHEDULE

PERFORMED IAW CODE

PERFORMED IAW PWS

WORK ACCOMPLISH REPORT

4.0%
RANDOM

SAMPLE

10% 10%

RE-PREFORM

RE-PERFORM

RE-PERFORM

04
RECURRING MAINTENANCE IJO IAW FUCTIONAL AREA
PLANNING/ESTIMATION/SCHEDULING

COMPLETED AS SCHEDULED

PERFORMED IAW CODE

PERFORMED IAW PWS

WORK ACCOMPLISH REPORT

4.0%
RANDOM SAMPLE

10%

RE-PREFORM

RE-PERFORM

RE-PERFORM

04
PREVENTIVE MAINTENANCE
SCHEDULING SERICES WORKED IAW SCHEDULE

COMPLETED AS SCHEDULED

PERFORMED IAW CODE

PERFOMED IAW PWS

WORK ACCOMPLISH REPORT

4.0%
RANDOMN SAMPLE

10%

RE-PREFORM

RE-PERFORM

RE-PERFORM

07
PLANT OPERATIONS -WATER/WASTEWATER
LOG/REPORTS MAINTAINED

CHEMICALS MAINTAINED

PERFORMED IAW PWS

4.0%
RANDOM SAMPLE
RE-PREFORM

10%

RE-PERFORM

1,3

07
PLANT OPERATIONS -CENTRAL HEATING AND AIR CONDITIONING
LOG/REPORTS MAINTAINED

QUALIFIED PERSONNEL USED

PERFORMED IAW PWS

4.0%
RANDOM SAMPLE
RE-PREFORM

10%

RE-PERFORM

1,4

01
SUPPLY OPERATIONS
TIMELY MATERIAL ISSUE

ACCOUNTABILITY IAW PWS

PROVIDE DIAW PWS

4.0%
PLANNED SAMPLE
10%

5%

RE-PERFORM

01
SUPPLY STORAGE SERVICE
STORAGE IAW PWS

MATERIAL ACCOUNTABILITY

4.5%
RANDOM SAMPLE
RE-PERFORM

10%

01
SUPPLY INVENTORY
INVENTORY IAW PWS
4.0%
PLANNED SAMPLE
RE-PERFORM
5,7
01
QUALITY CONTROL SERVICE
RECORDS MAINTAINED

CORRECTIVE ACTIONS IAW PWS

QC PLAN IAW PWS

4.0%
RANDOM SAMPLE
5%

10%

RE-PERFORM

01
DELIVERABLE REPORTING
PREPARED IAW PWS

DATA ACCURATE

TIMELY SUBMISSION

1.0%
PLANNED SAMPLE
RE-PERFORM
4
01
PLANNING/ESTIMATING
TIMELY COMPLETION

PREPARED IAW PWS

4.0%
RANDOM SAMPLE
**

RE-PERFORM

01
SCHEDULING SERVICE
TIMELY SUBMISSION OF SCHEDULE

SCHEDULE PREPARED IAW PWS

4.0%
RANDOM SAMPLE
**

RE-PERFORM

01
WORK ACCOMPLISHMENT REPORTING
TIMELY MIS INPUT

PREPARED IAW PWS

4.0%
RANDOM SAMPLE
**
2,6

GENERAL NOTES:

1. The percent (%) deduction listed is the percentage that may be deducted (for any work/action that can't be reperformed) from the corresponding contract line item (CLIN) to that service. Such deduction will be from the invoiced amount of the specified CLIN, for the month involved, where evidence of the Contractor’s failure to meet the minimum acceptable standards of performance listed in the PWS have documented.

2. Where deduction column is marked with (**) the timeliness of the performance is based on the overall effect that any delay has on the timely completion of the work involved. Note that planning, estimating, scheduling, dispatching, and work performance reporting are listed as component elements of various required services and are also listed separately, to reflect that the Government may inspect them for compliance with PWS and may require re-performance, should the minimum standards of performance not be achieved.

