Att1_1696746_Amd0005_DWGS_260605.pdf
PDF 23 MB Posted
- Attached to
- JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U. S. NAVSUPPACT MCB CAMP BLAZ, GUAM
- Solicitation number
- N62742-26-R-1306
About this file
This file contains technical drawing documents and specifications for the JFY 2022 Project J-875 Battle Staff Training Facility at MCB Camp Blaz, Guam. The drawings include landscape plans, site furnishing details, HVAC mechanical controls, piping plans, and enlarged floor plans for a two-story reinforced concrete training facility. Key landscape specifications call for native Guam plant species comprising a minimum 50% of all plantings, with detailed plant material schedules identifying specific tree and shrub quantities and sizes (including Manila palms, Daok trees, A'abang, Panao, Fagot, Banalo, and Foxtail palms at 25-gallon size, plus various shrub species). Site improvements include soil preparation with organic soil conditioner, temporary on-grade irrigation systems during a one-year establishment period, root barriers, aluminum edging, concrete benches and trash/recycle receptacles, bike racks, and smoker posts. The HVAC systems shown include chilled water and hot water distribution piping for CRAC units, DOAS units, AHU units, and VAV boxes with direct digital control integration and monitoring capabilities. Mechanical systems feature multiple chillers (CH-01, CH-02), chilled water pumps (CHWP-1A through CHWP-2C), condensate overflow switches, and temperature control setpoints maintained at 75°F in occupied spaces. Construction coordination requirements emphasize verification of underground utilities, maintenance of access routes, green waste management with CRB infestation monitoring, soil chemical analysis prior to planting, and strict adherence to Guam's seismic and environmental building standards. The document revision history indicates multiple updates between April 27, 2026 and July 1, 2026, with the final authorization dated July 1, 2026.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/01/2026
455 444444
44545
445445
450500
5004545450450
44044
445445
242 44444444444
6 44
848 44
446446
447447 448448
447447 448448 44994
44144 44244244244244242442 439434384 8437437
444444440000043
99943
838 4
4494499 448448
4474444 446446
445445444444444444444444444444444444444444444444
454454
45545
45353
4 244422444424424242442424444244 22444 224444444444444444444 22244442244 222444422242424442422422242422444242442424444442444444444444444444244242422224244444
4444444444444444444
449449449449
4444444444
4 8
444444444444444444444
45045500544550505000
44444 4545 4444
00000000000050050505500000000
9999999994999949494
44444444445454454545455455055505045444
44444477 4444444888
88888
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LT
IE
S
EN
G
IN
EE
RI
NG
C O
M M
AN
D
P
AC
IF
IC
NA
VF
AC
P
AC
IF
IC
MA
KA
LA
PA
, H
AW
AI
I
U.
S.
N
AV
SU
PP
AC
T
MC
B
CA
MP
B
LA
Z, G
UA
M
JF
Y
P
RO
JE
CT
J -8
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G
F
AC
IL
IT
Y
DKS/DMK
KYM
RYO
1696746
N62742-20-D-0001
AS NOTED
LK LK BT
KYM
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAUG
ETACIFITREC
No. 015
CETIHCRA
T
PACSDNAL E
RET
SI
GE
R
E D
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAMUG
ETACIFITREC
No. 015
CETIHCRAR
T
PACSDNAL E
RET
SI
GE
R
E D
NATHANIEL PYRON,
MILCON PLANNER, DPPH
03/10/2026
A2 SCALE: 1" = 30'-0"
PLAN
NORTH
LANDSCAPE PLAN
SECURITY CHAIN
LINK FENCE
(SEE CIVIL DWGS)
FAGOT
(TYP SYM)
SEE DET
PROJECT
BOUNDARY
COMBAT
OPERATIONS
CENTER (COC)
PAD WITH
TENTS (SEE
ARCH DWGS)
TRASH
DUMPSTER
PAD AND
ENCLOSURE
BIKE RACK
(TYP SYM)
SEE DET
FOXTAIL PALM
(TYP SYM)
SEE DET
LANDSCAPE NOTES
A PROVIDE 1" OF ORGANIC SOIL CONDITIONER AND
FERTILIZER, SPREAD AND TILL 4" DEEP INTO SOIL.
B PROVIDE TEMPORARY ON-GRADE IRRIGATION
SYSTEM DURING MAINTENANCE PERIOD, SEE
SHEET LP601 FOR TEMPORARY IRRIGATION NOTES.
C TURF AREAS, PAVEMENTS AND FACILITIES THAT
HAVE BEEN DAMAGED FROM PLANTING
OPERATIONS MUST BE RESTORED TO ORIGINAL
CONDITION AT THE CONTRACTOR'S EXPENSE. KEEP
CLEAN AT ALL TIMES AT LEAST ONE PAVED
PEDESTRIAN ACCESS ROUTE AND ONE PAVED
VEHICULAR ACCESS ROUTE TO EACH BUILDING.
CLEAN OTHER PAVING WHEN WORK IN ADJACENT
AREAS IS COMPLETE.
ABBREVIATIONS
ARCH ARCHITECTURAL
CRB COCONUT RHINOCEROS BEETLE
DET DETAIL
DIA DIAMETER
DWG DRAWING
DWGS DRAWINGS
ELEC ELECTRICAL
EXST EXISTING
FT FEET OR FOOT
LID LOW IMPACT DEVELOPMENT
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
SS STAINLESS STEEL
STRUC STRUCTURAL
TELECOM TELECOMMUNICATION
TYP SYM TYPICAL SYMBOL
UV ULTRAVIOLET
DAOK
(TYP SYM)
SEE DET
KEY PLAN
NOT TO SCALE
N
1" = 30'
30' 60'030'
GRAPHIC SCALE:
LP101
33-FT MIN NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ANTITERRORISMR MT SR OR MRR MOR SROROR MMSSROR SSROOR MRR MMMSR SROO IRRORR SRRR SMMRROOR MMOORR IRR MMOORR MMMMSSSSRRRROOOO SSSRROO SRR SSSRROORR MMMMMMIIRRRROORRRR SSRRRRRR MMMMSSRRRROOOORRRRRR MMMMMMMMSSSSIIRRRROOOOOORR SSMMMMSSRRRROOOORR SSSSSSRRRROOOORRRR MMSSSSSSRRRROOOORRRR MMRR MMMMMMIIOORR RROORROO MMMMSSSSRRRRRRRR MMMMIIRRRRORR RROO MMMMSSSSSRRROORR SSSSSSRRRROOOORRRR SSMMMMMMMSSSSSRRRRROOOOORRRRRRR SSRROO SSRR MMRROORRRRRR MMSSSSSSSSSRRRRROOOO MMMMIIOORRRR MMRR MMMIRRRRRROORRR MMMIIOOORRRRRRRRRRRRR MMMMSSSSSSSMMMRRRRRRRROOOOOOOORRRRROOOOORRRO SSSSMMMMMRRRRRRRR MMMSSSRRR SSSOOORRRRROOO SSSOOORRRRRRRR MMMSSSSRRRROOOO SSSSRRRROOOO MMMMMMOOORRR IIRRRR SSSSRRRROOOORRR RRR MMMMOOOORRRR MMMMSSSSOO S UNOBSTRUCTEDC DBBBB TR DDCT DCCU T DDCTECUCUCUR DR DETTETU TR TRUR EERR EDDETU TCU TTCTCCU EERRRRR EDDDCCUCUU DDDDDDDDDDTTTTCCTTCCCCCCUURRRRR DDDDDEEEEECCCCCCUUUUUU TTTEETTTTTUUUU EEEERRRRRR DDDDDTTTTTTCCCCCCUUUUR EEEERRRRRRRRRR DDDDDDEECCCCCCUUUUUURRRRRRR DDEDDDDEEDDEETTTTTTTTTTTCCCCCCUUCCUUUU DDDDDDEEEEEECCCCCCUUUUUURRRRRR EETTTTTTTTTTUUUURRRRRR EEEEEETTTTTTCCUUUURRRRRRR EEEERRRR DDDDDDDDTTTTTTCCCCCCCCUUCCCCCCUUUUUU DDDDDDEEEEEERRRRRRRRRRR DDDDDDTTTTTTCCCCCCUUUUUUCCCCUUUU DDEEEEEEECCUURRRRRR DDDDEEETTTTTTTTTTUUUU EERRRRRR EEDDDDDDDDEEEEEEEECCCCCCUUUUUUUURRRRRRRRRRRR EETTTTTTCCUUUURRRRRR EEEERRRRRRRR EETTTTTTEETTUUUUU DDDDDTTTTTTCCCCCCRUUR DDR DDDDDDDDDDTTTTTTTTTTTCCCCCCCCCUUUUUUURRRRRRRRRR DDDEEEEEEEDDDDCCCCCCCCCUUUCCCCCUUUUUUUCCCCCUUUCCCUURRRRRUUURRR EEEEEEEEEDDDDDDDDEEEEEEERRRRRRRRRRRR TTTTTEEEUUUU TTTTCTTTTTUUUURRRRRRR TTTTTTUUUU EEETTTUU EEEEDDDDDDDDDTTTCCCCTTTCCCCCCUUUCCCCCCUUUURRRRR CCC DDDDUUUURRRR DDDDCCCCUUUURRRR DDDDEEEEEEEEEEEE DISTANCE FROMF MRA OC MFE R MOMFE ROORRROC MMEC MMORORRF OFREE FE MMMROFRE FECEEE MMMOORROFRFF OOCEC OMMMMMRRROOFFEEEE MMMMMMRRRRFFFEE MMMMMOOOOOORRRRRROOOOOOOORRRRRRRRFFFFFFEEEEEE MMMMMMMMOOFFFFFEEEECC OOCCEECCC OOOOMMMMMMMMRRRRRREEEEEE MMMMEEEE MMMMMMMMRRRRFF OOOOOOOORRRRRRFFFFFFFFFF MMMMOOOOOORRRRRREE RREE OOOOOOOOOORRRRRRFFFFFFEEEE MMOOOORRRRRFFFFEEEEEE OORRFF MMMMMMEEEE MMMMMMOORRRRFFFFFFFRRRRRR MMMMMMOOOOOOEECCCCCCCC MMMMMMOOFFFFFFEEEE RRRRRR MMOOOOEE MMOOOOOOOOOOOOOORRRRRRRRRFFFFFFF MMEEEEEEE MMMMMMMMOOOOOOOORRRRRRCCCCCCEECCC RRFF OOOORRRRFF OOFF MMEEEEEE MMMMEEEEEEE MMMOOOOOOORRROOOOOORRRRRRFFFFFFF MMMMRROORRFFFFFFEEEE MMMMMRRRFFFEEEECC MMMMMMOOORRRFFFEEEECCCCEEE MMMCCCC MMMMMOOOOOOOOOOMMMMRRRRRRRRRRRRRRRRRRRRRREEE OOOOOOOOMMMMMMEEEEEEEEE MMEEEE OOOORRRROOOFFFFRRRRFFF OOOORRRRFFFF MMMMMMEEEEEEEEEEEE OOOORRRRFFFF OOOORRRRRFFFF OOOORRRRFFFF MMMMMMMMMMMMMMMRRRFFFFEEE OOOFFRRRFFFFEEE OOOOOOOORRRRCCC RRRR MMMMEEEE RRRR MCCC MMMMMMOOOO BUILDINGD GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG
