This file is a specification document for the JFY 2022 Project J-875 Battle Staff Training Facility at U.S. Naval Supply Activity MCB Camp Blaz, Guam, specifically containing the project table of contents and detailed specifications for resilient flooring, resinous flooring, wall and door protection, and hydraulic passenger elevators.

The document outlines comprehensive technical requirements across multiple construction divisions and systems. For resilient flooring (Section 09 65 00), the specification requires thermoplastic rubber wall base at 4 inches high with minimum 1/8 inch thickness, compliance with ASTM standards for critical radiant flux and moisture testing, and adhesives meeting indoor air quality certifications (FLOORSCORE, UL 2818 Greenguard Gold, or SCS Global Services Indoor Advantage Gold). For standard resinous flooring (Section 09 67 23.13), the specification mandates epoxy/urethane static dissipative flooring systems with specific performance metrics including 100% solids content, surface resistivity between 10^6-10^9 ohm/square, and a nominal finished thickness of 28 mils applied in five distinct steps. Wall and door protection (Section 10 26 00) requires resilient PVC-free corner guards with minimum 18 ft-lbs/sq. inch impact resistance and stainless steel options containing minimum 60 percent recycled content. For hydraulic passenger elevators (Section 14 24 23), the specification requires an in-ground direct plunger emergency medical service accessibility elevator with 4,000 lb. rated load, 125 fpm speed, and single-speed center-open car doors with 4-foot minimum opening width, along with comprehensive controls including firefighters' emergency operation, hoistway access operation, and independent service capabilities. All materials must comply with applicable ASME, ASTM, NFPA, and UFC standards, with submittals requiring government approval for product data, samples, test reports, and certificates of compliance.

View the file

Other files

File Type Posted
26-1306 Note 12.pdf PDF
N62742-26-R-1306_AMD0006.pdf PDF
Att1_1696746_Amd0005_DWGS_260605.pdf PDF
N62742-26-R-1306_AMD0005.pdf PDF
26-1306 Note 11.pdf PDF
N62742-26-R-1306_AMD0004.pdf PDF
26-1306 Note 10.pdf PDF
26-1306 Note 9.pdf PDF
26-1306 Note 8.pdf PDF
26-1306 Note 7.pdf PDF
26-1306 Note 6.pdf PDF
N62742-26-R-1306_AMD0003.pdf PDF
26-1306 Note 5.pdf PDF
26-1306 Note 4.pdf PDF
Att1_1696746Amd0002dwg_260515r1_Signed.pdf PDF
N62742-26-R-1306_AMD0002.pdf PDF
Att2_1696746Amd0002spc_260515r1.pdf PDF
26-1306 Note 3.pdf PDF
26-1306 Note 2.pdf PDF
26-1306 Note 1.pdf PDF
N62742-26-R-1306_AMD0001.pdf PDF
ECC_CJA_Red.pdf PDF
Class JA King-Fisher Guam redact.pdf PDF
1696746_DWG_2of5.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
1696746_DWG_5of5.pdf PDF
Class JA_Federal Signal_Redacted.pdf PDF
1696746_SPC.pdf PDF
1696746_DWG_3of5.pdf PDF
CJA_KabaMas GPMO_13Feb2025_Redacted1.pdf PDF
Schn_AMI_CJA_red.pdf PDF
1696746_DWG_1of5.pdf PDF
1696746_DWG_4of5.pdf PDF
Solicitation-N6274226R1306.pdf PDF
CJA_JCI DDC_Red.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY

U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM

1696746

PROJECT TABLE OF CONTENTS Page 1 (06/05/26)

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24, CHG 1: 05/25 SUMMARY OF WORK

01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS

01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.00 20 05/25 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21, CHG 1: 08/25 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 13.02 34 01/25 FACILITY-RELATED CONTROL SYSTEMS

(FRCS) PROCUREMENT FOR NAVY

01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23, CHG 3: 08/25 QUALITY CONTROL

01 45 35 05/24 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22, CHG 2: 08/25 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 12/23 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS MCBCB EV

01 57 19.03 21 07/31/25 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROL Secretary of the Navy (SECNAV) Explosive Safety Risk Acceptance Within Joint Region Marianas

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23, CHG 2: 11/25 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 91 00.15 05/23, CHG 3: 08/24 BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

02 56 13.16 02/25 CLAY WASTE CONTAINMENT

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 10: 08/25 CAST-IN-PLACE CONCRETE

03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE CONSTRUCTION

DIVISION 04 – MASONRY

04 20 00 05/25 UNIT MASONRY

1696746

PROJECT TABLE OF CONTENTS Page 2

DIVISION 05 - METALS

05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13 08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS

05 51 33 08/24 METAL LADDERS

05 52 00 08/23 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 08/24 FINISH CARPENTRY

06 41 16.00 10 08/25 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 08/25 ELASTOMERIC SHEET WATERPROOFING

07 21 13 08/23, CHG 1: 08/25 BOARD AND BLOCK INSULATION

07 21 16 08/23, CHG 1: 08/25 MINERAL FIBER BLANKET INSULATION

07 24 00 08/23 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 10 08/23 BUILDING AIR BARRIER SYSTEM

07 56 00 08/09 FLUID-APPLIED ROOFING SYSTEM

07 60 00 08/23, CHG 1: 05/25 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20, CHG 1: 08/25 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS, FRAMES, AND WINDOW WALL

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/24, CHG 1: 05/25 GYPSUM BOARD

09 30 10 08/20 CERAMIC TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 11/24 RESILIENT FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 68 00 11/24 CARPETING

09 69 13 11/24 RIGID GRID ACCESS FLOORING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

1696746

PROJECT TABLE OF CONTENTS Page 3

10 21 13 08/20 TOILET COMPARTMENTS

10 22 13 08/24 WIRE MESH PARTITIONS

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 99 00 04/06 MISCELLANEOUS BUILDING SPECIALTIES

DIVISION 12 - FURNISHINGS

12 00 01.00

12 24 13

20 02/23

08/20

FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

ROLLER WINDOW SHADES

12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 73 05/25 SEISMIC CONTROL FOR NONSTRUCTURAL

COMPONENTS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00 11/25 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.19 02/25 SEISMIC BRACING FOR MECHANICAL SYSTEMS

23 05 93 05/25 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 08/24, CHG 1: 08/25 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 08/24 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 30 00 02/25 HVAC AIR DISTRIBUTION

23 64 10 05/25 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 11/25 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

1696746

PROJECT TABLE OF CONTENTS Page 4

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 08/24 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR

FACILITY-RELATED CONTROL SYSTEMS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,

MEDIUM-VOLTAGE TRANSFORMERS

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 05/25, CHG 1: 08/25 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 32 15.01 05/24 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES-EMERGENCY

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 05/25 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 41 00 11/21 AUDIO-VISUAL SYSTEMS

27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS

27 51 20 10/22 TWO-WAY COMMUNICATION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

31 21 13 11/18 RADON MITIGATION

31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL

31 31 16.19 08/22 TERMITE CONTROL BARRIERS

31 62 00 03/24 CEMENT DEEP SOIL MIXING

1696746

PROJECT TABLE OF CONTENTS Page 5

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 CHG 1: 11/24 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 05/22 BASE COURSE FOR RIGID PAVING

32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE

FOR FLEXIBLE PAVING

32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 84 24 08/11, CHG 1: 05/17 TEMPORARY IRRIGATION SPRINKLER SYSTEMS

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 52 40 05/25 FUEL SYSTEMS PIPING (NON-HYDRANT)

33 56 10 05/25 FACTORY-FABRICATED FUEL STORAGE TANKS

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY 1696746

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC

DRAWING

NO.

