N62742-26-R-1306_AMD0002.pdf
PDF 797 KB Posted
- Attached to
- JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U. S. NAVSUPPACT MCB CAMP BLAZ, GUAM
- Solicitation number
- N62742-26-R-1306
About this file
This is Amendment 0002 to Request for Proposal (RFP) N62742-26-R-1306 for construction of a Battle Staff Training Facility at U.S. Naval Supply Activity Marine Corps Base Camp Blaz, Guam. The amendment extends proposal submission deadlines: Price Proposal (Paper) and Technical Proposal (Factors 1, 2, and 3) are due June 23, 2026 at 2:00 p.m. Hawaii Standard Time, and Subcontracting Plan (Paper) is due June 24, 2026 at 2:00 p.m. HST. The deadline for submitting questions regarding the solicitation is June 2, 2026, after which the Government will not respond to additional inquiries. The solicitation is unrestricted with a NAICS code 236220 (Commercial and Institutional Building Construction) and estimated contract cost between $25 million and $100 million. Contracting is through NAVFAC Pacific with Jennifer Hue as the point of contact. The performance period is 1157 calendar days from the notice to proceed, and performance bonds are required within 21 days of award.
The amendment includes significant revisions to contract drawings (60+ sheets with revision date 4/27/2026), specifications sections, and administrative requirements. The price proposal includes a base item (SLIN 0001AA) for all labor, material, and equipment; a unit-price item (SLIN 0001AB) for over-excavation of unsatisfactory soil at 1,100 cubic yards; a unit-price item (SLIN 0001AC) for Cement Deep Soil Mixing at 7,920 cubic yards; and three optional items for a pavilion, standby generator/building/fuel storage/sand filter, and security chain link fence. CLIN 0005 includes Furniture, Fixtures, and Equipment with a Government estimated budget of $3,934,910 plus a Prime Contractor Handling and Administrative Rate not to exceed 5%. All CLINs will be funded with Japan Fiscal Year 2022 funding, with the Government's objective to award CLINs 0001 and 0004 within available funds. Option items may be exercised at award or within 365 days thereafter without extending the contract completion date.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 2
0002 27 May 2026 See Continuation Sheet J-875 N62742
NAVFACSYSCOM PACIFIC
258 MAKALAPA DR STE 100, JBPHH HI 96860-3134
JBPHH, HI 96860-3134
UNITED STATES
Jennifer Hue, Email: jennifer.m.hue.civ@us.navy.mil Telephone: 8086026755 SCD: PAS:
N6274226R1306
10 Apr 2026
See Section 00 70 00 - Conditions of the Contract
See Schedule
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): RFP N62742-26-R-1306, JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM; AMENDMENT 0002 is for the following:
SF1442 - Solicitation, Offer and Award (SF1442) Delete and replace pages 1 through 2 with attached pages 1 through 2.
SF1442 - Solicitation, Offer and Award (SF1442), Continued Price Proposal Schedule Delete and replace pages 3 through 5 with attached pages 3 through 5 (Amendment No. 0002).
Section 00 21 16 - Instructions to Proposers, paragraph 1.2 NUMBER OF COPIES/TIME OF RECEIPT Revise a. PRICE PROPOSAL (PAPER) and b. TECHNICAL PROPOSAL (FACTORS 1, 2 AND 3) (PAPER) due date to "June 23, 2026, 2:00 p.m., H.S.T." and c. SUBCONTRACTING PLAN (PAPER) due date to "June 24, 2026, 2:00 p.m., H.S.T."
Section 00 21 16 - Instructions to Proposers, paragraph 1.4 INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION Revise the last sentence to state: "The Government may not respond to questions submitted after June 2, 2026."
SPECIFICATIONS (Due to system character limitation, see attached SPECIFICATIONS SUMMARY OF CHANGES)
N6274226R13060002
RFP N62742-26-R-1306, JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U.S.
NAVSUPPACT MCB CAMP BLAZ, GUAM; AMENDMENT 0002
SPECIFICATIONS SUMMARY OF CHANGES
DOCUMENT 00 01 15 – LIST OF DRAWINGS
• PARA. 1.2 CONTRACT DRAWINGS: The following drawings, bearing revision date of 4/27/2026, supersede previously issued drawings bearing the same number and title. The revised drawings accompany this Amendment, see Attachment (1).
SHEET
NO.
NAVFAC
DWG NO.