ROOT
BARRIER
(TYP SYM)
SEE DET
A'ABANG
(TYP SYM)
SEE DET
BERMUDA /
CENTIPEDE
GRASS MIX
(TYP SYM)
BERMUDA /DMMMMM DA /AAA //AAAAA //AADAAA /AAAAAAAAA ////A //AAAAAAAADDAAAAAA //AAAAAAAAAA //////AAAAAA ////AAAAAA ////AAAAAAAAAA //AAAAAADDAAAA //AAAAAA ////AAAAAA ///AAAAAAA //AAAA //AAAAAAAA ////AAAADDAAAAAAAAAAAAAAAAA ///////AAAAAAAAAAAAAAA //////AAAAAAAAAAAA ////////AAAAAA ////AAAAAAAA CENTIPEDEPT EDEEEDEEDDDDDEEEDDEDEEDDDDDEEEEEEEEEEDDDDDDDDEEDDEEEEDDDDDDDDEEEEEEDDEEEEDDEEEEDDDDEEEEDDDDDDDDEEEEDDEEDDEEEEDDEEEEEDDDDDEEEEEEDDEEEEDDDDDDDDDEEEEEDDDDDEEDDDDDDDDEEEEEEEEEEEEEDDEEEDDDDDDDDDEEEEEEEDDDDDDDDDDEEEEEEEEEEDDDDDDDEEEEDDDDEEEE GRASS MIXS MS M XXXXXMMIXIXXMIXMMMM XXXXXXXXXMMMM XXXXXXIIIIXXXXMMMMMMMMM XXXXXXIIXXXXXXXXXMMMM XXIIXXIIXXXXXXMMMMMMMMM XXXXXXXXXMMMMM XXIIIXXXXXMMMMM XXIIIIIXXXXXMMMMMMMM XXXXXXXXXXMMMMMMMM XXXXXXXXXXXXXXMMM XXMMMMMIIIIIIIIIXXXXIIIIXXXXXXXXXXXXXMMMM XXXXMMMM XXXXMMMMM (TYP SYM)SYMS M)MMMM))MMMM)MMMMMMM))))MMMMMMMMMMM))MMMMMMMMMMMMMM))))))MM))))MMMMMMMMMMM))MM))))))))MMMMMMMMMMMMMMMM))MMMMMMMMMMMMMMMMMMMMMM))))MMMM))))))MMMMMMMM))))MMMMMMMMMMMMMMMMMMMMM))MMMM))MMMMMMM)))))))MMMMMMMMMMMMMMM
BANALO
(TYP SYM)
SEE DET
NANASO
(TYP SYM)
SEE DET
ALUMINUMUM UMMMMMUUMMMMUUUUUMMMMMMMMMUUUUMMMMMMMMMMUUUUUUUUMMMMMMMMMMMMMMMMMMUUUUMMMMMMMMMMMMUUUUUUUMMMMMMMMMMUUUUUUMMMMMMMMUUUUUUMMMMMMMMMUUUMMMMMMMMMMMUUUUUUUMMMMMMMMMMMMUUUUUMMUUMMMMMMMMMMMMMMMMMMMUUUUMMMMUUUUMMMMUUUU
EDGINGNNNNN
(TYP SYM)MS M))))MMMMM))))MMMMMM))))))))MMMMMMMMMM))))))))MMMMMMMM))MMMM))))))MMMMMMMMMMMMMM))))))))MMMMMMMM))))))))MMMMMMMMMMMMMMMMMMMMMMMMMMM))))))))))))MM))))))))))MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM)))))))))MMMMMMMMMMMM
SEE DETTD TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
BERMUDA /
CENTIPEDE
GRASS MIX
(TYP SYM)
A4A4
LP501LP501LLLLLL T C2C2
LP501LP501LLLLLLL
T C4C4
LP501LP501LLLLL
TT C4C4
LP501LP501LLLLL
T C4C4
LP501LP501LLLLLL
T C4C4
LP501LP501LLLLLLL
T B4B4
LP501LP501LLLLLL
T C3C3
2LP502LP50222222LLLLLTTTT B3B3
LP501LP501LLLLL
ROOTR OTOTTT
BARRIERB R RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR (TYP SYM)P P MMM))MM)MMMMMMMMM)))MMMMMMMM))M))MMMMMMM)MMMMMMMMMM))))))MMMMMMMMM))MM))MMMMMMMMMMMMMMMMMMMMM))))))MMMMMMMMMM))MMMM))))MMMMMMMMMMMMM))))))))MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM)MMMMMMMMMMMM)))))))))))))MMMMM)))MMMMMMMMMMMMMMMMMMMMMMMMMM))))MMMM)MMMM))))MMMM SEE DETD TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT C1C1
LP501LP501LLLLLL
10-FT CLEAR
FROM SECURITY
CHAIN LINK FENCE
20-FT CLEAR
FROM SECURITY
CHAIN LINK FENCE
MANILA PALM
(TYP SYM)
SEE DETT B4B4
LP501LP501LLLLLL
SECURITY CHAIN
LINK FENCE
(SEE CIVIL DWGS)
10-FT CLEAR
FROM SECURITY
CHAIN LINK FENCE
20-FT CLEAR
FROM SECURITY
CHAIN LINK FENCE
PANAO
(TYP SYM)
SEE DETTTTT C4C4
LP501LP501LLLLLL
EXST ELECEEEXEXEXXXXST EEEELEE CCCCCCCEECCCCCCEEECEEEECCCCEEECCCCCCCCCEEEEEECCCCCCCCEEEEEECCEECCCCEECCEEEEEECCCCCCEECCCCCCEEEECCCCEECCEEEEEEEEEECCCCCCCCCCCCEEEEEEEEEECCCCCCCCCCCCCEEEEEEEECCEEEEEECCCCCEEEEECCCEEEEEEEEEEECCCCCCCCCCCEEEECCCCCCCEEEEEEEEEEECCCCCCCCCCCCCCEECCEECCEEEEEEEECCCEEEEEEEEEEEEECCCCCCCCCCCCCCCCCEEEECCCCEEEECCCCEEEE ENCLOSUREEOLOOOLO U EREEREERERUUUURUUUUREERERRUU EERREERREEUUUUUU EEEEEERRRRRRRRRUUUU EEEEEERRRRRRUUUUUUU EEEERRRRUUUUUU EEEERRRREERRRRUUUURRRRUUUURRUUUU EEEEERREEEERRRRUUUUUU EEEERRRREERRRRUUUUURRRRUUUU EEEEERRRRRRRUUUUUURRUUUUUUUUUURRRRREEEEERRRUU EEEEEERRRRRUUUUUUUUUU EEEEEEEERRRREEEERRRRRRREEEERRRRRUUUUUUUUUUUURRRUUUUUUUUUUURRRREEERRREEEEEEERRREEEEERRRRUUUU EEERRRRUUUU
TRASH /
RECYCLE
RECEPTACLE
(TYP SYM)
SEE DETTT C4C4
2LP502LP50222222LLLLL
CONCRETE
BENCH
(TYP SYM)
SEE DETTT A4A4
2LP502LP502L 22222LLLLL
2-FT WIDE STONE
DIAPHRAGM (SEE
CIVIL DWGS)
ELEC ENCLOSURE
(SEE ELEC DWGS)
J-875
BATTLE STAFF
TRAINING FACILITY
SEE A2 / LP501
PLANTING AT
ENTRY
ENLARGEMENT
NANASO
(TYP SYM)
SEE DET
ALUMINUM
EDGING
(TYP SYM)
SEE DET
TTTT A4A4
LP501LP501LLLLLL
TT C2C2
LP501LP501LLLLL
NANASO
(TYP SYM)
SEE DET
5244 2
ALUMINUM
EDGING
(TYP SYM)
SEE DET
TTTT A4A4
LP501LP501LLLLLL
TTTT C2C2
LP501LP501LLLLLL
ROOTTTT
BARRIERR RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR
(TYP SYM)MS MM))MMM))M))MM))))MMMM))MMMM))))MMMMM))))))MMMMMM))))))MMMMMMMM))))MMMMMMMMMMMMMM))MM))))MM)))))))))MMMMMMMMMMMMMM))))))MMMM))))))MMMMMMMM
SEE DETTDDDD TTTTTTTT C1C1
LP501LP501LLLLL
ROOT
BARRIER
(TYP SYM)
SEE DETTTTT B3B3
LP501LP501LLLLLLL
C1C1
LP501LP501LLLLLL
A'ABANG
(TYP SYM)
SEE DETT C4C4
LP501LP501LLLLLLL
DRY SWALE
(SEE CIVIL
DWGS)
DRY SWALE
(SEE CIVIL
DWGS)
DETENTION
BASIN
(SEE CIVIL
DWGS)
RESTORE
EXISTING
GRASS
(TYP SYM)
OUTLET
CONTROL
STRUC
(SEE CIVIL
DWGS)
STONE CHECK DAM
(SEE CIVIL DWGS)
RIPRAP
(SEE CIVIL
DWGS)
RESTORE
EXISTING
GRASS
(TYP SYM)
RIPRAP
(SEE CIVIL
DWGS)
DRY SWALE
(SEE CIVIL DWGS)
FIRE LANE
FIRE LANE
FI
R
E
LA
N E
LP101
17321828
LA
ND
SC
AP
E
PL
AN
BA
SE
A
ND
O
PT
IO
NS
SAND
FILTER (SEE
CIVIL DWGS)
SIGNGN
(SEE CIVILEE V LLV LLVVVVIIVVV LVV LV LLLLVVVVVV LLLLLLLVV LIIVV LLVV LLVVVVVV LLLLIIVVVV LLVV LLLLVV LLVV LLVVV LLVVIIIILLLLLLLLVVVVVVVV LLLLLLLLVVVVVV LLLLIIVVVV LLVVV LLLLLVVVVVVIIVVVVVIILLLLLVVVVVV LLLLVVVVVVVV LLLLLLLLLLVV LLVV LLVVVVVVVVIIIIVVVVIIIVVVV LLLLLLLVVVV LLLLVVVV LLLLVVVV
DWGS)WGGS
PROJECT
BOUNDARY
4/
/2
AD
DE
D
CA
LL
OU
T
FO
R
OP
TI
ON
IT
EM
#3
OPTION ITEM #3 1
OPTION
ITEM #1
OPTION
ITEM #2
6/
/2
UP
DA
TE
D
DE
TA
IL
BU
BB
LE
R
EF
ER
EN
CE
A
SS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS
ESS ESS ESSS
CU CU CU CU CU CU
WWWW
W W
WW
ESS
ESS
ESS
ESES
ESS
ESS
ESS
ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ESS ES
ESS
ESS
ES
ESS
ESS
ESS
ESESESESSSSSS
ESES
ESS
EC
EC
EC
EC EC EC EC EC E
WW
WWWWWWWWWWWWWWWWWW
WW
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LT
IE
S
EN
G
IN
EE
RI
NG
C O
M M
AN
D
P
AC
IF
IC
NA
VF
AC
P
AC
IF
IC
MA
KA
LA
PA
, H
AW
AI
I
U.