3. Chemicals must be maintained IAW all State, Federal and Local laws and regulations.

4. Failure to utilize the properly certified /qualified personnel to perform tasks shall be subject to re-performance.

5. Supply inventory shall be performed IAW the PWS and applicable Army Regulations.

6. Late submission of Deliverables may delay payment of billing invoices.

7. Re-performance of work that did not meet the MASP will be at no additional cost to the Government.

QUALITY ASSURANCE SUEVEILLANCE PLAN

INSPECTION CHECKLISTS AND SAMPLING GUIDES

IC# TITLE

1 SERVICE ORDERS (ALL PRIORITIES)

2 NONRECURRING IJO's

3 RECURRING MAINTENANCE IJO's

4 PREVENTIVE MAINTENANCE

5 PLANNING AND ESTIMATING SERVICES

6 SCHEDULING SERVICES

7 WORK ACCOMPLISHMENT REPORTING

8 SUPPLY OPERATIONS

9 SUPPLY STORAGE SERVICES

10 SUPPLY INVENTORY SERVICES

11 QUALITY CONTROL SERVICES

12 DELIVERABLES REPORTING

13 WATER/WASTEWATER PLANT OPERATIONS

14 CENTRAL HEATING PLANT/AIR CONDITIONING PLANT OPERATIONS

15 DISPATCH SERVICES

SAMPLING GUIDE #1

Service Orders

C.5.1.6.3. Perform Service Order work on Post and Housing facilities (Ref. C.5.1.6. and PWS functional areas).

1. Minimum Acceptable Standards of Performance (MASP): See Performance Requirements Summary

2. Lot Size for Sampling: Random Sample

3. Sampling Size: To be determined based on the lot size using Tables I and IIA of ANSI/ASQC Z1.4-2003.

4. Sampling Procedure: For each inspection cycle, obtain the service orders that the Contractor has reported issued for current month for each functional area. This will be the functional area lot size. Assign a sequential number to each service order. Using the Random table from ANSI/ASQC Z1.4-2003 or equivalent, select a random set of numbers equal to that inspection cycle sample size. Match the randomly selected numbers with the numbers assigned to the service orders. These will be the service orders for inspection for that cycle. Tally results of inspections and determine if the inspection lot is acceptable.

5. Inspection Procedure: Inspect the work performed on each Service Order using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #1

SERVICE ORDERS

Document Number: Date:

Facility Number: Inspector:

Functional Area: Priority:

Inspection Item:Sat/Unsat
Note:S = Satisfactory U = Unsatisfactory
C = Critical Item R = Rework Item

C 1. Was work responded to and completed IAW C.5.1.6.3.through C.5.1.6.3.5.? Sat

C2. Was emergency work continued until emergency was alleviated IAW C.5.1.6.3.1.?
(Priority 1 only)

3. Was service order work continued IAW C.5.1.6.3. through C.5.1.6.3.5.? Sat

4. Was work resumed within 5 days of receipt of materials?

C/R5. Was all work required performed IAW applicable Federal, State and Local Codes
and Regulations including Safety?

R 6. Does work appear to have been performed in a professional manner IAW C.1.3.?

C/R7. Were appropriate reports completed and submitted as required in the functional
areas for which the work was performed? (i.e. gas systems, water system, HVAC
systems, pest control)

R 8. Was all work required by the work document performed?

9. Did Contractor notify the POC of work completion or of any delays?

R 10. Was work site cleared of debris after completion of work IAW C.1.21.?

C 11. Were material resources utilized efficiently?

OVER ALL ASSESSMENT OF SERVICE:

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject service order will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

Remarks/Comments:

SAMPLING GUIDE #2

Non-Recurring IJOs

C.5.1.7.1. Perform NonRecurring IJO Work (Ref. PWS Functional Areas).

1. Minimum Acceptable Standards of Performance (MASP): See Performance Requirements Summary

2. Lot Size for Sampling: 100 %

3. Sampling Size: 10%

4. Sampling Procedure: For each inspection cycle, obtain the NonRecurring IJO's/Phases that the Contractor has reported complete for each functional area. This will be the functional area lot size. Inspect work performance using inspection checklist provided.