REVISION
NO. TITLE
G-002 17321760 1 LIST OF SHEETS
G-005 17321763 1 BUILDING CODE SUMMARY
G-101 17321764 1 CODE COMPLIANCE SITE PLAN
G-102 17321765 1 1ST FLOOR PLAN – LIFE SAFETY
G-103 17321766 1 2ND FLOOR PLAN – LIFE SAFETY
CS100 17321786 1 CIVIL SITE PLAN – BASE AND BID OPTIONS
CS101 17321787 1 CIVIL SITE LOCATION PLAN BASE AND BID
OPTIONS
CS504 17321791 1 CIVIL DETAILS – SHEET 4
CS505 17321792 1 CIVIL DETAILS – SHEET 5
CG100 17321793 1 CIVIL GRADING PLAN – BASE BID
CG100B 17321794 1 CIVIL GRADING PLAN – BID OPTIONS
CP100 17321801 1 CIVIL PAVING PLAN – BASE AND BID OPTIONS
CP502 17321803 1 CIVIL PAVING DETAILS – SHEET 2
CU100 17321807 1 CIVIL UTILITY PLAN
LP101 17321828 1 LANDSCAPE PLAN - BASE AND OPTIONS
S-001 17321836 1 STRUCTURAL NOTES AND LEGEND -SHEET 1
SB105 17321851 1 SLAB PLAN - AREA 'A' (EL. 0'-0", UNO)
SB106 17321852 1 SLAB PLAN - AREA 'B' (EL. 0'-0", UNO)
SB401 17321853 1 MECHANICAL ENCLOSURE FOUNDATION / SLAB
PLAN
SB402 17321854 1 CANOPY FOUNDATION / SLAB PLAN
SF102 17321860 1 SECOND FLOOR FRAMING PLAN - AREA 'A' (EL. 14'-
0", UNO)
SF103 17321861 1 SECOND FLOOR FRAMING PLAN - AREA 'A' (EL. 16'-
0", UNO)
SF104 17321862 1 SECOND FLOOR FRAMING PLAN -AREA 'B' (EL. 14'-
0", UNO)
SF105 17321863 1 SECOND FLOOR FRAMING PLAN -AREA 'B' (EL. 16'-
0", UNO)
SF401 17321869 1 MECHANICAL ENCLOSURE FRAMING PLAN
SF402 17321870 1 CANOPY ROOF FRAMING PLAN
AS101 17321901 1 ARCHITECTURAL SITE PLAN AND OPTION ITEMS
AS102 17321902 1 CHILLER ENCLOSURE PLAN, EXTERIOR
ELEVATIONS, AND SECTION
A-101 17321912 1 OVERALL FIRST FLOOR PLAN
A-102 17321913 1 ENLARGED FLOOR PLAN - 1A
A-103 17321914 1 ENLARGED FLOOR PLAN - 1B & OPTION ITEM #2
A-104 17321915 1 OVERALL SECOND FLOOR PLAN
A-105 17321916 1 ENLARGED FLOOR PLAN - 2A
A-106 17321917 1 ENLARGED FLOOR PLAN - 2B
A-111 17321918 1 OVERALL FIRST FLOOR REFLECTED CEILING PLAN
A-113 17321920 1 ENLARGED REFLECTED CEILING PLAN - 1B &
OPTION ITEM #2
A-114 17321921 1 OVERALL SECOND FLOOR REFLECTED CEILING
PLAN
A-115 17321922 1 ENLARGED REFLECTED CEILING PLAN - 2A
A-116 17321923 1 ENLARGED REFLECTED CEILING PLAN - 2B
A-301 17321928 1 BUILDING SECTIONS
A-401 17321931 1 INTERIOR ELEVATIONS
A-402 17321932 1 INTERIOR ELEVATIONS
A-403 17321933 1 INTERIOR ELEVATIONS
A-404 17321934 1 INTERIOR ELEVATIONS
A-405 17321935 1 INTERIOR ELEVATIONS
A-411 17321936 1 DETAILED RESTROOM PLANS AND INTERIOR
ELEVATIONS
A-412 17321937 1 DETAILED RESTROOM PLANS AND INTERIOR
ELEVATIONS
A-413 17321938 1 DETAILED ELEVATOR PLANS AND SECTION
A-415 17321940 1 DETAILED STAIR B PLANS AND SECTION
A-416 17321941 1 DETAILED STAIR C PLANS AND SECTION
A-501 17321942 1 TYPICAL MOUNTING HEIGHTS
A-502 17321943 1 PARTITION TYPES
A-503 17321944 1 PARTITION TYPES
A-504 17321945 1 COLUMN DETAILS
A-505 17321983 1 COLUMN DETAILS – ADDED SHEET
A-601 17321946 1 DOOR AND OPERABLE PARTITION SCHEDULES
A-605 17321950 1 DOOR DETAILS
A-609 17321954 1 WINDOW DETAILS
A-610 17321955 1 INTERIOR COLOR MATERIAL SCHEDULE
A-614 17321959 1 ENLARGED SIGNAGE FLOOR PLAN – 1A
A-615 17321960 1 ENLARGED SIGNAGE FLOOR PLAN – 1B
A-730 17321968 1 MISCELLANEOUS INTERIOR DETAILS
A-801 17321972 1 ENLARGED RAF FLOOR PLAN – 1A
A-802 17321973 1 ENLARGED RAF FLOOR PLAN – 1B
A-901 17321976 1 AIR BARRIER DIAGRAM - FLOOR PLANS
A-902 17321977 1 AIR BARRIER DIAGRAM - SECTIONS
AI101 17321979 1 ENLARGED FLOOR FINISH PLAN – 1A