S.
N
AV
SU
PP
AC
T
MC
B
CA
MP
B
LA
Z, G
UA
M
JF
Y
P
RO
JE
CT
J -8
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G
F
AC
IL
IT
Y
DKS/DMK
KYM
RYO
1696746
N62742-20-D-0001
AS NOTED
LK LK BT
KYM
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAUG
ETACIFITREC
No. 015
CETIHCRA
T
PACSDNAL E
RET
SI
GE
R
E D
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAMUG
ETACIFITREC
No. 015
CETIHCRAR
T
PACSDNAL E
RET
SI
GE
R
E D
NATHANIEL PYRON,
MILCON PLANNER, DPPH
03/10/2026
CONCRETE BENCH
NOTE: REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE PLANS FOR LOCATIONS.
TOP VIEW
FRONT VIEW SIDE VIEW
CORE DRILL
HOLE IN FIELD
1/2"-13 UNC S/S
THREADED ROD,
ALL WEATHER
EPOXY IN PLACE
ENLARGEMENT
6'-0"
3"
2' -0
1'
-6
1'-0"
1/2" DIA INSERTS
MATERIAL: CONCRETE
COLOR / FINISH: SEAT - SAND TAN, SMOOTH
LEGS - SAND TAN, LIGHT SAND BLASTED
LP101A4
SCALE: NTS
TRASH / RECYCLE RECEPTACLE
2' -8
25-1/2"
SIDE VIEWFRONT VIEW
1'-10"
1'-2"
19 1/2"
/4
12 3/4"
(4) 3/8-16 UNC
S/S INSERTS
1 1/4" DIA
DRAIN HOLE
BOTTOM VIEW
MATERIAL: CONCRETE, RIGID PLASTIC HOOD
COLOR / FINISH: SAND TAN, LIGHT SAND BLASTED
NOTE: REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS, THIS RECEPTACLE TYPE
WITH 5" DIA OPENING TO BE PLACED WITHIN
THE AT ZONE, SEE PLANS FOR LOCATIONS.
3/8" DIA
INSERTS
CORE DRILL
HOLE IN FIELD
3/8"-16 UNC S/S
THREADED ROD,
ALL WEATHER
EPOXY IN PLACE
ENLARGEMENT
5" DIA
OPENING
SCALE: NTS
C4 LP101
BICYCLE RACK
SCALE: NTS LP101C3
NOTE: REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS, SEE PLANS FOR LOCATIONS. SEE
CIVIL DWG CS505 FOR BIKE RACK PAD DETAIL.
30"
" M
IN
27 5/8"
CONC
SLAB
ANCHOR ROD
CONC FOOTING
2 3/8" DIA
STAINLESS
STEEL
TUBING
LP502
17321830
SI
TE
F
UR
NI
SH
IN
G
D
ET
AI
LS
A
ND
O
PT
IO
NS
LP101
OPTION ITEM #2
SCALE: 1/8" = 1'-0"
LP101
OPTION ITEM #1
SCALE: 1/8" = 1'-0"C1
A1
GENERATOR
BUILDING
PAVILION
(SEE ARCH
DWGS)
FUEL
STORAGE
YARD
SMOKER POST
(TYP SYM)
SEE DETTT A3A3
2LP502LP502L 22222LLLL
NANASO
(TYP SYM)
SEE DET
ALUMINUM
EDGING
(TYP SYM)
SEE DET
TT A4A4
LP501LP501LLLLL
TRASH /
RECYCLE
RECEPTACLE
(TYP SYM)
SEE DET
S
TT C4C4
2LP502LP502222222LLLLL
CONCRETE
BENCH
(TYP SYM)
SEE DETTTT A4A4
2LP502LP502L 22222LLLLL
RUBBLE MULCH
(TYP SYM)
SEE DET
EE
B1B1
LP501LP501LLLLL
TT C2C2
LP501LP501LLLLL
FOXTAIL PALM
(TYP SYM)
SEE DETT B4B4
LP501LP501LLLLLL
NOTE: REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS, SEE PLANS FOR LOCATIONS.
3' -4
SMOKER POST (SS),
2-1/2" DIA,
FREESTANDING
CONC SLAB
12" DIA BASE,
10 LBS
SMOKER POST (FREESTANDING)
SCALE: NTS LP101A3
1A
6/
/2
UP
DA
TE
D
DE
TA
IL
BU
BB
LE
R
EF
ER
EN
CE
TREES
BOTANICAL NAME COMMON NAME SIZE REMARKS
12 ADONIDIA MERRILLII MANILA PALM 25 GAL 1-1/2" - 2" CAL MIN, 8'-10' OVERALL HT, 3'-5' SPD, 5'-6'
STRAIGHT BROWN TRUNK HT
1 CALOPHYLLUM INOPHYLLUM DAOK 25 GAL 2" CAL MIN, 8`-10` OVERALL HT, 6`-8` SPD, 5`-6`
CLEAR STRAIGHT TRUNK
11 EUGENIA REINWARDTIANA A'ABANG 25 GAL 2" CAL MIN, 8'-10' OVERALL HT, 8'-10' SPD, 6'-8' CLEAR
STRAIGHT TRUNK
6 GUETTARDA SPECIOSA PANAO 25 GAL 1-1/2" - 2" CAL MIN,, 6'-8' OVERALL HT, 5'-7' SPD, 3'-4'
CLEAR STRAIGHT TRUNK
5 NEISOSPERMA OPPOSITIFOLIA FAGOT 25 GAL 2" CAL MIN, 7`-8` OVERALL HT, 5`-7` SPD, 3`-4` CLEAR
STRAIGHT TRUNK
8 THESPESIA POPULNEA BANALO 25 GAL 1-1/2" - 2" CAL MIN, 8`-10` OVERALL HT, 8`-10` SPD, 6`-8` CLEAR STRAIGHT TRUNK
5 WODYETIA BIFURCATA FOXTAIL PALM 25 GAL 2" CAL MIN, 10'-12' OVERALL HT, 4'-6' SPD, 6'-7'
STRAIGHT BROWN TRUNK HT
SHRUBS
10 CORDYLINE FRUTICOSA 'GREEN' GREEN TI 3 GAL 24" - 36" HT, FULL VARIED STALKS
6 CORDYLINE FRUTICOSA 'RED' RED TI 3 GAL 24" - 36" HT, FULL VARIED STALKS
8 DRACAENA MARGINATA DRACAENA 5 GAL 36" - 42" HT, FULL, VARIED STALKS
71 SCAEVOLA SERICEA NANASO 3 GAL 18" - 24" HT, FULL, 30" OC
GROUND COVERS
164,030 SF CYNODON DACTYLON /
EREMOCHLOA OPHIUROIDES BERMUDA / CENTIPEDE GRASS MIX SEED HYDROSEED
11,012 SF CYNODON DACTYLON /
EREMOCHLOA OPHIUROIDES BERMUDA / CENTIPEDE GRASS MIX SEED HYDROSEED (GRASS RESTORATION)
MISCELLANEOUS
164,620 SF SOIL PREPARATION (1" LAYER ORGANIC SOIL CONDITIONER OR APPROVED SUBSTITUTE / COMPOST, ROTOR-TILL 4" DEEP INTO SOIL), DOES NOT INCLUDE DRAINAGE SWALE AREAS
-710 SF
2,032.3 CY ON-SITE SCREENED TOPSOIL (4" LAYER), DOES NOT INCLUDE DRAINAGE SWALE AREAS-8.8 CY
840 LF ROOT BARRIER (24" DEPTH), CHEMICAL-TYPE FABRIC WITH PERMANENTLY ATTACHED HERBICIDE-FILLED TIME-RELEASE NODULES
245 LF ALUMINUM EDGING (3/16" X 5.5", EXTRUDED ALUMINUM, MILL FINISH, BLACK)
440 SF
(11 CY)
RENATURALIZED RUBBLE HARVESTED FROM SITE, 6" MIN - 8" MAX DIA
2 EA CONCRETE BENCH (BACKLESS): 72" W X 24" D, COLOR: SAND TAN SMOOTH (SEAT), SAND TAN LIGHT SAND BLASTED (LEGS)5 EA
1 EA CONCRETE TRASH RECEPTACLE: 20" W X 43" H, COLOR: SAND TAN LIGHT SAND BLASTED WITH RIGID PLASTIC HOOD1 EA
1 EA CONCRETE RECYCLE RECEPTACLE: 20" W X 43" H, COLOR: SAND TAN LIGHT SAND BLASTED WITH RIGID PLASTIC HOOD1 EA
1 EA SMOKER POST, FREESTANDING, STAINLESS STEEL: 2-1/2" DIA X 40" HT
PLANT MATERIAL SCHEDULE
OPTION
ITEM #1
OPTION
ITEM #2SYMBOL BASE
-710 SF
-1,700 SF
-21 CY
60 LF
100 SF
(2.5 CY)
-1,700 SF
PERMEABLE FILTER FABRIC100 SF440 SF
119,965 SF -700 SF
1,481 CY -8.6 CY
-1,620 SF
-20 CY
156,453 SF -700 SF -1,620 SF
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LT
IE
S
EN
G
IN
EE
RI
NG
C O
M M
AN
D
P
AC
IF
IC
NA
VF
AC
P
AC
IF
IC
MA
KA
LA
PA
, H
AW
AI
I
U.