5. Inspection Procedure: Evaluate the Contractor's IJO/Phase work using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional are

INSPECTION CHECKLIST #2
NonRecurring IJO Work

Document Number: JAA00025-1 Date: Oct.19, 2021

Facility Number: 62711 Inspector: H. Lopez

Functional Area: C.5.7 Post: FT .Huachuca

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item
C/R1. Was work performed IAW applicable Federal, State and Local Codes and
Regulations including Safety?
R2. Does work appear to have been performed in a professional manner?
IAW C.1.3.3.?
C/R3. Were appropriate reports completed and submitted as required in the
functional areas for which the work was performed? (i.e. gas systems,
water system, HVAC systems, pest control)

R 4. Was all work required by the work document performed?

R 5. Was the work site cleared of debris after completion of work IAW C.1.21.?

C 6. Were material resources utilized efficiently?

C 7. Was work completed within specified time frame UN Sat

C 8. Was work performed per required schedule?

OVER ALL ASSESSMENT OF SERVICE:

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject individual job order will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

Remarks/Comments: Replace damaged seat auditorium

SAMPLING GUIDE #3

Recurring Maintenance IJOs

C.1.8. Perform Recurring Maintenance IJO Work on Post Facilities (Ref. PWS Functional Areas).

1. Minimum Acceptable Standards of Performance (MASP): See Performance Requirements Summary

2. Lot Size for Sampling: Random sample.

3. Sampling Size: To be determined based on the lot size using Tables I and IIA in ANSI/ASQC Z1.4-2003.

4. Sampling Procedure: For each inspection cycle, obtain the Recurring IJO's/Phases that the Contractor has reported scheduled for each functional area. This will be the functional area lot size. Assign a sequential number to each IJO/Phase. Using the Random table from ANSI/ASQC Z1.4-2003 or equivalent, select a random set of numbers equal to that inspection cycle sample size. Match the randomly selected numbers with the numbers assigned to the IJO/Phase. These will be the IJO's/Phases inspected for that cycle. Tally results of inspections and determine if the inspection lot is acceptable.

5. Inspection Procedure: Evaluate the Contractor's Recurring Maintenance work using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #3

Recurring Maintenance IJO Work

Document Number: Date: 10 AUG 22

Facility Number: Site Uniform Inspector: Thomas J. Whipple

Functional Area: C.5.16.9.2 Post: Ft Huachuca AZ

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

C 1. Was work performed IAW the PWS? (i.e. frequency, tasks) UN/

C/R2. Was work performed IAW applicable Federal, State and Local Codes
And Regulations including Safety?
R3. Does work appear to have been performed in a professional manner?
IAW C.1.3.3.?
C/R4. Were appropriate reports completed and submitted as required in the
Functional areas for which the work was performed? (i.e. gas systems,
Water system, HVAC systems, pest control)

R 5. Was all work required by the work document performed?

R 6. Was the work site cleared of debris after completion of work IAW C.1.21.?

R 7. Were material resources utilized efficiently?

C 8. Was work completed within specified time frame?

C 9. Was work performed per required schedule?

OVER ALL ASSESSMENT OF SERVICE:

Remarks/Comments: Please see attached ICE comment. The person submitting the complaint failed to provide the location. DPW verified with the USAICoE G-4 the affected location was Site Uniform, which is to be serviced every M/W/F.

SAMPLING GUIDE #4

Preventive Maintenance for Post Facilities

C.5.7. Perform Post Facility Preventive Maintenance on Post Facilities (Ref. C.5.7. and throughout).