AI102 17321980 1 ENLARGED FLOOR FINISH PLAN – 1B
AI103 17321981 1 ENLARGED FLOOR FINISH PLAN - 2A
AI104 17321982 1 ENLARGED FLOOR FINISH PLAN - 2B
I-801 17321997 1 OVERALL FIRST FLOOR FF&E PLAN
I-804 17322000 1 ENLARGED FF&E FLOOR PLAN – 1A
I-805 17322001 1 ENLARGED FF&E FLOOR PLAN – 1B
PL115 17322061 1 PLUMBING PLAN - FIRST FLOOR - AREA 'E'
PL601 17322076 1 PLUMBING SCHEDULES - SHEET 2
MH101 17322094 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'A'
MH102 17322095 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'B'
MH103 17322096 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'C'
MH104 17322097 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'D'
MH105 17322098 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'E'
MH106 17322099 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'F'
MH111 17322101 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'A'
MH112 17322102 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'B'
MH113 17322103 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'C'
MH114 17322104 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'D'
MH115 17322105 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'E'
MH116 17322106 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'F'
MH502 17322112 1 HVAC DETAILS - SHEET 2
MH600 17322125 1 HVAC SCHEMATICS - SHEET 1
MH601 17322126 1 HVAC SCHEMATICS - SHEET 2
MH603 17322128 1 HVAC SCHEMATICS - SHEET 4
MH700 17322129 1 MECHANICAL SCHEDULES - SHEET 1
MH701 17322130 1 MECHANICAL SCHEDULES - SHEET 2
MH704 17322133 1 MECHANICAL SCHEDULES - SHEET 5
MP105 17322142 1 HVAC PIPING PLAN - FIRST FLOOR - AREA 'E'
MP107 17322144 1 HVAC PIPING PLAN - FIRST FLOOR - MECHANICAL
ENCLOSURE
MP115 17322150 1 HVAC PIPING PLAN - SECOND FLOOR - AREA 'E'
E-001 17322168 1 ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS,
AND NOTES
ES100 17322170 1 ELECTRICAL SITE PLAN – BASE BID
EG101 17322172 1 OVERALL GROUNDING PLAN
EG103 17322174 1 ENLARGED GROUNDING PLAN AREA B
EG107 17322178 1 GENERATOR & PAVILION BUILDINGS - GROUNDING
AND LIGHTNING PROTECTION PLANS
EL101 17322180 1 OVERALL LIGHTING PLAN - FIRST FLOOR
EL103 17322182 1 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1B
EL105 17322184 1 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA
1D
EL112 17322191 1 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA
2D
EL113 17322192 1 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA
2E
EL502 17322200 1 LIGHTING DETAILS - SHEET 2
EL602 17322205 1 SITE LIGHTING DIAGRAM
EL702 17322207 1 LIGHT FIXTURE SCHEDULE - SHEET 2
EP101 17322208 1 OVERALL POWER PLAN - FIRST FLOOR
EP102 17322209 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1A
EP103 17322210 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1B
EP104 17322211 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1C
EP105 17322212 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1D
EP106 17322213 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1E
EP107 17322214 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1F
EP113 17322220 1 ENLARGED POWER PLAN - SECOND FLOOR AREA 2E
EP114 17322221 1 ENLARGED POWER PLAN - SECOND FLOOR AREA 2F
EP122 17322222 1 GENERATOR BUILDING - POWER PLAN
EP402 17322225 1 ENLARGED POWER PLAN - BASE BID ELECTRICAL
ROOMS