DRAWING

NO.

REVISION

NO.

SHEET TITLE

17321759 G-001 COVER SHEET

17321760 G-002 2 LIST OF SHEETS

17321761 G-003 1 LIST OF SHEETS

17321762 G-004 LIST OF SHEETS

17321763 G-005 1 BUILDING CODE SUMMARY

17321764 G-101 1 CODE COMPLIANCE SITE PLAN

17321765 G-102 1 1ST FLOOR PLAN - LIFE SAFETY

17321766 G-103 1 2ND FLOOR PLAN - LIFE SAFETY

17321767 G-104 UTILITY BUILDING AND PAVILION - LIFE SAFETY

17321772 V-101 TOPOGRAPHIC SURVEY

17321774 B-001 SOIL BORING LOCATION MAP AND BORING LOGS-1

17321775 B-002 BORING LOGS-2

17321776 B-003 BORING LOGS-3

17321777 B-004 BORING LOGS-4

17321780 C-001 CIVIL ABBREVIATIONS AND SYMBOLS

17321781 C-002 CIVIL NOTES - PAGE 1

17321782 C-003 CIVIL NOTES - PAGE 2

DOCUMENT 00 01 15 Page 1

17321783 C-101 CIVIL HAUL - ACCESS ROUTE

17321784 C-102 CIVIL BEDROCK DETERMINATION MAP

17321785 CD100 CIVIL DEMOLITION PLAN

17321786 CS100 2 CIVIL SITE PLAN

17321787 CS101 1 CIVIL SITE LOCATION PLAN

17321788 CS501 1 CIVIL - DETAILS - SHEET 1

17321789 CS502 CIVIL - DETAILS - SHEET 2

17321790 CS503 CIVIL - DETAILS - SHEET 3

17321791 CS504 1 CIVIL - DETAILS - SHEET 4

17321792 CS505 1 CIVIL - DETAILS - SHEET 5

17321793 CG100 1 CIVIL GRADING PLAN

17321794 CG100B 1 CIVIL GRADING PLAN - BID OPTIONS 1 AND 2

17321795 CG101 CIVIL LID STORMWATER DESIGN

17321796 CG200 CIVIL GRADING PROFILES

17321797 CG201 CIVIL LID PROFILES

17321798 CG501 CIVIL GRADING - DETAILS - SHEET 1

17321799 CG502 CIVIL GRADING - DETAILS - SHEET 2

17321800 CG503 CIVIL GRADING - DETAILS - SHEET 3

17321801 CP100 1 CIVIL PAVING PLAN

17321802 CP501 CIVIL PAVING - DETAILS - SHEET 1

17321803 CP502 1 CIVIL PAVING - DETAILS - SHEET 2

17321804 CP503 CIVIL PAVING - DETAILS - SHEET 3

17321805 CP504 CIVIL PAVING - DETAILS - SHEET 4

17321806 CP505 CIVIL PAVING - DETAILS - SHEET 5

17321807 CU100 1 CIVIL UTILITY PLAN

17321808 CU200 CIVIL UTILITY PROFILES - SHEET 1

17321809 CU201 CIVIL UTILITY PROFILES - SHEET 2

DOCUMENT 00 01 15 Page 2

17321810 CU202 CIVIL UTILITY PROFILES - SHEET 3

17321811 CU501 CIVIL UTILITY - DETAILS - SHEET 1

17321812 CU502 CIVIL UTILITY - DETAILS - SHEET 2

17321813 CU503 CIVIL UTILITY - DETAILS - SHEET 3

17321814 CU504 CIVIL UTILITY - DETAILS - SHEET 4

17321815 CU505 CIVIL UTILITY - DETAILS - SHEET 5

17321828 LP101 2 LANDSCAPE PLAN

17321829 LP501 PLANTING DETAILS

17321830 LP502 1 SITE FURNISHING DETAILS

17321831 LP601 1 PLANT MATERIAL SCHEDULE AND NOTES

17321836 S-001 1 STRUCTURAL NOTES AND LEGEND - SHEET 1

17321837 S-002 STRUCTURAL NOTES AND LEGEND - SHEET 2

17321838 SS101 ENCLOSURE FOUNDATION PLAN

17321839 SS102 ENCLOSURE SLAB PLAN

17321840 SS103 ENCLOSURE ROOF FRAMING PLAN

17321841 SS110 PAVILION FOUNDATION / SLAB PLAN

17321842 SS111 1 PAVILION ROOF PLAN

17321843 SS301 STRUCTURAL SECTIONS

17321844 SS310 STRUCTURAL SECTIONS

17321845 SS601 STRUCTURAL SCHEDULES

17321846 SS610 STRUCTURAL SCHEDULES

17321847 SB101 1 COMPREHENSIVE FOUNDATION PLAN

17321848 SB102 1 FOUNDATION PLAN - AREA 'A'

17321849 SB103 1 FOUNDATION PLAN - AREA 'B'

17321850 SB104 1 COMPREHENSIVE SLAB PLAN (EL. 0'-0", UNO)

17321851 SB105 2 SLAB PLAN - AREA 'A' (EL. 0'-0", UNO)

17321852 SB106 2 SLAB PLAN - AREA 'B' (EL. 0'-0", UNO)

DOCUMENT 00 01 15 Page 3

17321853 SB401 2 MECHANICAL ENCLOSURE FOUNDATION / SLAB PLAN

17321854 SB402 1 CANOPY FOUNDATION / SLAB PLAN

17321855 SB403 1 ELEVATOR PIT ENLARGED PLAN

17321856 SB501 1 STRUCTURAL FOUNDATION / SLAB DETAILS - SHEET 1

17321857 SB502 1 STRUCTURAL FOUNDATION / SLAB DETAILS - SHEET 2

17321858 SB503 STRUCTURAL FOUNDATION / SLAB DETAILS - SHEET 3

17321859 SF101 1 COMPREHENSIVE SECOND FLOOR FRAMING PLAN (EL.

14'-0", UNO)

17321860 SF102 2 SECOND FLOOR FRAMING PLAN - AREA 'A' (EL. 14'-0",

UNO)

17321861 SF103 2 SECOND FLOOR FRAMING PLAN - AREA 'A' (EL. 16'-0",

UNO)