1. Minimum Acceptable Standards of Performance (MASP): See Performance Requirements Summary

2. Lot Size for Sampling: Random Sample. Based on the number of Post Facilities maintained during each inspection cycle.

3. Sampling Size: To be determined based on the lot size using Tables I and IIA in ANSI/ASQC Z1.4-2003.

4. Sampling Procedure: At the end of each Preventive Maintenance cycle, using the contractorfurnished list of facilities scheduled to be worked, assign a sequential number to each facility scheduled for completion. Using Table I, ANSI/ASQC Z1.4-2003, determine the sample size for the lot. Using the Random Number Table in ANSI/ASQC Z1.4-2003, select a set of numbers equal to the number of samples for the day. Match the randomly selected numbers with the numbers assigned to the Facilities maintained. Combine the results of all inspections and compare the total results to the accept/reject level in Table IIA of ANSI/ASQC Z1.4-2003 for the sample size and MASP. Determine if the Contractor's work for the cycle was satisfactory or unsatisfactory.

5. Inspection Procedure: Inspect the Preventive Maintenance performed on each Post Facility using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #4

PREVENTIVE MAINTENANCE INSPECTION CHECKLIST

Document Number: Date:

Facility Number: Inspector:

Functional Area: Cycle:

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

C 1. Was work performed per required schedule?

C/R2. Was work performed IAW applicable Federal, State and Local Codes
and Regulations including Safety?

R 3. Does work appear to have been performed in a professional manner?

C/R4. Were appropriate reports completed and submitted as required in the
functional areas for which the work was performed? (i.e. gas systems, water
system, HVAC systems, pest control)

C 5. Did Contractor notify the O&M branch of work completion or of any delays?

R 6. Was all work required by the work document performed?

R 7. Was the work site cleared of debris after completion of work IAW C.1.21.?

C 8. Were material resources utilized efficiently?

C 9. Was work completed within specified time frame?

OVER ALL ASSESSMENT OF SERVICE: |_| PASSED |_| FAILED |_| REWORK

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject preventive maintenance will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLE GUIDE #5

Planning and Estimating Services

C.5.1.7 Perform Planning and Estimating Services

1. Minimum Acceptable Standards of Performance (MASP): See Performance Requirements Summary.

1. Lot Size for Sampling: 100%

1. Sampling Size: 10%

1. Sampling Procedure: For each inspections cycle, obtain each Estimate that the Contractor is issued for each functional area. This will be the functional area lot size. Inspect work performed using the inspection checklist provided.

1. Inspection procedure: Evaluate the Contractor’s Estimate using the inspection checklist provided with this guide.

1. Performance Criteria:

1. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

1. Performance is unacceptable when the Contractor’s work exceeds that established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #5

Planning and Estimating Services

Document Number: Date:

Inspector: Functional Location:

Type of Document for estimating: Building:

Inspection Item: Sat/Un-Sat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

R 1. Were the estimates prepared IAW PWS? Sat

C 2. Were the estimates completed within the timeframe required in C.5.1 Sat

R 3. Did the estimates incorporate the required functional area standards?

C 4. Was all work required by the work document estimated?

C/R5. Are estimating requirements performed IAW PWS and applicable Federal,
State and Local Codes and Regulations including Safety?

C 6. Were material resources utilized efficiently?

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject estimate will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLING GUIDE #6

Scheduling Services for IJOs

C.5.1.8. Perform Scheduling Services (IJO's) (Ref. C.5.1.).

2. Lot Size for Sampling: Random Sample. Based on the total number IJO's to be scheduled each inspection cycle.

3. Sampling Size: To be determined based on the lot size using Tables I and IIA in ANSI/ASQC Z1.4-2003.

4. Sampling Procedure: On the first work day of each week take the list of IJO's, submitted by the Contractor the previous week that are ready to be scheduled. This is the lot size. Using Table I, ANSI/ASQC Z1.4-2003, determine the sample size for the lot. Assign a sequential number to each IJO. Using the Random Number Table in ANSI/ASQC Z1.4-2003, select a set of numbers equal to the number of samples. Match the randomly selected numbers with the numbers assigned to the IJO's. These will be the IJO's to be inspected each week. Compare the results of each inspection to the accept/reject level in Table IIA of ANSI/ASQC Z1.4-2003. Determine if the Contractor's work is acceptable.

5. Inspection Procedure: Inspect the scheduling performed for each IJO using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #6

Scheduling Services

Document Number: Date:

Phase Number: Inspector:

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

C/R 1. Was the Work Order scheduled IAW C.5.1.?