EP403 17322226 1 ENLARGED POWER PLAN - BID OPTION #2
ELECTRICAL ROOMS
EP601 17322235 1 ELECTRICAL ONELINE DIAGRAM - BASE BID SHEET
EP603 17322237 1 ELECTRICAL ONELINE DIAGRAM - BID OPTION 2
SHEET 3
EP701 17322239 1 PANELBOARD SCHEDULES - SHEET 1
EP703 17322241 1 PANELBOARD SCHEDULES - SHEET 3
EP704 17322242 1 PANELBOARD SCHEDULES - SHEET 4
EP706 17322244 1 PANELBOARD SCHEDULES - SHEET 6
EP710 17322248 1 PANELBOARD SCHEDULES - SHEET 10
EP720 17322249 1 CABLE SCHEDULE
T-001 17322265 1 TELECOMMUNICATIONS LEGEND
TS101 17322267 1 TELECOM SITE PLAN
TN102 17322272 1 PARTIAL PLAN - TELECOMMUNICATIONS - FIRST
FLOOR - AREA 'A'
TN103 17322273 1 PARTIAL PLAN - TELECOMMUNICATIONS - FIRST
FLOOR - AREA 'B'
TN502 17322287 1 TELECOMMUNICATIONS DETAILS - SHEET 3
TN604 17322296 1 TELECOM RISER DIAGRAMS - SHEET 3
TY101 17322297 1 SPECIAL SYSTEMS - FIRST FLOOR - AREA 'A'
TY102 17322298 1 SPECIAL SYSTEM - FIRST FLOOR - AREA 'B'
TY502 17322302 1 SPECIAL SYSTEMS DETAILS - SHEET 2
TA102 17322329 1 PARTIAL AV FIRST FLOOR PLAN -A
TA107 17322334 1 PARTIAL AV SECOND FLOOR PLAN -A
TA401 17322338 1 AV INTERIOR ELEVATIONS
TA403 17322340 1 AV INTERIOR ELEVATIONS
TA408 17322345 1 ENLARGED AV PLANS
TA410 17322347 1 AV INTERIOR ELEVATIONS & SECTIONS
TA601 17322352 1 AV SYSTEMS SCHEDULES
TA701 17322353 1 AV INFRASTRUCTURE RISER DIAGRAMS
TA702 17322354 1 AV INFRASTRUCTURE RISER DIAGRAMS
TA703 17322355 1 AV INFRASTRUCTURE RISER DIAGRAMS
TA704 17322356 1 AV INFRASTRUCTURE RISER DIAGRAMS
SPECIFICATIONS PROJECT TABLE OF CONTENTS
• Delete this Section in its entirety and replace it with PROJECT TABLE OF CONTENTS, dated 4-27-
2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 01 30 00 – ADMINISTRATIVE REQUIREMENTS
• Delete this Section in its entirety and replace it with Section 01 30 00 – ADMINISTRATIVE
REQUIREMENTS, dated 04-27-2026. The revised Section accompanies this Amendment, see
Attachment (2).
SECTION 01 31 23.13 20 – ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT
CONTRACT MANAGEMENT SYSTEM (eCMS)
• PARA 1.6.1 Restricted Information, Line 6: Change “$250k” to “$350k”.
SECTION 01 32 17.00 20 – COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
• PARA 1.3.2 Weekly Look Ahead Schedule Requirements, (k), Lines 1-2: Add “or attach” after
“Upload”, change “Weekly Look Ahead Schedules” to “Three-Week Look Ahead Schedule with QC
Meeting Minutes”.
• PARA 1.10.1.5.6 Turnover and Closeout Activities, Line 5 after “and Acceptance”: Add “, eOMSI
Progress Submittal, eOMSI Field Verification Meeting, Prefinal eOMSI Submittal and Field
Verification, and Warranty Management Plan Review Meeting.”.
SECTION 01 33 00 – SUBMITTAL PROCEDURES
• PARA 1.4.2 Submittals Reserved for NAVFAC Pacific Approval, Line 2: Change “NAVFAC, Code
CI4” to “NAVFACPAC, Code PDC4”.
SECTION 01 45 00 – QUALITY CONTROLS
• Delete this Section in its entirety and replace it with Section 01 45 00 – QUALITY CONTROLS, dated 04-27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 01 45 35 – SPECIAL INSPECTIONS
• SCHEDULE OF SPECIAL INSPECTIONS, PARA. X. FIRE PROTECTION – SMOKE
CONTROL, Line 1: Uncheck the box after “ALL PORTIONS OF THIS SECTION ARE
APPLICABLE IF BOX IS CHECKED:”.
SECTION 01 57 19 – TEMPORARY ENVIRONMENTAL CONTROLS
• PARA 3.5.3 Preconstruction Air Permits, 2nd paragraph, Lines 3: Change “52.263-7” to “52.236-7”.