17321862 SF104 2 SECOND FLOOR FRAMING PLAN - AREA 'B' (EL. 14'-0",

UNO)

17321863 SF105 2 SECOND FLOOR FRAMING PLAN - AREA 'B' (EL. 16'-0",

UNO)

17321864 SF106 1 COMPREHENSIVE ROOF FRAMING PLAN (ABOVE EL. 32'-0")

17321865 SF107 1 ROOF FRAMING PLAN - AREA 'A' (ABOVE EL. 32'-0")

17321866 SF108 1 ROOF FRAMING PLAN - AREA 'B' (ABOVE EL. 32'-0")

17321867 SF301 1 STRUCTURAL SECTIONS - SHEET 1

17321868 SF302 1 STRUCTURAL SECTIONS - SHEET 2

17321869 SF401 2 MECHANICAL ENCLOSURE FRAMING PLAN

17321870 SF402 2 CANOPY ROOF FRAMING PLAN

17321871 SF501 1 STRUCTURAL FLOOR FRAMING DETAILS - SHEET 1

17321872 SF502 1 STRUCTURAL FLOOR FRAMING DETAILS - SHEET 2

17321873 SF503 1 STRUCTURAL ROOF FRAMING DETAILS

17321874 SF504 STRUCTURAL CONCRETE STAIR DETAILS

17321875 SF505 STRUCTURAL FRAMING DETAILS

17321876 SJ601 1 STRUCTURAL SCHEDULES

17321877 SK501 TYPICAL REINFORCING DETAILS

17321878 SK502 TYPICAL FOUNDATION DETAILS

17321879 SK503 TYPICAL SLAB-ON-GRADE DETAILS - SHEET 1

DOCUMENT 00 01 15 Page 4

17321880 SK504 TYPICAL SLAB-ON-GRADE DETAILS - SHEET 2

17321881 SK505 TYPICAL SHEAR WALL DETAILS

17321882 SK506 1 CONCRETE COLUMN DETAILS

17321883 SK507 CONCRETE BEAM DETAILS

17321884 SK508 TYPICAL CONCRETE ELEVATED SLAB DETAILS

17321900 A-001 1 ARCHITECTURAL NOTES AND SYMBOLS

17321901 AS101 1 ARCHITECTURAL SITE PLAN AND OPTION ITEMS

17321902 AS102 2 CHILLER ENCLOSURE PLAN, EXTERIOR ELEVATIONS, AND

SECTION

17321903 AS103 TRANSFORMER ENCLOSURE PLAN, EXTERIOR ELEVATIONS,

AND SECTION

17321904 AS104 TRASH ENCLOSURE PLAN, EXTERIOR ELEVATIONS, AND

SECTIONS

17321905 AS105 SITE SIGNAGE

17321906 AS106 BUILDING SIGNAGE

17321907 AS107 1 GENERATOR AND FUEL TANK ENCLOSURE PLAN AND ROOF

PLAN, OPTION ITEM #2

17321908 AS108 GENERATOR AND FUEL TANK ENCLOSURE ELEVATIONS,

OPTION ITEM #2

17321909 AS109 GENERATOR AND FUEL TANK ENCLOSURE SECTIONS, OPTION

ITEM #2

17321910 AS110 1 PAVILION PLANS, ELEVATIONS, AND SECTIONS, OPTION

ITEM #1

17321911 AS111 SITE DETAILS

17321912 A-101 2 OVERALL FIRST FLOOR PLAN

17321913 A-102 2 ENLARGED FLOOR PLAN - 1A

17321914 A-103 2 ENLARGED FLOOR PLAN - 1B & OPTION ITEM #2

17321915 A-104 2 OVERALL SECOND FLOOR PLAN

17321916 A-105 2 ENLARGED FLOOR PLAN - 2A

17321917 A-106 2 ENLARGED FLOOR PLAN - 2B

17321918 A-111 1 OVERALL FIRST FLOOR REFLECTED CEILING PLAN

17321919 A-112 1 ENLARGED REFLECTED CEILING PLAN - 1A

17321920 A-113 2 ENLARGED REFLECTED CEILING PLAN - 1B & OPTION ITEM

#2

17321921 A-114 2 OVERALL SECOND FLOOR REFLECTED CEILING PLAN

DOCUMENT 00 01 15 Page 5

17321922 A-115 2 ENLARGED REFLECTED CEILING PLAN - 2A

17321923 A-116 2 ENLARGED REFLECTED CEILING PLAN - 2B

17321924 A-120 ROOF PLAN

17321925 A-201 1 EXTERIOR ELEVATIONS - NORTH AND EAST & OPTION ITEM

#2

17321926 A-202 1 EXTERIOR ELEVATIONS - SOUTH AND WEST & OPTION ITEM

#2

17321927 A-203 DETAILED EXTERIOR ELEVATIONS

17321928 A-301 2 BUILDING SECTIONS

17321929 A-310 WALL SECTIONS

17321930 A-311 WALL SECTIONS

17321931 A-401 2 INTERIOR ELEVATIONS

17321932 A-402 2 INTERIOR ELEVATIONS

17321933 A-403 2 INTERIOR ELEVATIONS

17321934 A-404 2 INTERIOR ELEVATIONS

17321935 A-405 2 INTERIOR ELEVATIONS

17321984 A-406 1 INTERIOR ELEVATIONS - ADDED SHEET

17321985 A-407 1 INTERIOR ELEVATIONS - ADDED SHEET

17321986 A-408 1 INTERIOR ELEVATIONS - ADDED SHEET

17321987 A-409 1 INTERIOR ELEVATIONS - ADDED SHEET

17321988 A-410 1 INTERIOR ELEVATIONS - ADDED SHEET

17321936 A-411 2 DETAILED RESTROOM PLANS AND INTERIOR ELEVATIONS

17321937 A-412 2 DETAILED RESTROOM PLANS AND INTERIOR ELEVATIONS

17321938 A-413 2 DETAILED ELEVATOR PLANS AND SECTION

17321939 A-414 DETAILED STAIR A PLANS AND SECTION

17321940 A-415 1 DETAILED STAIR B PLANS AND SECTION

17321941 A-416 1 DETAILED STAIR C PLANS AND SECTION

17321942 A-501 2 TYPICAL MOUNTING HEIGHTS

17321943 A-502 2 PARTITION TYPES

DOCUMENT 00 01 15 Page 6

17321944 A-503 1 PARTITION TYPES

17321945 A-504 1 COLUMN DETAILS

17321983 A-505 1 COLUMN DETAILS - ADDED SHEET

17321946 A-601 2 DOOR AND OPERABLE PARTITION SCHEDULES

17321947 A-602 1 DOOR, WINDOW, LOUVER TYPES AND SCHEDULES & OPTION

ITEM #2

17321948 A-603 OPERABLE PARTITION DETAILS

17321949 A-604 DOOR DETAILS

17321950 A-605 1 DOOR DETAILS

17321951 A-606 DOOR DETAILS

17321952 A-607 GATE DETAILS

17321953 A-608 WINDOW DETAILS

17321954 A-609 1 WINDOW DETAILS

17321955 A-610 2 INTERIOR COLOR MATERIAL SCHEDULE

17321956 A-611 EXTERIOR COLOR MATERIAL SCHEDULE

17321957 A-612 1 ROOM FINISH SCHEDULE

17321958 A-613 1 ROOM FINISH SCHEDULE

