26-1306 Note 9.pdf

PDF 486 KB Posted

Attached to
JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U. S. NAVSUPPACT MCB CAMP BLAZ, GUAM
Solicitation number
N62742-26-R-1306
Issued by

About this file

This is a Pre-Proposal Questions & Answers document (Notice No. 9) issued June 24, 2026, for RFP N62742-26-R-1306 by the Naval Facilities Engineering Systems Command Pacific for the Battle Staff Training Facility project at U.S. Naval Support Activity MCB Camp Blaz, Guam (JFY 2022 Project J-875).

The document addresses clarifications on technical specifications and drawings previously raised by prospective contractors. Key answers confirm that epoxy-coated rebar is not required for cast-in-place concrete (uncoated black steel Grade 60 ASTM A615/A615M is acceptable); the exterior insulation and finish system is direct-applied without requiring insulation boards; suspended slabs at elevation 16'-0" shall use stay-in-place or removable metal forms rather than steel deck systems; and below-grade waterproofing for footings and stem walls shall be applied to exterior sides only. The government clarified that specification section 04 20 00 (Unit Masonry) applies to CMU blow-out walls and elevator shaft walls; spreader beams are not required; and wall type SW3 with footing FTG1 should be used for unmarked walls at Grid B & 8 on drawing SB103. The estimated over-excavation quantity for site work (CLIN 0001AB) is 1,100 cubic yards based on floor slab and footing requirements per Detail C4 on Sheet SK502. Multiple answers reference forthcoming amendments to update drawings and specifications, including detailed sections for second floor framing, elevator footing waterproofing details, radon pipe installation details, and room finish schedule corrections. One question regarding extension of the proposal submission deadline beyond July 7, 2026, received a deferred response.

View the file

Other files

File Type Posted
26-1306 Note 12.pdf PDF
N62742-26-R-1306_AMD0006.pdf PDF
N62742-26-R-1306_AMD0005.pdf PDF
Att1_1696746_Amd0005_DWGS_260605.pdf PDF
Att2_1696746_Amd0005_SPECS_260605.pdf PDF
26-1306 Note 11.pdf PDF
N62742-26-R-1306_AMD0004.pdf PDF
26-1306 Note 10.pdf PDF
26-1306 Note 8.pdf PDF
26-1306 Note 7.pdf PDF
26-1306 Note 6.pdf PDF
N62742-26-R-1306_AMD0003.pdf PDF
26-1306 Note 5.pdf PDF
26-1306 Note 4.pdf PDF
Att1_1696746Amd0002dwg_260515r1_Signed.pdf PDF
N62742-26-R-1306_AMD0002.pdf PDF
Att2_1696746Amd0002spc_260515r1.pdf PDF
26-1306 Note 3.pdf PDF
26-1306 Note 2.pdf PDF
26-1306 Note 1.pdf PDF
N62742-26-R-1306_AMD0001.pdf PDF
1696746_DWG_5of5.pdf PDF
CJA_KabaMas GPMO_13Feb2025_Redacted1.pdf PDF
Class JA King-Fisher Guam redact.pdf PDF
Class JA_Federal Signal_Redacted.pdf PDF
Schn_AMI_CJA_red.pdf PDF
Solicitation-N6274226R1306.pdf PDF
1696746_SPC.pdf PDF
1696746_DWG_1of5.pdf PDF
1696746_DWG_3of5.pdf PDF
1696746_DWG_4of5.pdf PDF
ECC_CJA_Red.pdf PDF
1696746_DWG_2of5.pdf PDF
CJA_JCI DDC_Red.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP N62742-26-R-1306

Notice No. 9

DEPARTMENT OF THE NAVY

COMMANDER

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DRIVE SUITE 100

PEARL HARBOR HI 96860-3134

June 24, 2026

PRE-PROPOSAL QUESTIONS & ANSWERS

JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY,

U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

REVISED RESPONSES FROM NOTICE NO. 5:

151. Reference: Specifications, 03 30 00 Concrete

Please confirm if all reinforcement for cast-in-place concrete shall be uncoated black steel rebar

Grade 60 (ASTM A615/A615M) and epoxy-coated rebar is not required.