SECTION 01 57 19.03 20 – SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
• Delete this Section in its entirety and replace it with Section 01 57 19.03 21 – SUPPLEMENTAL
TEMPORARY ENVIRONMENTAL CONTROLS, dated 04-27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 01 78 00 – CLOSEOUT SUBMITTALS
• PARA 2.1 CERTIFICATION OF EPA DESIGNATED ITEMS, Lines 3-4: Delete “and FAR 52-223-
17 Affirmative Procurement of EPA designated items in Service and Construction Contracts”.
SECTION 03 42 13.00 10– PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
• PARA. 1.1 REFERENCES, ASTM INTERNATIONAL (ASTM): Delete “ASTM A775/A775M
(2022) Standard Specification for Epoxy-Coated Steel Reinforcing Bars” and delete “ASTM
A884/A884M (2025) Standard Specification for Epoxy-Coated Steel Wire and Welded Wire
Reinforcement”
• Delete PARA. 2.2.3.4 “2.2.3.4 Epoxy Coated Reinforcement a. Reinforcing Bars: ASTM
A775/A775M b. Wires and Welded Wire: ASTM A884/A884M”.
SECTION 07 56 00 – FLUID-APPLIED ROOFING SYSTEM
• PARA 1.3 SUBMITTALS, SD-11 Closeout Submittals: Add “Construction Contractor Roofing
Signature Checklist” after “Roofing System Installer Warranty”.
• PARA. 3.7 INFORMATION CARD. After this paragraph, insert new paragraph as follows:
“3.8 ROOFING SIGNATURE CHECKLIST
Complete the Construction Contractor Roofing Signature Checklist attached to the end of this section.”
• Insert the Construction Contractor Roofing Signature Checklist after Section 07 56 00, page 10. The
Construction Contractor Roofing Signature Checklist accompanies this Amendment, see Attachment
(2).
SECTION 08 71 00 – DOOR HARDWARE
• Delete this Section in its entirety and replace it with Section 08 71 00 – DOOR HARDWARE, dated
04-27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 09 29 00 – GYPSUM BOARD
• PARA 1.1 REFERENCE, under ASTM INSTERNATIONAL (ASTM): Add “ASTM
C1658/C1658M (2019; E 2020) Standard Specification for Glass Mat Gypsum Panels”
• PARA 2.1.1 Gypsum Board, Lines 1-2: Change “ASTM C1396/C1396M. Paperless type, moisture and mildew resistant with ASTM D3273 score of 10” with “ASTM C1658/C1658M. Use paperless
(glass mat) gypsum board.”.
SECTION 10 21 13 – TOILET COMPARTMENTS
• PARA 1.1 REFERENCES, ASTM INTERNATIONAL (ASTM): Change “ASTM A167 (2011)
Standard Specification for Stainless and Heat Resisting Chromium Nickel Steel Plate, Sheet, and
Strip” to “ASTM A240/A240M (2025a) Standard Specification for Chromium and Chromium-Nickel
Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications”.
• PARA 2.2.4.1 General Requirements, Conformance Standard, Line 5: Change “ASTM A167” to
“ASTM A240/A240M”.
SECTION 10 26 00 – WALL AND DOOR PROTECTION
• Delete this Section in its entirety and replace it with 10 26 00 – WALL AND DOOR PROTECTION, dated 04-27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 10 44 16 – FIRE EXTINGUISHERS
• Delete this Section in its entirety and replace it with 10 44 16 – FIRE EXTINGUISHERS, dated 04-
27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 12 00 01.00 20 – FURNITURE, FIXTURES AND EQUIPMENT (FF&E) PACKAGE
• PARA 1.2.5 Construction Wage Rate Requirement Statute: Delete “Prior to the Interior Designer sending out the Best Value Determination (BVD) Request for Quote (RFQ) Package[s] to vendors, the NAVFAC Contracting Officer, Contract Specialist, Project Manager, Design Manager, NAVFAC
Interior Designer and Collateral Equipment Manager must make made made a determination as to whether the FF&E [and Specialty CEQ]installation is covered by the Construction Wage Rate
Requirements statute. The BVD RFQ Package must identify identified any items with installation that is subject to the Construction Wage Rate Requirements statute.”.
• PARA 1.2.5.1 Construction Wage Rate Requirements Statute is Not Applicable, (a), Line 2: Change
“Option (Item)” to “Planned Modification”.
• PARA 3.2.2: Add “Submittal” after “Walk Through(s) and Punch List (s)”.
SECTION 13 48 73– SEISMIC CONTROL FOR NONSTRUCTURAL COMPONENTS
• PARA. 1.1 REFERENCES, ASTM INTERNATIONAL (ASTM): Add “ASTM A153/A153M (2023)
Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware-23” after “ASTM
A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless”.