17321959 A-614 1 ENLARGED SIGNAGE FLOOR PLAN - 1A

17321960 A-615 1 ENLARGED SIGNAGE FLOOR PLAN - 1B

17321961 A-616 ENLARGED SIGNAGE FLOOR PLAN - 2A

17321962 A-617 ENLARGED SIGNAGE FLOOR PLAN - 2B

17321963 A-618 SIGNAGE SCHEDULE

17321964 A-619 TYPICAL SIGNAGE DETAILS

17321965 A-701 CEILING DETAILS

17321966 A-710 CASEWORK DETAILS

17321967 A-720 RAILING DETAILS

17321968 A-730 1 MISCELLANEOUS INTERIOR DETAILS

17321969 A-731 MISCELLANEOUS INTERIOR DETAILS

DOCUMENT 00 01 15 Page 7

17321970 A-740 ROOF DETAILS

17321971 A-750 1 MISCELLANEOUS EXTERIOR DETAILS

17321972 A-801 1 ENLARGED RAF FLOOR PLAN - 1A

17321973 A-802 1 ENLARGED RAF FLOOR PLAN - 1B

17321974 A-803 ENLARGED RAF FLOOR PLAN - 2A

17321975 A-804 ENLARGED RAF FLOOR PLAN - 2B

17321976 A-901 1 AIR BARRIER DIAGRAM - FLOOR PLANS

17321977 A-902 2 AIR BARRIER DIAGRAM

17321978 A-903 AIR BARRIER DETAILS

17321979 AI101 2 ENLARGED FLOOR FINISH PLAN - 1A

17321980 AI102 2 ENLARGED FLOOR FINISH PLAN - 1B

17321981 AI103 1 ENLARGED FLOOR FINISH PLAN - 2A

17321982 AI104 1 ENLARGED FLOOR FINISH PLAN - 2B

17321997 I-801 1 OVERALL FIRST FLOOR FF&E PLAN

17321998 I-802 OVERALL SECOND FLOOR FF&E PLAN

17321999 I-803 FF&E SCHEDULE

17322000 I-804 1 ENLARGED FF&E FLOOR PLAN - 1A

17322001 I-805 1 ENLARGED FF&E FLOOR PLAN - 1B

17322002 I-806 ENLARGED FF&E FLOOR PLAN - 1C

17322003 I-807 ENLARGED FF&E FLOOR PLAN - 1D

17322004 I-808 ENLARGED FF&E FLOOR PLAN - 1E

17322005 I-809 ENLARGED FF&E FLOOR PLAN - 1F

17322006 I-810 ENLARGED FF&E FLOOR PLAN - 2A

17322007 I-811 ENLARGED FF&E FLOOR PLAN - 2B

17322008 I-812 ENLARGED FF&E FLOOR PLAN - 2C

17322009 I-813 ENLARGED FF&E FLOOR PLAN - 2D

17322010 I-814 ENLARGED FF&E FLOOR PLAN - 2E

DOCUMENT 00 01 15 Page 8

17322011 I-815 ENLARGED FF&E FLOOR PLAN - 2F

17322012 I-816 TYPICAL MOUNTING HEIGHTS - FF&E

17322023 F-001 FIRE PROTECTION NOTES, SYMBOLS AND ABBREVIATIONS

17322024 FX401 ENLARGED FLOOR PLAN 1A - FIRE SPRINKLER

17322025 FX402 ENLARGED FLOOR PLAN 1B - FIRE SPRINKLER

17322026 FX403 ENLARGED FLOOR PLAN 2A - FIRE SPRINKLER

17322027 FX404 ENLARGED FLOOR PLAN 2B - FIRE SPRINKLER

17322028 FX405 ENLARGED UTILITY BUILDING FLOOR PLAN - FIRE

SPRINKLER

17322029 FX501 FIRE SPRINKLER DETAILS

17322030 FA401 ENLARGED FLOOR PLAN 1A - FIRE ALARM-MASS

NOTIFICATION SYSTEM

17322031 FA402 ENLARGED FLOOR PLAN 1B - FIRE ALARM-MASS

NOTIFICATION SYSTEM

17322032 FA403 ENLARGED FLOOR PLAN 2A - FIRE ALARM-MASS

NOTIFICATION SYSTEM

17322033 FA404 ENLARGED FLOOR PLAN 2B - FIRE ALARM-MASS

NOTIFICATION SYSTEM

17322034 FA405 ENLARGED UTILITY BUILDING FLOOR PLAN - FIRE

ALARM-MASS NOTIFICATION SYSTEM

17322035 FA501 FIRE ALARM-MASS NOTIFICATION SYSTEM DETAILS

17322036 FA601 FIRE ALARM-MASS NOTIFICATION SYSTEM - SEQUENCE OF

OPERATIONS

17322037 FA602 FIRE ALARM-MASS NOTIFICATION SYSTEM - RISER DIAGRAM

17322048 P-001 PLUMBING LEGEND, ABBREVIATIONS AND NOTES

17322049 PL100 COMPOSITE PLUMBING PLAN - BELOW FIRST FLOOR

17322050 PL101 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'A'

17322051 PL102 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'B'

17322052 PL103 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'C'

17322053 PL104 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'D'

17322054 PL105 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'E'

17322055 PL106 PLUMBING PLAN - BELOW FIRST FLOOR - AREA 'F'

17322056 PL110 COMPOSITE PLUMBING PLAN - FIRST FLOOR

17322057 PL111 PLUMBING PLAN - FIRST FLOOR - AREA 'A'

DOCUMENT 00 01 15 Page 9

17322058 PL112 PLUMBING PLAN - FIRST FLOOR - AREA 'B'

17322059 PL113 PLUMBING PLAN - FIRST FLOOR - AREA 'C'

17322060 PL114 1 PLUMBING PLAN - FIRST FLOOR - AREA 'D'

17322061 PL115 PLUMBING PLAN - FIRST FLOOR - AREA 'E'

17322062 PL116 PLUMBING PLAN - FIRST FLOOR - AREA 'F'

17322063 PL120 COMPOSITE PLUMBING PLAN - SECOND FLOOR

17322064 PL121 PLUMBING PLAN - SECOND FLOOR - AREA 'A'

17322065 PL122 PLUMBING PLAN - SECOND FLOOR - AREA 'B'

17322066 PL123 PLUMBING PLAN - SECOND FLOOR - AREA 'C'

17322067 PL124 1 PLUMBING PLAN - SECOND FLOOR - AREA 'D'

17322068 PL125 PLUMBING PLAN - SECOND FLOOR - AREA 'E'

17322069 PL126 PLUMBING PLAN - SECOND FLOOR - AREA 'F'

17322070 PL140 COMPOSITE PLUMBING PLAN - ROOF

17322071 PL400 1 ENLARGED PLUMBING PLANS - SHEET 1

17322072 PL401 1 ENLARGED PLUMBING PLANS - SHEET 2

17322073 PL500 PLUMBING DETAILS - SHEET 1

17322074 PL501 PLUMBING DETAILS - SHEET 2

17322082 PL502 1 PLUMBING DETAILS - SHEET 3 - ADDED SHEET

17322075 PL600 1 PLUMBING SCHEDULES - SHEET 1