S.
N
AV
SU
PP
AC
T
MC
B
CA
MP
B
LA
Z, G
UA
M
JF
Y
P
RO
JE
CT
J -8
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G
F
AC
IL
IT
Y
DKS/DMK
KYM
RYO
1696746
N62742-20-D-0001
AS NOTED
LK LK BT
KYM
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAUG
ETACIFITREC
No. 015
CETIHCRA
T
PACSDNAL E
RET
SI
GE
R
E D
B R
A D L E Y T . T A N I MUR A
EXP. 4/30/27
MAMUG
ETACIFITREC
No. 015
CETIHCRAR
T
PACSDNAL E
RET
SI
GE
R
E D
NATHANIEL PYRON,
MILCON PLANNER, DPPH
03/10/2026
GENERAL NOTES:
1. VERIFY LOCATION OF UNDERGROUND UTILITIES AND OTHER OBSTRUCTIONS THAT MAY AFFECT THE WORK. REPORT ANY
OBSTRUCTIONS ENCOUNTERED, AND/OR DAMAGED, TO THE CONTRACTING OFFICER. ONCE DAMAGE IS ASSESSED, INCLUDING APPROPRIATE DISCIPLINE(S), COORDINATE REPAIRS TO UTILITY LINES OR OTHER UNDERGROUND OBSTRUCTIONS AT
CONTRACTOR'S EXPENSE.
2. THE LANDSCAPE ESTABLISHMENT PERIOD WILL COMMENCE ON THE DATE THAT INSPECTION BY THE CONTRACTING OFFICER SHOWS THE NEW PLANTS FURNISHED UNDER THIS CONTRACT HAVE BEEN SATISFACTORILY INSTALLED AND MUST CONTINUE FOR A PERIOD
OF 365 DAYS.
3. BEGIN MAINTENANCE IMMEDIATELY AFTER PLANTS HAVE BEEN INSTALLED. INSPECT EXTERIOR PLANTS AT LEAST ONCE A WEEK DURING THE INSTALLATION AND ESTABLISHMENT PERIOD AND PERFORM NEEDED MAINTENANCE PROMPTLY. MAINTENANCE
CONSISTS OF, BUT IS NOT LIMITED TO THE FOLLOWING:
A. WATERING, PRUNING, FERTILIZING, ADJUSTING STAKES, WEEDING AND PERFORMING OTHER OPERATIONS NECESSARY TO
PROMOTE PLANT GROWTH, AND VIGOR.
4. TURF AREAS, PAVEMENTS AND FACILITIES THAT HAVE BEEN DAMAGED FROM PLANTING OPERATIONS MUST BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. KEEP CLEAN AT ALL TIMES AT LEAST ONE PAVED PEDESTRIAN ACCESS ROUTE AND ONE PAVED VEHICULAR ACCESS ROUTE TO EACH BUILDING. CLEAN OTHER PAVING WHEN WORK IN ADJACENT AREAS IS
COMPLETE.
5. TO AID IN THE PREVENTION OF ACCIDENTAL INTRODUCTIONS OF NON-NATIVE SPECIES OR INVASIVE SPECIES, CONTRACTORS WILL BE REQUIRED TO DEVELOP A HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) PLAN WHICH WILL IDENTIFY RISKS AND POTENTIAL PATHWAYS FOR INVASIVE SPECIES AND WILL OUTLINE PROCEDURES FOR CONTROLLING AND REMOVING RISKS IDENTIFIED. THIS PLAN WILL BE APPROVED BY THE INSTALLATION'S NATURAL RESOURCE MANAGER OR BIOLOGICAL MONITOR.
TEMPORARY IRRIGATION NOTES:
1. IRRIGATION SYSTEM IS SUBJECT TO FIELD ADJUSTMENTS DUE TO UNANTICIPATED SITE CONDITIONS. AVOID ANY
CONFLICT BETWEEN UNDERGROUND UTILITIES, STRUCTURES AND PLANTINGS. THE CONTRACTOR WILL BE
RESPONSIBLE FOR LOCATING AND PROTECTING ALL EXISTING UTILITIES.
2. CONTRACTOR MUST REFER TO SECTION 01 50 00 TEMPORARY CONSTRUCTION AND CONTROLS, AND COORDINATE WITH OICC TO DETERMINE IF POTABLE WATER WILL BE AVAILABLE AND PROVIDED BY THE
GOVERNMENT.
3. CONTRACTOR MUST PROVIDE A TEMPORARY ON-GRADE AUTOMATIC IRRIGATION SYSTEM (TO BE APPROVED BY THE CONTRACTING OFFICER) FOR THE DURATION OF THE PLANT ESTABLISHMENT PERIOD AND NOT TO EXCEED ONE YEAR FROM ACCEPTANCE. THE TEMPORARY AUTOMATIC IRRIGATION SYSTEM MUST CONSIST OF, BUT IS
NOT LIMITED TO THE FOLLOWING:
A. IRRIGATION WATER METER.
B. REDUCED PRESSURE BACKFLOW PREVENTER WITH STAINLESS STEEL ENCLOSURE.
C. SHUT OFF AND ISOLATION VALVES.
D. BOOSTER PUMP IF ADEQUATE WATER PRESSURE IS UNAVAILABLE TO SUPPORT THE TEMPORARY
IRRIGATION SYSTEM REQUIREMENTS.
E. AUTOMATIC IRRIGATION CONTROLLER INCLUDING A MINIMUM OF 3 INDEPENDENT PROGRAMS, 7 DAY
PROGRAM CYCLE, AND 8 START TIMES PER PROGRAM PER DAY.
PLANTING NOTES:
1. NATIVE PLANT SPECIES MUST BE GROWN AND ORIGINATE ON GUAM. LANDSCAPING MUST CONTAIN 50% MINIMUM NATIVE SPECIES.
2. CONTRACTOR MUST NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.
3. CONTRACTOR TO VERIFY EXACT LOCATIONS OF ALL TREES WITH THE CONTRACTING OFFICER PRIOR TO COMMENCEMENT OF
PLANTING OPERATIONS.
4. REFER TO CIVIL DRAWINGS FOR FINAL GRADING AND SIDEWALK LAYOUT.
5. TOPSOIL MUST BE INSTALLED PER SPECIFICATIONS. CONTRACTOR WILL BE RESPONSIBLE TO DETERMINE AND PROVIDE ADEQUATE QUANTITIES OF MATERIALS TO INSTALL PLANTINGS IN PLACE PER DESIGN INTENT. CAREFULLY COORDINATE TO ENSURE PROPER PLACEMENT TO FINISH GRADES. CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN FINISH GRADES AND DESIGNED DRAINAGE
PATTERNS.
6. LOCATE TREES A MINIMUM SIX FEET AWAY FROM DRAINAGE SWALES.
7. CONTRACTOR TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS ON PROJECT SITE PRIOR TO CONSTRUCTION.
8. CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID
CONFLICTS AND TO ENSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.
9. CLEAR, GRUB, AND REMOVE ALL WEEDS, STUMPS, ROOTS, ROCKS, CONCRETE DEBRIS, AND TRASH PRIOR TO PLANTING
OPERATIONS.
10. ALL GREEN WASTE GENERATED FROM CLEARING AND GRUBBING TASKS AND CONSTRUCTION ACTIVITIES MUST BE MANAGED ON SITE. CONTRACTOR WILL BE REQUIRED TO PREPARE A GREEN WASTE MANAGEMENT PLAN THAT WILL BE INCLUDED IN THEIR OVERALL WASTE MANAGEMENT PLAN. CONTRACTOR IS REQUIRED TO MONITOR GREEN WASTE PILES WEEKLY FOR CRB INFESTATION. IF INFESTATION IS PRESENT, THE PILES MUST GO THROUGH A GRINDER/SHREDDER PRIOR TO RESUMING COMPOST
ACTIVITIES.
11. CONTRACTOR MUST OBTAIN ANY NECESSARY DIG PERMITS 15 CALENDAR DAYS PRIOR TO START OF EXCAVATION.
12. BACKFILL MIX MUST CONSIST OF FOUR (4) PARTS OF AMENDED IMPORTED PLANTING SOIL TO ONE (1) PART ORGANIC SOIL CONDITIONER (SEE SPECIFICATIONS). ADD ONE (1) POUND OF 10-30-10 FERTILIZER TO ONE (1) CUBIC YARD OF BACKFILL MIX. MIX
THOROUGHLY ON PROJECT SITE PRIOR TO ANY PLANTING OPERATIONS.