C/R 2. Is the Master Schedule Report submitted IAW C.5.1.?

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject SOO will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

CONTRACTOR NOTIFIED OF REWORKREWORK COMPLETED
SIGNATURE__________________________SIGNATURE________________________
DATE________________________________DATE______________________________

SAMPLING GUIDE #7

Work Accomplishment Reporting

C.5.1.2.2. Perform Work Accomplishment Reporting (Ref. C.5.1.).

2. Lot Size for Sampling: Random Sample.

3. Sampling Size: Based on number of Work Accomplishment line items the Contractor inputs into MIS each day.

4. Sampling Procedure: Take the Contractor provided daily input of Work Accomplishment line items that the Contractor inputs into MIS each day. Using Table I, ANSI/ASQC Z1.4-2003, determine the sample size for the lot. Assign a sequential number to each line item. Using the Random Number Table in ANSI/ASQC Z1.4-2003, select a set of numbers equal to the number of samples. Match the randomly selected numbers with the numbers assigned to the line items. These will be the line items to be inspected each day. Compare the results of each inspection to the accept/reject level in Table IIA of ANSI/ASQC Z1.4-2003. Determine if the Contractor's work is acceptable.

5. Inspection Procedure: Inspect the Work Accomplishment Report using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #7

Work Accomplishment Reporting

Document Number: Date:

Facility Number: Inspector:

Contractor Employee: Functional Area:

Other Identification:

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical Item R = Rework item
C/R1. Was work accomplishment input performed accurately according to
data provided by the worker for the type of work document?

C/R 2. Was all required information input?

C3. Was work accomplishment data input within the timeframe IAW PWS
paragraph C.5.1?

C 4. Are employee errors on the L&E corrected within the time specified in C.5.1?

C 5. Are data input errors in MIS corrected within the time specified in C.5.1?

OVER ALL ASSESSMENT OF SERVICE: PASSED |_| FAILED |_| REWORK

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject SOO will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLING GUIDE #8

Supply Operations Services

C.5.12. Perform Supply Operations Services (Ref. C.5.12.).

2. Lot Size for Sampling: 100% inspection.

3. Sampling Size: 100% inspection.

4. Inspection Procedure: Inspect the Contractor performed Supply Operations Services using the inspection checklist provided with this guide.

5. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

6. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #8

Supply Operations

Date: Inspector:

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item
C/R1.Are all requests and receipts for materials being processed IAW
PWS C.5.12.?

C/R 2. Is input verified and errors corrected IAW PWS C.5.12.?

C 3. Are requisitions processed within time frames specified in PWS C.5.12.?

R4.Is serviceable material, returned to supply upon completion of jobs, being
properly processed and added to the ASL IAW PWS C.5.12.?

R 5. Is unserviceable material turned in to DRMO IAW PWS C.5.12.?

C/R6.Are local purchase requests processed daily for receipt by Contractor IAW
PWS C.5.12.?

R 7. Are all request and issue documents filed for proper accountability?

R8.Are all request documents furnished to the Accountable Officer IAW
PWS C.5.12.?

R 9. Are requisitions properly received in Supply 2000?

C10.Are customers waited on within 15 minutes of arrival at the Contractor
issue point?
C11.Are customers notified when materials are ready for pickup IAW
PWS C.5.12.?

C 12. Are supplies only issued to authorized customers?

R 13. Are DA 1687 signature cards current?

C/R 14. Are items cataloged to meet requisitioning standards of PWS C.5.12.?

R15. Are local purchase items cataloged correctly to identify end item,
if applicable?
C/R16. Do item descriptions contain size, color, price, source and manufacturer?
(as applicable)

C 17. Are timely corrections made to catalog as discrepancies are identified?

R 18. Are manufacturer part numbers added to catalog description?

C/R19.Are requests for assistance from procurement agents responded to in a
timely manner?

C/R 20. Are status updates being updted in GFEBS each day, i.e. requesting quotes, Awaiting material, etc…

C 21. Were material resources utilized efficiently?

