This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity. The CDRL requires the contractor to submit a Cost and Hour Report using the FlexFile format on a frequency specified in an attachment. It must include data on contractor costs in accordance with the Cost and Software Data Reporting system. The report is to be delivered electronically through the Cost Assessment Data Enterprise portal.

The related federal contract opportunity is a pre-solicitation notice from the Defense Logistics Agency Aviation and United States Air Force for the remanufacturing of F100 engine modules over ten years. The contractor must be able to remanufacture inlet fans, cores, fan drive turbines, high pressure turbines, and gearboxes for the F100-PW-220/220E/-229/-229EEP engines at facilities in Europe and the continental United States. The estimated delivery turnaround times range from 200 to 300 days. The requirement is sole-sourced to Pratt & Whitney and the contractor must be an approved source to remanufacture the national stock numbers prior to award.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

xtm: Off
1_DATA_ITEM_NO:
2_TITLE_OF_DATA_ITEM: Cost and Hour Report (FlexFile)
3_SUBTITLE: Contractor Cost Data Reporting (CCDR)
4_AUTHORITY_Data_Acquisit: DI-FNCL-82162 (T)
5_CONTRACT_REFERENCE:
6_REQUIRING_OFFICE:
7_DID_250_REQ: LT
8_APP_CODE: N/A
DIST_STATEMENT: D
10_FREQUENCY: ASREQ, See Block 16
11_AS_OF_DATE: ASREQ, See Block 16
12_DATE_OF_FIRST_SUBMISSI: ASREQ, See Block 16
13_DATE_OF_SUBSEQUENT_SUB: ASREQ, See Block 16
addressee1: CADE, SEE BLOCK 16
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: Block 04: The contractor shall develop, maintain, and deliver the data item in accordance with the Data Item Description listed in block 4, the CSDR Manual (DoDM 5000.04), and as tailored in this CDRL and Attachment AXXX - CSDR Plan. The CSDR Manual is available from the CADE website at https://cade.osd.mil/.

The contractor shall deliver this data item in one of the following formats: a) a stand-alone Microsoft Excel file (file extension ".xlsx"), b) a comma separated values (file extension ".csv") so long as the Excel or comma separated values submission fulfills the requirements of the DD FORM 2794 and is in accordance with the FlexFile DIDDI-FNCL-82162 (T), or c) JavaScript Object Notation (JSON) as described in the FlexFile File Format Specification (FFS) and Data Exchange Instructions (DEI) referenced in the FlexFile DID DI-FNCL-82162 (T) Requirements Section 2. The FlexFile FFS and DEI are available at the CADE website at https://cade.osd.mil/policy then selecting "Data Item Descriptions and Forms".

Block 07: Deliverables will be reviewed by the Government for technical content and format compliance. The DCARC office will issue a letter stating if the submission to the CADE system has been accepted or rejected within 30 days of receipt of delivery. The DCARC letter will identify reasons a submission was rejected, if applicable. The contractor shall make all corrections to the deliverable identified in the rejection letter and shall resubmit to the DCARC. The rejection letter will include a resubmission timeline which will be at least 15 calendar days from receipt of a rejection letter.

Blocks 10, 11, 12, and 13: The contractor shall submit reports at frequencies specified in Attachment AXXX - CSDR Plan.

Block 14: The contractor shall submit files electronically using the CADE website at https://cade.osd.mil/. Data submitters shall register through the CADE website and possess a DoD-approved External Certification Authority (ECA) digital certificate or DoD-issued CAC to obtain a CADE Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the CADE Portal and requesting a CSDR submitter user role. After the registration information has been verified, CAPE will authorize the user account and requested roles. All CADE Portal accounts shall be renewed at least annually.

17_PRICE_GROUP: N/A
ESTIMATED_TOTAL_PRICE: 0
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
xTDP: Off
xTM: Off
OTHER: FNCL
DSYSTEMITEM:
E_CONTRACTPR_NO: SPRTA123R0196
FCONTRACTOR:
16_REMARKS_Continued: Subcontractor Reporting: Prime contractors shall ensure CSDR requirements contained in their prime contracts are flowed down to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.73, or as required by the cost working integrated product team (CWIPT). This includes requiring subcontractors to electronically report directly to CAPE using the CSDR Submit-Review System.

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the CAPE for DDCA approval.

The Office of the Secretary of Defense (OSD) utilizes support contractors to review the data submitted under this CDRL to ensure contractual requirements are met and to facilitate distribution of the data to authorized Government users. Prior to data submission against this CDRL, contractors will be requested to provide the Government permission to share this CDRL with their support contractors for the limited purpose of managing the CSDR system. Submitting contractors have the option of reviewing the Non-Disclosure Agreements these support contractors have with the Government and requesting additional Non-Disclosure Agreements with these support contractors.