17322076 PL601 1 PLUMBING SCHEDULES - SHEET 2

17322077 PL901 PLUMBING ISOMETRICS - OVERALL

17322078 PL902 PLUMBING ISOMETRICS - FIRST FLOOR BATHROOM

17322079 PL903 PLUMBING ISOMETRICS - SECOND FLOOR BATHROOM

17322080 PL905 PLUMBING ISOMETRICS - ENLARGED VIEW

17322081 PL906 PLUMBING ISOMETRICS - SPECIAL SYSTEMS

17322092 M-001 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES

17322093 MH100 COMPOSITE HVAC DUCT PLAN - FIRST FLOOR

DOCUMENT 00 01 15 Page 10

17322094 MH101 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'A'

17322095 MH102 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'B'

17322096 MH103 HVAC DUCT PLAN - FIRST FLOOR - AREA 'C'

17322097 MH104 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'D'

17322098 MH105 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'E'

17322099 MH106 1 HVAC DUCT PLAN - FIRST FLOOR - AREA 'F'

17322100 MH110 COMPOSITE HVAC DUCT PLAN - SECOND FLOOR

17322101 MH111 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'A'

17322102 MH112 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'B'

17322103 MH113 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'C'

17322104 MH114 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'D'

17322105 MH115 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'E'

17322106 MH116 1 HVAC DUCT PLAN - SECOND FLOOR - AREA 'F'

17322107 MH127 GENERATOR/TANK MECHANICAL PLAN

17322108 MH300 MECHANICAL SECTIONS - SHEET 1

17322109 MH301 MECHANICAL SECTIONS - SHEET 2

17322110 MH400 ENLARGED FLOOR PLAN - SHEET 1

17322111 MH501 HVAC DETAILS - SHEET 1

17322112 MH502 1 HVAC DETAILS - SHEET 2

17322113 MH503 HVAC DETAILS - SHEET 3

17322114 MH504 HVAC DETAILS - SHEET 4

17322115 MH505 HVAC DETAILS - SHEET 5

17322116 MH506 HVAC DETAILS - SHEET 6

17322117 MH507 HVAC DETAILS - SHEET 7

17322118 MH508 HVAC DETAILS - SHEET 8

17322119 MH509 HVAC DETAILS - SHEET 9

17322120 MH510 HVAC DETAILS - SHEET 10

DOCUMENT 00 01 15 Page 11

17322121 MH511 FUEL OIL SYSTEM DETAILS - SHEET 1

17322122 MH512 FUEL OIL SYSTEM DETAILS - SHEET 2

17322123 MH513 FUEL OIL SYSTEM DETAILS - SHEET 3

17322124 MH514 FUEL OIL SYSTEM DETAILS - SHEET 4

17322125 MH600 1 HVAC SCHEMATICS - SHEET 1

17322126 MH601 1 HVAC SCHEMATICS - SHEET 2

17322127 MH602 HVAC SCHEMATICS - SHEET 3

17322128 MH603 1 HVAC SCHEMATICS - SHEET 4

17322129 MH700 1 MECHANICAL SCHEDULES - SHEET 1

17322130 MH701 1 MECHANICAL SCHEDULES - SHEET 2

17322131 MH702 MECHANICAL SCHEDULES - SHEET 3

17322132 MH703 MECHANICAL SCHEDULES - SHEET 4

17322133 MH704 MECHANICAL SCHEDULES - SHEET 5

17322134 MH800 1 MECHANICAL CONTROLS

17322135 MH900 HVAC ISOMETRICS - SHEET 1

17322136 MH901 HVAC ISOMETRICS - SHEET 2

17322137 MP100 COMPOSITE HVAC PIPING PLAN - FIRST FLOOR

17322138 MP101 HVAC PIPING PLAN - FIRST FLOOR - AREA 'A'

17322139 MP102 HVAC PIPING PLAN - FIRST FLOOR - AREA 'B'

17322140 MP103 HVAC PIPING PLAN - FIRST FLOOR - AREA 'C'

17322141 MP104 HVAC PIPING PLAN - FIRST FLOOR - AREA 'D'

17322142 MP105 2 HVAC PIPING PLAN - FIRST FLOOR - AREA 'E'

17322143 MP106 HVAC PIPING PLAN - FIRST FLOOR - AREA 'F'

17322144 MP107 2 HVAC PIPING PLAN - FIRST FLOOR - MECHANICAL

ENCLOSURE

17322145 MP110 COMPOSITE HVAC PIPING PLAN - SECOND FLOOR

17322146 MP111 HVAC PIPING PLAN - SECOND FLOOR - AREA 'A'

17322147 MP112 HVAC PIPING PLAN - SECOND FLOOR - AREA 'B'

DOCUMENT 00 01 15 Page 12

17322148 MP113 HVAC PIPING PLAN - SECOND FLOOR - AREA 'C'

17322149 MP114 HVAC PIPING PLAN - SECOND FLOOR - AREA 'D'

17322150 MP115 2 HVAC PIPING PLAN - SECOND FLOOR - AREA 'E'

17322151 MP116 HVAC PIPING PLAN - SECOND FLOOR - AREA 'F'

17322152 MP400 1 ENLARGED FLOOR PLAN - SHEET 1

17322168 E-001 1 ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES

17322169 E-002 ONE-LINE AND THREE LINE DIAGRAM LEGEND

17322170 ES100 1 ELECTRICAL SITE PLAN

17322171 ES100B ELECTRICAL SITE PLAN - BID OPTIONS 1 & 2

17322172 EG101 1 OVERALL GROUNDING PLAN

17322173 EG102 ENLARGED GROUNDING PLAN AREA A

17322174 EG103 1 ENLARGED GROUNDING PLAN AREA B

17322175 EG104 OVERALL LIGHTNING PROTECTION PLAN

17322176 EG105 ENLARGED LIGHTNING PROTECTION PLAN AREA A

17322177 EG106 ENLARGED LIGHTNING PROTECTION PLAN AREA B

17322178 EG107 1 GENERATOR & PAVILION BUILDINGS - GROUNDING AND

LIGHTNING PROTECTION PLANS

17322179 EG401 ENLARGED GROUNDING PLAN - MECHANICAL ENCLOSURE

17322180 EL101 1 OVERALL LIGHTING PLAN - FIRST FLOOR

17322181 EL102 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1A

17322182 EL103 1 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1B