• PARA. 1.1 REFERENCES, ASTM INTERNATIONAL (ASTM): Add “ASTM A194/A194M (2024)
Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High
Pressure or High Temperature Service, or Both” after “ASTM A193/A193M (2025) Standard
Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and
Other Special Purpose Applications”.
• PARA 1.2.1 General Requirements, Table, Row 3: Change “1.48 G” with “2.25 G”.
• PARA 1.2.1 General Requirements, Table, Row 4: Change “0.95 G” with “1.14 G”.
• PARA 1.2.1 General Requirements, Table, Delete Rows 5 and 6.
• PARA 1.3 SUBMITTALS, SD-03 Product Data: Delete “Common Bolts; G”.
• PARA. 2.1 EQUIPMENT REQUIREMENTS, after 3rd paragraph: Add “Submit supports and attachments shop drawings along with catalog cuts, templates, and erection and installation details, as appropriate, for the items listed in paragraph ELECTRICAL EQUIPMENT, MECHANICAL
EQUIPMENT, and MISCELLANEOUS EQUIPMENT AND COMPONENTS.”.
SECTION 23 03 00.00 20 – BASIC MECHANICAL MATERIALS AND METHODS
• Delete this Section in its entirety.
SECTION 23 08 00 – COMMISSIONING OF MECHANICAL [AND PLUMBING] SYSTEMS
• Delete this Section in its entirety and replace it with Section 23 08 00 – COMMISSIONING OF
MECHANICAL AND PLUMBING SYSTEMS, dated 04-27-2026. The revised Section
SECTION 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
• PARA 2.1.4 Ethernet Switch, Line 2: Add “and Section 01 35 13.02 34 FACILITY-RELATED
CONTROL SYSTEMS PROCUREMENT FOR NAVY.” after “FOR FACILITY-RELATED
CONTROL SYSTEMS”.
• PARA 2.2 CONTROL NETWORK WIRING, (b), Line 2: Change “CAT-5e” to “CAT-6”.
• PARA 3.1.2 DDC Hardware: Change “Install all DDC Hardware that connects to an IP network in lockable enclosure. Install other DDC Hardware that is not in suspended ceilings in lockable enclosures. For all DDC hardware with a user interface, coordinate with site to determine proper passwords and configure passwords into device.” to “Install all DDC Hardware that connects to an IP network in lockable enclosure with an alarm input to monitor lockable enclosure door. Install other
DDC Hardware that is not in suspended ceilings in lockable enclosures. For all DDC hardware with a user interface, coordinate with site to determine proper passwords and configure passwords into device.”.
SECTION 23 64 26 – CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING
SYSTEMS
• Delete this Section in its entirety and replace it with Section 23 64 26 – CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS, dated 04-27-2026. The revised Section
SECTION 25 08 10 – CONTROL SYSTEMS UTILITY MONITORING AND CONTROL
SYSTEM TESTING
• Delete this Section in its entirety and replace it with Section 25 08 10 – CONTROL SYSTEMS
UTILITY MONITORING AND CONTROL SYSTEM TESTING, dated 04-27-2026. The revised
Section accompanies this Amendment, see Attachment (2).
SECTION 25 10 10 – UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT
END AND INTEGRATION
• Delete this Section in its entirety and replace it with Section 25 10 10 – UTILITY MONITORING
AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION, dated 04-27-2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 27 10 00 – BUILDING TELECOMMUNICATIONS CABLING SYSTEM
• PARA. 3.7.1 Labels, Line 1: Add “Guam C4IT labeling scheme,” after “Provide labeling in accordance with”.
SECTION 28 31 76 – INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
• PARA. 1.9.2.2 Supervisor, Line 1: Delete “NICET Level IV”, and replace with “NICET Level III”.
SECTION 31 00 00 – EARTHWORK
• PARA. 3.4 SUBGRADE PREPARATION, 5th Paragraph, 1st Line: After “When subgrades”, add
“encounter unsatisfactory material or”.
• PARA. 3.4 SUBGRADE PREPARATION, 5th Paragraph, 2nd Line: Replace “6 inches” with “3 feet or until limestone is reached”.
SECTION 31 21 13 – RADON MITIGATION
• Delete this Section in its entirety and replace it with 31 21 13 – RADON MITIGATION, dated 04-27-
2026. The revised Section accompanies this Amendment, see Attachment (2).
SECTION 32 17 23 – PAVEMENT MARKINGS
• Delete this Section in its entirety.
SECTION 33 52 40 – FUEL SYSTEMS PIPING (NON-HYDRANT)
• Delete this Section in its entirety and replace it with 33 52 40 – FUEL SYSTEMS PIPING (NON-
HYDRANT), dated 04-27-2026. The revised Section accompanies this Amendment, see Attachment
(2).