13. INDICATED BACKFILL MIX IS FOR BIDDING PURPOSES ONLY. A SOIL CHEMICAL ANALYSIS MUST BE PERFORMED BY A QUALIFIED LABORATORY, INCLUDING RECOMMENDATIONS, WHICH WILL BE REQUIRED AND TAKE PRECEDENCE OVER THE ABOVE INDICATED
MIXTURE AND SPECIFICATION.
14. PLANTING TABLETS FOR TREES AND SHRUBS MUST BE AS FOLLOWS:
25 GALLON 8 TABLETS
3 GALLON 2 TABLETS
USE SLOW RELEASE FERTILIZER TABLETS 20-10-5, 21 GRAM SIZE.
15. CONTRACTOR TO PERFORM AERATION, MINIMUM 4" DEPTH, USING HOLLOW TINES TO AVOID SOIL COMPACTION, ON ALL NATURAL
GRASS AREAS ON LAST DAY OF LANDSCAPE ESTABLISHMENT PERIOD.
16. REPAIR AND GRASS ALL AREAS DAMAGED BY CONSTRUCTION OPERATIONS INCLUDING ACCESS, STORAGE, AND LAY DOWN AREAS.
LP601
17321831
PL
AN
T M
AT
ER
IA
L
SC
HE
DU
LE
A
ND
N O
TE
S
F. RAIN SENSOR.
G. PVC OR HDPE MAINLINE AND DISTRIBUTION LINES, INCLUSIVE OF JOINT RESTRAINT SYSTEMS IF
NECESSARY TO PREVENT PIPE MOVEMENT DURING SYSTEM OPERATION.
H. SLOW CLOSING REMOTE CONTROL VALVES CONSTRUCTED OF GLASS FILLED NYLON AND INCLUDES:
FABRIC-REINFORCED DIAPHRAGM, INTERNAL SCREEN SCRUBBER MECHANISM TO PREVENT DEBRIS
CLOGGING, AND PRESSURE REGULATION.
I. GEAR DRIVEN ROTOR HEADS WITH ADJUSTABLE ARC, PRESSURE REGULATION, AND CHECK VALVES
FOR LARGE RADIUS AREAS.
J. FIXED SPRAY HEADS OR FIXED STREAM ROTARY HEADS WITH PRESSURE REGULATION, CHECK
VALVES, AND NOZZLES WITH MATCHED PRECIPITATION RATES FOR SMALL RADIUS AREAS.
K. ALL LABOR, MATERIALS AND APPURTENANCES REQUIRED TO INSTALL AND MAINTAIN THE
TEMPORARY IRRIGATION SYSTEM.
4. CONTRACTOR TO SUBMIT A WATERING SCHEDULE PRIOR TO START OF LANDSCAPE ESTABLISHMENT
PERIOD, FOR APPROVAL TO ASSIST THE PLANTS IN TRANSITIONING TO NO WATER AT END OF
MAINTENANCE PERIOD AND REQUIRE INFREQUENT DEEP WATERING TIMES TO FURTHER ASSIST IN DEVELOPING DEEP ROOT STRUCTURES. ALL IRRIGATION WATERING TIMES MUST BE SET FOR "OFF PEAK" EVENING HOURS. OPERATION DURING OTHER TIMES MUST BE APPROVED BY THE CONTRACTING OFFICER.
IRRIGATION PIPING MAY BE INSTALLED ON-GRADE. HOWEVER, THE PIPING LAYOUT MUST NOT
CREATE A TRIP HAZARD FOR PEDESTRIANS OR OBSTRUCT VEHICULAR PATHS. PIPE SLEEVES ARE
REQUIRED WHERE TEMPORARY IRRIGATION LINES CROSS PEDESTRIAN OR VEHICULAR PATHS.
PIPE SLEEVES MUST ALLOW FOR IRRIGATION PIPING AND THEIR RELATED COUPLINGS TO EASILY
SLIDE THROUGH SLEEVE MATERIAL.
EXTEND SLEEVES 18" BEYOND EDGES OF PAVING OR CONSTRUCTED HARDSCAPE.
MARK SLEEVE LOCATIONS ON SIDES OF PAVING OR WITH IRRIGATION FLAGS IN PLANTING AREAS.
VERIFY ALL SLEEVE LOCATIONS WITH CONTRACTING OFFICER PRIOR TO CONSTRUCTION OF PAVING.
CONTRACTOR MUST COORDINATE INSTALLATION OF ALL SLEEVES AND CONDUITS UNDER
PAVEMENT AND THROUGH WALLS. CONTRACTOR MUST ASSURE THAT THESE ITEMS ARE LAID PRIOR
TO PLACEMENT OF PAVEMENT OR WALL STRUCTURES.
THE LANDSCAPE CONTRACTOR MUST REMOVE THE TEMPORARY IRRIGATION SYSTEM IN ITS
ENTIRETY UPON COMPLETION OF THE IRRIGATION ESTABLISHMENT PERIOD AND MUST
REPLANT/REPAIR ANY AREAS DAMAGED DURING THE REMOVAL OF THE TEMPORARY IRRIGATION
SYSTEM.
5.
6.
7.
8.
9.
10.
11.
6/
/2
UP
DA
TE
D
PL
AN
T
QU
AN
TI
TI
ES
164 030 SF 710 SF -1 700 SF
164 620 SF -710 SF -1 700 SF
2 032 3 CY 8 8 CY 21 CY
6/05/2026
DRD_IA_SEAL
6_05_2026
AD
DE
D
SH
EE
T
647 7
6 3
MCRAC-X-XXX
WCC ACV
CRAC-X-XXX S/S
CRAC-X-XXX
SF STATUS
FAN
SUPPLY AIRRETURN AIR
FI
LT
ER
W C
C
SP
T CRAC-X-XXX ST
CRAC-X-XXX ST SP
CRAC-X-XXX OV
LIMITS OF CRAC
NOTE:
DESIGNATION "X-XXX" REFERS TO INDIVIDUAL CRAC
DESIGNATIONS AS SCHEDULED.
GENERAL REQUIREMENTS
1. HVAC SYSTEM SHALL BE CONTROLLED BY UNIT
MOUNTED, STAND ALONE DIRECT DIGITAL
CONTROLLERS, UNLESS NOTED OTHERWISE.
CONTROLLERS SHALL BE INTEGRATED INTO BUILDING
DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR REMOTE
CONTROL AND MONITORING. DDC SYSTEM
COMMUNICATION SHALL BE AS SPECIFIED.
2. SET POINTS LABELED AS ADJUSTABLE SHALL BE FULLY
ADJUSTABLE FROM OPERATOR WORKSTATIONS.
SETPOINTS FOR THERMOSTATS WITH INTEGRAL SET
POINT ADJUSTMENTS SHALL BE ADJUSTABLE FROM
BOTH THE THERMOSTAT AND THE OPERATOR
WORKSTATION. SETPOINT ADJUSTMENT SHALL NOT
REQUIRE PROGRAMMING OF DDC PANELS. ALL
SETPOINTS, TIMERS, DEADBANDS, ETC., LISTED IN
SEQUENCES SHALL BE ADJUSTABLE IN SEQUENCE OR
NOT, SOFTWARE POINTS SHALL BE USED FOR THESE
POINTS.
3. ALARM REPORTING SHALL BE DONE AT PANEL
ASSOCIATED WITH EQUIPMENT AND SHALL BE
AVAILABLE FROM OPERATOR WORKSTATIONS.
NORMAL CONTROL POSITIONS
1. NORMAL POSITIONS OF CONTROLLED DEVICES SHALL
BE POSITION DEVICE. RETURNS TO ON POWER FAILURE
OR CONTROLLER FAILURE. NORMAL POSITIONS SHALL
BE AS FOLLOWS:
A. AUTOMATIC CONTROL VALVE (ACV) ON COOLING
COILS: OPEN TO COIL UNLESS NOTED OTHERWISE.
CRAC UNIT (CRAC-X-XXX) CONTROL SEQUENCE
1. CRAC-X-XXX SHALL BE CONTROLLED BY UNIT MOUNTED
STAND ALONE DDC CONTROLLER.
2. CRAC-X-XXX SERVING TELECOMMUNICATION ROOMS
SHALL BE ENABLED 24 HRS, 7 DAYS A WEEK.
A. WHEN SPACE TEMPERATURE IS ABOVE COOLING
SETPOINT (75 F, ADJUSTABLE), FAN SHALL START
AND WATER COOLING COIL (WCC) ACV SHALL
MODULATE TO MAINTAIN SPACE TEMPERATURE.
WHEN SPACE IS BELOW SETPOINT WCC ACV SHALL
CLOSE AND FAN SHALL STOP
3. WHEN SYSTEM IS IN THE "UNOCCUPIED" MODE OF
OPERATION AND OVERRIDE SWITCH IS ACTIVATED,
CRAC SHALL OPERATE AS INDICATED FOR OCCUPIED
MODE FOR A PERIOD OF 60 MINUTES (ADJUSTABLE).
CRAC SHALL SWITCH TO "UNOCCUPIED" MODE AFTER
TIME PERIOD HAS ELAPSED AND OPERATE AS
INDICATED FOR UNOCCUPIED MODE OF OPERATION.
4. WHERE MULTIPLE CRAC SERVE A SINGLE SPACE,
PROVIDE LEAD/LAG CONTROL. CHANGE LEAD UNIT
DESIGNATION ON A WEEKLY (ADJUSTABLE) BASIS.
