This is a Pre-Proposal Questions and Answers document (Notice No. 3) for RFP N62742-26-R-1306 issued by the Department of the Navy, Naval Facilities Engineering Systems Command Pacific, for JFY 2022 Project J-875, Battle Staff Training Facility at U.S. NAVSUPPACT MCB Camp Blaz, Guam.
The notice addresses eight substantive pre-proposal questions submitted by prospective offerors. The Government extended the proposal due date to June 23, 2026, with the deadline for submitting additional questions revised to June 2, 2026, citing disruptions from Typhoon Sinlaku that impeded local subcontractor and supplier coordination. Regarding pricing structure, the Government confirmed that Unit Priced SLINs 0001AB and 0001AC must be included in the Complementary Pricing Information subtotal for supporting facilities and site work outside the primary facility 5-foot line. The Government clarified that "other costs" in the pricing schedule should capture items not falling within the Battle Staff Training Facility proper or supporting facilities categories, with examples including cybersecurity features, geospatial mapping and surveying, and eOMSI information. Four technical questions regarding air-cooled chiller specifications, RAF-1 tile finish availability, flooring finish consistency, and smoke control system inspection requirements received deferred responses. The Government declined to permit pile driving as an alternative to the specified 4-foot soilcrete column design, stating that contractors may submit Value Engineering Change Proposals post-award but must base proposals on the solicited design. The Government also declined to modify proposal submission requirements to permit electronic submission via PIEE with delayed hard-copy delivery, maintaining the requirement for multiple hard-copy volumes with accompanying CD-based electronic submission.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP N62742-26-R-1306
Notice No. 3
May 19, 2026
PRE-PROPOSAL QUESTIONS & ANSWERS
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,
U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The
RFP remains unchanged unless it is amended in writing on a Standard Form 30.
NOTICE NO. 3:
8. Reference: Solicitation-N6274226R1306 SF1442 Block 13
Given the widespread and continuing impacts of Typhoon Sinlaku, which resulted in prolonged outages of power, potable water, and communication services for a substantial portion of the island, normal business operations have been materially disrupted. These conditions limited access to offices, but most importantly severely constrained coordination with local subcontractors and suppliers. Business operations are just returning to normal. The typhoon has significantly impeded the development of complete, accurate, and price specific information.
Subcontractors remain severely impacted and the situation continues to affect their ability to support timely bid preparation.
In the interest of providing a “Best Value cost” to the Government, maintaining full and open competition, and allowing offerors sufficient time to prepare thorough and responsive proposals following the island-wide disruption, will the Government issue an amendment granting an additional three (3) week extension to the bid due date, establishing a revised submission deadline of July 14, 2026? The one week extension previously given, is insufficient..
ANSWER: A forthcoming amendment will extend the proposal due date to June 23, 2026.
Please also note that the deadline for submitting questions regarding the solicitation will be revised to specify June 2, 2026.
9. Reference: Solicitation-N6274226R1306 Price Proposal Schedule Complementary Pricing
Information
Per Price Proposal Schedule:
TOTAL Item No 0001 includes SLIN 0001AA through SLIN 0001AC, which has price for Unit
Priced SLIN 0001AB and SLIN 0001AC.
DEPARTMENT OF THE NAVY
COMMANDER
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DRIVE SUITE 100
PEARL HARBOR HI 96860-3134
Per Complementary Pricing Information:
Total of CLIN 0001 includes
Subtotal of Battle Staff Training Facility complete to the 5-foot line outside of the building in accordance with the drawings and specifications, subtotal of supporting facilities and site work, outside the primary facility 5-foot line and subtotal of other costs.
Please confirm price for Unit Priced SLIN 0001AB and SLIN 0001AC need to be considered while pricing different line items in Complementary Pricing Information.
ANSWER: Yes, please include the prices for SLIN 0001AB and SLIN 0001AC in
Complementary Pricing Information and put it with costs for below item:
Subtotal of Base Price (CLIN 0001) for the supporting facilities and site work, outside the primary facility 5-foot line, complete in accordance with the drawings and specifications, but excluding work described in another Item.