SECTION 33 56 10 – FACTORY-FABRICATED FUEL STORAGE TANKS
• Delete this Section in its entirety and replace it with 33 56 10 – FACTORY-FABRICATED FUEL
STORAGE TANKS, dated 04-27-2026. The revised Section accompanies this Amendment, see
SECTION 33 71 02 – UNDERGROUND ELECTRICAL DISTRIBUTION
• PARA. 3.3 CABLE INSTALLATION PLAN AND PROCEDURE, Line 6: Add “break away swivel rated at factory cable maximum pulling tension,” after “pulling tension,”.
• PARA. 3.3 CABLE INSTALLATION PLAN AND PROCEDURE, after (k): add “l. Break away swivel rated at factory cable maximum pulling tension.”.
SECTION 33 82 00 – TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
• Delete this Section in its entirety and replace it with 33 82 00 – TELECOMMUNICATIONS
OUTSIDE PLANT (OSP), dated 04-27-2026. The revised Section accompanies this Amendment, see
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
N6274226R1306 10 Apr 2026 1 83
J-875
NAVFACSYSCOM PACIFIC
258 MAKALAPA DR STE 100, JBPHH HI
96860-3134
JBPHH, HI 96860-3134
UNITED STATES
Jennifer Hue, Email: jennifer.m.hue.civ@us.navy.mil Telephone: 8086026755
N62742
Jennifer Hue 8086026755
RFP NO. N62742-26-R-1306, JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U.S. NAVSUPPACT, MCB CAMP BLAZ, GUAM
GENERAL DESCRIPTION: SEE SPECS 01 11 00, SECTION 1.1.1, Project Description
THIS PROCUREMENT IS UNRESTRICTED. North American Industry Classification System (NAICS) Code 236220, COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION - Average Annual Receipts for the Past 3 Years - $45M
ESTIMATED COST: BETWEEN $25,000,000 and $100,000,000.
DPAS RATING: DO-C2
ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of a contract. The awardee's proposal will be incorporated into the contract and all items proposed will become binding requirements of the contract. By submission of the offer, the offeror agrees that all items proposed (e.g. subcontractors with teaming agreements, etc.) will be utilized for the duration of the contract and any substitutions must be equal or better and will require prior approval by the Contracting Officer.
15 1157
00 73 00 Para 1.3
See 00 21 16 02:00 PM 16 Jun 2026
See 00 21 16
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE
FOR
RFP NO. N62742-26-R-1306
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,
U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
RFP N62742-26-R-1306
SF 1442 (Continued)
Amendment No. 0002
ITEM
NO. DESCRIPTION QTY
UNIT OF
ISSUE
UNIT
PRICE AMOUNT
0001AA BASE ITEM: The basis for SLIN 0001AA is the price for all labor, material, and equipment for the entire work for WON
1696746 complete and in accordance with the drawings and specifications but not including work defined in any other Item
No.
1 Lump Sum $__________________
0001AB BASE ITEM: The basis for Item No.
0001AB is the price to perform the removal
(over-excavation) of soft, yielding, or unsatisfactory soil materials, and the placement of satisfactory fill per Section 31
00 00 for the site work, in place and complete.
1,100 Cubic Yard $_________/cy = $_________________
0001AC BASE ITEM: The basis for Item No.
0001AC is the price to install Cement Deep
Soil Mixing (CDSM) operations for the ground improvements at the site as required per drawings and Section 31 62 00, in place and complete.
7,920 Cubic Yard $_________/cy = $_________________
TOTAL Item No
0001 (0001AA
through 0001AC)
0002 OPTION ITEM 1: The basis for Item No.
0002 (OPTION ITEM 1) is the entire work for the pavilion, including site development and utilities as required to support the pavilion, complete and in accordance with the drawings and specifications except work identified in any other Item No.
1 Lump Sum = $_________________
0003 OPTION ITEM 2: The basis for Item No.
0003 (OPTION ITEM 2) is the entire work for the Standby Back-up Generator, Generator Building, Fuel Storage Yard, and
Sand Filter, including site development and utilities as required to support them, complete and in accordance with the drawings and specifications except work identified in any other Item No. If Option
1 Lump Sum = $_________________
FOR
RFP NO. N62742-26-R-1306
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,
U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
RFP N62742-26-R-1306
SF 1442 (Continued)
Amendment No. 0002
Item 2 is accepted, the Emergency Generator at
Room 130 will not be required.