OVER ALL ASSESSMENT OF SERVICE: PASSED FAILED REWORK

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject SOO will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLING GUIDE #9

Supply Storage Services

C.5.12. Perform Supply Storage Services (Ref. C.5.12.).

2. Lot Size for Sampling: Random Sample.

3. Sampling Size: Alternately, inspect Contractor Supply Storage Operation.

4. Sampling Procedure: On the first work day of each month randomly select 5% of current GovernmentFurnished RPMA supplies and materials stored by the Contractor during the previous month. This will be the month's lot size. Assign a sequential number to each item. Using the Random table from ANSI/ASQC Z1.4-2003 or equivalent, select a random set of numbers equal to that inspection cycle sample size. Match the randomly selected numbers with the numbers assigned to the workdays. If an item is selected that has been previously selected and inspected within the previous cycle, an alternate selection will be made in its place. These will be the items inspected for that cycle. Tally results of inspections and determine if the inspection lot is acceptable.

5. Inspection Procedure: Inspect the Supply Storage Operations using the inspection checklist provided with this guide.

6. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

7. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #9

Supply Storage Operations

Date: Inspector:

Inspection Item: Sat/Unsat

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

C 1. Are material due out slips filled on a first in first out basis?

C/R 2. Are location bin labels established for each item in inventory?

C3.Are expired shelf life items rotated and issued to prevent loss to the
Government?

C/R 4. Are material items protected from pilferage IAW PWS C.5.12.?

C/R 5. Are materials, stored outside, protected from weather?

C/R 6. Is hazardous material handled and stored IAW PWS C.5.12.?

R7.Is access to storage areas limited to authorized personnel IAW
PWS C.5.12.?
C/R8.Are materials put in correct location, within specified time frames
IAW PWS C.5.12.?

R 9. Are the storage areas maintained neat and clean?

C/R 10. Are all Federal, State and Local Code, including safety followed?

C/R 11. Are hazardous materials labeled upon receipt?

C/R 12. Are hazardous items labeled before being issued to craftsman?

C/R 13. Does all hazardous material have a current MSDS available?

C/R 14. Are items with hazardous labels returned to Supply for accountability?

C 15. Were material resources utilized efficiently?

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject SOO will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLING GUIDE #10

Supply Inventory Services

C.5.12. Perform Supply Inventory Services (Ref. C.5.12.).

2. Lot Size for Sampling: 100% inspection.

3. Sampling Size: 100% inspection.

4. Inspection Procedure: Inspect the Contractor performed Supply Inventory Services using the inspection checklist provided with this guide.

5. Performance Criteria:

a. Performance is acceptable when inspections reveal that Contractor has maintained service below established MASP for that lot.

b. Performance is unacceptable when the Contractor’s work exceeds the established MASP for that lot.

6. Deductions: A deduction will be taken for each inspection lot when the Contractor exceeds the acceptable MASP in that functional area.

INSPECTION CHECKLIST #10

Supply Inventory Services

Date: Inspector:

Note:S = Satisfactory U = Unsatisfactory
C = Critical item R = Rework item

Inspection Item: Sat/Unsat

C/R 1. Was the inventory performed IAW C.5.12.?

C/R 2. Are inventory discrepancies adjusted as required?

C/R3. Are inventory adjustment reports prepared within 24 hours of discovery
of overage or shortage?

C/R 4. Are location surveys accomplished IAW PWS C.5.12.?

R5. Is a review conducted to determine the cause of discrepancies when they
are found and is action taken to correct the cause of the discrepancy?
R6. Are results of inventory and location surveys reconciled with the
accountable records?

C 7. Were material resources utilized efficiently?

Note: If Contractor fails to satisfy requirement or requirement cannot be reperformed to satisfy requirement or fails 25% of the inspection items, the subject SOO will be failed and an Unsatisfactory Inspection Report (UIR) issued. Note any unsatisfactory critical inspection item warrants a UIR.

SAMPLING GUIDE #11

Quality Control…

This is the start of the file's text. The full file is on GovTribe.