ANSWER: Epoxy-coated rebar is not required. See Structural Design Criteria Note 9 on sheet S-

001 for additional requirements.

153. Reference: Drawings SB106, SB501, Slab Plan, Structural Fdn/Slab Details

Drawing SB-106 shows concrete shear walls for elevator pit walls. However, the detailed section on Drawing SB-501 Det. B1 shows a non-load bearing CMU wall. Please clarify.

ANSWER: See responses to Q104-105. Sheet SB106 will be revised via forthcoming amendment to show non-loadbearing CMU walls where they occur.

154. Reference: Specifications, 04 20 00 Unit Masonry

Please confirm if spec section 04 20 00 is not applicable for building walls and interior partitions for this project. If this would be applicable, please advise where it should be applicable?

ANSWER: This specification applies to the CMU blow out walls and the north, west and south elevator shaft walls.

156. Reference: Drawing A-750, Miscellaneous Exterior Details

Please confirm if below grade waterproofing for footing and stem wall shall be on the exterior side only.

ANSWER: The below grade waterproofing for footing and stem wall shall be on the exterior sides of exterior walls as shown on Detail A2/A-750 and at the exterior sides of elevator foundation walls. Sheet A-750 will be revised via forthcoming amendment to add elevator footing detail indicating extent of waterproofing.

157. Reference: Drawing SF104 to 105, Second Floor Framing Plan

Please provide detailed structural drawing of the W10x19 spreader beam as per Note 6 of

Drawing SF104 & 105.

ANSWER: Spreader beams are not required. Note #6 will be reviewed via forthcoming amendment.

158. Reference: Spec Section 07 24 00, Exterior Insulation & Finish System

Spec Section 07 24 00 Exterior Insulation & Finish System doesn’t specify any insulation board.

Please confirm that the required Exterior Finish System is a Direct-Applied Exterior Finish

System that doesn’t require insulation boards.

ANSWER: Confirming that the Exterior Finish System is a direct-applied system that does not require insulation boards.

159. Reference: Drawing SF102 to 105, Second Floor Framing Plan

Please confirm if suspended slab at Elev 16’ - 0” shall be under steel deck system?

ANSWER: The slabs at EL16’-0” are not under a steel deck system. The intent is to use stay-in-place metal forms or removable forms to construct the slab and beams at EL 16’-0”. See Note 4 on the referenced sheets.

160. Reference: Drawing SF102 to 105, Second Floor Framing Plan

Second floor framing plan at elev. 14’ & 16’ were updated as per amendment 002. However, updated detailed sections on Drawing SF-501 to SF503 were not provided. Please provide.

ANSWER: Will provide updated detailed sections on SF501 to SF503 via forthcoming amendment.

NOTICE NO. 9

161. Reference: Spec. Section 07 24 00

Exterior Insulation and Finish System

Please confirm if insulation board is required for this specification.

ANSWER: Please refer to response to Q158.

162. Reference: CLIN Schedule and RFP Drawings

Per CLIN Schedule CLIN 0001AB, BASE ITEM: The basis for Item No. 0001AB is the price to perform the removal (over-excavation) of soft, yielding, or unsatisfactory soil materials, and the placement of satisfactory fill per Section 31 00 00 for the site work in Item 0001AB, in place and complete (EST QTY = 1,100 CY). But, we are not able to identify where this Qty is required.

Please clarify.

ANSWER: The quantity is provided as an estimate of the floor slab and footing over excavation required by Detail C4 on Sheet SK502, which is referenced on sheet SB101, General Note #2.

163. Reference: Amendment 0003 SF 1442 Block 13

Would the Government consider extending the proposal submission deadline by one additional week beyond July 7, 2026, to account for reduced subcontractor and vendor availability and potential delays in obtaining complete and final pricing during the July 4th holiday period?