SAFETY SHUTDOWN
1. SAFETY SHUTDOWN CIRCUIT SHALL BE PROVIDED
EXTERNAL TO SYSTEM CONTROLLER. CIRCUIT SHALL BE
DIRECTLY CONNECTED TO STARTERS OF MOTOR-
POWERED EQUIPMENT AND SHALL FUNCTION
REGARDLESS OF STATUS OF SYSTEM CONTROLLER. IN
EVENT OF SYSTEM SHUTDOWN, DEVICES SHALL
RETURN TO NORMAL POSITION. CIRCUITS SHALL BE
RESET MANUALLY. FOLLOWING SHALL COMPRISE
SAFETY SHUT-DOWN CIRCUIT:
A. CONDENSATE OVERFLOW SWITCH
SEQUENCE OF OPERATION:
CRAC UNIT POINTS LIST
PLAN DESIGNATION POINT DESCRIPTION
POINT TYPE
ALARMS
NOTES
AO DO AI DI VP
CRAC CONDENSATE OVERFLOW X
NOTES:
CRAC FAN START STOP X
1. DESIGNATION "X-XXX" REFER TO INDIVIDUAL FAN COIL UNIT DESIGNATIONS AS SCHEDULED.
CRAC-X-XXX SF STATUS CRAC SUPPLY FAN STATUS
CRAC-X-XXX ECM CRAC SUPPLY FAN ECM X COMMUNICATION VIA PROTOCOL AS SPECIFIEDX
CRAC WATER COOLING COIL AUTOMATIC
CONTROL VALVE
CRAC DISCHARGE AIR TEMPERATURE X
X
CRAC SPACE TEMPERATURE X ALARM IF TEMPERATURE VARIES 5° ABOVE OR
BELOW SETPOINT FOR 5 MINUTES
X
CRAC SPACE TEMPERATURE SETPOINT SETPOINT ADJUSTABLE FROM THERMOSTATX
X OVERFLOW ALARM
CRAC-X-XXX S/S
X ALARM MISMATCH WITH FCU-X-XXX S/S
X
X
X
CRAC-X-XXX WWC ACV
CRAC-X-XXX DAT APPLICABLE TO BLOWER COILS ONLY
CRAC-X-XXX ST
CRAC-X-XXX ST SP
CRAC-X-XXX CND OF
CRAC UNIT SCHEMATIC (CRAC-X-XXX)
(CHILLED WATER COOLING ONLY)
OF CRAC-X-XXX CND OF
M
IT
ECMCRAC-X-XXX ECM
T CRAC-X-XXX DAT
X
X
1ST FLOOR
CH-01
136.40 GPM
CH-02
136.4 GPM
DHRC-1
40.5 GPM
CHWP-1A
137 GPM
CHWP-1B
137 GPM
DOAS-1
54.8 GPM
AHU-1
62.1 GPM
2ND FLOOR
ROOF
DOAS-2
58.7 GPM
AHU-2
68.6 GPM
CRAC-203
20.3 GPM
CRAC-202
20.3 GPM
BCHD-105
2.4 GPM
CRAC-201
20.30 GPM
CRAC-102
20.6 GPM
CRAC-103
20.6 GPM
SEE HOT WATER
SYSTEM
CHWP-2A
41 GPM
CHWP-2B
41 GPM
6"
2 1/2"
1 1/2"
1 1/2" 2"2"
2"
3"
6"
6"
6"
2 1/2" 2 1/2"
6"
6"
3"
2"2"
1 1/2"
1 1/2"
3/4"2"
2"
6"
2 1/2"
CHWP-2C
41 GPM
BCHD -104
2.4 GPM
BCHD-102
4.36 GPM
3/4"
3/4"
CRAC-101
20.60 GPM
BCHD-103
4.36 GPM
BCHD-101
4.36 GPM
1 1/4" 1 1/4"1 1/2"
1 1/2"2 1/2"2 1/2"
2 1/2" 6" 3" 2"
CHWP-1C
137 GPM
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
PA
R
TM
EN
T O
F
TH
E N
AV
Y
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
P
AC
IF
IC
M
AK
AL
A
PA
, H
AW
AI
I
NTS
RYO
KYM
DKS/DMK
6/
/2
5:
:0
PM
C :\R
EV
IT
_2
4_
PR
O
JE
C T_
FI
LE
S\
BL
D G
-J -8
-1
-M
_S w ib es
An dy
_Y
KD
TN
5W
JY
4B
V.
rv t
MH800
JF
Y
P
RO
JE
CT
J -8
M
EC
HA
NI
CA
L
CO
NT
RO
LS
AP
17322134
JV AS
3/10/2026
NATHANIEL PYRON, MILCON
PLANNER, DPPH
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G F
AC
IL
IT
Y
1696746
N62742-20-D-0001
MC
B
CA
MP
B
LA
Z, G
UA
M
U.
S.
N
AV
SU
PP
AC
T
KYM
N A
VF
AC
P
AC
IF
IC
M H
NOT TO SCALEC1 CRAC UNIT SCHEMATIC & POINT LIST
NOT TO SCALEA1 HVAC - CHILLED WATER RISER DIAGRAM
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
/05 /20
RE
VI
SE
D
CH
W P
IP
E
SI
ZE
T T
5 64
D
C
B
MATCHLINE - SEE A1 / MH102 MATCHLINE - SEE A1 / MH103
MA
TC
HL
IN
E
-S
EE
A 1 /
M H1
MA
TC
HL
IN
E -S
EE
A
1 / M
H1
DHRC-1
ET-1 AS-1
CHWP-2B
CHWP-2A
HWP-1B
2 1/2"ø HWR
2 1/2"ø CHWR
2 1/2"ø CHWS
ET-2
AS-2
HWP-1C CHWP-2C
2 1/2"ø HWS
6"Ø RISER UP
TO 2ND FLOOR
2 1/2"ø CHWS
2 1/2"ø CHWS 2 1/2"ø CHWS
2"Ø RISER UP
TO 2ND FLOOR
(TYP.)
VAV-116
3/4"ø HWR
3/4"ø HWS
3/4"ø HWS 3/4"ø HWR
VAV-115
CRAC-101 1 1/2"ø CHWR 1 1/2"ø CHWS
2 1/2"ø CHWS
1 1/4"ø CHWR
1 1/4"ø CHWS
1 1/4"ø HWS
VAV-117
3/4"ø HWR 3/4"ø HWS
1"ø HWR 1"ø HWS 3/4"ø HWS
3/4"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
BCHD-104
1 1/4"ø HWR
CRAC-103 CRAC-102
2 1/2"ø CHWR 2 1/2"ø CHWS
MS-101
BCHD-102
2 1/2"ø CHWR
1 1/4"ø HWR 1 1/4"ø HWS
3"ø CHWS 3"ø CHWR
VAV-125
1"ø HWR
AHU-01
1"ø HWS
MECH RM
VESTIBULE 1D
V1D
GTR 1T
(TRAINING
TELECOMM RM)
CORRIDOR 1D
C1D
ELEV MACHINE
RM
CTR 1
ELEV 1
E1
STAIR 1A
S1A
LOBBY 1
L1
SVTC CONF RM /
SIPR CAFE
GTR 1
CHILLER
ENCLOSURE
119A
1 1/4"ø CHWR 1 1/4"ø CHWS
3/4 "ø
C
ND
3/4"ø CHWS 3/4"ø CHWR
3/4"ø CHWR 3/4"ø CHWS
3/4"ø CND
3/4"ø RS 3/4"ø RL
EF-102
CHWP-1C
CHWP-1A
CHWP-1B
ACCU-1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
PA
R
TM
EN
T O
F
TH
E N
AV
Y
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
P
AC
IF
IC
M
AK
AL
A
PA
, H
AW
AI
I
AS NOTED
RYO
KYM
DKS/DMK
6/
/2
5:
:4
PM
C :\R
EV
IT
_2
4_
PR
O
JE
C T_
FI
LE
S\
BL
D G
-J -8
-1
-M
_S w ib es
An dy
_Y
KD
TN
5W
JY
4B
V.
rv t
MP105
JF
Y
P
RO
JE
CT
J -8
HV
AC
P
IP
IN
G
P
LA
N -F
IR
ST
F
LO
O R
-A
RE
A 'E
AP
17322142
JV CG
3/10/2026
NATHANIEL PYRON, MILCON
PLANNER, DPPH
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G F
AC
IL
IT
Y
1696746
N62742-20-D-0001
MC
B
CA
MP
B
LA
Z, G
UA
M
U.
S.
N
AV
SU
PP
AC
T
KYM
N A
VF
AC
P
AC
IF
IC
M P1
1/4" = 1' - 0"
0 5' 10' 15'1'
E
PLAN
NORTH
GENERAL NOTES
KEY PLAN
GRAPHIC SCALE(S)
KEY NOTESX
1/4" = 1'-0"A1 HVAC PIPING PLAN - FIRST FLOOR - AREA 'E'
1. SEE M-001 FOR GENERAL MECHANICAL NOTES THAT SHALL APPLY TO ALL
SHEETS UNLESS NOTED OTHERWISE.
2. CONTRACTOR SHALL REFER TO MECHANICAL DETAILS AND SPECIFICATIONS
FOR ADDITIONAL INSTALLATION REQUIREMENTS.
3. ALL CONDENSATE PIPING SHALL BE INSTALLED AT 1/8" PER FT. SLOPE.
4. MOUNT ALL T-STATS NO HIGHER THAN 48" AFF.
1. PROVIDE NEW HOT WATER/ CHILLED WATER SUPPLY & RETURN PIPING AS
INDICATED. INSULATE PIPING PER SPECIFICATIONS. INSTALL PER DETAIL.
COORDINATE EXACT ROUTING IN FIELD WITH OTHER TRADES.
2. PROVIDE NEW CONDENSATE DRAIN AS INDICATED. MAINTAIN MIN. 1/8" PER FOOT
PITCH IN THE DIRECTION OF FLOW. INSULATE PIPING PER SPECIFICATIONS.
TERMINATE PIPING AT FLOOR/ OPEN HUB DRAIN WITH 1" AIR GAP.
3. PROVIDE NEW REFRIGERANT PIPING AS INDICATED. VERIFY EXACT PIPE SIZES
IN FIELD BASED ON ACTUAL ROUTING. INSULATE PIPING PER SPECIFICATIONS.