17322183 EL104 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1C

17322184 EL105 1 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1D

17322185 EL106 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1E

17322186 EL107 ENLARGED LIGHTING PLAN - FIRST FLOOR AREA 1F

17322187 EL108 OVERALL LIGHTING PLAN - SECOND FLOOR

17322188 EL109 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2A

17322189 EL110 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2B

DOCUMENT 00 01 15 Page 13

17322190 EL111 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2C

17322191 EL112 1 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2D

17322192 EL113 1 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2E

17322193 EL114 ENLARGED LIGHTING PLAN - SECOND FLOOR AREA 2F

17322194 EL122 GENERATOR BUILDING - LIGHTING PLAN - BID OPTION #2

17322195 EL123 PAVILION - LIGHTING PLAN - BID OPTION #1

17322196 EL301 LIGHTING SECTIONS - SHEET 1

17322197 EL302 LIGHTING SECTIONS - SHEET 2

17322198 EL401 ENLARGED LIGHTING PLANS

17322199 EL501 LIGHTING DETAILS - SHEET 1

17322200 EL502 1 LIGHTING DETAILS - SHEET 2

17322201 EL503 LIGHTING DETAILS - SHEET 3

17322202 EL504 LIGHTING DETAILS - SHEET 4

17322203 EL505 LIGHTING DETAILS - SHEET 5

17322204 EL601 LIGHTING CONTROL SCHEDULE

17322205 EL602 1 SITE LIGHTING DIAGRAM

17322206 EL701 LIGHT FIXTURE SCHEDULE - SHEET 1

17322207 EL702 1 LIGHT FIXTURE SCHEDULE - SHEET 2

17322208 EP101 1 OVERALL POWER PLAN - FIRST FLOOR

17322209 EP102 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1A

17322210 EP103 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1B

17322211 EP104 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1C

17322212 EP105 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1D

17322213 EP106 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1E

17322214 EP107 1 ENLARGED POWER PLAN - FIRST FLOOR AREA 1F

17322215 EP108 OVERALL POWER PLAN - SECOND FLOOR

17322216 EP109 ENLARGED POWER PLAN - SECOND FLOOR AREA 2A

DOCUMENT 00 01 15 Page 14

17322217 EP110 ENLARGED POWER PLAN - SECOND FLOOR AREA 2B

17322218 EP111 ENLARGED POWER PLAN - SECOND FLOOR AREA 2C

17322219 EP112 ENLARGED POWER PLAN - SECOND FLOOR AREA 2D

17322220 EP113 1 ENLARGED POWER PLAN - SECOND FLOOR AREA 2E

17322221 EP114 1 ENLARGED POWER PLAN - SECOND FLOOR AREA 2F

17322222 EP122 1 GENERATOR BUILDING - POWER PLAN

17322223 EP123 PAVILION - POWER PLAN - OPTION ITEM #1

17322224 EP401 ENLARGED POWER PLAN - MECHANICAL ENCLOSURE

17322225 EP402 1 ENLARGED POWER PLAN - BASE BID ELECTRICAL ROOMS

17322226 EP403 1 ENLARGED POWER PLAN - BID OPTION #2 ELECTRICAL ROOMS

17322227 EP404 ENLARGED POWER PLAN - MECHANICAL ROOM 119

17322228 EP405 ENLARGED POWER PLAN - MECHANICAL ROOM 217

17322229 EP501 ELECTRICAL DETAILS - SHEET 1

17322230 EP502 ELECTRICAL DETAILS - SHEET 2

17322231 EP503 ELECTRICAL DETAILS - SHEET 3

17322232 EP504 1 ELECTRICAL DETAILS - SHEET 4

17322233 EP505 ELECTRICAL DETAILS - SHEET 5

17322234 EP506 ELECTRICAL DETAILS - SHEET 6

17322235 EP601 1 ELECTRICAL ONELINE DIAGRAM - BASE BID SHEET 1

17322236 EP602 ELECTRICAL ONELINE DIAGRAM - BASE BID SHEET 2

17322237 EP603 1 ELECTRICAL ONELINE DIAGRAM - BID OPTION 2 SHEET 3

17322238 EP604 ELECTRICAL ONELINE DIAGRAM - BID OPTION 2 SHEET 4

17322239 EP701 1 PANELBOARD SCHEDULES - SHEET 1

17322240 EP702 PANELBOARD SCHEDULES - SHEET 2

17322241 EP703 1 PANELBOARD SCHEDULES - SHEET 3

17322242 EP704 1 PANELBOARD SCHEDULES - SHEET 4

17322243 EP705 PANELBOARD SCHEDULES - SHEET 5

DOCUMENT 00 01 15 Page 15

17322244 EP706 1 PANELBOARD SCHEDULES - SHEET 6

17322245 EP707 PANELBOARD SCHEDULES - SHEET 7

17322246 EP708 PANELBOARD SCHEDULES - SHEET 8

17322247 EP709 PANELBOARD SCHEDULES - SHEET 9

17322248 EP710 1 PANELBOARD SCHEDULES - SHEET 10

17322249 EP720 1 CABLE SCHEDULE

17322265 T-001 1 TELECOMMUNICATIONS LEGEND

17322266 TS100 TELECOM OVERALL SITE PLAN

17322267 TS101 1 TELECOM SITE PLAN

17322268 TS501 TELECOM SITE DETAILS - SHEET 1

17322269 TS502 TELECOM SITE DETAILS - SHEET 2

17322270 TS503 TELECOM SITE DETAILS - SHEET 3

17322271 TN101 COMPOSITE PLAN - TELECOMMUNICATIONS - FIRST FLOOR

17322272 TN102 1 PARTIAL PLAN - TELECOMMUNICATIONS - FIRST FLOOR -

AREA 'A'

17322273 TN103 1 PARTIAL PLAN - TELECOMMUNICATIONS - FIRST FLOOR -

AREA 'B'

17322274 TN104 COMPOSITE PLAN - TELECOMMUNICATIONS - SECOND FLOOR

17322275 TN105 PARTIAL PLAN - TELECOMMUNICATIONS - SECOND FLOOR -

AREA 'A'

17322276 TN106 PARTIAL PLAN - TELECOMMUNICATIONS - SECOND FLOOR -

AREA 'B'

