26-1306 Note 11.pdf
PDF 178 KB Posted
- Attached to
- JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U. S. NAVSUPPACT MCB CAMP BLAZ, GUAM
- Solicitation number
- N62742-26-R-1306
About this file
This document is a Pre-Proposal Questions & Answers notice issued by the Naval Facilities Engineering Systems Command Pacific for RFP N62742-26-R-1306. The notice provides clarification on a single technical question regarding structural specifications for the JFY 2022 Project J-875, Battle Staff Training Facility at U.S. Naval Support Activity MCB Camp Blaz, Guam.
Question 155 requested specifications for the weight per foot of W8 beams and the thickness of L4x4 continuous angles at the Chiller Enclosure as referenced in Drawing SF505. The government's revised response clarifies that contractors must use W8X24 for all beams and L4X4X3/8 for the angles, with Sheet SF401 updated to reflect these specifications. This notice is informational only and does not constitute an amendment to the RFP unless issued as a Standard Form 30.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP N62742-26-R-1306
Notice No. 11
DEPARTMENT OF THE NAVY
COMMANDER
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DRIVE SUITE 100
PEARL HARBOR HI 96860-3134
Notice No. 11
July 2, 2026
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-26-R-1306
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,
U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The
RFP remains unchanged unless it is amended in writing on a Standard Form 30.
REVISED RESPONSE FROM NOTICE NO. 10:
155. Reference: Drawing SF505, Structural Framing Details
Please specify weight/ft of W8 beam and thickness of L4x4 cont angle at Chiller Enclosure.
ANSWER: Use W8X24 for all beams. Use L4X4X3/8 for the angles. Sheet SF401 was revised to specify weight per foot of W8 beam and thickness of L4x4 angles.
End of Notice