ANSWER: Response deferred.

164. Reference: Dwg: AS102 & A-612

Room #119A (Chiller Encl.) On Dwg AS102, Internal Wall Finish for Room #119A marked as

EF-1. Whereas Room Finish Schedule A-612 states wall finish as P-1B. Please clarify.

ANSWER: Wall finish for Room 119A Chiller Enclosure is EF-1. Will revise Sheet A-612 via forthcoming amendment to note “See AS102” for Room 119A.

165. Reference: Dwg: AS102 & A-612

Room #119A (Chiller Encl.) On Dwg A-612, Ceiling & Ceiling Finish listed as EXP & P-3A respectively. Whereas on Dwg AS102 Ceiling type marked as Heavy Duty Woven Wire Mesh

Panel on Structural Steel. Please confirm which one is correct.

ANSWER: See response to Q164.

166. Reference: Dwg: SB103

On Dwg SB103, Wall located at Grid B & 8 are marked without Wall Type tag. Please provide wall type for the highlighted wall in below image. Also confirm if any wall footing required for these walls.

ANSWER: Use wall type SW3, and wall footing FTG1. Will update Sheet SB103 via forthcoming amendment to indicate wall and footing type.

167. Reference: Dwg PL101 thru PL106

Please provide sectional detail for Radon Pipe laying with aggregate fill.

ANSWER: Will provide sectional details via forthcoming amendment for Radon Pipe laying with aggregate fill. The preliminary drawing is attached to this notice.

End of Notice

MIN. 6"

GRAVEL LAYER 4" MIN.

WALL

PIPE SLEEVE

GRAVEL LAYER

CONCRETE FOOTING

4 TYPICAL RADON PIPE WALL PENETRATION

SCALE: NTS

FLOOR

4" PVC MAIN PIPE

(NON-PERFORATED)

15 MIL MEMBRANE

100MM PIPE

PERFORATED PIPE

PIPE COUPLING

PIPE THROUGH CONCRETE SHALL NOT

BE PERFORATED.

RADON PIPE PENETRATION1

CLEAN GRAVEL SIZE 13MM-19MM,

50MM MIN. TOP COVER

BACKFILL

CONCRETE FLOOR

SCALE: NTS

100MM MIN SIDE AND BOTTOM COVER

RADON PERFORATED PIPE2

CONCRETE FLOOR 100MM PERFORATED PIPE

15 MIL MEMBRANE

CLEAN GRAVEL SIZE 13MM-19MM,

50MM MIN. TOP COVER

SCALE: NTS

PVC RAIN GUARD

12" COMPACTED GRAVEL

RADON RISER DETAIL

CLEAN GRAVEL SIZE

13MM-19MM, 50MM MIN.

TOP COVER

PERFORATED SUBSLAB

PIPING.

COMPACTED SUBGRADE (SOIL)

110V JUNCTION BOX,

SEE ELECTRICAL

EXHAUST FAN

SEALANT ALL AROUND

SLAB ON GRADE

VAPOR BARRIER

WALL OR COLUMN

PROVIDE FASTENERS

AS REQUIRED

SEALANT ALL AROUND PIPING

PROVIDE ROOF PENETRATION

FLASHING.

FINISHED ROOF

SCALE: NTS

5 TYPICAL RADON VENT PIPE DETAIL

SCALE: NTS

A

A

4" PVC MAIN PIPE (NON-PERFORATED)

4" PERFORATED PVC PIPE

60 DEG. 60 DEG.

GRAVEL LAYER

PROVIDE 2 ROWS OF 1/2" DIAMETER HOLES SET

AT 6" CENTER TO CENTER, 120° APART

FINISH FLOOR

4"X4"X4" PVC TEE OR CROSS

J-875 BSTF

Response - RFI 167 J. Valmik 06/18/2026