17322277 TN110 CABLE TRAY PLAN - FIRST FLOOR

17322278 TN111 CABLE TRAY PLAN - SECOND FLOOR

17322279 TN300 TELECOM CABINET ELEVATION GTR 1 RM 121A

17322280 TN301 TELECOM CABINET ELEVATION GTR 1T RM 121B

17322281 TN302 TELECOM CABINET ELEVATION GTR 2 RM 229A

17322282 TN303 TELECOM CABINET ELEVATION GTR 2T RM 229B

17322283 TN401 ENLARGED FIRST FLOOR GTR PLAN

17322284 TN402 ENLARGED SECOND FLOOR GTR PLAN

17322285 TN500 TELECOMMUNICATIONS DETAILS - SHEET 1

DOCUMENT 00 01 15 Page 16

17322286 TN501 TELECOMMUNICATIONS DETAILS - SHEET 2

17322287 TN502 1 TELECOMMUNICATIONS DETAILS - SHEET 3

17322288 TN503 TELECOMMUNICATIONS DETAILS - SHEET 4

17322289 TN504 TELECOMMUNICATIONS DETAILS - SHEET 5

17322290 TN505 TELECOMMUNICATIONS DETAILS - SHEET 6

17322291 TN506 TELECOMMUNICATIONS DETAILS - SHEET 7

17322292 TN507 TELECOMMUNICATIONS DETAILS - SHEET 8

17322293 TN601 TELECOM BACKBONE RISER DIAGRAM

17322294 TN602 TELECOM RISER DIAGRAMS - SHEET 1

17322295 TN603 TELECOM RISER DIAGRAMS - SHEET 2

17322296 TN604 1 TELECOM RISER DIAGRAMS - SHEET 3

17322297 TY101 1 SPECIAL SYSTEMS - FIRST FLOOR - AREA 'A'

17322298 TY102 1 SPECIAL SYSTEM - FIRST FLOOR - AREA 'B'

17322299 TY103 SPECIAL SYSTEMS - SECOND FLOOR - AREA 'A'

17322300 TY104 SPECIAL SYSTEMS - SECOND FLOOR - AREA 'B'

17322301 TY501 SPECIAL SYSTEMS DETAILS - SHEET 1

17322302 TY502 1 SPECIAL SYSTEMS DETAILS - SHEET 2

17322318 TT-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS LEGEND

17322319 TT-101 1ST FLOOR TWO-WAY COMMUNICATION PLAN

17322320 TT-102 2ND FLOOR TWO-WAY COMMUNICATION PLAN

17322321 TT-501 TWO-WAY COMMUNICATIONS DETAILS & DIAGRAM

17322322 TT-502 TWO-WAY COMMUNICATIONS SEQUENCE OF OPERATIONS MATRIX

17322326 TA001 AV SYSTEMS GENERAL NOTES

17322327 TA002 AV SYSTEMS SYMBOLS, LEGEND, AND ABBREVIATIONS

17322328 TA101 OVERALL AV FIRST FLOOR PLAN

17322329 TA102 1 PARTIAL AV FIRST FLOOR PLAN - A

17322330 TA103 PARTIAL AV FIRST FLOOR PLAN - B

DOCUMENT 00 01 15 Page 17

17322331 TA104 PARTIAL AV FIRST FLOOR CABLE TRAY PLAN - A

17322332 TA105 PARTIAL AV FIRST FLOOR CABLE TRAY PLAN - B

17322333 TA106 OVERALL AV SECOND FLOOR PLAN

17322334 TA107 1 PARTIAL AV SECOND FLOOR PLAN - A

17322335 TA108 PARTIAL AV SECOND FLOOR PLAN - B

17322336 TA109 PARTIAL AV SECOND FLOOR CABLE TRAY PLAN - A

17322337 TA110 PARTIAL AV SECOND FLOOR CABLE TRAY PLAN - B

17322338 TA401 1 AV INTERIOR ELEVATIONS

17322339 TA402 AV INTERIOR ELEVATIONS

17322340 TA403 1 AV INTERIOR ELEVATIONS

17322341 TA404 AV INTERIOR ELEVATIONS

17322342 TA405 ENLARGED AV PLANS & INTERIOR ELEVATIONS

17322343 TA406 ENLARGED AV PLANS & INTERIOR ELEVATIONS

17322344 TA407 ENLARGED AV PLANS & INTERIOR ELEVATIONS

17322345 TA408 1 ENLARGED AV PLANS

17322346 TA409 ENLARGED AV PLANS

17322347 TA410 1 AV INTERIOR ELEVATIONS & SECTIONS

17322348 TA501 AV INFRASTRUCTURE DETAILS

17322349 TA502 AV INFRASTRUCTURE DETAILS

17322350 TA503 AV INFRASTRUCTURE DETAILS

17322351 TA504 AV INFRASTRUCTURE DETAILS

17322352 TA601 1 AV SYSTEMS SCHEDULES

17322353 TA701 1 AV INFRASTRUCTURE RISER DIAGRAMS

17322354 TA702 1 AV INFRASTRUCTURE RISER DIAGRAMS

17322355 TA703 1 AV INFRASTRUCTURE RISER DIAGRAMS

17322356 TA704 1 AV INFRASTRUCTURE RISER DIAGRAMS

-- End of Document --

DOCUMENT 00 01 15 Page 18

SECTION 09 65 00

RESILIENT FLOORING

11/24

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish

ASTM E648 (2023) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

ASTM F710 (2022) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

ASTM F1861 (2021; R 2025) Standard Specification for Resilient Wall Base

ASTM F1869 (2023) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 253 (2011) Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SECTION 09 65 00 Page 1

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC Guide 21 (2015) Guide to Evaluation of Slip and Fall Resistance of Flooring Surfaces

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2022) Adhesive and Sealant Applications

TILE COUNCIL OF NORTH AMERICA (TCNA)

TCNA A326.3 (2022) American National Standard Test Method for Measuring Dynamic Coefficient of Friction of Hard Surface Flooring Materials

UL SOLUTIONS (UL)

UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Resilient Flooring and Accessories

Adhesives

Wall Base

Applied Moisture Barrier

Mouldings

SD-04 Samples

Resilient Flooring and Accessories ; G

SD-06 Test Reports

Moisture, Alkalinity, and Bond Tests ; G

SD-07 Certificates

Indoor Air Quality for Wall Base ; S

Indoor Air Quality for Adhesives ; S

SD-08 Manufacturer's Instructions

Surface Preparation ; G

SECTION 09 65 00 Page 2

Installation ; G

SD-10 Operation and Maintenance Data

Resilient Flooring and Accessories ; G

1.3 CERTIFICATES

1.3.1 Indoor Air Quality

Submit required indoor air quality certifications and validations in one submittal package.

1.3.1.1 Floor Covering Materials

Provide wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.

1.3.1.2 Adhesives, Caulking, and Sealants

Provide asbestos-free products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area free from strong contaminant sources and residues with ambient air temperature maintained above 68 degrees F and below 85 degrees F, stacked according to manufacturer's recommendations. Remove resilient flooring products from packaging to allow ventilation prior to installation. Do not store rubber surface products with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions.

Do not store exposed rubber surface materials in occupied spaces. Do not store near materials that may offgas or emit harmful fumes, such as fresh paint or adhesives.

1.5 ENVIRONMENTAL REQUIREMENTS

Maintain areas to receive resilient flooring at a temperature above 70 degrees F and below 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

1.6 SCHEDULING

Schedule resilient flooring application after the completion of other work

SECTION 09 65 00 Page 3 which would damage the finished surface of the flooring.

1.7 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.

PART 2 PRODUCTS

2.1 WALL BASE

Conform to ASTM F1861, Type TP (thermoplastic rubber), Style B (coved).