INSTALL PER DETAIL. COORDINATE EXACT ROUTING IN FIELD WITH OTHER
TRADES.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
/27 /20
/05
/20
RE
VI
SE
D
CH
W
P
IP
E
SI
ZE
RE
-R
OU
TE
D
CH
W S/
R
PI
PI
NG
5 6
EB
ACCU-11 (TYP.)
HOT
WATER
PLANT
CONTROL
PANEL
CHILLED
WATER
PLAN
CONTOL
PANEL
CHILLER
ENCLOSURE
119A
6"ø CHWR 6"ø CHWS
6" ø
CH
W
S
CH-01 CH-02
6" ø
CH
W
R
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
PA
R
TM
EN
T O
F
TH
E N
AV
Y
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
P
AC
IF
IC
M
AK
AL
AP
A, H
AW
AI
I
AS NOTED
RYO
KYM
DKS/DMK
6/ 5/
0:
:5
AM
C :\R
EV
IT
_2
4_
PR
O
JE
C T_
FI
LE
S\
BL
D G
-J -8
-1
-M
_S w ib es
An dy
_Y
KD
TN
5W
JY
4B
V.
rv t
MP107
JF
Y
P
RO
JE
CT
J -8
HV
AC
P
IP
IN
G
P
LA
N -F
IR
ST
F
LO
O R
-M
EC
HA
NI
CA
L
EN
CL
O
SU
RE
AP
17322144
JV CG
3/10/2026
NATHANIEL PYRON, MILCON
PLANNER, DPPH
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G F
AC
IL
IT
Y
1696746
N62742-20-D-0001
MC
B
CA
MP
B
LA
Z, G
UA
M
U.
S.
N
AV
SU
PP
AC
T
KYM
N A
VF
AC
P
AC
IF
IC
M P1
1/4" = 1' - 0"
0 5' 10' 15'1'
PLAN
NORTH
GENERAL NOTES
KEY PLAN
GRAPHIC SCALE(S)
KEY NOTESX
1/4" = 1'-0"B1 HVAC PIPING PLAN - FIRST FLOOR - MECHANICAL ENCLOSURE
1. SEE M-001 FOR GENERAL MECHANICAL NOTES THAT SHALL APPLY TO ALL
SHEETS UNLESS NOTED OTHERWISE.
2. CONTRACTOR SHALL REFER TO MECHANICAL DETAILS AND SPECIFICATIONS
FOR ADDITIONAL INSTALLATION REQUIREMENTS.
3. ALL CONDENSATE PIPING SHALL BE INSTALLED AT 1/8" PER FT. SLOPE.
4. MOUNT ALL T-STATS NO HIGHER THAN 48" AFF.
1. PROVIDE NEW CHILLED WATER SUPPLY & RETURN PIPING AS INDICATED.
INSULATE PIPING PER SPECIFICATIONS. INSTALL PER DETAIL. COORDINATE
EXACT ROUTING IN FIELD WITH OTHER TRADES.
2. PROVIDE NEW REFRIGERANT PIPING AS INDICATED. VERIFY EXACT PIPE SIZES
IN FIELD BASED ON ACTUAL ROUTING. INSULATE PIPING PER SPECIFICATIONS.
INSTALL PER DETAIL. COORDINATE EXACT ROUTING IN FIELD WITH OTHER
TRADES.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
/27 /20
/05
/20
CO
OR
DI
NA
TE
D
CH
ILE
R
LO
CA
TI
ON
RE
VI
SE
D
CH
W P
IP
E
SI
ZE
5 64
D
C
B
MATCHLINE - SEE A1 / MH112 MATCHLINE - SEE A1 / MH113
MA
TC
HL
IN
E
-S
EE
A 1 /
M H1
MA
TC
HL
IN
E -S
EE
A
1 / M
H1
CRAC-202
3/4"ø CHWR 3/4"ø CHWS
6"Ø CHWS/R RISERS
DN. TO 1ST FLOOR
6"Ø HWS/R RISERS DN.
TO 1ST FLOOR
DDC
CONTROL
PANEL
DOAS-2
DDC
CONTROL
PANEL
VAVs
DDC
CONTROL
PANEL
AHU-2
2"ø CHWR 2"ø CHWS
(TYP.)
(TYP.)
STAIR 2A
S2ASTORAGE
ELEV 2
E2
CTR 2
GTR 2T
(TRAINING
TELECOMM RM)
GTR 2
SVTC CONF RM /
SIPR CAFE
LOBBY 2
L2
CORRIDOR 2D
C2D
MECH RM
CRAC-201
1 1/2"ø CHWR
1 1/2"ø CHWS
3/4 "ø
H W
S
3/4 "ø
H W
R
3/4"ø HWS 3/4"ø HWR3/4
"ø H
W S
3/4 "ø
H W
R
VAV-217
VAV-216
VAV-215
BCHD-105
CRAC-203
AHU-2
DOAS-02
3/4"ø HWS
3/4 "ø
H W
R
3/4 "ø
C
ND
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
PA
R
TM
EN
T O
F
TH
E N
AV
Y
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
P
AC
IF
IC
M
AK
AL
A
PA
, H
AW
AI
I
AS NOTED
RYO
KYM
DKS/DMK
6/
/2
5:
:3
PM
C :\R
EV
IT
_2
4_
PR
O
JE
C T_
FI
LE
S\
BL
D G
-J -8
-1
-M
_S w ib es
An dy
_Y
KD
TN
5W
JY
4B
V.
rv t
MP115
JF
Y
P
RO
JE
CT
J -8
HV
AC
P
IP
IN
G
P
LA
N -S
EC
O
ND
F
LO
O
R -A
RE
A
'E
AP
17322150
JV CG
3/10/2026
NATHANIEL PYRON, MILCON
PLANNER, DPPH
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G F
AC
IL
IT
Y
1696746
N62742-20-D-0001
MC
B
CA
MP
B
LA
Z, G
UA
M
U.
S.
N
AV
SU
PP
AC
T
KYM
N A
VF
AC
P
AC
IF
IC
M P1
1/4" = 1' - 0"
0 5' 10' 15'1'
E
PLAN
NORTH
GENERAL NOTES
KEY PLAN
GRAPHIC SCALE(S)
KEY NOTESX
1/4" = 1'-0"A1 HVAC PIPING PLAN - SECOND FLOOR - AREA 'E'
1. SEE M-001 FOR GENERAL MECHANICAL NOTES THAT SHALL APPLY TO ALL
SHEETS UNLESS NOTED OTHERWISE.
2. CONTRACTOR SHALL REFER TO MECHANICAL DETAILS AND SPECIFICATIONS
FOR ADDITIONAL INSTALLATION REQUIREMENTS.
3. ALL CONDENSATE PIPING SHALL BE INSTALLED AT 1/8" PER FT. SLOPE.
4. MOUNT ALL T-STATS NO HIGHER THAN 48" AFF.
1. PROVIDE NEW HOT WATER/ CHILLED WATER SUPPLY & RETURN PIPING AS
INDICATED. INSULATE PIPING PER SPECIFICATIONS. INSTALL PER DETAIL.
COORDINATE EXACT ROUTING IN FIELD WITH OTHER TRADES.
2. PROVIDE NEW CONDENSATE DRAIN AS INDICATED. MAINTAIN MIN. 1/8" PER FOOT
PITCH IN THE DIRECTION OF FLOW. INSULATE PIPING PER SPECIFICATIONS.
TERMINATE PIPING AT FLOOR/ OPEN HUB DRAIN WITH 1" AIR GAP.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
/05 /20
RE
VI
SE
D
CH
W P
IP
E
SI
ZE
C1
MH300
C4
MH300
DHRC-1
CH
W
P- 2A
CH
W
P- 2B
AS-1
2 1/2"ø HWR
2 1/2"ø HWS
HW
P-
1B
2 1 /2" ø
CH
W S
2 1 /2" ø
HW
R
2 1/2"ø HWS
WCC-01
CHWP-2C
HW
P-
1C
DOAS-01
ET-1
VAV-125
DDC
CONTROL
PANEL
VAVs
HOT
WATER
PLANT
CONTROL
PANEL
CHILLED
WATER
PLAN
CONTOL
PANEL
ET-2
HC-01
VAV-126
AHU-01
6" ø
CH
W
R 6" ø
CH
W S
6"ø CHWR
6"ø CHWR
6"ø CHWS 6"ø CHWR
A1
MH300
A4
MH300
2 1/2"ø CHWS
2 1/2"ø CHWR
DOAS-02
AHU-2
1"ø HWR
1"ø HWS
DDC
CONTROL
PANEL
AHU-2
DDC
CONTROL
PANEL
VAVs
DDC
CONTROL
PANEL
DOAS-2
VAV-218
1 1/2"ø HWR
1 1/2"ø HWS
2"ø CHWR
2"ø CHWS
2 1/2"ø CHWS
2 1/2"ø CHWR
2" ø
CH
W
R 2" ø
CH
W S
6"ø CHWR 6"ø CHWS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
PA
R
TM
EN
T O
F
TH
E N
AV
Y
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
P
AC
IF
IC
M
AK
AL
A
PA
, H
AW
AI
I
AS NOTED
RYO
KYM
DKS/DMK
6/
/2
5:
:2
PM
C :\R
EV
IT
_2
4_
PR
O
JE
C T_
FI
LE
S\
BL
D G
-J -8
-1
-M
_S w ib es
An dy
_Y
KD
TN
5W
JY
4B
V.
rv t
MP400
JF
Y
P
RO
JE
CT
J -8
EN
LA
RG
ED
F
LO
O R
PL
AN
SH
EE
T
AP
17322152
JV AS
3/10/2026
NATHANIEL PYRON, MILCON
PLANNER, DPPH
BA
TT
LE
S
TA
FF
T
RA
IN
IN
G F
AC
IL
IT
Y
1696746
N62742-20-D-0001
MC
B
CA
MP
B
LA
Z, G
UA
M
U.
S.