0004 OPTION ITEM 3: The basis for Item No.
0004 (OPTION ITEM 3) is the entire work for the Security Chain Link Fence, complete and in accordance with the drawings and specifications except work identified in any other Item No.
1 Lump Sum = $_________________
0005AA PLANNED MODIFICATION: Furniture, Fixtures and Equipment (FF&E) and
Specialty Collateral Equipment (CEQ). See
Note 8.
Gov’t Estimated
Budget
= $ 3,934,910.00
0005AB Handling and Administrative Rate (HAR)
NTE 5%. See Note 8.
(DO NOT ROUND)
TOTAL Item No.
0004 (0004AA +
0004AB)
NOTES:
1. The Offeror SHALL include a price for ALL Item Nos. The Government will not adjust the quantities noted in the schedule at time of award (Ref: FAR 52.215-1(f)(5)).
2. Multiple awards will not be made (Ref: FAR 52.215-1(f)(6)).
3. CLINs 0001 through 0004 will be funded with Japan Fiscal Year 2022 funding. It is the Government’s objective to award CLINs 0001 and 0004 within the funds available.
4. In accordance with FAR 52.217-5, Evaluation of Options, “[e]xcept when it is determined in accordance with FAR 17.202(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for the option to the total price for the basic requirement.
Evaluation of the option will not obligate the Government to exercise the option.” The total of the proposed price for CLINs 0001 through 0005 will form the basis for the evaluation noted in Document 00
22 00.
5. The Government may exercise Option Item 1 (CLIN 0002), Option Item 2 (CLIN 0003), and/or Option
Item 3 (CLIN 0004) at the time of award or by written notice to the Contractor within 365 calendar days of contract award. Exercising Option Items 1 (CLIN 0002), 2 (CLIN 0003), and/or 3 (CLIN 0004) will not extend the contract completion date.
6. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer and the extended total recomputed accordingly. If the offer provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
7. Payment for SLINs 0001AB and 0001AC shall be for actual quantities only. For SLINs 0001AB, the unit prices will be used to adjust the contract price for any increase or decrease in the estimated quantities
FOR
RFP NO. N62742-26-R-1306
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,
U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
RFP N62742-26-R-1306
SF 1442 (Continued)
Amendment No. 0002 subject to Document 00 73 00, Variation in Estimated Quantity. For SLIN 0001AC, refer to Specifications
Section 31 62 00, paragraph 1.4.2.
8. The following notes apply to CLIN 0005 for Furniture, Fixtures, and Equipment (FF&E):
a. Government Estimated Amount for FF&E and Specialty CEQ. The Government Estimated
Amount for FF&E and Specialty CEQ, as shown above (SLIN 0005AA), includes the material cost, freight, and installation charges. The Government Estimated Amount has been identified to provide Offerors with the projected magnitude of effort for FF&E. The total CLIN 0005 amount shall include all costs to procure, install, and store the Furniture, Fixtures and Equipment, and includes the Prime Contractor’s proposed Handling and Administration Rate (HAR).
b. Prime Contractor Handling and Administration Rate (HAR). Offerors may propose a HAR fee in SLIN 0005AB, up to but not to exceed 5%, for the handling and administration of the FF&E and Specialty CEQ. This fee will account for all administrative costs; overhead; bonding fees, if any; administration of subcontractors; profit; and any other costs associated with and related to the coordination and processing of the procurement and installation of the FF&E and Specialty CEQ.
The prime contractor’s proposed HAR mark-up will be applied to the Government Estimated
Amount to derive a total proposed price for CLIN 0005. In the event of a difference between the proposed HAR and the extended total, the HAR percentage will be held to be the intended offer and the total recomputed accordingly.
c. The prime contractor’s HAR percentage rate will be incorporated into the contract as proposed and will not be adjusted regardless of fluctuations in the Government Estimated Amount. The HAR is a fixed percentage rate that will be utilized in calculating the final price for the planned modification. When the final FF&E Package and Specialty CEQ Package is priced, the contractor’s proposed HAR percentage rate, as incorporated into the contract, will be applied to the selected supplier/vendor’s quote to arrive at a total proposed price for final negotiation of the planned modification.
d. It is anticipated that a planned modification will be awarded at least six months prior to the completion of the work. The planned modification will be issued after the receipt of appropriate funding. A minimum of six months is required for the contractor to purchase, deliver, and install the FF&E and Specialty CEQ without impacting the overall completion date of the project. No schedule extension will be granted if the planned modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the planned modification less than six months prior to the contract completion date, the contractor may be entitled to a contract extension.
9. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the
Contracting Officer and to MARAD via email. MARAD email: Cargo.MARAD@dot.gov (attn.: MIL team). In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.