Provide 4 inch high and a minimum 1/8 inch thick wall base. Provide preformed corners in matching height, shape, and color.

Provide certification of indoor air quality for Wall Base .

2.2 MOULDINGS

Provide tapered mouldings of vinyl or rubber and types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 1/4 inch. Provide bevel change in level between 1/4 and 1/2 inch with a slope no greater than 1:2.

2.3 ADHESIVES

Provide asbestos-free adhesives and applied moisture barrier for flooring, base and accessories as recommended by the manufacturer specifically designed for use on concrete up to 99 percent relative humidity and up to 11 pH and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.

Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives .

2.4 SURFACE PREPARATION MATERIALS

Provide asbestos-free surface preparation materials, such as leveling compounds, and floor crack fillers as recommended by the flooring manufacturer for the subfloor conditions.

2.5 POLISH/FINISH

Provide polish finish as recommended by the manufacturer and conform to ASTM D4078 for polish. Confirm that polish finishes meet dry and wet coefficient of friction per TCNA A326.3 , SSPC Guide 21 , as applicable.

2.6 CAULKING AND SEALANTS

Provide asbestos-free caulking and sealants in accordance with Section

SECTION 09 65 00 Page 4

07 92 00 JOINT SEALANTS.

2.7 ACCESSORIES

Provide accessories necessary to complete transitions, coves, terminations, and trim as recommended by the resilient flooring and accessories manufacturers in writing.

2.8 MANUFACTURER'S COLOR, PATTERN, AND TEXTURE

Provide color, pattern and texture for resilient flooring and accessories as indicated on the drawings selected from manufacturer's standard colors. Color listed is not intended to limit the selection of equal colors from other manufacturers. Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern. Submit manufacturer's descriptive data and three samples of each indicated color and type of flooring, base, mouldings, and accessories sized a minimum 6 by 9 inch.

Submit Data Package 1 in accordance with Section 01 78 23 OPERATION AND

MAINTENANCE DATA.

2.9 FIRE RESISTANCE TESTING REQUIREMENTS

Provide a minimum average critical radiant flux of 0.45 watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648 or NFPA 253 .

2.10 APPLIED MOISTURE BARRIER

2-part epoxy-based applied moisture barrier recommended by carpet manufacturer specifically for high relative humidity (RH)/high pH concrete conditions. Barrier shall be recommended for 100% relative humidity, up to 25-pound calcium chloride MVER test results and up to 14 pH level.

Applied to cured and preparated concrete.

PART 3 EXECUTION

3.1 EXAMINATION

Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation .

Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, and recommended adhesives.

3.2 SURFACE PREPARATION

Provide a smooth, true, level plane for surface preparation of the flooring, except where indicated as including moisture barrier. Floor to be flat to within 3/16 inch in 10 feet. Prepare subfloor in accordance with flooring manufacturer's printed instructions. Comply with ASTM F710 for concrete subfloor preparation. Floor fills or toppings may be required as recommended by the flooring manufacturer. Install underlayments, when required by the flooring manufacturer, in accordance with manufacturer's printed installation instructions. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, and uneven

SECTION 09 65 00 Page 5 surfaces. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer. Remove concrete curing and sealer compounds from the slabs, other than the type that does not adversely affect adhesion. Remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions.

3.3 MOISTURE, ALKALINITY, AND BOND TESTS

Determine the suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer. Conduct alkalinity testing as recommended by the flooring manufacturer. Determine the compatibility of the resilient flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's printed installation instructions.

Submit copy of test reports for moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.

3.4 GENERAL INSTALLATION

Do not install building construction materials that show visual evidence of biological growth.

3.5 PLACING MOULDINGS

Provide mouldings where flooring termination is higher than the adjacent finished flooring and at transitions between different flooring materials. When required, locate mouldings under door centerline.

Mouldings are not required at doorways where thresholds are provided.

Secure mouldings with adhesive as recommended by the manufacturer.

Prepare and apply adhesives in accordance with manufacturer's printed installation instructions.

3.6 PLACING WALL BASE

Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed installation instructions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at concrete walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.

3.7 CLEANING

Immediately upon completion of installation of flooring in a room or an area, dry and clean the flooring and adjacent surfaces to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's printed instructions.

3.8 PROTECTION

From the time of installation until acceptance, protect flooring from

SECTION 09 65 00 Page 6 damage as recommended by the flooring manufacturer. Remove and replace flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered.

-- End of Section --

SECTION 09 65 00 Page 7

SECTION 09 67 23.13

STANDARD RESINOUS FLOORING

11/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI/ESD STM 97.2 (2006) ESD Association Standard Test Method for the Protection of Electrostatic Discharge Susceptible Items: Floor Materials and Footwear – Voltage Measurement in Combination with a Person

ASTM INTERNATIONAL (ASTM)

ASTM C307 (2018) Standard Test Method for Tensile Strength of Chemical-Resistant Mortar, Grouts, and Monolithic Surfacings

ASTM C579 (2018) Standard Test Methods for Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

ASTM C580 (2018) Standard Test Method for Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

ASTM D257 (2014; R 2021) Standard Test Methods for DC Resistance or Conductance of Insulating Materials

ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss

ASTM D570 (2022) Standard Test Method for Water Absorption of Plastics

ASTM D635 (2018) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position

ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics

ASTM D695 (2015; R 2016) Standard Test Method for Compressive Properties of Rigid Plastics

SECTION 09 67 23.13 Page 1

ASTM D696 (2016) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer

ASTM D790 (2017) Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

ASTM D2240 (2015; R 2021) Standard Test Method for Rubber Property - Durometer Hardness

ASTM D2370 (2016; R 2021) Standard Test Method for Tensile Properties of Organic Coatings

ASTM D2566 (1986) Test Method for Linear Shrinkage of Cured Thermosetting Casting Resins During Cure

ASTM D3363 (2022) Standard Test Method for Film Hardness by Pencil Test

ASTM D4541 (2022) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers

ASTM E84 (2024) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 101 (2024) Life Safety Code

1.2 ADMINISTRATIVE REQUIREMENTS

1.2.1 Pre-Installation Meetings

Pre-installation Conference: Conduct conference at Project site.

1.2.2 Product Data

Within 30 days of contract award, submit manufacturer's catalog data for the following items:

a. Epoxy Flooring

b. Epoxy/Urethane Static Disspative Floors

1.3 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for Contractor Quality

SECTION 09 67 23.13 Page 2

Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Installation Drawings

SD-03 Product Data

Manufacturer's Catalog Data

SD-04 Samples

Hardboard Mounted Epoxy Flooring ; G

SD-07 Certificates

Listing of Product Installations

Referenced Standards Certificates

SD-11 Closeout Submittals

Warranty

1.4 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction. Deliver materials in original packages, containers, or bundles bearing brand name and name of material.

Maintain materials used in the installation of floor topping at a temperature between 65 and 85 degrees F.

1.5 QUALITY CONTROL

Prior to commencement of work, submit referenced standards…