N
AV
SU
PP
AC
T
KYM
N A
VF
AC
P
AC
IF
IC
M P4
PLAN
NORTH
GENERAL NOTES
KEY PLAN
GRAPHIC SCALE(S)
KEY NOTESX
1. ALL DUCTWORK AND EQIUPMENT SHOWN ON THIS DRAWING IS DIAGRAMMATIC.
LOCATE ALL DUCTWORK AND EQUIPMENT SO AS TO CLEAR ALL OBSTACLES.
2. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL,
STATE, AND LOCAL CODES.
3. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
4. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT. CONSTRUCTION
DISCREPANCIES TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CONTRACTING OFFICER FOR A RESOLUTION.
5. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES WITH OTHER
TRADES & SUB-CONTRACTORS.
3/8" = 1'-0"C1 FIRST FLOOR MECHANICAL ROOM PIPING ENLARGED FLOOR PLAN
3/8" = 1'-0"A1 SECOND FLOOR MECHANICAL ROOM PIPING ENLARGED FLOOR PLAN
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
/05 /20
RE
VI
SE
D
CH
W
P
IP
E
SI
ZE
1 1
1 1
| 00 - GENERAL |
| G-002 - LIST OF SHEETS |
| G-003 - LIST OF SHEETS |
| 03 - CIVIL |
| CS100 - CIVIL SITE PLAN – BASE AND BID OPTIONS |
| CG501 - CIVIL GRADING DETAILS – SHEET 1 |
| 04 - LANDSCAPE |
| LP101 - LANDSCAPE PLAN - BASE AND OPTIONS |
| LP502 - SITE FURNISHING DETAILS AND OPTIONS |
| LP601 - PLANT MATERIAL SCHEDULE AND NOTES |
| 05 - STRUCTURAL | |
| SS111 - PAVILION ROOF PLAN | |
| SB101 - COMPREHENSIVE FOUNDATION PLAN | |
| SB102 - FOUNDATION PARTIAL PLAN - AREA A1 | |
| SB103 - FOUNDATION PARTIAL PLAN - AREA B | |
| SB104 - COMPREHENSIVE SLAB PLAN (EL. 0-0", UNO) | |
| SB105 - SLAB PLAN - AREA A1 (EL, 0-0", UNO) | |
| SB106 - SLAB PLAN - AREA B (EL. 0-0", UNO) | |
| SB401 - MECHANICAL ENCLOSURE FOUNDATION / SLAB PLAN | |
| SB403 - ELEVATOR PIT ENLARGED PLAN | |
| SB501 - STRUCTURAL FOUNDATION / SLAB DETAILS - SHEET 1 | |
| SB502 - STRUCTURAL FOUNDATION / SLAB DETAILS - SHEET 2 | |
| SF101 - COMPREHENSIVE SECOND FLOOR FRAMING PLAN (EL 14-0", UNO) | |
| SF102 - SECOND FLOOR FRAMING PLAN - AREA A1 (EL. 14-0", UNO) | |
| SF103 - SECOND FLOOR FRAMING PLAN - AREA A1 (EL. 16-0", UNO) | |
| SF104 - SECOND FLOOR FRAMING PLAN - AREA B1 (EL. 14-0", UNO) | |
| SF105 - SECOND FLOOR FRAMING PLAN - AREA B1 (EL. 16-0", UNO) | |
| SF106 - COMPREHENSIVE ROOF FRAMING PLAN (ABOVE EL. 32-0) | |
| SF107 - ROOF FRAMING PLAN - AREA A1 (ABOVE EL. 32-0) | 2 |
| SF108 - ROOF FRAMING PLAN - AREA B (ABOVE EL. 32-0) | |
| SF301 - STRUCTURAL SECTIONS - SHEET 1 | |
| SF302 - STRUCTURAL SECTIONS - SHEET 2 | |
| SF401 - MECHANICAL ENCLOSURE FRAMING PLAN | |
| SF402 - CANOPY ROOF FRAMING PLAN | |
| SF501 - STRUCTURAL FLOOR FRAMING DETAILS - SHEET 1 | |
| SF502 - STRUCTURAL FLOOR FRAMING DETAILS - SHEET 2 | |
| SF503 - STRUCTURAL ROOF FRAMING DETAILS | |
| SJ601 - STRUCTURAL SCHEDULES | |
| SK506 - CONCRETE COLUMN DETAILS |
| 06 - ARCHITECTURAL |
| A-001 - ARCHITECTURAL NOTES AND SYMBOLS |
| AS102 - CHILLER ENCLOSURE PLAN, EXTERIOR ELEVATIONS, AND SECTION |
| AS107 - GENERATOR & FUEL TANK ENCLOSURE PLAN AND ROOF PLAN, OPTION ITEM #2 |
| AS110 - PAVILION PLANS, ELEVATIONS & SECTIONS, OPTION ITEM #1 |
| A-101 - OVERALL FIRST FLOOR PLAN |
| A-102 - ENLARGED FLOOR PLAN - 1A |
| A-103 - ENLARGED FLOOR PLAN - 1B & OPTION ITEM #2 |
| A-104 - OVERALL SECOND FLOOR PLAN |
| A-105 - ENLARGED FLOOR PLAN - 2A |
| A-106 - ENLARGED FLOOR PLAN - 2B |
| A-111 - OVERALL FIRST FLOOR REFLECTED CEILING PLAN |
| A-112 - ENLARGED REFLECTED CEILING PLAN - 1A |
| A-113 - ENLARGED REFLECTED CEILING PLAN - 1B & OPTION ITEM #2 |
| A-114 - OVERALL SECOND FLOOR REFLECTED CEILING PLAN |
| A-115 - ENLARGED REFLECTED CEILING PLAN - 2A |
| A-116 - ENLARGED REFLECTED CEILING PLAN - 2B |
| A-201 - EXTERIOR ELEVATIONS - NORTH AND EAST & OPTION ITEM #2 |
| A-202 - EXTERIOR ELEVATIONS - SOUTH AND WEST & OPTION ITEM #2 |
| A-301 - BUILDING SECTIONS |
| A-401 - INTERIOR ELEVATIONS |
| A-402 - INTERIOR ELEVATIONS |
| A-403 - INTERIOR ELEVATIONS |
| A-404 - INTERIOR ELEVATIONS |
| A-405 - INTERIOR ELEVATIONS |
| A-406 - INTERIOR ELEVATIONS - ADDED SHEET |
| A-407 - INTERIOR ELEVATIONS - ADDED SHEET |
| A-408 - INTERIOR ELEVATIONS - ADDED SHEET |
| A-409 - INTERIOR ELEVATIONS - ADDED SHEET |
| A-410 - INTERIOR ELEVATIONS - ADDED SHEET |
| A-411 - DETAILED RESTROOM PLANS AND INTERIOR ELEVATIONS |
| A-412 - DETAILED RESTROOM PLANS AND INTERIOR ELEVATIONS |
| A-413 - DETAILED ELEVATOR PLANS AND SECTION |
| A-501 - TYPICAL MOUNTING HEIGHTS |
| A-502 - PARTITION TYPES |
| A-601 - DOOR AND OPERABLE PARTITION SCHEDULES |
| A-602 - DOOR, WINDOW, LOUVER TYPES AND SCHEDULES & OPTION ITEM #2 |
| A-610 - INTERIOR COLOR MATERIAL SCHEDULE |
| A-612 - ROOM FINISH SCHEDULE |
| A-613 - ROOM FINISH SCHEDULE |
| A-750 - MISCELLANEOUS EXTERIOR DETAILS |
| A-902 - AIR BARRIER DIAGRAM |
| AI101 - ENLARGED FLOOR FINISH PLAN - 1A |
| AI102 - ENLARGED FLOOR FINISH PLAN - 1B |
| 09 - PLUMBING |
| PL114 - PLUMBING PLAN -FIRST FLOOR -AREA 'D' |
| PL115 - PLUMBING PLAN -FIRST FLOOR -AREA 'E' |
| PL124 - PLUMBING PLAN -SECOND FLOOR -AREA 'D' |
| PL401 - ENLARGED PLUMBING PLANS -SHEET 2 |
| PL400 - ENLARGED PLUMBING PLANS -SHEET 1 |
| PL502 - PLUMBING DETAILS - SHEET 3 - ADDED SHEET |
| PL600 - PLUMBING SCHEDULES -SHEET 1 |
| 10 - MECHANICAL |
| MH103 - HVAC DUCT PLAN -FIRST FLOOR -AREA 'C' |
| MH704 - MECHANICAL SCHEDULES -SHEET 5 |
| MH800 - MECHANICAL CONTROLS |
| MP105 - HVAC PIPING PLAN -FIRST FLOOR -AREA 'E' |
| MP107 - HVAC PIPING PLAN -FIRST FLOOR -MECHANICAL ENCLOSURE |
| MP115 - HVAC PIPING PLAN -SECOND FLOOR -AREA 'E' |
| MP400 - ENLARGED FLOOR PLAN -SHEET 1 |
| 11 - ELECTRICAL |
| EP504 - ELECTRICAL DETAILS - SHEET 4 |
| 2026-07-01T15:26:14-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:18-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:18-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:19-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:22-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:25-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:26-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:26-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:27-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:28-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:29-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:30-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:30-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:31-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:32-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:32-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:33-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:34-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:34-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:35-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:36-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:36-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:37-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:38-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:39-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:39-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:39-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:40-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:40-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:41-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:42-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:43-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:43-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:44-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:44-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:45-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:45-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:46-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:47-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:48-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:49-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:50-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:50-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:51-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:52-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:53-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:54-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:55-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:55-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:56-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:57-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:58-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:58-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:26:59-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:00-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:01-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:01-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:02-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:02-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:03-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:04-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:05-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:05-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:06-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:06-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:07-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:07-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:08-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:08-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:09-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:10-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:10-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:11-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:15-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:16-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:17-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:18-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:19-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:20-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:21-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:22-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:23-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:24-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:25-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:26-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:27-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:28-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:29-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:30-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:31-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:32-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:33-1000 | |
| Evan Mizue | |
| I authorize this document. |
| 2026-07-01T15:27:34-1000 | |
| Evan Mizue | |
| I authorize this document. |
File details come from the government source that posted it. Updated .