10. Reference: Solicitation-N6274226R1306 Complementary Pricing Information
Per Complementary Pricing Information:
Total of CLIN 0001 includes
i) Subtotal of Battle Staff Training Facility complete to the 5-foot line outside of the building in accordance with the drawings and specifications,
ii) subtotal of supporting facilities and site work, outside the primary facility 5-foot line and
iii) subtotal of other costs
Please elaborate which scope of work is expected under iii) subtotal of other costs for bidding purposes.
ANSWER: Line iii) (“other costs”) is intended to capture any cost item included in your proposal that doesn’t fall within Lines i) (“Battle Staff Training Facility complete to the 5-foot line outside of the building” or ii) (“supporting facilities and site work, outside the primary facility 5-foot line”). Examples of costs that might not be included in Lines i) or ii) include cybersecurity features, geospatial mapping & surveying, or eOMSI information.
11. Reference: Air Cooled (CH) Schedule on Drawing No. MH700
Air Cooled Chiller Minimum Total Cooling Capacity. The Chiller – Air Cooled (CH) Schedule on Drawing No. MH700 shows all the important information for the chillers, CH-01 and CH-02.
But does not include the information for the Passes and Minimum Total Cooling Capacity for both chillers. Please provide.
ANSWER: Response deferred.
12. Reference Drawing Sheet A-610. RAF-1 is indicated to be factory laminated Casal Grande
Metropolis Color Mud, finish Natural. In checking with our suppliers, this tile is not available in
24" (610mm size) but it is available in 600mm. It is shown in literature to be 24" nominal size, which does not account for the grout joint which would make up the difference. Since this tile needs to be 24" as the raised floor would not have grout joints, the current finish will not work.
Please provide alternate basis of design for RAF-1 Tile Finish.
13. The Porcelain finish on RAF-1 is also the finish in other adjoining corridors to the raised flooring which is to be installed on the raised slab portions. If RAF-1 Porcelain finish is changed, please confirm floor finish in these areas will require to be changed as well.
14. Specification Section 01 45 35, Special Inspection, Schedule of Special Inspection Part X, Fire Protection - Smoke Control has been checked. There is no smoke control system in the project. Please confirm should Part S, Fire Protection - Smoke Control be 'unchecked'?
15. We would like to request 2 weeks extension for the submission of Bid.
ANSWER: Refer to response to Q8.
16. We would like to verify in lieu of the 4’ soilcrete column to use pile driving.
ANSWER: No. The Government explored alternatives during design. While the Contractor may explore a Value Engineering Change Proposal after award, please develop your proposal based on the solicited design.
17. Solicitation-N6274226R1306 Section 00 21 16 Instructions to Proposers; 1.2 Number of
Copies/ Time of Receipt
The solicitation currently requires delivery of multiple hard-copy proposal volumes with an accompanying electronic submission on physical media (CD). Other recent NAVFAC Pacific procurements for Guam projects allow for proposal submission via the PIEE with a hard copy follow-up. Offerors respectfully note that the current requirement for hard-copy submission with electronic copies on CD presents several challenges:
• Reduced Pricing Competitiveness:
Due to Hawaii specific FEDEX handling procedures, the need to print, assemble, and ship multiple hard-copy volumes requires proposal completion earlier than would otherwise be necessary. For local Guam contractors, this compresses the time available to incorporate the most current subcontractor and supplier pricing, potentially impacting the Government’s receipt of the most competitive bids. At proposal closure, this often necessitates hand delivery to
NAVFAC because FEDEX will not guarantee delivery, pushing back “bid lock”. The process currently required in the solicitation adds cost and can affect best value pricing to the Navy.
NAVFAC Pacific’s use of PIEE on other projects eliminates this problem. This, combined with the submission of our small business utilization plan the following day, advantages local Hawaii-based contractors unfairly.
• Consistency with Recent NAVFAC Practices:
Allowing submission via PIEE, with hard copies to follow, would align this procurement with recent NAVFAC Pacific solicitations, improving consistency and reducing risk to both the
Government and offerors.
Requested Action:
The Offeror requests the Government consider revising the proposal submission instructions to permit electronic submission via PIEE as the official proposal receipt method, with required hard-copy originals submitted within five (5) business days thereafter.
ANSWER: Your recommendation has been considered; however, the solicitation remains unchanged.
End of Notice